Loading...
Notice of Proposed Construction and Worksheet§77.13 Construction or alteration requiring notice. (a) Except as provided in §77.15, each sponsor who proposes any of the following construction or alteration shall notify the Administrator In the form and manner prescribed in §77.17: (1) Any construction or alteration of more than 200 feet in height above the ground level at its site. (2) Any construction or alteration of greater height than an imaginary surface extending outward and upward at one of the following slopes- (1) 100 to I for a horizontal distance of 20,000 feet from the nearest point of the nearest runway of each airport specified in subparagraph (5) of this paragraph with at least one runway more than 3,200 feet in actual length, excluding heliports. 00 50 to 1 for a horizontal distance. of 10,000 feet from the nearest point of the nearest runway of each airport specified in subparagraph (5) of this paragraph with its longest runway no more than 3,200 feet in actual length, excluding heliports. (111) 25 to I for a horizontal distance of 5,000 feet from the nearest point of the nearest landing and takeoff area of each heliport specified in subparagraph (5) of this paragraph. (3) Any highway, railroad, or other traverse way for mobile objects, of a height which, if adjusted. upward 17 feet for an Interstate Highway that is part of the National System of Military and Interstate Highways where overcrossings are designed for a minimum of 17 feet vertical distance, 15 feet for any other public roadway, 10 feet or the height of the highest mobile object that would normally traverse the road, whichever is greater, for a private road, 23 feet for a railroad, and for a waterway or any other traverse way not previously mentioned, an amount equal to the' height of the highest mobile. object that would normally traverse it, would exceed a standard of subparagraph ( I ) or (2) of this paragraph. (4) When requested by the FAA, any construction or alteration that would be in an instrument approach area (defined in the FAA standards governing instrument approach procedures) and available information indi- cates it might exceed a standard of Subpart C of this part. (5) Any construction or alteration on any of the following airports (in- cluding heliports): (i) An airport that is available -for public use and is listed in the Air. port Directory of the current Airman's Information Manual or in either the Alaska or Pacific Airman's Guide and Chart Supplement. (ii) An airport under construction, that is the subject of a notice or pro- posaI on file with the Federal Aviation Administration, and except for military airports, it is clearly indicated that that airport will be available for public use. (III) An airport that is operated by an armed force of the United States. (b) Each sponsor who proposes construction or alteration that is thu sub- ject of a notice under paragraph (a) of this section and is advised by an FAA regional office that a supplemental notice is required shall submit that notice on a prescribed form to be received by the FAA regional office at least 48 hours before the start of the construction or alteration. (c) Each sponsor who undertakes construction or alteration that is the subject of a notice under paragraph (a) of this section shall, within 5 days sfter that construction or alteration reaches its greatest height, submit a supplemental notice on a prescribed form to the FAA regional office having jurisdiction over the area involved, if— (1) The construction or alteration is more than 200 feet above the sur- face level of its site; or (2) An FAA regional office advises him that submission of the form is re- quired. 