Proposed Airport Budgets1997 Proposed Airport 1998 Proposed Airport 1998 Proposed Airport Budget (B-1, Small) Budget (B-I, Small) Budget (B-II, Small) LAND ACQUISITION COSTS LAND ACQUISITION COSTS LAND ACQUISITION COSTS $18,081.00 To purchase or gain closure of road. $18,081.00 To purchase or gain closure of road. $2,571,782.00 Purchase all or a portion of 48 acres identified in Peccia's $345,396.00 Purchase all or a portion of 5 parcels $1,287,547.00 Purchase all or a portion of 10 private Prelim Airport Layout Plan to allow extension of the runway. parcels of land to accomodate OFA to accomodate a B-11, Small and RPZ and to allow extension of Airport. runway. $180,000.00 Purchase Beaver & Timmereck Properties $180,000.00 Purchase of Beaver & Timmereck Properties $180,000.00 Purchase of Beaver & Timmereck Properties $543,477.00 TOTAL Land Acquisition Costs $1,485,628.00 TOTAL Land Acquisition Costs $2,751,782.00 TOTAL LAND ACQUISITION COSTS AIRPORT CAPITAL IMPROVEMENTS AIRPORT CAPITAL IMPROVEMENTS AIRPORT CAPITAL IMPROVEMENTS $136,200.00 Fence perimeter od airport w/ chainlink. $136,200.00 Fence perimeter of airport w/ chainlink. $136,000.00 Fence Permitier w/ chain link. $15,000.00 Install PAPI Navigation System $15,000.00 Install PAPI Navigation System. $15,000.00 Install PAPI Navigation System $3,400.00 Install strobe lights on FM radio towers. $30,000.00 Improve FM radio tower lighting - esti- $30,000.00 Improve Radio Tower Lighting mate comes from Peccia's study. $120,000.00 Improve wiring of runway lights. $120,000.00 Improve wiring of runway lights. $376,200.00 Reconstruct Runway $55,000.00 Resurface runway. $55,000.00 Resurface runway. $536,800.00 Construct Parallel Taxiway & Apron $13,000.00 Relocate or widen taxiways to 24'. $13,000.00 Relocate or widen taxiways to 24'. $150,000.00 Install medium Intensity Runway Lighting $170,396.00 Extend runway 700' & remove objects $170,396.00 Extend runway 700' & remove objects $95,000.00 Relocate buildings in Object Free Area in RPZ (purchase of Beaver & Timmer- in RPZ. eck properties included) $25,000.00 Extend single parallel taxiway. $25,000.00 Extend single parallel tawiway. $114,000.00 Extend Runway $537,996.00 TOTAL AIRPORT CAPITAL IMPROVEMENT $564,596.00 TOTAL AIRPORT CAPITAL IMPROVEMENTS $52,800.00 Construct Large Aircraft Tiedowns Total Land Acquisition & Capital Im- Total Land Acquisition and Capital Improve- $40,000.00 Relocation of Bldgs in Ultimate OFA $1,081,473.00 provements for a B-1, Small Airport. $2,050,224.00 ment Costs for a B-I, Small Airport $1,635,200.00 TOTAL AIRPORT CAPITAL IMPROVEMENTS $4,386,982.00 Total Land Acquisition and Capital Improve- ments for a B-11, Small airport (Visual) BALLFIELD CAPITAL IMPROVEMENTS BALLFIELD CAPITAL IMPROVEMENTS BALLFIELD CAPITAL IMPROVEMENTS $827,269.00 Total estimated cost for 22 field complex $944,377.00 Amount budgeted for balifields (1 million $944,377.00 Amount budgeted for ballfields (1 million less in the redevelopment plan. less 55,623 of money already spent) 55,623 of money already spent) $100,000.00 TRAFFIC SIGNAL $110,000.00 TRAFFIC SIGNAL $110,000.00 TRAFFIC SIGNAL MISCELLANEOUS EXPENSES MISCELLANEOUS EXPENSES $50,000.00 Title Reports, appraisals, etc... $100,000.00 Title Reports, Appraisals, etc... $100,000.00 Airport Master Plan Study $100,000.00 Airport Master Plan Study $2,008,742.00 TOTAL $3,254,601.00 TOTAL $5,641,359.00 TOTAL $200,874.00 10% Contingency Fee $325,460.00 10% Contingency Fee $564,135.00 10% Contingency Fee $2,209,616.00 TOTAL BUDGETED IN PLAN $3,580,061.00 TOTAL NEEDED FOR A B-1, SMALL AIRPORT $6,205,494.00 TOTAL NEEDED FOR A B-11, SMALL AIRPORT