Loading...
07/19/93 Babb/Improvement Cost EstimatesT�e Gly o� Kai �5pel I �® Telephone (406) 752-6600 incorporated 1892 � t P.O. Box 1997 Zip 59903-1997 C-261-93 July 19, 1993 To: Bruce Williams, City Manager From: Robert H. Babb, Director of Public Works Re: Airport Improvement Cost Estimate In response to your July 16, 1993 memorandum I submit the following cost estimates to the 11 items detailed. I have not included the backup calculations but have retained them at my office. 1. Extend runway to 4700' - Excavation &'Pavement $92,250!p 2. Extend single parallel taxiway - Excavation & Pavement $24,700!' 3. Increase existing taxiway to 24' - Excavation & Pavement $13,215 4. Remove all objects in protective zone - Estimate $8,000 5. Remove identified hazards - Displace north threshold 200' No Cost 6. Strobe light KGEZ Radio tower - Estimate $2,500 7. Build helicopter landing pad - Excavation & Pavement $6,130 8. Install PAP I navigation system - estimate $15,000X 9. New lights - Engineering Estimate $120,000 10. Provide & improve over run area - Will be taken care of with displacement of threshold -0- 11. 6' chain -link fence - Airport Style, 11,350 Lin. Ft. $136,200 Total of 11 items $4170995 Estimated Engineering Cost 73 005 $490,000 POP-C-14ASE Or- ® /10OULD BE 02-150/S.F . Douglas Routhe Maya Bruce Williams City Manager CNy CaxncIf Members: Gary W. Nystul Ward 1 Cliff Collins Word I Barbara Moses Ward II Fred Buck Ward 11 Jim Atkinson Ward III Lauren Gronmo Ward III .� Pamela B. Kennedy Ward N. M. Duane tarson Ward N. L ® .