Date 7/28/2004
REPORT Honorable Mayor and City Council
FROM Randy Brodehl, Fire Chief
SUBJECT Fire Station 62 Workshop Presentation
MEETING DATE 8/2/2004
PO Box 1997
312 First Avenue East
Kalispell, Montana 59903-1997
(406) 758-7760
FAX: (406) 758-7952
BACKGROUND: The Grover Company and Cole + Russell Associates were retained to develop
a plan for the design and construction of a north fire station. The first step in this process was to
develop a feasibility study including a needs assessment, conceptual plan, estimates for construction,
and recommendations for funding and construction. They are ready to present their findings to the
Council.
August 19`h is the last day to submit documents for general obligation bonds to the county for the
November general election. Should Council decide to put this before the voters as a general
obligation bond, a resolution will be presented to Council for approval at the August 16, 2004
council meeting.
RECOMMENDATIONS: Council reviews the presentation by The Grover Company and Cole +
Russell Associates and discusses construction and funding options for the north fire station.
Randy Brodehl, Fire Chief
Chris Kukulski, City Manager
"Assisting our community in reducing, preventing, and mitigating emergencies. "
KALISPELL FIIZE DEPARTMENT
Randy Brodehl - Fire Chief
Jim Stewart - Assistant Chief/Fire Marshal
Dee McCluskey — Assistant Chief/Operations
Executive Summary:
312 First Avenue East
Kalispell, Montana 59901
(406) 758-7760
FAX: (406) 758-7952
To date the following services and tasks have been completed in reference to the feasibility for the
construction of a north fire station:
■ Needs Assessment
■ Conceptual Site Studies & Evaluation
Site #1 — Southwest intersection of North Haven Drive and Four Mile Road.
Site #2a — Northeast intersection of Four Mile Drive and Parkway Drive.
Site #2b — North of Four Mile Drive midway between Parkway Drive and Rt. 93.
Site#3 - Southwest of intersection of North Haven Drive and Four Mile Road.
■ Site Due Diligence
■ Conceptual Site Development Cost Analysis
■ Conceptual Station Design
■ Conceptual Opinion of Project Soft Costs
■ Conceptual Opinion of Probable Construction Cost
Proposed Work Shop Agenda:
1. Introduction — Chief Brodehl
2. Presentation of Study
- David Acomb, C+RA
- Chad Grover, Grover Company
David Johnson, C+RA
3. Presentation of Concept Design
4. Review of Project Soft Costs
5. Review of Probable Construction Cost
6. Questions and Discussion
c.,}[� * fit,, .e• t lre I
An Employee Owned Company
"Assisting our community in reducing, preventing, and mitigating emergencies. "
KALISPELL FIRE DEPARTMENT
Randy Brodehl - Fire Chief
Jim Stewart - Assistant Chief/Prevention
Dee McCluskey — Assistant Chief/Operations
Kalispell Fire Station
Facility Space Needs Analysis
May 11, 2004
PO Box 1997
312 First Avenue East
Kalispell, Montana 59903-1997
(406) 758-7760
FAX: (406) 758-7952
Programmed space Program Area Approx. room size
Administration
Vestibule 80 11 x 7
Lobby 100 13 x 8
Duty Officer office 140 15 x 9
Training room (12 chairs at conference tables) w/ library 300 22 x 14
100
Work/ File room (Printer/ Copier/ Fax/ Mailboxes/ File Cabinets) 150 15 x 10
Storage 40 8 x 5
Public Restroom_ 60 10 x 6
Subtotal 970
Living Spaces
Fitness
400
25
x
16
Kitchen
280
21
x
13
Dining for 8 people
240
19
x
12
Dayroom with 8 recliners
500
28
x
18
Sleeping Quarters (8 bed open dorm w/ partitions)
560
Locker area (24 lockers @ 24"x24"x6')
220
Individual Toilet/Shower Rooms ( 3 at 80sf ea.)
