07/19/93 Babb/Improvement Cost Estimatei 11U ulU1 Ndnodl
Incorporated 1892
Telephone (406) 752-6600
ucxgos raume
P.O. Box 1997
M`aycx
Zip 59903-1997
Bruce Williams
Cuy Moroger
C-261-93
Cxy Cad
July 19, 1993
Members:
To: Bruce Williams, City Manager
Gary W. Nysid
From: Robert H. Babb, Director of Public Works
Word
Re: Airport Improvement Cost Estimate
Cliff Collins
In response to your July 16, 1993 memorandum I submit the following
cost
Wadi
estimates to the 11 items detailed. I have not included the backup
calculations
but have retained them at my office.
BaboraMoses
Wad U
1. Extend runway to 4700' - Excavation & 'Pavement
$92,250 0
Fred Buck
Wad U
2. Extend single parallel taxiway - Excavation & Pavement
$24,7
Jim Alklnxm
3. Increase existing taxiway to 24, - Excavation & Pavement
$13,215
Word III
4. Remove all objects in protective zone - Estimate
$8,000
touen Granny
Word III
S. Remove identified hazards - Displace north threshold 200'
No Cost
Pamela B. Kennedy
6. Strobe light KGEZ Radio tower - Estimate
$2,500
Word
7. Build helicopter landing pad - Excavation & Pavement
$6,130
M. Duane lawn
Word N
8. Install PAP I navigation system - estimate
$15,000
9. New lights - Engineering Estimate
$120,000
10. Provide & improve over run area - Will be taken care of with
displacement of threshold
-0-
11. 6' chain -link fence - Airport Style, 11,350 Lin. Ft.
$136,200
Total of 11 items
$417,995
Estimated Engineering Cost
$73,005
$490,000
ADDI7 1 tgAMz- L/4ND 4 OULO 3E
f Z . , a Lip Jr 2