Loading...
02/17/09 Preliminary Plat Phase 2PLANNING FOP, THE FUTURE Planning Department 201 1st Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kalispell.com/planning REPORT TO: Kalispell Mayor and City Council FROM: Sean Conrad, Senior Planner Myrt Webb, Interim City Manager SUBJECT: Preliminary plat of Silverbrook Estates Phase 2 MEETING DATE: February 17, 2009 BACKGROUND: The Kalispell City Planning Board met on January 27, 2009 and held a public hearing to consider a request by 93 8s Church, LLC for preliminary plat approval of Silverbrook Estates Phase 2. Phase 2 includes approximately 167 acres which constitutes the remaining acreage outside of phases 1 of the 325 acre project site. Phase 2 proposes 196 single-family lots, 90 townhouse lots and 13 commercial lots. The single family lots will range in size from approximately 1/4 of an acre up to 1/3 of an acre in size. The townhouse lots will average approximately 4,250 square feet and have an average lot width of 50 feet. The 13 commercial lots will range in size from approximately 8,700 square feet to just over one acre. Open space and parkland areas will make up approximately 48 acres of the 167 acres in phase 2. Phase 2 lies at the southwest corner of the intersection of Highway 93 and Church Drive. The 167t acres which make up phase 2 can be described as tract 3 and a portion of tracts 4 and 5 of Certificate of Survey 15896 located within the NE 1/4 of Section 13, Township 29 North, Range 22 West, P.M.M., Flathead County, Montana. Planning department staff presented staff report #KPP-08-2 providing details of the proposal and the evaluation. The planning staff noted two changes from the Planned Unit Development (PUD) site plan approved by the council in December of 2006 and the PUD site plan submitted with phase 2. The two changes included increasing the number of commercial lots from 12 to 13 and reconfiguring the townhouse lots and reducing the open space and paths around these lots. Planning department staff also suggested a minor amendment to condition # 15 after discussions with the developer's representative. The changes to the condition would require berming along Highway 93 to help protect residences from the highway noise, berms between the highway and commercial lots are not required. Wayne Freeman of CTA Architects Engineers and Howard Mann of 93 & Church LLC, spoke in favor of the proposed project. No one else wished to speak and the public hearing was closed. The board discussed the conditions requiring additional open space and the need for a right-of-way connection to the property immediately west. A motion was made and seconded to add condition #43 that would require an approach to the west that would be a dedicated right-of-way within Block 54. The developer of Silverbrook Estates would not be required to construct the connector street. The motion passed unanimously. The planning board then voted on the motion to recommend approving the preliminary plat with an amendment to condition # 15 per staffs recommendation and the addition of condition #43. The motion passed on a 5 to 2 vote. RECOMMENDATION: A motion to approve the preliminary plat with the 43 conditions recommended by the planning board would be in order. FISCAL EFFECTS: Minor positive impacts once fully developed. ALTERNATIVES: As suggested by the City Council. Respectfully submitted, Sean Conrad Myr ebb Senior Planner Interim City Manager Report compiled: February 4, 2009 c: Theresa White, Kalispell City Clerk PLANNING FOR THE FUTURE REPORT TO: Kalispell Mayor and City Council FROM: Sean Conrad, Senior Planner Myrt Webb, Interim City Manager Planning Department 201 1" Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kalispell.com/planning SUBJECT: Preliminary plat of Silverbrook Estates Phase 2 MEETING DATE: March 23, 2009 BACKGROUND: The Kalispell City Planning Board met on January 27, 2009 and held a public hearing to consider a request by 93 & Church, LLC for preliminary plat approval of Silverbrook Estates Phase 2. Phase 2 includes approximately 167 acres which constitutes the remaining acreage outside of phases 1 of the 325 acre project site. Phase 2 proposes 196 single-family lots, 90 townhouse lots and 13 commercial lots. The single family lots will range in size from approximately 1/4 of an acre up to 1 /3 of an acre in size. The townhouse lots will average approximately 4,250 square feet and have an average lot width of 50 feet. The 13 commercial lots will range in size from approximately 8,700 square feet to just over one acre. Open space and parkland areas will make up approximately 48 acres of the 167 acres in phase 2. Phase 2 lies at the southwest corner of the intersection of Highway 93 and Church Drive. The 167t acres which make up phase 2 can be described as tract 3 and a portion of tracts 4 and 5 of Certificate of Survey 15896 located within the NE 1/4 of Section 13, Township 29 North, Range 22 West, P.M.M., Flathead County, Montana. Planning department staff presented staff report #KPP-08-2 providing details of the proposal and the evaluation. The planning staff noted two changes from the Planned Unit Development (PUD) site plan approved by the council in December of 2006 and the PUD site plan submitted with phase 2. The two changes included increasing the number of commercial lots from 12 to 13 and reconfiguring the townhouse lots and reducing the open space and paths around these lots. Planning department staff also suggested a minor amendment to condition # 15 after discussions with the developer's representative. The changes to the condition would require berming along Highway 93 to help protect residences from the highway noise, berms between the highway and commercial lots are not required. Wayne Freeman of CTA Architects Engineers and Howard Mann of 93 8s Church LLC, spoke in favor of the proposed project. No one else wished to speak and the public hearing was closed. The board discussed the conditions requiring additional open space and the need for a right-of-way connection to the property immediately west. A motion was made and seconded to add condition #43 that would require an approach to the west that would be a dedicated right-of-way within Block 54. The developer of Silverbrook Estates would not be required to construct the connector street. The motion passed unanimously. The planning board then voted on the motion to recommend approving the preliminary plat with an amendment to condition # 15 per staffs recommendation and the addition of condition #43. The motion passed on a 5 to 2 vote. During the council's February 17th meeting to consider the preliminary plat the council was advised by the Public Works Department of a letter the department received from the Department of Environmental Quality (DEQ). This letter provided the department with a conflicting approach on how DEQ views sewage capacity within the city's lines. The council subsequently tabled the preliminary plat of Silverbrook Estates Phase 2 until the issue was resolved with DEQ. City staff met with DEQ and has since resolved the matter. However, to honor the agreement made with DEQ the Public Works Department is recommending the council consider amending condition 10 as follows: 10. Prior to submitting a final plat application for each phase the developer shall provide the Public Works Department with a plan of how sewage will be conveyed to the sewer treatment plant. Silverbrook Phase 2 shall not submit plans for construction to the city and the city will not review and approve the plans until the Grandview lift station upgrade is completed. The plan, enee to final pat approval.