Loading...
02/17/98 Stelling/Independent Fee EstimateNreA FEB mffEEnglneenw, I/vr. r ., , • Transportation • wastewater • Airports • water • Subdivisions • Site Development Pla Irrg SLOte 206, 600 Central Plaza consulting t Falls, MT $9401 February 17, 1998 Mr. Clarence Krepps City Manager City of Kalispell P.O. Box 1997 Kalispell, MT 59903-1997 RE: Independent Fee Estimate Kalispell City Airport Master Plan Dear Mr. Krepps: (406) 452-8600 Fax (406) 452-8700 EMN: dwtattnet Enclosed are two (2) copies of our independent consultant fee estimate for the Kalispell City Airport Master Plan. Our estimate was based on interviews with Tim Orthmeyer of Morrison Maierle, Gary Gates with the FAA, and a review of the furnished scope of work. Our fee estimate for the Phase 1 - Feasibility Report is $39,022 and our estimate for the Phase 2 - Master Plan including ALP is $75,867. Our total estimate for the project is $114,889. Our fee estimates were based on a projected Labor and General Administrative Overhead of 140% of Direct Salary Costs. Also, we used a Fixed Payment (Profit) of 12%. The fee estimate reflects my experience in preparing a comprehensive public involvement program on the Kalispell Bypass project. The numerous meetings with the Airport Advisory Board and the public workshops are necessary for any planning project conducted in the Kalispell area. The general public is accustomed to this level of involvement and will be undoubtedly critical of anything less. I have reviewed the ALP recently prepared by Peccia and Associates. From my limited review of the existing ALP, it appears that considerable work will have to be completed to bring the ALP up to an acceptable level for FAA approval. Land use planning will be a very critical element in the development of a comprehensive ALP. 9802 ind fee ltr.wpd 17Feb98 Mr. Clarence Krepps February 17, 1998 Page 2 Our estimates included the following subcontracted cost estimates: Tower Evaluation $7,500 Phase 1 Tower Evaluation 2,500 Phase 2 Title Memorandums 750 Phase 1 Topographic Survey 3,000 Phase 2 Noise Modeling 2,000 Phase 2 Total Costs $15,750 Our fee estimates does not include the preparation of a DBE plan. We understand that the City of Kalispell has completed this portion of the work. I presume you may have questions. We would be happy to discuss any element of this independent estimate. Sincerely, G Mitchell N. Stelling, P.E. Stelling Engineers, Inc. MNS/cjp 9802 ind fee Itr.wpd 17Feb98 • In compliance with Architectural, Engineering, and Planning Consultant Services for Airport Grant Projects AC 150/5100-14C Prepared by Stelling Engineers, Inc. 600 Central Plaza, Suite 206 Great Falls, MT 59401 (406) 452-8600 (406) 452-8700 Fax 9802 Ind fee kahs.wpd 17Feb98 KALISPELL CITY AIRPORT IMPROVEMENTS Independent Fee Estimate -Phase 1 PHASE-1 FEASIBILITY STUDY 1. Direct Salary Project Manager 38 23.00 $ 874.00 Project Engineer 18 19.00 342.00 Typist/Secretarial 16 9.50 152.00 2.2 PROJECT ADMIRiISTRATION Project Manager 58 23.00 $ 1,334.00 Project Engineer 20 19.00 380.00 Typist/Secretarial 20 9.50 190.00 Project Manager 112 23.00 $ 2,576.00 Project Engineer 152 19.00 2,888.00 Typist/Secretarial 68 9.50 646.00 Technician/Draftsman 72 15.00 1,080.00 Total Direct Salary Cost $10,462.00 2. Labor and General & Administration Overhead Percentage of Direct Salary Costs = 140% $14,646.80 3. Direct Non -Salary Expenses Transportation (5 trips @ 400 mi/trip @ $.35) $700.00 Meals (10 days @ $20/day) 200.00 Room (10 nights @ $65/night) 650.00 Telephone/Fax 200.00 Postage 200.00 Printing Reports (6 report sets @ $20/set) 120.00 Maps, Photos 150.00 Misc. Reproduction 130.00 Public Meeting Room (Outlaw Inn) 200.00 Total Direct Non -Salary Expenses $ 2,550.00 9802 Ind fee kalis.wpd 