377.15 Construction or alteration not requiring notice. No person is required to notify the Administrator for any of the following :onstruction or alteration: (a) Any object that would be shielded by existing structures of a perma. nent and substantial character or by natural terrain or topographic features of equal or greater height, and would be located in the congested area of a city, town, or settlement where it is evident beyond all reasonable doubt that the structure so shielded will not adversely affect safety in air naviga- tion (b) Any antenna structure of 20 feet or less in height except one that would increase the height of another antenna structure. (c) Any air navigation facility, airport visual approach or landing aid, aircraft arresting device, or meteorological device, of a type approved by the Administrator, or an appropriate military service on military airports, the location and height of which is fixed by its functional purpose. (d) Any construction or alteration for which notice is required by any other FAA regulation. §77.117 Form and time of notice. (a) Each person who is required to notify the Administrator under §77.13 (a) shall send one executed form set (four copies) of FAA Form 7460-1. Notice of Proposed Construction or Alteration, to the Chief, Air Traffic Division, FAA Regional Office having jurisdiction over the area with- in which the construction or alteration will be located. Copies of FAA Form 7460-1 may be obtained from the headquarters of the Federal Aviation Administration and the regional offices. (b) The notice required under §77.13 (a) 01 through (4) must be sub- mitted at )east 30 days before the earlier of tit e following dates---- (1) The date the proposed construction or alteration is to begin. (2) The date an application for a construction permit is to be filed. However, a notice relating to proposed construction or alteration that is subject to the licensing requirements of the Federal Communications Act may be sent to the FAA at the same time the application for construction is filed with the Federal Communications. Commission, or at any time before that filing. (c) A. proposed structure or an alteration to an existing structure that ex- ceeds 2,000 feet in height above the ground will be presumed to be a hazard to air navigation and to result in an inefficient utilization of airspace and the applicant has the burden of overcoming that presumption. Each notice submitted under the pertinent provisions of Part 77 proposing a structure in excess of 2,000 feet above ground, or an alteration that will make an ex= isting structure exceed that height, must contain a detailed showing, di- rected to meeting this burden. Only in exceptional cases, where the FAA concludes that a clear and compelling showing has been made that it would not result in an inefficient utilization of the airspace and would not result in a hazard to air navigation, will a determination of no hazard be issued. (d) In the case of an emergency involving essential public services, pub. lic health, or public safety, that requires immediate construction or altera- tion, the 30 N day requirement in paragraph (b) of this section does not apply and the notice may be sent by telephone, telegraph, or other expeditious means, with an executed FAA Form 7460-1 submitted within five days thereafter. Outside normal business hours, emergency notices by telephone or telegraph may be submitted to the nearest FAA Flight Service Station. (e) Each person who is required to notify the Administrator by paragraph (b) or (c) of §77.13, or both, shall send an executed copy of FAA Form 7460-2, Notice of Progress of Construction or Alteration, to the Chief, Air Traffic Division. FAA Regional Office having jurisdiction over the area involved.' ADDRESSES OF THE REGIONAL OFFICES AND SAN JUAN AREA OFFICE AL-ALASKAN REGION) NW -NORTHWEST REGION NE -NEW ENGLAND REGION SW -SOUTHWEST REGION Alaskan Regional Office Northwest Regional Office New England Regional Office Southwest Regional Office 632 Sixth Avenue FAA Building, Boeing Field 154 Middlesex Street 4400 Blue Mound Road Anchorage, Alaska 99501 Seattle, Washington 98108 Burlington, Mass. 01803 Mail Address: Tel. 907-272-5561 Tel. 206-767-2750 Tel, 617-272-2350 P.O. Box 1689 WE -WESTERN REGION ISO -SOUTHERN REGION RM-ROCKY MOUNTAIN REGION Fort Worth, Texas 76101 Western Regional Office Southern Regional Office Rocky Mountain Regional