- (Findings of Fact, Section D, Sewer) RECOMMENDATION: A motion to approve the preliminary plat with the 43 conditions recommended by the planning board with staffs recommended amendment to condition 10 would be in order. FISCAL EFFECTS: Minor positive impacts once fully developed. ALTERNATIVES: As suggested by the City Council. Respectfully submitted, Sean Conrad Senior Planner Report compiled: March 17, 2009 c: Theresa White, Kalispell City Clerk AAVRI�I-Z- Myrt ebb Interim City Manager WHEREAS, 93 & Church LLC, the owner of the certain real property described above, has petitioned for approval of the Subdivision Plat of Phase 2 of said property, and WHEREAS, the Kalispell City Planning Board and Zoning Commission held a public hearing on January 27, 2009 on the proposal and reviewed Subdivision Report #KPP-08-2 issued by the Kalispell Planning Department, and WHEREAS, the Kalispell City Planning Board and Zoning Commission has recommended approval of the Preliminary Plat of Silverbrook Estates Subdivision Phase 2 subject to certain conditions and recommendations, and WHEREAS, the City Council of the City of Kalispell at its regular Council Meeting of February 17, 2009, reviewed the Kalispell Planning Department Report #KPP-08-2, reviewed the recommendations of the Kalispell City Planning Board and Zoning Commission, and found from the Preliminary Plat, and evidence, that the subdivision is in the public interest. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF KALISPELL, MONTANA AS FOLLOWS: SECTION I. That the Findings of Fact contained in Kalispell Planning Department Report #KPP-08-2 are hereby adopted as the Findings of Fact of the City Council. SECTION II. That the application of 93 & Church LLC for approval of the Preliminary Plat of Silverbrook Estates Subdivision Phase 2, Kalispell, Flathead County, Montana is hereby approved subject to the following conditions: General Conditions: 1. That the development of. the site shall be in substantial compliance with the application submitted, the site plan, materials and other specifications as well as any additional conditions associated with the preliminary plat as approved by the city council. Note: Implementing the conditions of approval may reduce the number of lots shown on the approved preliminary plat. (Kalispell Subdivision Regulations, Appendix C — Final Plat) 2. The total gross square footage for all buildings on the 13 commercial lots in phase 2A shall not exceed 120,000 square feet. The largest building shall not exceed 25,000 gross square feet. (Findings of Fact, Section G, Compliance with Zoning) 3. The preliminary plat approval for phase 2 shall be valid for a period of three years from the date of approval. (Kalispell Subdivision Regulations, Section 2.06.E). Prior to final plat: 4. Prior to final plat approval of phase 2B the townhouse lots shall be renumbered with the A&B designations added to each lot (i.e. 305A and 305B) to further clarify the lots as townhouse lots. (Findings of Fact, Section G, Compliance with Zoning) 5. The following note shall be placed on the final plat for phase 2B: "Further subdivision of the lots in phase 2B is prohibited." (Findings of Fact, Section G, Compliance with Zoning) 6. Prior to submitting a final plat application for phase 2C a zone change application for blocks 33 and 40 to change the zoning from R-4 to R-2 shall be approved by the Kalispell City Council. (Findings of Fact, Section G, Compliance with Zoning) 7. Prior to final plat approval of phase 2A Church Drive shall be striped to include a left turn lane for the eastern most access point onto Church Drive. The striping shall be approved by the Public Works Department. (Findings of Fact, Section D, Roads) 8. New infrastructure required to serve the subdivision shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction and Montana Public Works Standards. The design shall be certified in writing by a professional engineer licensed in the State of Montana. All design work shall be reviewed and approved in writing by the Kalispell Public Works Department prior to construction. This infrastructure shall include but not be limited to streets, street lighting, street signage, curb, gutter, boulevard and sidewalks. (Kalispell Design and Construction Standards) 9. Water and sewer main extensions shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction and Montana Public Works Standards. The water and sewer main extension plans shall be reviewed and approved by the Kalispell Public Works Department. Prior to final plat, a certification shall be submitted to the Public Works Department stating that the water and sewer mains have been built as designed and approved. (Kalispell Design and Construction Standards) 10. Prior to submitting a final plat application for each phase the developer shall provide the Public Works Department with a plan of how sewage will be conveyed to the sewer treatment plant. The plan, once reviewed and approved by the Public Works Department, shall be installed prior to final plat approval. (Findings of Fact, Section D, Sewer) 11. The developer shall submit to the Kalispell Public Works Department for review and approval a stormwater report and an engineered drainage plan that meets the requirements of the current City standards for design and construction. Prior to final plat, a certification shall be submitted to the Public Works Department stating that the drainage plan for the subdivision has been installed as designed and approved. (Kalispell Design and Construction Standards) 12. The developer shall submit to the Kalispell Public Works Department prior to construction an erosion/sediment control plan for review and approval and a copy of all documents submitted to Montana Department of Environmental Quality for the General Permit for Stormwater Discharge Associated with Construction Activities. (Kalispell Design and Construction Standards) 13. A letter from the Kalispell Public Works Department shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell or a proper bond has been accepted for unfinished work. (Kalispell Design and Construction Standards) 14. The following requirements shall be met per the Kalispell Fire Department and so certified in writing by the Fire Department: (Kalispell Subdivision Regulations, Section 3.20). a. Water mains designed to provide minimum fire flows shall be installed per City specifications at approved locations. Minimum fire flows shall be in accordance with International Fire Code (2006). b. Fire hydrants shall be provided per City specifications at locations approved by this department, prior to combustible construction. C. Fire Department access shall be provided in accordance with International Fire Code (2006). d. It shall be noted on the face of the plat that hazardous weed abatement shall be provided in accordance with City of Kalispell Ordinance 10-8. e. Street naming shall be approved by the fire department. 