_ _
240
Domestic Laundry/ Linen Storage
60
10
x
6
Janitor's Closet
25
6
x
4
Subtotal
2525
Support
Alarm Office (Policer workstation, radio base station, maps,
files, 3 additional workstations) 225 19 x 12
Turn -Out -Gear Room (24 TOG lockers, 24 Wildland gear
lockers) _ 450 27 x 17
PPE Gear Cleanup / Equipment Decontamination Room 175 17 x 11
EMS Storage 50 9 x 6
Shop / Tool Room 120 14 x 9
SCBA room 120 14 x 9
Mechanical room _ _ 80 _ 11 x 7
Apparatus Bay Mezzanine (training, storage and mechanical
1120 80 x 14
Training Tower (3 story at 200 sf ea. floor) 600
Hose dryer/ hose rack alcove 150 15 x 10
Janitor/ storage 75 11 x 7
Rest&ta 9 x 6
Subtotal -- — -—"�
321215
Operations
Apparatus Bays (1) at 20' x 75', (1) at 18' x 75', and (1) at 16' x
75' 4050
Subtotal"
4050
KALISPELL FIRE DEPARTMENT
Randy Brodehl - Fire Chief
Jim Stewart - Assistant Chief/Prevention
Dee McCluskey — Assistant Chief/Operations
PO Box 1997
312 First Avenue East
Kalispell, Montana 59903-1997
(406) 758-7760
FAX: (406) 758-7952
Administration
970
Dormitory
2525
Support
3215
Operations
4050
Total SF
10760
Infrastructure @10%
Building Circulation @12.5%
Grand Total SF
Cost per square foot
Total opinion of probable building hard cost
ADD ALTERNATE #1: increase total capacity of
Community/Training room to 60 people and add additional
public restroom = 1000 sf @ $155 /sf
1076
1345
13181 SF
New Construction Cost Range
$140 to $155
$1,845,340 to $2,043,055
$155,000
A revised opinion of probable building hard cost will be presented Monday, August 2,
2004. This will be based upon conceptual planning of the fire station.
KALISPELL FIRE DEPARTMENT
Randy Brodehl - Fire Chief
Jim Stewart - Assistant Chief/Prevention
Dee McCloskey — Assistant Chief/Operations
PO Box 1997
312 First Avenue East
Kalispell, Montana 59903-1997
(406)758-7760
FAX: (406) 758-7952
"Soft Costs"- Other costs associated with designing, building, and moving into a
completed facility. This cost does not include any of the `Building Hard Cost".
Land Acquisition -
$100,000 - $150,000 per acre
Min. 2acres — 4 acres
$200,000 - $400,000 — low
$300,000 - $600,000 - high
Miscellaneous Expenses:
Radio Communication System-
$7,000
Security Systems-
$8,000410,000
Audio/ Visual Systems-
$5,500
Furniture -
Office Furniture
$80,000.00+-
Gear Lockers-
$12,000
Laundry Equipment-
$7,500
Hose Dryer-
$3,000
Kitchen Appliances +Range Hood
$15,000
Fitness Equipment-
$14,000
Communication-
Data-
$375
Telephone-
$10,500
Wiring Install-
$4,500
Permit/ Tap Fees -
Building/ Planning/ Zoning/ Fire Permit-
$8,150
Sewer Tap-
$11,024
Water Tap-
$4,576
Plumbing Permit-
$200
Mechanical Permit-
$300
Electrical Permit-
$400
Landscaping and Signage-
$17,500
Surveying-
$2,500
Geo-Technical Investigation-_
$5,000
Construction Testing and Inspections-
$6,000
Sub -Total: $225,025.00
Engineering/ Architecture- 9% = $183,000.00
Total Probable Soft Costs: $408,025.00 + Land Costs
C0
KALISPELL FIRE DEPARTMENT
Randy Brodehl - Fire Chief
Jim Stewart - Assistant Chief/Prevention
Dee McCluskey — Assistant Chief/Operations
Site #1
PO Box 1997
312 First Avenue East
Kalispell, Montana 59903-1997
(406) 758-7760
FAX: (406) 758-7952
Located southwest of the intersection of North Haven Drive and Four Mile Road.