17Feb98 Page 1 of 14 I I tM,rifNj Is l 'a, TMIN PHASE-1 EEASIBILITY STUDY (Continued) 4. Subtotal of Items 1, 2, and 3 $27,658.80 Profit 12% of Items 1 and 2 $ 3,013.20 AM Tower Consultant $ 7,500.00 Title Memorandums (Research) 850.00 7, Total Cost of Items 4, 5, and 6 $39,022.00 9802 Ind fee kalis.wpd 17Feb98 Page 2 of 14 KALISPELL CITY AIRPORT IMPROVEMENTS Independent Fee Estimate -Phase 1-Feasibility Level Report 2.1 DEVELOP WORKSCOPE Project Manager ® Coordinate between FAA, MDA, and City Manager on acceptable work scope for Feasibility Study & Master Plan 8 hours ® Scoping meetings in Kalispell with City officials 10 hours ® Develop work scope and fee proposal 16 hours 0 Obtain and analyze fee proposals from Radio Tower subconsultants 4 hours Subtotal Project Manager 38 hours Project Engineer Attend one scoping meeting in Kalispell with City officials 10 hours Assist project manager in developing work scope, fee proposal and subconsultant fees 9 hours Subtotal Project Engineer 18 hours Secretarial/Clerical • Scope of work, letters, & final agreement 16 hours Subtotal Project Engineer 16 hours 9802 Ind fee kalis.wpd 17Feb98 Page 3 of 14 I I UMM M-agrimillff I-Lmwm- 11%, -11 i 2.2 PROJECT ADMINISTRATION Project Manager • Prepare planning grant application to FAA for Federal Assistance and MDA Grant 12 hours ® Prepare FAA applications for reirnbursemenL Estimate three requests through the Phase 1 6 hours ® Monthly report on progress to Sponsor and FAA and two progress meetings. 20 hours 0 Manage the planning efforts for Phase 1 20 hours Subtotal Project Manager 58 hours Project Engineer Assist project manager in applications, progress reports, and reimbursements. 20 hours Subtotal Project Engineer 20 hours Secretarial/Clerical Grant applications, reimbursements, progress reports. 20 hours Subtotal Secretarial/Clerical 20 hours 9802 Ind fee kalis.wpd 17Feb98 Page 4 of 14 KALISPELL CITY AIRPORT IMPROVEMENTS Independent Fee Estimate -Phase I -Feasibility Level Report 2.3 FEASIBILITY REPORT - PHASE I Project Manager ® Prepare press release for Daily Interlake 3 hours ® Direct work efforts on inventory of existing facilities. 4 hours ® Meet with MDT officials on proposed improvements to Highway 93 and the Kalispell Bypass. 4 hours a Direct AM tower evaluation and review alternatives, costs, and impacts to B-II standards and FAA Part 77 surfaces. 24 hours a Meeting with KGEZ owners (Combine with MDT meeting). 10 hours a Review FAA dimensional requirements for ARC B-11 aircraft. 8 hours 0 Direct and review construction cost estimates for upgrade to B-11 dimensional standards and generic B-11 site. 8 hours ® Review airspace drawing for submittal to FAA personnel. 3 hours ® Land acquisition cost evaluation. 8 hours • Environmental overview. 8 hours ® Report preparation and review. 20 hours 0 Conduct and make presentation at one public meeting. 12 hours Subtotal Project Manager 112 hours 9802 Ind fee kalis.wpd 17Feb98 Page 5 of 14 KALISPELL CITY AIRPORT IMPROVEMENTS Independent Fee Estimate -Phase 1-Feasibility Level Report 2.3 FEASIBILITY REPORT - PHASE I (Continued) Project Engineer ® Physically inventory airport facilities to provide complete evaluation of existing conditions including pavements, landing areas, RPZ's, navaids, electrical, all historical records. 40 hours a Meet with MDT officials in Kalispell regarding upcoming Highway 93 improvements. 4 hours ® Develop options and costs for AM tower evaluation. Coordinate with AM tower subconsultant. Meet with KGEZ owners. 28 hours 0 Establish ARC B-11 dimensional criteria for existing and generic airport site. 8 hours ® Establish land areas required for expansion to B-11 dimensional criteria. 4 hours ® Prepare cost estimates, including AM tower alternatives for existing and generic site. 16 hours ® Environmental overview. 