15. A 12-foot meandering berm shall be constructed within the buffer along Highway 93 to protect residences from highway noise. The berm shall be landscaped with the landscaping plan reviewed and approved by the Parks and Recreation Department. (Findings of Fact, Section A, Noise) 16. A letter shall be submitted from an engineer licensed in the state of Montana approving the reshaped slopes along the Stillwater River and adjacent drainage way for stability purposes in accordance with CMG Engineering's slope stability assessment. (Findings of Fact, Section A, Slope Stability) 17. A note shall be shown on the face of the final plat indentifying those lots closest to the crest of the reshaped slope mentioned in condition 16 and require a minimum 20 foot building setback from the crest of the reshaped slope. (Findings of Fact, Section A, Slope Stability) 18. The Silverbrook Estates covenants, conditions, restrictions and reservations shall be amended to include the 9 recommendations from the Montana Department of Fish, Wildlife and Parks letter of January 12, 2009 to minimize the problems that future homeowners could have with wildlife, as well as helping them protect themselves, their property, and the wildlife. (Findings of Fact, Section B, Effects on Wildlife and Wildlife Habitat) 19. Phase 2B shall be amended to include a minimum one acre of open space. The open space shall be located centrally in either block 29 or block 30. Prior to final plat approval the open space location shall be approved by the Kalispell Site Review Committee. (Findings of Fact, Section G, Compliance with Zoning) 20. The one acre open space shall be developed with the following: ® Irrigation ® Landscaping to consist of trees, grass and shrubs ® Pedestrian paths ® A focal feature such as a gazebo, art work or formal garden The development plan shall be submitted to the Parks and Recreation Department for review and approval and installed prior to final plat of phase 2B. 21. Additional open space shall be provided either north or south of the one acre open space site required in condition 19 to provide a linear greenbelt from the intersection of Swift Creek Way and Diamond Peak Loop to Silvertip Trail. The open space shall be a minimum of 50 feet in width and include a walking path to be constructed per standards approved by the Parks and Recreation Department. The walking path shall be constructed prior to final plat approval. (Findings of Fact, Section G, Compliance with Zoning) 22. A letter shall be obtained from the Kalispell Parks and Recreation Director approving a landscape plan for the placement of trees and landscaping materials within the landscape boulevards of the streets serving the subdivision. The approved landscape plan shall be implemented or a cash in lieu payment for installation of the street trees and groundcover be provided to the Kalispell Parks and Recreation Department. (Kalispell Subdivision Regulations, Section 3.11). 23. The 2.19 acre area designated on the preliminary plat as open space in block 46 of phase 2D will meet the parkland dedication requirements provided that it is developed to create a recreational amenity within the subdivision. A letter from the Kalispell Parks and Recreation Department shall be provided at the time of final plat that outlines the improvements and confirms those improvements have been made. (Kalispell Subdivision Regulations, Section 3.19 and Findings of Fact, Section D, Parks and Open Space) 24. The approved pedestrianibike path plan shall be installed as follows: ® Paths within the open space along Highway 93 shall be installed prior to final plat approval of phase 2A. ® Paths within the open space along the Stillwater River, wetland and drainage shall be installed prior to final plat approval of the second phase of the subdivision. ® All other remaining paths shall be installed prior to final plat approval of the respective phase they are located in. (Findings of Fact, Section D, Parks and Open Space) 25. A park maintenance district shall be formed in accordance with section 7-12-4001 MCA incorporating all the lots within Silverbrook Estates phase 2 subdivision. When needed the taxes levied within the maintenance district shall be determined by the Parks and Recreation Department with approvals by the Kalispell City Council. Such a district shall become effective upon recording the final plat of phases 2A, 213, 2C and 2D. 26. The following note shall be placed on the final plat: "Construction of homes on lots 357-363 of Block 31 and lots 305 and 334 of Block 29 should incorporate acoustical architectural measures along the side of the house facing the highway. This would include placing less sensitive noise rooms (kitchens, bathrooms, laundry rooms) on the side of the house closest to the highway. Other options would include reducing the number of doors or windows, installing triple pane windows and solid wood doors." (Findings of Fact, Section A, Noise) 27. The following note shall be placed on the final plat: "Property owner(s) are responsible for the boulevard strip for the length of their property boundaries. Responsibilities include watering and mowing of the grass within the boulevard. Removal of grass or trees within the boulevard and placement of any other kind of materials is prohibited unless approved by the Kalispell Department of Parks and Recreation." 28. The following note shall be placed on the final plat: "Property owner(s) shall waive their right to protest the creation of a special improvement district for road upgrades to Church Drive." (Findings of Fact, Section D, Roads) 29. The following note shall be placed on the final plat: "Property owner(s) shall waive their right to protest the creation of a special improvement district for sanitary sewer upgrades which will serve the subdivision." (Findings of Fact, Section D, Sewer) 30. The following note shall be placed on the final plat: "This subdivision is located in an agricultural area and potential nuisances such as noise, dust, odors, and irregular hours of operation are to be expected. As such, the right to farm on adjoining properties shall not be restricted as a result of the development or occupancy of this subdivision." (Findings of Fact, Section E, Effects on Agriculture) 31. The following note shall be placed on the final plat: `Be aware that an existing arena and race track are located to the north of the subdivision. Noise generated by the arena and race track may be heard from your property." (Findings of Fact, Section A, Noise) 32. The rear property boundaries of lots 574-579 of Block 53 shall be amended to provide a minimum distance of 170 feet from the bank of the Stillwater River to the rear property boundary. (Findings of Fact, Section B, Effects on Wildlife and Wildlife Habitat) 33. The rear property boundaries of lots 569-572 of Block 53, lots 561-568 of Block 52 and lot 409 of Block 34 shall be amended to provide for a minimum distance of 50-feet from the top of the bank along the drainage to the rear property boundary. The contour line designating the top of bank shall be determined by City staff and the developer's consultants. (Findings of Fact, Section B, Effects on Wildlife and Wildlife Habitat) 34. A 30-foot rear yard setback shall be required for all structures on lots adjacent to the Stillwater River Hillside and its tributaries. This would include