Pros
1-Potential for future expansion
2-Exterior training opportunities
3-Visibility for apparatus egress to Four Mile
4-Right hand turn into traffic for majority of calls
5-Flat site and lower development costs
Cons
1-Higher land purchase cost
KALISPELL FIRE DEPARTMENT
Randy Brodehl - Fire Chief
Jim Stewart - Assistant Chief/Prevention
Dee McCluskey — Assistant Chief/Operations
PO Box 1997
312 First Avenue East
Kalispell, Montana 59903-1997
(406) 758-7760
FAX: (406) 758-7952
Site #1 Cost Analysis
Underground Utilities
Item Est. Quantity Units Est. Unit Price Total
8" Water Main
400
LF
$30.00
$12,000
Water Service
140
LF
$12.00
$1,680
8" Sewer Main
800
LF
$37.00
$29,600
Sewer Service
140
LF
$14.00
$1,960
Sewer Lift Station
1
EA
$4,700.00
$4,700
Dry Utilities
1000
LF
$12.00
$12,000
Site Improvements
Import Earthwork
2000
CY
$12.50
$25,000
Asphalt Paving
4254
SY
$14.75
$62,747
8" Subgrade
2851
CY
$22.00
$62,722
Curb and Gutter
1192
LF
$11.50
r $13,708
Storm Drainage
Inlet/Catch Basins
4
EA
$1,150.00
$4,600
Outlet
1
EA
$750.00
$750
Storm Sewer Main
560
LF
$34.00
$19,040
Subtotal
$250,507
Construction Contingency
25%
LS
$62,627
Engineering/Inspection Fees
15%
LS
$46,970
Total Estimated Cost
$360,103
G•Co
KALISPELL FIRE DEPARTMENT
Randy Brodehl - Fire Chief
Jim Stewart - Assistant Chief/Prevention
Dee McCluskey — Assistant Chief/Operations
4itP 40A
PO Box 1997
312 First Avenue East
Kalispell, Montana 59903-1997
(406) 758-7760
FAX: (406) 758-7952
Located northeast of the intersection of Four Mile Drive and Parkway Drive.
Pros
1. Site Acquisition Cost may be lower.
2. Potential for shared use of parking lot for F.D
3. Reduced infra -structure cost.
G�Co,
Cons
1. Close proximity to comer creates traffic congestion
issue.
2. Park pedestrian and vehicular safety concerns.
3. Emergency Egress is on downhill slope.
4. Replace cost of existing parking lot.
5. Higher site development costs.
6. Emergency egress crosses traffic f ajority of calls -
left hand turn. � F
KALISPELL FIRE DEPARTMENT
Randy Brodehl - Fire Chief
Jim Stewart - Assistant Chief/Prevention
Dee McCluskey — Assistant Chief/Operations
PO Box 1997
312 First Avenue East
Kalispell, Montana 59903-1997
(406) 758-7760
FAX: (406) 758-7952
Site #2A Cost Analysis
Under round
Utilities
Item
Est. Quantity
Units
Est. Unit Price
Total
Water Main
107
LF
$300.00
$32,100
Water Service
135
LF
$12.00
$1,620
Fire Hydrant
1
EA
$2,500.00
$2,500
Sewer Main
1100
LF
$37.00
$40,700
Sewer Lift Station
1
EA
$4,700.00
$4,700
Dry Utilities
800
LF
$12.00
$9,600
Site Im
rovements
Import Earthwork
25701
CY
$9.50
$244,160
Retaining Wall
3450
SF
$5.50
$18,975
Asphalt Paving
3085
SY
$14.75
$45,504
Subgrade
2067
CY
$22.00
$45,474
Curb and Gutter,
1390
LF
$11.50
$15,985
Storm Drainage
Inlet/Catch Basins
4
EA
$1,150.00
$4,600
Outlet
1
EA
$750.00
$750
Storm Sewer Main
600
LF
$34.00
$20,400
Demolition
Remove Ex. As halt 1278 SY $1.25
$1,598
Subtotal
$488,665
Construction Contingency
25%
LS
$122,166
En ineerin /Ins ection Fee
15%
LS
$91 625
Total Estimated Cost
$702,456
EO
KALISPELL FIRE DEPARTMENT
Randy Brodehl - Fire Chief
Jim Stewart - Assistant Chief/Prevention
Dee McCluskey — Assistant Chief/Operations
Site #2R
PO Box 1997
312 First Avenue East
Kalispell, Montana 59903-1997
(406) 758-7760
FAX: (406) 758-7952
Located north of Four Mile Drive, east of Site #2A.
