Loading...
07/19/93 Babb/Airport Improvement Cost Estimate® �✓mot.,; T�eIlKal�5pel Telepfmne (406) 752-6600 incorporated 1892 P.O. Box 1997 Zip 59903-1997 C-261-93 July 19, 1993 To: Bruce Williams, City Manager From: Robert H. Babb, Director of Public Works Re: Airport Improvement Cost Estimate V0 In response to your July 16, 1993 memorandum I submit the following cost estimates to the 11 items detailed. I have not included the backup calculations but have retained them at my office. 1. Extend runway to 4700' - Excavation & Pavement $92,250 2. Extend single parallel taxiway - Excavation & Pavement $24,700 3. Increase existing taxiway to 24' - Excavation & Pavement $13,215 4. Remove all objects in protective zone - Estimate $8,000 5. Remove identified hazards - Displace north threshold 200' No Cost 6. Strobe light KGEZ Radio tower - Estimate $2,500 7. Build helicopter landing pad - Excavation & Pavement $6,130 8. Install PAP I navigation system - estimate $15,000 9. New lights - Engineering Estimate $120,000 10. Provide & improve over run area - Will be taken care of with displacement of threshold -o- il. 6' chain -link fence - Airport Style, 11,350 Lin. Ft. $136,200 Total of 11 items $417,995 Estimated Engineering Cost $73,005 $490,000 ,v Douglas Roulhe Mayor Bruce Williams City Manager City Council Members: Gary W. Nysiul Word I Cliff Collins Word I Barbara Moses Ward II Fred Buck Word II Jim Atkinson Ward III Lauren Gronmo Ward III Pamela B. Kennedy Word N M. Duane Larson Ward IV