lots 574-579 of Block 53, lots 569-572 of Block 53, lots 561-568 of Block 52 and lot 409 of Block 34. (Findings of Fact, Section B, Effects on Wildlife and Wildlife Habitat) 35. The roads within the subdivision shall be named and signed in accordance with the policies of the Kalispell Public Works Department and the Uniform Traffic Control Devices Manual and be subject to review and approval of the Kalispell Fire Department. A letter shall be obtained from the Kalispell Public Works Department stating the naming and addressing on the final plat have been reviewed and approved. (Kalispell Subdivision Regulations, Section 3.09) 36. All existing and proposed easements shall be indicated on the face of the final plat. Utility easements for City water and sewer shall be provided to allow for the logical extension of utilities from this subdivision to adjoining properties. A letter from the Kalispell Public Works Department shall be obtained stating that the required easements are being shown on the final plat. (Kalispell Subdivision Regulations, Section 3.18) 37. Prior to filing the final plat a letter from the US Postal Service shall be included stating the Service has reviewed and approved of the design and location of the mail delivery site. The mail delivery site shall be installed or bonded for prior to final plat. In addition, the mail delivery site and improvements shall also be included in the preliminary and final engineering plans to be reviewed by the Public Works Department. The mail delivery site shall not impact a sidewalk or proposed boulevard area. (Kalispell Subdivision Regulations, Section 3.22) 38. Street lighting shall be located within the subdivision and shall have a full cutoff lens so that it does not intrude unnecessarily onto adjoining properties. (Kalispell Subdivision Regulations Section 3.09(Q) 39. The following statement shall appear on the final plat: "The undersigned hereby grants unto each and every person, firm or corporation, whether public or private, providing or offering to provide telephone, telegraph, electric power, gas, cable television, water or sewer service to the public, the right to the joint use of an easement for the construction, maintenance, repair, and removal of their lines and other facilities, in, over, under, and across each area designated on this plat as "Utility Easement" to have and to hold forever." Developer's Signature (Kalispell Subdivision Regulations, Section 3.18(E)) 40. That a minimum of two-thirds of the necessary infrastructure for each phase of this subdivision shall be completed prior to final plat submittal. The minimum of two-thirds of the necessary infrastructure shall include the extension of water and sewer mains from the city to the site and necessary lift stations to transport effluent back to the city. (Findings of Fact, Section A, On -site improvements) On going conditions: 41. All utilities shall be installed underground. (Kalispell Subdivision Regulations, Section 3.17) 42. All areas disturbed during development shall be re -vegetated with a weed -free mix immediately after development. 43. A 60 foot public road and utility right-of-way located between Fox Forest Loop and Tract 1D shall be dedicated to the City of Kalispell within Block 54 to provide road and utility connections to the property immediately west. Final location of the right-of-way shall be approved by the Public Works Department. Development of the right-of-way will be required by the developer of Tract 1D. (Kalispell Planning Board) SECTION III. Upon proper review and filing of the Final Plat of said subdivision in the office of the Flathead County Clerk and Recorder, said premises shall be a subdivision of the City of Kalispell. PASSED AND APPROVED BY THE CITY COUNCIL AND SIGNED BY THE MAYOR OF THE CITY OF KALISPELL, THIS 17TH DAY OF FEBRUARY, 2009. ATTEST: Theresa White City Clerk Pamela B. Kennedy Mayor KALISPELL CITY PLANNING BOARD & ZONING COMMSSION AHNUTES OF SPECIAL MEETING 2009 CALL TO ORDER AND ROLL The special meeting of the Kalispell City Planning Board and CALL Zoning Commission was called to order at 7:00 p.m. Board members present were: Bryan Schutt, Rick Hull, C.M. (Butch) Clark, John Hinchey, Jim Williamson, Richard Griffin and Troy Mendius. Tom Jentz and Sean Conrad represented the Kalispell Planning Department. There were 10 people in the audience. ELIC COMMENT I No one wished to speak. MEM33ER SEATER I Jim Williamson took his seat at 7:05 p.m. SILVERBROOK ESTATES, A request by 93 8, Church, LLC for preliminary plat PHASE 2 PRELIMINARY approval of the second phase of the Silverbrook Estates PLAT subdivision. Phase 2 includes approximately 167 acres which constitutes the remaining acreage outside of phase of the 325 acre project site. Phase 2 proposes 197 single- family lots, 90 townhouse lots, 13 commercial lots and one fire station lot. STAFF REPORT P-08-02 I Sean Conrad representing the Kalispell Planning Department reviewed staff report KPP-08-02 for the board. Conrad reviewed the location of the project for the board. He stated in December of 2006 the city council annexed the 325 acre site known as Silverbrook Estates and approved a planned unit development zoning overlay district with the zoning districts of R-2 (Single Family); R-4 (Two Family); and B-1 (Neighborhood Buffer). The approved PUD plan allowed for a total of 586 residential lots and 12 commercial lots and as noted on the approved PUD there was a cap of 125,000 square feet on the commercial area with the largest business being 25,000 square feet. There are several parks throughout the project site and a generous highway buffer separating the residential and commercial development from Highway 93 which is located to the east. At the same time the council approved the master plan they also approved phase 1 of the development, which is located in the southern half of the site and is made up of 249 single family residential lots. The final plat for half of the lots in phase 1 has been filed. Tonight the board is reviewing phase 2 of Silverbrook Estates which is located in the northern half of the site and includes townhouse lots, the commercial area, and single family residential lots. The PUD plan for phase 2 is nearly identical with just 2 changes, increasing the number of commercial Kalispell City Planning Board Minutes of the meeting of January 27, 2009 Page 1 of 6 lots from 12 to 13; and reducing the number of townhouse lots and shifting the open space within the townhouse lots. Conrad noted the city's Site Review Committee thought that the increase in the number of commercial lots from 12 to 13 was minor provided that the commercial lots do not exceed the overall maximum commercial build out of 125,000 square feet. Conrad continued regarding the changes in the townhouse lots the open space, water features, and trails were removed and townhouse lots were eliminated along Highway 93 and the townhouse lots west of the commercial area were replaced with single family lots. The only concern staff had with the townhouse redesign was the loss of open space that was in the original, approved plan. Staff is recommending that this proposed plan move forward with the condition that a minimum of one acre of open space be provided in the townhouse development - in either block, and where the open space