Pros
1. Site Acquisition Cost may be lower.
2. Potential for shared use of parking lot for ED
3. Bay protected from prevailing wind.
Cons
1. Close proximity to corner creates traffic congestion issue.
2. Park pedestrian and vehicular safety concerns.
3. Emergency Egress is on downhill slope.
4. Sloped apron up to Four Mile Drive
5. Higher site development costs.
6. Emergency egress crosses traffic for majority of calls - left
hand turn.
7. Impaired site lines up hill.
8. Storm water drainage issues
9. New bike path fronts proposed sit
majority of calls - left hand turn.
KALISPELL FIRE DEPARTMENT
Randy Brodehl - Fire Chief
Jim Stewart - Assistant Chief/Prevention
Dee McCluskey — Assistant Chief/Operations
PO Box 1997
312 First Avenue East
Kalispell, Montana 59903-1997
(406) 758-7760
FAX: (406) 758-7952
Site #213 Cost Analysis
Underground
Utilities
Item
Est. Quantity
Units
Est. Unit Price
Total
8" Water Main
875
LF
$30
$26,250
Water Service
150
LF
$12
$1,800
8" Sewer Main
630
LF
$37
$23,310
Sewer Service
150
LF
$14
$2,100
Sewer Lift Station
1
EA
$4,700
$4,700
Dry Utilities
600
LF
$12
$7,200
Site Improvements
Import Earthwork
17450
CY
$10
$165,775
Asphalt Paving
3956
SY
$15
$58,351
Subgrade
2650
CY
$22
$58,300
Curb and Gutter
1986
LF
$12
$22,839
Storm
Drainage
Inlet/Catch Basins
6
EA
$1,150
$6,900
Outlet
1
EA
$750
$750
Storm Sewer Main
600
LF
$34
$20,400
Subtotal
$398,675
Construction Contingency
25%
LS
$99,669
Engineering/Inspection Fees
15%
LS
$78,738
Total Estimated Cost
$577,082
0
KALISPELL FIRE DEPARTMENT
Randy Brodehl - Fire Chief
Jim Stewart - Assistant Chief/Prevention
Dee McCluskey — Assistant Chief/Operations
Conceptual Side Elevation
COl1CP^teal Rant( Rlwatinn
('nnr-antnnl C2irla Rlauntinn
Conceptual Front Elevation
PO Box 1997
312 First Avenue East
Kalispell, Montana 59903-1997
(406) 758-7760
FAX: (406) 758-7952
KALISPELL FIRE a •
CONCEPTUAL OPINION OF PROBABLE CONSTRUCTION COSTS
00' 11,460 SF
$/SF TOTAL COST
GENERAL TRADES
EXCAVATION & FOUNDATIONS
8.20
94,020
STRUCTURE
15.39
176,330
ROOFING
7.51
86,060
EXTERIOR SKIN
32.36
370,820
INTERIOR PARTITIONS & FINISHES
25.32
290,150
SPECIALTIES
1.88
21,490
EQUIPMENT
0.36
4,100
GENERAL REQUIREMENTS
22.41
256,840
TOTAL GENERAL TRADES
113.42
1,299,810
FIRE PROTECTION
2.13
24,400
PLUMBING
8.52
97,620
HVAC
8.73
100,060
ELECTRICAL
8.57
98,230
TOTAL CONSTRUCTION COST
$ 141.37
$ 1,620,120
SITE DEVELOPMENT COSTS
34.40
394,172
TOTAL CONSTRUCTION AND SITE COSTS
2,014,292
DESIGN CONTINGENCY (10%)
17.58
201,429
CONSTRUCTION CONTINGENCY (5%)
8.79
100,715
SOFT COSTS
35.60
408,000
TOTAL PROJECT COST
$ 237.73
$ 2,724,436
MEGEN CONSTRUCTION COMPANY, INC.
