Loading...
Airport Improvement Priority ListAirport Improvement Priority List l . Additional Land for runway 2. Purchase of additional land 3. 6' chain -link fence - airport style, 11,350 lin. ft. 4. Extend runway to 4,700' - excavation and pavement 5. Strobe light KGEZ Radio tower - estimate 6. Extend single parallel taxiway - excavation and pavement 7. New lights - Engineering estimate S. Remove identified hazards - displace north threshold 200' 9. Provide and improve over run area - will be taken care of with displacement of threshold 10. Install PAP I navigation system - estimate 11. Remove all objects in protective zone - estimate 12. Private road closure would be 30,000 sq. ft. 13. Increase existing taxiway to 24' - excavation and pavement 14. Increase load bearing of runway with a 2" overlay 2,300 ton 15. Build helicopter landing pad - excavation and pavement Tom added "Pave and Improve Parking/Tie Down Areas/Ramps as #5