is provided they also provide a swath of open space that would create the linear path that leads from the townhouse lots to the commercial development. Conrad said these recommendations are listed in Conditions 19, 20, 8, 21. Staff recommends that the Kalispell City Planning Board and Zoning Commission adopt Staff Report #KPP-08-02 as findings of fact and recommend to the Kalispell City Council that Silverbrook Estates, Phase 2 be approved subject to the 42 conditions listed in the staff report. Conrad concluded by noting staff is recommending an amendment to Condition # 15 that would read, "A 12-foot meandering berm shall be constructed within the buffer along Highway 93 to protect residences from highway noise. The berm shall be landscaped with the landscaping plan reviewed and approved by the Parks and Recreation Department." BOARDTIONS Clark noted in the past the city has required alleys to keep the houses from being front loading and preventing what is called a "snout -house" look. He asked why alleys were not required for this development. Conrad said when this plan was approved in 2006 it was noted the design and size of the lots would prevent the "snout -house" look by downplaying the garages and moving the living space closer to the street. Conrad added the width of the lots are 45 - 50 feet and are much larger than the typical townhouse lots you would find in the east and west parts of Kalispell. Jentz added based on the design standards submitted by the developer the garage will be a small component of the house structure and therefore staff supported the design._ Kalispell City Planning Board Minutes of the meeting of January 27, 2009 Page 2 of 6 Schutt said regarding Condition # 10 that relates to sewage conveyance, is this developer required to build the west side sewer interceptor? Conrad said the developer is not obligated to build the west side interceptor, however what it does mean is right now the city is working with DEQ, looking at the existing facilities at the Grandview Lift Station, determining the overall capacity and deciding at what point does a new system need to be put in. What condition # 10 is saying is they really don't have the answer yet. When the developer comes in he needs to provide a plan to the Public Works Department saying here is how we would like to convey sewage to the treatment plant and it may be through the existing city lines or they may not have the capacity. Griffin asked if there are any conditions that the developer has concerns with and Conrad said Condition # 15 was an issue and that is why he brought it up to the board. Griffin said there are references to fences for the townhouse lots and will each be fenced, is it a condition or is that at the option of the builder. Conrad said that would be up to the individual homeowner or builder. Conrad suggested it may also be addressed in the CCR's for the project. Conrad pointed out they were granted an allowance to reduce the front yard fence height. Hinchey said he was concerned about the townhouses blocking the access to the commercial lots but it looks like Condition #21 addresses that. He asked if they would lose a lot or two with the required condition and Conrad said possibly or some of the lots may get slightly smaller. Hinchey pointed out, however if the lots are made smaller would the townhouses become more "snout -like". Conrad agreed if those lots were to become significantly smaller it would be a concern and he made a note to review that area when the final plat comes in. Hinchey noted his disappointment that 6-8 water features in the new design were removed. In addition Hinchey said he doesn't see any connectivity to the west and he thought it would be prudent to provide the connectivity somewhere near lots 586 and 587. Conrad said the board could certainly consider recommending the connectivity to the council. Clark noted the approved plan appears to be more appealing than the proposed plan and added he agrees with Hinchey regarding the connectivity to the west. Clark said connectivity is absolutely mandatory. APPLICANT/ CONS T TS ( Wayne Freeman, CTA of Bozeman said they have been Kalispell City Planning Board Minutes of the meeting of January 27, 2009 Page 3 of 6 working with the city and the developer on this project since 2006. The original master plan was created 2-1/2 years ago before anyone could foresee the downturn of the economy and during the city's evolving criteria for the stormwater ordinance. He added the economy and stormwater ordinance is what primarily drove the revisions. Freeman said very little has changed since this project was originally presented to the board. Most of the items have been installed exactly as originally proposed or has been escalated by the developer with a lot of money and effort. This project is becoming something that we can all be proud Of. Freeman continued in looking at the commercial area the adjustments were made primarily due to market shift. They had 120 townhouse units and they have found that is the item that has really not sold so they looked at adjusting the numbers. The townhouse lots are larger and they have strenuous design guidelines that would prohibit "snout - houses". The landowner would be able to have fencing that would extend from the building but it has to match the fencing that is already on site. Freeman reviewed the stormwater changes and noted they had to capture the MDT off -site water and put it through their system and into the established detention and retention basins. To accommodate the additional water they had to modify their entire plan. Freeman said the owner doesn't have a problem with modifying the plan to include the future connectivity to the west. Clark said he doesn't have any problem with the commercial area but he still has issues with the townhouse design. Freeman reminded the board that the conditions require the inclusion of an open space area of at least one acre in the townhouse area, along with a landscaped pathway to the commercial area, which he noted will enhance the design. Further discussion was held. Griffin said he had noticed a large pond sitting on the north side of Church Drive this winter and asked if the volume of water they will have to accept from MDT will be significant and will they have to alter the system. Freeman said the work has already been completed and MDT paid for a portion of the cost. Griffin asked if the parking requirement for the commercial area has been met and Freeman said yes. Hull asked what will happen when Schrade Creek starts Kalispell City Planning Board Minutes of the meeting of January 27, 2009 Page 4 of 6 running again and Freeman said the city has required this development take that flow underground and into the detention basin. Hinchey asked if the city encourages through lots and Conrad said no but they were approved for this PUD plan. Jentz said what you have is a collector going through the middle of the development and what this design does is gets the continuous driveways off of the collector going through the property. The city looked at the benefits of this design and thought it would be a plus to the transportation system through the subdivision. Freeman described the landscaping through that area for the board. Howard Mann, 3154 Parkview Lane and developer of