KALISPELL FIRE STATION
CONCEPTUAL OPINION OF PROBABLE • '' •'COSTS
• 1/4 •1 SF
NO. DESCRIPTION
EXCAVATION & FOUNDATIONS
1 WALL FOOTINGS
2 COLUMN FOOTING
3 12" CMU FOUNDATION WALL
4 SLAB ON GRADE
5 SLAB ON GRADE - APP
6 THICKENED SLAB
7 FOUNDATION DRAIN
8 TRENCH DRAIN
TOTAL EXCAVATION & FOUNDATIONS
STRUCTURE
1 STRUCTURALSTEEL
2 METAL FLOOR DECK
3 SLAB ON METAL DECK, 3"
4 MISC METALS
5 TOWER STAIR
6 ROOF TRUSSES
7 ADD FOR HEAVY TIMBER TRUSS
8 T & G WOOD DECK
9 MISC FRAMING
TOTAL STRUCTURE
ROOFING
1 ASPHALT SHINGLE ROOF
2 DOWNSPOUT
3 GUTTER
4 RIDGE VENTS
5 PLYWOOD BLOCKING
6 ROOF BLOCKING
7 METAL FASCIA
TOTAL ROOFING
EXTERIOR SKIN
1 THIN STONE
2 COLUMNS
3 8" CMU BACKUP
4 12" CMU BACKUP
5 BOND BEAM"
QUANTITY UNIT COST TOTAL COST
91
CY
350.00
31,850
12
CY
400.00
4,800
1,030
SF
11.00
11,330
4,380
SF
3.65
15,990
5,600
SF
4.00
22,400
3
CY
600.00
1,800
515
LF
6.50
3,350
1
LS
2,500.00
2,500
94,020
6
TN
2,500.00
15,000
1,480
SF
1.50
2,220
1,480
SF
3.00
4,440
2
TN
4,000.00
8,000
72
LFR
165.00
11,880
13,690
SF
4.50
61,610
1
LS
10,000.00
10,000
15,195
SF
3.50
53,180
1
LS
10,000.00
10,000
176,330
15,195
SF
4.00
60,780
235
LF
7.00
1,650
327
LF
15.00
4,910
255
LF
5.00
1,280
1
LS
3,000.00
3,000
1
LS
5,000.00
5,000
629
LF
15.00
9,440
86,060
1,976
SF
16.00
31,620
1,230
SF
30.00
36,900
7,614
SF
10.00
76,140
1,159
SF
12.00
13,910
677
LF
3.50
2,370
MEGEN CONSTRUCTION COMPANY, INC.
KALISPELL FIRE STATION
CONCEPTUAL OPINION OF PROBABLE CONSTRUCTIONCOSTS
IJULY • 2004 11,460 SF
NO.
DESCRIPTION
QUANTITY
UNIT COST
TOTAL COST
6
STONE WATER TABLE
518
LF
30.00
15,540
7
MISC METALS
1
LS
10,000.00
10,000
8
MISC BLOCKING
1
LF
10,000.00
10,000
9
4X4 TIMBER BRACKETS
51
EA
150.00
7,650
10
BUILDING WRAP
8,566
SF
0.15
1,280
11
8" FIBER CEMENT SIDING
4,268
SF
3.00
12,800
12
SMOOTH SIDING
3,180
SF
3.00
9,540
13
lX8 FIBER BOARD TRIM
536
LF
3.00
1,610
14
1/2" DENS GLAS
1,181
SF
1.25
1,480
15
SEALANTS & CAULKING
1
LS
2,500.00
2,500
16
HM DOOR-FRM-HDWR - SINGLE
2
EA
800.00
1,600
17
HM DOOR-FRM-HDWR - DOUBLE
1
EA
1,000.00
1,000
18
HM FRAME GROUTED
4
EA
30.00
120
19
OVERHEAD DRS GARAGE
3
EA
3,000.00
9,000
20
OVERHEAD DRS APPARATUS BAY
3
EA
4,280.00
12,840
21
ALUMINUM DOORS
5
EA
3,000.00
15,000
22
WINDOWS
1,043
SF
40.00
41,720
23
STOREFRONT
41
SF
40.00
1,640
24
1 1/2 " FURRING W/RIGID INSUL
8,566
SF
2.75
23,560
25
DRYWALL FURRED
2,458
SF
2.00
4,920
26
EXTERIOR SOFFIT FIBER CEMENT
1,965
SF
12.00
23,580
27
SIGNAGE
1
LS
2,500.00
2,500
TOTAL EXTERIOR SKIN 370,820
INTERIOR PARTITIONS & FINISHES
1
