07/19/93 Babb/Improvement Cost EstimatesT�e Gly o� Kai �5pel I
�®
Telephone (406) 752-6600 incorporated 1892 � t
P.O. Box 1997
Zip 59903-1997
C-261-93
July 19, 1993
To: Bruce Williams, City Manager
From: Robert H. Babb, Director of Public Works
Re: Airport Improvement Cost Estimate
In response to your July 16, 1993 memorandum I submit the following cost
estimates to the 11 items detailed. I have not included the backup calculations
but have retained them at my office.
1.
Extend runway to 4700' - Excavation &'Pavement
$92,250!p
2.
Extend single parallel taxiway - Excavation & Pavement
$24,700!'
3.
Increase existing taxiway to 24' - Excavation & Pavement
$13,215
4.
Remove all objects in protective zone - Estimate
$8,000
5.
Remove identified hazards - Displace north threshold 200'
No Cost
6.
Strobe light KGEZ Radio tower - Estimate
$2,500
7.
Build helicopter landing pad - Excavation & Pavement
$6,130
8.
Install PAP I navigation system - estimate
$15,000X
9.
New lights - Engineering Estimate
$120,000
10.
Provide & improve over run area - Will be taken care of with
displacement of threshold
-0-
11.
6' chain -link fence - Airport Style, 11,350 Lin. Ft.
$136,200
Total of 11 items
$4170995
Estimated Engineering Cost
73 005
$490,000
POP-C-14ASE Or- ® /10OULD
BE
02-150/S.F
.
Douglas Routhe
Maya
Bruce Williams
City Manager
CNy CaxncIf
Members:
Gary W. Nystul
Ward 1
Cliff Collins
Word I
Barbara Moses
Ward II
Fred Buck
Ward 11
Jim Atkinson
Ward III
Lauren Gronmo
Ward III .�
Pamela B. Kennedy
Ward N.
M. Duane tarson
Ward N.
L
® .