Silverbrook stated the board will see 6-8 of those townhouse lots disappear with the one acre park so it will look more like the original plan. PUBLIC HEARING No one wished to speak and the public hearing was closed. MOTION Hinchey moved and Clark seconded a motion to adopt staff report KCU-08-04 as findings of fact and recommend to the Kalispell City Council that Silverbrook Estates, Phase 2 be approved subject to the 42 conditions listed in the staff report. OTION TO AMEND Clark moved and Williamson seconded a motion to amend CONDITION # 15 Condition # 15 to read: "A 12-foot meandering berm shall be constructed within the buffer along Highway 93 to protect residences from highway noise. The berm shall be landscaped with the landscaping plan reviewed and approved by the Parks and Recreation Department." ROLL CALL - AMD The motion passed unanimously on a roll call vote. CONDITION # 15 MOTION TO ADD Clark moved and Hinchey seconded a motion to add CONDITION #43 Condition #43 that would require an approach to the west that would be a dedicated R/W within Block 54. The developer of Silverbrook Estates would not be required to construct the connector street. ROLL CALL - ADD The motion passed unanimously on a roll call vote. CONDITION #43 BOARD DISCUSSION Hull thought a motion should be made that addresses the townhouse design however Schutt, Hinchey & Clark felt conditions 19, 20 8v 21 already address that issue. Hull stated he was opposed to this development from the beginning because it is too far from the city and city Kalispell City Planning Board Minutes of the meeting of January 27, 2009 Page 5 of 6 services are stretched to thin which increases costs. Hull said he will be voting against this phase too. ROLL CALL - ORIGINAL The original motion, as amended, passed on a roll call vote OTION of 5 in favor and 2 in opposition. OLD BUSINESS: None. NEW BUSINESS: None. ADJOURNMENT The meeting adjourned at approximately 7:55 p.m. CORNERSTONE Immediately following the regular meeting a work session COMMUNITY CHURCH was held on the following item: PLANNED UNIT DEVELOPMENT 1. Cornerstone Community Church PUD NEXT MEETING A work session of the Kalispell City Planning Board and Zoning Commission is scheduled for February 24, 2009, at 7:00 p.m. in the Kalispell City Council Chambers located at 201 1st Avenue East in Kalispell. The tentative agenda will include: 1. An update on the status of the proposed Pre -Release Center. 2. Kalispell City Zoning Ordinance Update. The next regular meeting of the Kalispell City Planning Board and Zoning Commission is scheduled for Tuesday, March 10, 2009, at 7:00 p.m. in the Kalispell City Council Chambers located at 201 First Avenue East in Kalispell. Bryan H. Schutt President Michelle Anderson Recording Secretary APPROVED as submitted/corrected: / /09 Kalispell City Planning Board Minutes of the meeting of January 27, 2009 Page 6 of 6 PLANNING FOR February 4, 2009 Myrt Webb, Interim City Manager City of Kalispell P.O. Box 1997 Kalispell, MT 59903 Planning Department 201 V Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kalispell.com/planning Re: 93 8s Church, LLC - Preliminary Plat request for Phase 2 of Silverbrook Estates Dear Myrt: The Kalispell City Planning Board met on January 27, 2009 and held a public hearing to consider a request by 93 8s Church, LLC for preliminary plat approval of Silverbrook Estates Phase 2. Phase 2 includes approximately 167 acres which constitutes the remaining acreage outside of phase 1 of the 325 acre project site. Phase 2 proposes 196 single-family lots, 90 townhouse lots and 13 commercial lots. The single family lots will range in size from approximately 1 /4 of an acre up to 1/3 of an acre in size. The townhouse lots will average approximately 4,250 square feet and have an average lot width of 50 feet. The 13 commercial lots will range in size from approximately 8,700 square feet to just over one acre. Open space and parkland areas will make up approximately 48 acres of the 167 acres in phase 2. Phase 2 lies at the southwest corner of the intersection of Highway 93 and Church Drive. The 167t acres which make up phase 2 can be described as tract 3 and a portion of tracts 4 and 5 of Certificate of Survey 15896 located within the NE 1/4 of Section 13, Township 29 North, Range 22 West, P.M.M., Flathead County, Montana. Planning department staff presented staff report #KPP-08-2 providing details of the proposal and the evaluation. The planning staff noted two changes from the Planned Unit Development (PUD) site plan approved by the council in December of 2006 and the PUD site plan submitted with phase 2. The two changes included increasing the number of commercial lots from 12 to 13 and reconfiguring the townhouse lots and reducing the open space and paths around these lots. Planning department staff also suggested a minor amendment to Condition # 15 after discussions with the developer's representative. The changes to the condition would require berming along Highway 93 to help protect residences from the highway noise, berms between the highway and commercial lots are not required. Wayne Freeman of CTA Architects Engineers and Howard Mann of 93 8s Church LLC, spoke in favor of the proposed project. No one else wished to speak and the public hearing was closed. The board discussed the conditions requiring additional open space and the need for a right-of-way connection to the property immediately west. A motion was made and seconded to add Condition #43 that would require an approach to the west that would be a dedicated right-of-way within Block 54. The developer of Silverbrook Estates would not be required to construct the connector street. The motion passed unanimously. The planning board then voted on the motion to recommend approving the preliminary plat with an amendment to Condition # 15, per staff's recommendation, and the addition of Condition #43. The motion passed on a 5 to 2 vote. Please schedule this matter for the February 17, 2009 regular city council meeting. You may contact this board or Sean Conrad at the Kalispell Planning Department if you have any questions regarding this matter. Sincerely, Kalispell City Planning Board Bryan H. Schutt President Attachments: Staff report #KPP-08-02 and application materials Draft minutes of the 1 / 27/ 09 planning board meeting Exhibit A (the planning board's recommended conditions of approval) c w/ Att: Theresa White, Kalispell City Clerk c w/o Att: 93 8s Church LLC Attn: Howard Mann 100 Hathaway Lane Kalispell, MT 59901 CTA Architects Engineers Attn: Wayne Freeman 1143 Stoneridge Drive Bozeman, MT 59718 N EXHIBIT A PLANNING BOARD'S • t± r r CONDITIONS OF APPROVAL SILVERBROOK • •' General Conditions: That the development of the site shall be in substantial compliance with the application submitted, the site plan, materials and other specifications as well as any additional conditions associated with the preliminary plat as approved by the city council. Note: Implementing the conditions of approval may reduce the number of lots shown on the approved preliminary plat. (Kalispell Subdivision Regulations, Appendix C - Final Plat) 2. The total gross square footage for all buildings on the 13 commercial lots in phase 2A shall not exceed 120,000 square feet. The largest building shall not exceed 25,000 gross