CMU PARTITION - 8"
3,090
SF
10.00
30,900
2
CMU PARTITION - 12"
1,872
SF
12.00
22,460
3
MISC METALS
1
LS
7,500.00
7,500
4
HOSE DRYING RACK
1
LS
2,500.00
2,500
5
MISC BLOCKING
1
LS
2,000.00
2,000
6
BASE CABINET
46
LF
225.00
10,350
7
WALL CABINET
34
LF
100.00
3,400
8
ISLAND W/ COUNTER
4
LF
450.00
1,800
9
PL COUNTERTOP
12
LF
60.00
720
10
SHELVING
170
LF
15.00
2,550
11
PL LOCKERS
48
LF
350.00
16,800
12
WINDOW SILLS
195
LF
15.00
2,930
13
SEALANTS & CAULKING
1
LS
2,500.00
2,500
14
BATT INSULATION @ TRUSS
6,784
SF
1.50
10,180
15
3" RIGID INSULATION @ TRUSS
8,411
SF
3.00
25,230
16
HOLLOW METAL DOORS
10
EA
200.00
2,000
17
HOLLOW METAL FRAME - SINGLE
31
EA
125.00
3,880
18
BORROW LITES W/ HM FRAME
1
LS
500.00
500
19
GROUT HM FRAMES
9
EA
30.00
270
MEGEN CONSTRUCTION COMPANY, INC.
KALISPELL FIRE STATION
CONCEPTUAL OPINION OF - x -
• 2004 1
17,4•9 SFI
NO.
DESCRIPTION
QUANTITY
UNIT COST
TOTAL COST
20
WOOD DOORS
21
EA
175.00
3,680
21
FINISH HARDWARE
31
EA
400.00
12,400
22
DRYWALL PARTITION, 3-5/8" W/ INS
5,170
SF
5.15
26,630
23
DRYWALL PARTITION, 3-5/8" NO INS
417
SF
4.65
1,940
24
DRYWALL, CHASE DOUBLE
368
SF
8.00
2,940
25
DRYWALL FURRED
840
SF
2.00
1,680
26
DRYWALL CEILING, MOIST RESIST
693
SF
6.00
4,160
27
DRYWALL SOFFIT
1
LS
2,500.00
2,500
28
CERAMIC TILE FLOOR
978
SF
10.00
9,780
29
CERAMIC TILE BASE
401
LF
10.00
4,010
30
CERAMIC TILE WALL
975
SF
10.00
9,750
31
ACOUSTICAL CEILING
2,879
SF
1.75
5,040
32
VCT
1,583
SF
1.50
2,370
33
RUBBER TILE FLOOR
462
SF
3.50
1,620
34
RESILIENT BASE
915
LF
1.25
1,140
35
CARPET
216
SY
25.00
5,400
36
SEAL CONCRETE FLOOR
6,892
SF
0.50
3,450
INTERIOR PARTITIONS & FINISHES continued
37
PAINT DRYWALL
13,251
SF
0.65
8,610
38
PAINT DW CEILING/SOFFIT
693
SF
0.65
450
39
PAINT CMU
2,480
SF
1.00
2,480
40
EPDXY PAINT CMU WALLS
12,272
SF
1.50
18,410
41
PAINT DOORS & FRAMES
31
EA
90.00
2,790
42
PAINT EXPOSED CEILING
8,445
SF
1.00
8,450
43
MISC PAINTING
1
LS
2,000.00
2,000
TOTAL INTERIOR PARTITIONS & FINISHES
290,150
SPECIALTIES
1
MARKERBOARD
1
LS
1,000.00
1,000
2
TACKBOARD
1
SF
1,000.00
1,000
3
FIRE EXTINGUISHER & BRACKET
4
EA
100.00
400
4
FIRE EXTINGUISHER & CABINET
3
EA
250.00
750
5
SIGNAGE
1
LS
3,000.00
3,000
6
DEDICATION PLAQUE
1
LS
2,000.00
2,000
7
LOCKERS
24
EA
250.00
6,000
8
LOCKER BENCH
12
LF
35.00
420
9
TOILET TISSUE DISPENSER
6
EA
30.00
180
10
PPR TWL DISP/WASTE RECP
6
EA
150.00
900
11
TOWEL DISPENSER @ KITCHEN
1
EA
75.00
80
12
GRAB BAR
12
EA
100.00
1,200
13
MIRROR
72
SF
12.00
860
14
SOAP DISPENSER
6
EA
100.00
600
MEGEN CONSTRUCTION COMPANY, INC.