Office Tel. 817-624.491 f 5651 West Manchester Blvd. 3400 Whipple Street 10455 East 25th AvenueICE-CENTRAL REGION Mail Address: East Point, Georgia 30344 Aurora, Colorado 80010 Central Regional Office P.O. Box 92007 Mail Address: Mail Address- 601 E. 12th Street Worldway Postal Center P.O. Box 20636 Park Hill Station, P.O. Box 7213 Kansas City, Mo. 64106 Los Angeles, California 90009 Atlanta, Georgia 30320 Denver, Colorado 80207 Tel. 816-374-3246 Tel. 213-670.7030 Ext. 548 Tel. 404-526-7646 Tel. 303.837-3937 JPC-PACIFIC REGION; EA -EASTERN REGION San Juan Area Office GL-GREAT LAKES REGION Pacific Regional Office Eastern Regional Office RFD-1, Box 29A Great Lakes Regional Office 1833 Kalakua Avenue JFK International Airport Loiza Street Station 2300 East Devon Ave. Mail Address: Federal Building San Juan, Puerto Rico 00914 Des Plaines, 111. 60018 P.O. Box 4009 Jamaica, New York 11430 Tel. 791.2310 Tel. 312-297-1970 Honolulu, Hawaii 96813 Tel. 212-995-3333 Tel. 808-9550-491 AA Form 7460-1 (11-72) SUPERSEDES PREVIOUS EDITION THIS IS YOUR W Oi1KSHEE 1 n a n Wfi n M_ nna_0nnn1 I DEPARTMENT OF TRANSPORTATION NOTICE TO PREPARER OF FORM FEDERAL AVIATION ADMINISTRATION NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION 1. Retain this Work Sheet as your copy. 2. Complete and return the remaining four copies. Do not remove carbons. 1. NATURE OF STRUCTURE (Complete both A and B below) A. (Check one) ❑ NEW CONSTRUCTION ❑ ALTERATION 3. Be sure all copies are legible- 4. If a Notice is not required or if a B. ) (Check one (State leng13a ❑ PERMANENT ❑ TEMPORARY time) Mos. Standard Part T7, is a of copy of t be py of this form will be returned to you appropriately marked in 2. NAME AND ADDRESS OF INDIVIDUAL, COMPANY, CORPORATION, ETC. PROPOSING THE CONSTRUCTION OR ALTERATION (Number, Street, City, State and Zip Code) this area, otherwise a separate ac- knowledgement will be made within {— 30 days from receipt of Notice. S. Print or type all items. The address TO area will be used to return a copy of this form. (see above) 6. Notification to the FAA does not waive the requirements of any other Government Agency. L_ _j i 3. TYPE AND COMPLETE DESCRIPTION OF STRUCTURE 4. LOCATION OF STRUCTURE A. COORDINATES (To nearest second) B. NEAREST CITY OR TOWN, AND STATE LATITUDE LONGITUDE o I 'I 01 '1 (1) DISTANCE FROM 413 I (2) DIRECTION FROM 4B MILES C. NAME OF NEAREST AIRPORT, HELIPORT, OR SEAPLANE BASE (1) DISTANCE FROM NEAREST POINT OF (2) DIRECTION NEAREST FROM I I RUNWAY AIRPORT D.DE,SCRIPTION OF LOG,iTION OF SITE TPITS RESPECT TO UIGHWAYS, STREETS, AIRPORTS, PROVINENT TERRAIN FEATURES, E%- ISTING STRUCTURES, ETC. (Attach a highway, street, or any other appropriate map or scaled drawing showing the relationship of construction site to nearest airport(s). If more space is required, continue on a separate sheet of paper and attach to this notice.) 5. HEIGHT AND ELEVATION (Complete A, B and C to the nearest foot) 6. WORK SCHEDULE DATES A. WILL START A. ELEVATION OF SITE ABOVE MEAN SEA LEVEL B. HEIGHT OF STRUCTURE INCLUDING APPURTENANCES AND LIGHTING B. WILL COMPLETE (if any) ABOVE GROUND, OR WATER IF SO SITUATED C. OVERALL HEIGHT ABOVE MEAN SEA LEVEL (A-FB) 7. OBSTRUCTION MARKED AND/OR YES NO LIGHTED IN ACCORDANCE WITH A. MARKED B. AVIATION RED OBSTRUCTION LIGHTS CURRENT FAA ADVISORY CIRCULAR 70/7460-1, OBSTRUCTION MARK- C. HIGH INTENSITY WHITE OBSTRUCTION LIGHTS ING AND LIGHTING D. DUAL LIGHTING SYSTEM I HEREBY CERTIFY that all of the above statements made by me are true, complete, and correct to the best of my knowledge. 8. NAME AND TITLE OF PERSON FILING THIS NOTICE (Type or Print) 9. SIGNATURE (In ink) 10. DATE OF SIGNATURE I 11. TELEPHONE NO. (Precede with area code) Persons who knowingly and willfully fail to comply with the provisions of the Federal Aviation Regulations Part 77 are liable to a fine of $500 for the first offense, with increased Penalties thereafter as provided by Section 902(a) of the Federal Aviation Act of 1958 as amended. FAA Form 746U-1 (11-72) suE tRSeuta FRtVwus EUll IUN DO NOT REMOVE CARBONS