Loading...
Airport Improvement Cost Estimatescicphonc (406) 752-6600 P.O. Box 1997 Zip 59903-1997 C-261-93 July 19, 1993 I I IG to UI RCII 10 U I Incorporated 1892 Nice Williams Cily Manager City Ca li Membe+s: To: Bruce Williams, City Manager GaryW. Nysid From: Robert H. Babb, Director of Public Works Ward Re: Airport Improvement Cost Estimate Cliff Collins In response to your July 16, 1993 memorandum I submit the following cost Word estimates to the 11 items detailed. I have not included the backup calculations but have retained them at my office. ara brb BaWrara Moses �$92,25W 1. Extend runway to 4700' - Excavation & Pavement Fred Buck 2. Extend single parallel taxiway - Excavation & Pavement ti$24,7 Word II Jim Aikinson 3. Increase existing taxiway to 24' - Excavation & Pavement $13,215 Ward III 4. Remove all objects in protective zone - Estimate $8,000 tauenGranm i00&3 Ward III 5. Remove identified hazards - Displace north threshold 200' No Cost Pamela B. Kennedy 6. Strobe light KGEZ Radio tower - Estimate $2,500 Ward IV 7. Build helicopter landing pad - Excavation & Pavement $6,130 M. Gana Cason Ward N 8. Install PAP I navigation system - estimate $15,000 9. New lights - Engineering Estimate $120,000 10. Provide & improve over run area - Will be taken care of with displacement of threshold -0- 11. 6' chain -link fence - Airport Style, 11,350 Lin. Ft. $136,200 Total of 11 items $417,995 Estimated Engineering Cost $73,005 $490,000 ENTOMB, R "? D D L i J S L; A_' U_ ®o � eE lUO U L D 13.E 0 76 __— ;( lop ,, /1'