3. Stillwater River Bank Stabilization ProjectPLANNING FOR THE FUTURE ; REPORT TO: Kalispell Mayor and City Council FROM: PJ Sorensen, Kalispell Planning Dept Charles Harball, Acting City Manager Planning Department 2011" Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kaNspell.com/planning SUBJECT Stillwater River/Buffalo Hills Golf Course Bank Stabilization Project MEETING DATE: January 23, 2012 BACKGROUND: As a result of flooding damage in the spring of 2011, the City of Kalispell became eligible for federal funding through FEMA to repair damage to Buffalo Hills Golf Course. The funding anticipates a total project cost of $424,969.77. FEMA would cover 75% of the total cost, with the remainder met through local and state matches. The City Council provided authority to proceed at its November 21, 2011, meeting. The city received five (5) bids for the project, which were opened on January 17. The bids ranged from a low bid of $296,985.15 to a high bid of $434,484.00. The low bid was received from LHC, Inc, and the city consultant on the project has recommended that the bid from LHC be accepted. RECOMMENDATION: It is recommended that the city accept the low bid from LHC in the amount of $296,985.15. FISCAL EFFECTS: Based upon the project approval from the State of Montana Disaster and Emergency Services, the city share of the project is anticipated to be approximately $76,870.00, depending upon the actual final cost. A significant portion of the city share will be provided with in - kind services. ALTERNATIVES: As suggested by the city council. Respectfully submitted, PJ Sorensen Char Harball Kalispell Planning Dept Acting City Manager Report compiled: January 18, 2012 Attachments: Letter from RLK Hydro (city consultant on project) w/ Table of Submitted Bids c: Theresa White, Kalispell City Clerk Hydrology, Engineering & Environmental Consulting January 17, 2012 Mr. PJ Sorensen Planning Department City of Kalispell 201 1"Avenue East Kalispell, MT 59901 RE: City of Kalispell Stillwater River Bank Stabilization Project Dear Mr. Sorensen: A review of the bids for the above referenced project has been completed. A total of five bids were received and four of the five bids fully met the conditions outlined in the instructions for submittal of bids. In consideration of the bids received, RLK Hydro, Inc. recommends the low bid received from L.H.C., Incorporated in the amount of two hundred and ninety six thousand, nine hundred eighty five dollars and fifteen cents ($296,985.15) be accepted as a valid bid for providing construction services to the City of Kalispell. The project involves stabilization of approximately 750 linear feet of bank along the Stillwater River within the boundaries of the Buffalo Hill Golf Course. The stabilization is a combination of rock rip rap and vegetation that is designed to arrest the accelerated erosion of the banks within the subject river reach. In addition, rock re -enforcement of the concrete bridge wing walls will be completed. I have included a tab of the contractor bids that were received for the project. If you should have any questions regarding this recommendation, please do not hesitate to contact our corporate SYM.eatzow, DPh.D., P.E. S cc file Enclosure: City of Kalispell Stillwater River Bank Stabilization Contractor Bid Tab PO Box 1579 Kalispell, MT 59903-1579 Phone: 406-752-2025 Fax: 406-257-4125 Email: dan@,rlkhydro.com m o o O O _ m tD m ct O c0 00 M N 00 O a) 1- M 'I O �0 tD rl O d' 00 m l0 cH M 00 N M cr It m {!} t/} in i!} I(n O O O O O O O O O O N O O O ui M O O O N N O It 1- N U N M fM N lD O1 Om Ln O LO O N r4 rn n o6 o0 O -tt O t.D O rri lD oo � � m 00 ui 00 rn O r- O O rn rn N O O O O r4 I-� cD Lrl n U) 00 c-i a H lD ` O N Cl tD < W d` 00 N c-I 1-4 Ln O) M Q) N N N M N N E =5 N N N O N >- } } Z } c 01 Q C: N N m 00 cj C T G U (p C pC. C N O N U i C: Q O � a) U i C i O W y,., U U N C Cj J m OA O c F aU U _0 U a U "n 5 m J Ll.. S _I to