10 hours ® Report Preparation. 32 hours ® Assist with public meeting. 10 hours Subtotal Project Engineer 152 hours Secretarial/Clerical Report, correspondence, and estimates. 68 hours Subtotal Secretarial/Clerical 68 hours 9802 Ind fee kalis.wpd 17Feb98 Page 6 of 14 I raw MOM ea T-M M MEN mr-174 5,114 oil] 2.3 FEASIBILITY REPORT - PHASE I (Continued) Technician/Draftsman Prepare ARC B-H drawing showing dimensional criteria and property ownership at existing airport. 16 hours Draft FAR Part 77 airspace drawing. 16 hours Prepare generic B-11 airport drawing 16 hours Report exhibits. 16 hours Public meeting displays. 8 hours Subtotal Technician/Draftsman 72 hours 9802 Ind fee kalis.wpd 17Feb98 Page 7 of 14 KALISPELL CITY AIRPORT IMPROVEMENTS Independent Fee Estimate -Phase 2 PHASE-2 ENGINEERING SERVICES - MASTER PLAN 1. Direct Salary TITLE 2.4 GRANT ADMINISTRATION HOURS RATE CO.S.T($) Project Manager 26 23.00 $ 598.00 Typist/Secretarial 4 9.50 38.00 2.4.0 FORECASTS AND AVIATION DEMAND Project Manager 34 23.00 $ 782.00 Project Engineer 82 19.00 1,558.00 Typist/Secretarial 17 9.50 161.50 Draftsman/Technician 16 15.00 240.00 2.4.1) FACILITY REQUIREMENTS Project Manager 34 23.00 $ 782.00 Project Engineer 110 19.00 2,090.00 Typist/Secretarial 2 9.50 19.00 Draftsman/Technician 21 15.00 315.00 2.4.E SITE REQUIREMENTS Project Manager 16 23.00 $ 368.00 Project Engineer 40 19.00 760.00 Typist/Secretarial 10 9.50 95.00 Draftsman/Technician 8 15.00 120.00 2.4.17 AIRPORT LAYOUT PLAN Project Manager 42 23.00 $ 966.00 Project Engineer 128 19.00 2,432.00 Typist/Secretarial 8 9.50 76.00 Draftsman/Technician 100 15.00 1,500.00 2.4.G SCHEDULES AND COST ESTIMATES Project Manager 20 23.00 $ 460.00 Project Engineer 24 19.00 456.00 Typist/Secretarial 12 9.50 114.00 Draftsman/Technician 6 15.00 90.00 9802 Ind fee kahs.wpd 17Feb98 Page 8 of 14 �Wqlug i is - 1 �`� . M 2.4.H PUBLIC PRESENTATIONS AND MEETINGS Project Manager 138 23.00 $ 3,174.00 Project Engineer 84 19.00 1,596.00 Typist/Secretarial 56 9.50 532.00 Draftsman/Technician 24 15.00 360.00 Project Manager 40 23.00 $ 920.00 Project Engineer 60 19.00 1,140.00 Typist/Secretarial 52 9.50 494.00 Draftsman/Technician 32 15.00 480.00 Total Direct Salary Cost $22,716.50 2. Labor and General & Administration Overhead Percentage of Direct Salary Costs = 140% $31,803.10 3. Direct Mon -Salary Expenses Transportation (6 trips @ 400 mi/trip @ $.35) $ 980.00 Lodging (11 nights @ $65 night) 715.00 Meals (22 days @ $20/day) 440.00 Telephone/Fax 350.00 Postage 300.00 Copies (22,000 copies @ 10¢/copy) 2,200.00 Mylars (7 mylars @ $7/sheet) - 49.00 Bluelines (224 sheets @ $3/sheet) 672.00 Maps 50.00 Aerial Photos 250.00 Computer Plotting (50 sheets @ $6/sheet) 300.00 Meeting Room Rent(Cavnaugh's or Outlaw Inn) 1,000.00 Total Direct Non -salary Expenses $ 7,306.00 4. Subtotal of Items 1, 2, and 3 $61,825.00 5. Profit 12% of Items 1 and 2 $ 6,542.00 9802 Ind fee kalis.wpd 17Feb98 Page 9 of 14 0" Icy .4 kv WL UTO M I I I IF I (9i'li I T71.1-4r, 14 014 1 U14i I PHASE-2 ENGINEERING SERVICES - MASTER PLAN (Continued) 6. Special Services (subcontract costs) Radio Tower Consultant $2,500.00 Noise Modeling 2,000.00 Topographic/Contour Survey 3.000.00 Subtotal Special Services Costs $7,500.00 7. Total Cost of Items 4, 5, and 6 9802 Ind fee kalis.wpd 17Feb98 Page 10 of 14 KALISPELL CITY AIRPORT IMPROVEMENTS Independent Fee Estimate -Phase 2 PHASE-2 ENGINEERING SERVICES - MASTER PLAN 2.4 GRANT ADMINISTRATION AND PROJECT MANAGEMENT Project Project Clerical Draftsman Request for Reimbursements 6 4 MDT, FAA, MDA, & City Coordination --20 — Totals 26 4 2.4.0 FORECASTS OF AVIATION DEMAND Project Project Clerical Draftsman Manager Engineer General Aviation 