square feet. (Findings of Fact, Section G, Compliance with Zoning) 3. The preliminary plat approval for phase 2 shall be valid for a period of three years from the date of approval. (Kalispell Subdivision Regulations, Section 2.06.E). Prior to final plat: 4. Prior to final plat approval of phase 213 the townhouse lots shall be renumbered with the A&B designations added to each lot (i.e. 305A and 30513) to further clarify the lots as townhouse lots. (Findings of Fact, Section G, Compliance with Zoning) 5. The following note shall be placed on the final plat for phase 213: "Further subdivision of the lots in phase 213 is prohibited." (Findings of Fact, Section G, Compliance with Zoning) 6. Prior to submitting a final plat application for phase 2C a zone change application for blocks 33 and 40 to change the zoning from R-4 to R-2 shall be approved by the Kalispell City Council. (Findings of Fact, Section G, Compliance with Zoning) 7. Prior to final plat approval of phase 2A Church Drive shall be striped to include a left turn lane for the eastern most access point onto Church Drive. The striping shall be approved by the Public Works Department. (Findings of Fact, Section D, Roads) 8. New infrastructure required to serve the subdivision shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction and Montana Public Works Standards. The design shall be certified in writing by a professional engineer licensed in the State of Montana. All design work shall be reviewed and approved in writing by the Kalispell Public Works Department prior to construction. This infrastructure shall include but not be 3 limited to streets, street lighting, street signage, curb, gutter, boulevard and sidewalks. (Kalispell Design and Construction Standards) 9. Water and sewer main extensions shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction and Montana Public Works Standards. The water and sewer main extension plans shall be reviewed and approved by the Kalispell Public Works Department. Prior to final plat, a certification shall be submitted to the Public Works Department stating that the water and sewer mains have been built as designed and approved. (Kalispell Design and Construction Standards) 10. Prior to submitting a final plat application for each phase the developer shall provide the Public Works Department with a plan of how sewage will be conveyed to the sewer treatment plant. The plan, once reviewed and approved by the Public Works Department, shall be installed prior to final plat approval. (Findings of Fact, Section D, Sewer) 11. The developer shall submit to the Kalispell Public Works Department for review and approval a stormwater report and an engineered drainage plan that meets the requirements of the current City standards for design and construction. Prior to final plat, a certification shall be submitted to the Public Works Department stating that the drainage plan for the subdivision has been installed as designed and approved. (Kalispell Design and Construction Standards) 12. The developer shall submit to the Kalispell Public Works Department prior to construction an erosion/sediment control plan for review and approval and a copy of all documents submitted to Montana Department of Environmental Quality for the General Permit for Stormwater Discharge Associated with Construction Activities. (Kalispell Design and Construction Standards) 13. A letter from the Kalispell Public Works Department shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell or a proper bond has been accepted for unfinished work. (Kalispell Design and Construction Standards) 14. The following requirements shall be met per the Kalispell Fire Department and so certified in writing by the Fire Department: (Kalispell Subdivision Regulations, Section 3.20). a. Water mains designed to provide minimum fire flows shall be installed per City specifications at approved locations. Minimum fire flows shall be in accordance with International Fire Code (2006). b. Fire hydrants shall be provided per City specifications at locations approved by this department, prior to combustible construction. c. Fire Department access shall be provided in accordance with International Fire Code (2006). d. It shall be noted on the face of the plat that hazardous weed abatement shall be provided in accordance with City of Kalispell Ordinance 10-8. e. Street naming shall be approved by the fire department. 15. A 12-foot meandering berm shall be constructed within the buffer along Highway 93 to protect residences from highway noise. The berm shall be landscaped with the 11 landscaping plan reviewed and approved by the Parks and Recreation Department. (Findings of Fact, Section A, Noise) 16. A letter shall be submitted from an engineer licensed in the state of Montana approving the reshaped slopes along the Stillwater River and adjacent drainage way for stability purposes in accordance with CMG Engineering's slope stability assessment. (Findings of Fact, Section A, Slope Stability) 17. A note shall be shown on the face of the final plat indentifying those lots closest to the crest of the reshaped slope mentioned in condition 16 and require a minimum 20 foot building setback from the crest of the reshaped slope. (Findings of Fact, Section A, Slope Stability) 18. The Silverbrook Estates covenants, conditions, restrictions and reservations shall be amended to include the 9 recommendations from the Montana Department of Fish, Wildlife and Parks letter of January 12, 2009 to minimize the problems that future homeowners could have with wildlife, as well as helping them protect themselves, their property, and the wildlife. (Findings of Fact, Section B, Effects on Wildlife and Wildlife Habitat) 19. Phase 2B shall be amended to include a minimum one acre of open space. The open space shall be located centrally in either block 29 or block 30. Prior to final plat approve the open space location shall be approved by the Kalispell Site Review Committee. (Findings of Fact, Section G, Compliance with Zoning) 20. The one acre open space shall be developed with the following: • Irrigation ® Landscaping to consist of trees, grass and shrubs ® Pedestrian paths i A focal feature such as a gazebo, art work or formal garden The development plan shall be submitted to the Parks and Recreation Department for review and approval and installed prior to final plat of phase 2B. 21. Additional open space shall be provided either north or south of the one acre open space site required in condition 19 to provide a linear greenbelt from the intersection of Swift Creek Way and Diamond Peak Loop to Silvertip Trail. The open space shall be a minimum of 50 feet in width and include a walking path to be constructed per standards approved by the Parks and Recreation Department. The walking path shall be constructed prior to final plat approval. (Findings of Fact, Section G, Compliance with Zoning) 22. A letter shall be obtained from the Kalispell Parks and Recreation Director approving a landscape plan for the placement of trees and landscaping materials within the landscape boulevards of the streets serving the subdivision. The approved landscape plan shall be implemented or a cash in lieu payment for installation of the street trees and groundcover be provided to the Kalispell Parks and Recreation Department. (Kalispell Subdivision Regulations, Section 3.11). 