ALISPELL FIRE STATION
CONCEPTUAL OPINION OF PROBABLE CONSTRUCTION COSTS
DULY 29, 2004 11,460 SF
NO.
DESCRIPTION
QUANTITY
UNIT COST
TOTAL COST
15
MOP STRIP
1
EA
100.00
100
16
SHOWER CURTAIN & ROD
4
EA
75.00
300
17
SHOWER SEAT
1
EA
200.00
200
18
SHOWER GRAB BAR
1
EA
100.00
100
19
MIRROR @ FITNESS
160
SF
15.00
2,400
TOTAL SPECIALTIES
21,490
EQUIPMENT
1
RANGE HOOD INSTALLATION
1
EA
100.00
100
2
PROJECTION SCREEN
1
EA
1,500.00
1,500
3
HOIST
1
EA
2,500.00
2,500
TOTAL EQUIPMENT 4,100
FIRE PROTECTION
1 FIRE PROTECTION 1 LS 24,404.00 24,400
TOTAL FIRE PROTECTION 24,400
PLUMBING
1 PLUMBING
TOT4L •_ tBfVd
HVAC
1 HVAC
TOTAL HVAC
1 LS 97,616.00 97,620
97,620
1 LS 100,056.00 100,060
100,060
ELECTRICAL
1 ELECTRICAL & SITE 1 LS 98,226.00 98,230
TOTAL ELECTRICAL 98,230
SITEWORK
MEGEN CONSTRUCTION COMPANY, INC.
KALISPELL
STATION
CONCEPTUAL OPINION OF PROBABLE CONSTRUCTION
00' 11,460 SF
NO.
DESCRIPTION
QUANTITY
UNIT COST
TOTAL COST
1
Site 1
1
LS
360,103.00
360,103
2
Site 1 A
1
LS
394,172.00
394,172
3
Site 2A
1
LS
702,456.00
702,456
4
Site 2B
1
LS
577,082.00
577,082
TOTAL SITEWORK
394,172
GENERAL REQUIREMENTS
1
SUPERVISION
12
MOS
7,500.00
90,000
2
TEMPORARY FACILITIES
12
MOS
500.00
6,000
3
COMPUTER -FAX -COPY
12
MOS
300.00
3,600
4
OFFICE SUPPLIES
12
MOS
200.00
2,400
5
TELEPHONE
12
MOS
170.00
2,040
6
REPRODUCTIONS
12
MOS
200.00
2,400
7
COURIER SERVICE
12
MOS
200.00
2,400
8
PROJECT SIGN
1
LS
1,000.00
1,000
9
PAYMENT & PERF BOND
1
LS
20,000.00
20,000
10
BUILDING PERMIT
1
LS
10,000.00
10,000
11
TEMPORARY UTILITIES
1
LS
10,000.00
10,000
12
TEMPORARY TOILETS
12
MOS
200.00
2,400
13
BUILDING & FINAL CLEANING
1
LS
7,500.00
7,500
14
DUMPSTER
12
MOS
800.00
9,600
15
SAFETY & PROTECTION
1
LS
2,500.00
2,500
16
FEE
1
LS
85,000.00
85,000
TOTAL GENERAL REQUIREMENTS 256,840
MEGEN CONSTRUCTION COMPANY, INC.
C
0
Ic
0
Grover + Company, PLLC
Concept Plan Study
KALISPELL FIRE DEPARTMENT
Fire Station 62 Concept Study
August 2004
H
An Employee Owned Company
■
■
40
Grover + Company, PLLC
KALISPELL FIRE DEPARTMENT
Fire Station 62 Concept Study
August 2004
0
An Employee Owned Company
C q tiff i;i r[i4' 1y t 01l L Rus 1 11?aeh0eco
�f
1
z
W
H
a
W
0
W
.1
J
W
a
IA
a