8 16 1 Military Operations 2 8 1 Charter/Commercial 4 8 1 Forest Service 2 4 1 Business 2 4 1 Service Transportation 2 4 1 Industrial 2 4 1 Other Uses 4 8 2 Narrative 8 --16 8 --M Totals 34 82 17 16 2.4.1) FACILITY REQUIREMENTS Project Project Clerical Draftsman Manager Engineer Critical Aircraft 4 16 Runways 4 12 Taxiways 2 6 Apron 4 10 8 Tiedown 4 8 8 Fueling 2 4 2 Maintenance 1 4 Parking 1 4 2 Access 1 2 Hangars 2 8 Wind Data 2 16 1 Storage Service 1 4 Deviations to Standards 4 16 2 — Totals 34 110 2 21 9802 Ind fee kalis.wpd 17Feb98 Page 11 of 14 KALISPELL CITY IMPROVEMENTS Independent Estimate -Phase 2.4.E SITE ASSESSMENT Facility Requirements Environmental Overview Totals 2.41 AIRPORT LAYOUT PLAN Alternatives & Costs Tower Evaluation/Update Land Use Planning Noise Modeling Airport Layout Drawing Topographic Survey Airport Airspace Drawing Runway Protection Zone Drawing Land Use Drawing Terminal Area Drawing Exhibit "A" Totals 2.4.G SCHEDULES AND COST ESTIMATES Project Project Clerical Draftsman Manager Engineer 8 24 2 8 __8 16 _ _8 — 16 40 10 8 Project Project Clerical Draftsman Manager Engineer 8 24 4 4 (See Subconsultant) 8 24 4 4 (See Subconsultant) 8 24 24 (See Subconsultant) 4 8 12 2 8 8 4 16 16 4 12 16 —A —12 �16 42 128 8 100 Project Project Clerical Draftsman Manager Engineer Staged Construction Schedules 4 8 4 2 5, 10, & 20 Year Development Costs 8 8 4 2 Financial Plan _8 _8 4 _2. Totals 20 24 12 6 9802 Ind fee kalis.wpd 17Feb98 Page 12 of 14 a. & . 0 4 0 1** 4 R I III Eq INIUNI to ilIZZ orlf:�, W1 Project Manager ® Prepare press release for Daily Interlake. 3 ® Develop pilot and airport users questionnaire. 4 ® Follow-up calls on questionnaire 8 a Three public workshops (8 hrs. ea.). 24 ® Six Airport Advisory Board meetings (3 hrs. ea.) 18 a One public hearing. 4 a Seven trips to Kalispell (7 hrs. ea.) 49 ® Prepare for public workshops (4 hrs. ea-) 12 ® Prepare for Advisory Board meetings (2 hrs. ea.) 12 ® Prepare for public hearing 4 Subtotal Project Manager Project Engineer 138 hours ® Evaluate and summarize pilot survey results 8 ® Develop exhibits/handouts for workshops 8 ® Three public workshops (8 hrs. ea.) 24 ® One public hearing 4 ® Four trips to Kalispell (7 hrs. ea.) 28 ® Prepare minutes and documentation of meetings 12 Subtotal Project Engineer 84 hours Secretarial/Clerical Pilot & user questionnaire, mailing, & tabulation of results 16 Meeting agenda & handouts 20 Hearing transcripts, minutes to meetings, notices 20 Subtotal Secretarial/Clerical 56 hours Technician/Draftsman ® Exhibits for workshops/Advisory Board meetings Subtotal Technician/Draftsman 24 hours 9802 Ind fee kalis.wpd 17Feb98 Page 13 of 14 KALISPELL CITY AIRPORT IMPROVEMENTS Independent Estimate -Phase 2.4.H PUBLIC PRESENTATIONS AND MEETINGS (Continued) Out of Pocket - Travel ® Room: Project Manager Project Engineer ® Trips: Project Manager ® Meals: Project Manager Project Engineer 2.4.I REPORTS AND PUBLICATIONS Draft Report Final Report Totals Out -of -Pocket Reproduction Draft Master Plan Final Master Plan Working Papers/ALP Checklist Workshop Exhibits/Handouts Public Hearing Handouts Pilot Survey/Questionnaire Misc. Correspondence Total Copies Working Drawings (ALP) Draft ALP Set Final ALP Set Workshop Exhibits Total Blueline Sheets 7 nights 4 nights 7 trips 14 days 8 days Project Project Clerical Draftsman Manager Engineer 24 36 36 16 16 24 -Jk 16 40 60 52 32 20 reports x 250 pages = 5,000 55 reports x 250 pages = 13,750 10 drafts x 100 pages = 1,000 200 handouts x 5 pages = 1,000 50 handouts x 5 pages = 250 300 surveys x 2 pages = 600 100 letters x 4 pages = 400 22,000 10 sets x 7 sheets = 70 6 sets x 7 sheets = 42 6 sets x 7 sheets = 42 10 sets x 7 sheets = _ 70 224 9802 Ind fee kalis.wpd 17Feb98 Page 14 of 14