23. The 2.19 acre area designated on the preliminary plat as open space in block 46 of phase 2D will meet the parkland dedication requirements provided that it is developed to create a recreational amenity within the subdivision. A letter from the Kalispell Parks and Recreation Department shall be provided at the time of final 5 plat that outlines the improvements and confirms those improvements have been made. (Kalispell Subdivision Regulations, Section 3.19 and Findings of Fact, Section D, Parks and Open Space) 24. The approved pedestrian/bike path plan shall be installed as follows: ® Paths within the open space along Highway 93 shall be installed prior to final plat approval of phase 2A. • Paths within the open space along the Stillwater River, wetland and drainage shall be installed prior to final plat approval of the second phase of the subdivision. All other remaining paths shall be installed prior to final plat approval of the respective phase they are located in. (Findings of Fact, Section D, Parks and Open Space) 25. A park maintenance district shall be formed in accordance with section 7-12-4001 MCA incorporating all the lots within Silverbrook Estates phase 2 subdivision. When needed the taxes levied within the maintenance district shall be determined by the Parks and Recreation Department with approvals by the Kalispell City Council. Such a district shall become effective upon recording the final plat of phases 2A, 2B, 2C and 2D. 26. The following note shall be placed on the final plat: "Construction of homes on lots 357-363 of Block 31 and lots 305 and 334 of Block 29 should incorporate acoustical architectural measures along the side of the house facing the highway. This would include placing less sensitive noise rooms (kitchens, bathrooms, laundry rooms) on the side of the house closest to the highway. Other options would include reducing the number of doors or windows, installing triple pane windows and solid wood doors. (Findings of Fact, Section A, Noise) 27. The following note shall be placed on the final plat: "Property owner(s) are responsible for the boulevard strip for the length of their property boundaries. Responsibilities include watering and mowing of the grass within the boulevard. Removal of grass or trees within the boulevard and placement of any other kind of materials is prohibited unless approved by the Kalispell Department of Parks and Recreation." 28. The following note shall be placed on the final plat: "Property owner(s) shall waive their right to protest the creation of a special improvement district for road upgrades to Church Drive." (Findings of Fact, Section D, Roads) 29. The following note shall be placed on the final plat: "Property owner(s) shall waive their right to protest the creation of a special improvement district for sanitary sewer upgrades which will serve the subdivision." (Findings of Fact, Section D, Sewer) 30. The following note shall be placed on the final plat: "This subdivision is located in an agricultural area and potential nuisances such as noise, dust, odors, and irregular hours of operation are to be expected. As such, the right to farm on adjoining properties shall not be restricted as a result of the development or occupancy of this subdivision." (Findings of Fact, Section E, Effects on Agriculture) 31. The following note shall be placed on the final plat: "Be aware that an existing arena and race track are located to the north of the subdivision. Noise generated by the arena and race track may be heard from your property." (Findings of Fact, Section A, Noise) 32. The rear property boundaries of lots 574-579 of Block 53 shall be amended to provide a minimum distance of 170 feet from the bank of the Stillwater River to the rear property boundary. (Findings of Fact, Section B, Effects on Wildlife and Wildlife Habitat) 33. The rear property boundaries of lots 569-572 of Block 53, lots 561-568 of Block 52 and lot 409 of Block 34 shall be amended to provide for a minimum distance of 50- feet from the top of the bank along the drainage to the rear property boundary. The contour line designating the top of bank shall be determined by City staff and the developer's consultants. (Findings of Fact, Section B, Effects on Wildlife and Wildlife Habitat) 34. A 30-foot rear yard setback shall be required for all structures on lots adjacent to the Stillwater River Hillside and its tributaries. This would include lots 574-579 of Block 53, lots 569-572 of Block 53, lots 561-568 of Block 52 and lot 409 of Block 34. (Findings of Fact, Section B, Effects on Wildlife and Wildlife Habitat) 35. The roads within the subdivision shall be named and signed in accordance with the policies of the Kalispell Public Works Department and the Uniform Traffic Control Devices Manual and be subject to review and approval of the Kalispell Fire Department. A letter shall be obtained from the Kalispell Public Works Department stating the naming and addressing on the final plat have been reviewed and approved. (Kalispell Subdivision Regulations, Section 3.09) 36. All existing and proposed easements shall be indicated on the face of the final plat. Utility easements for City water and sewer shall be provided to allow for the logical extension of utilities from this subdivision to adjoining properties. A letter from the Kalispell Public Works Department shall be obtained stating that the required easements are being shown on the final plat. (Kalispell Subdivision Regulations, Section 3.18) 37. Prior to filing the final plat a letter from the US Postal Service shall be included stating the Service has reviewed and approved of the design and location of the mail delivery site. The mail delivery site shall be installed or bonded for prior to final plat. In addition, the mail delivery site and improvements shall also be included in the preliminary and final engineering plans to be reviewed by the Public Works Department. The mail delivery site shall not impact a sidewalk or proposed boulevard area. (Kalispell Subdivision Regulations, Section 3.22) 38. Street lighting shall be located within the subdivision and shall have a full cutoff lens so that it does not intrude unnecessarily onto adjoining properties. (Kalispell Subdivision Regulations Section 3.09(L)) 39. The following statement shall appear on the final plat: "The undersigned hereby grants unto each and every person, firm or corporation, whether public or private, providing or offering to provide telephone, telegraph, electric power, gas, cable television, water or sewer service to the public, the right to the joint use of an easement for the construction, maintenance, repair, and removal of their lines and other facilities, in, over, under, and across each area designated on this plat as "Utility Easement" to have and to hold forever." 7 Developer's Signature (Kalispell Subdivision Regulations, Section 3.18(E)) 40. That a minimum of two-thirds of the necessary infrastructure for each phase of this subdivision shall be completed prior to final plat submittal. The minimum of two- thirds of the necessary infrastructure shall include the extension of water and sewer mains from the city to the site and necessary lift stations to transport effluent back to the city. (Findings of Fact, Section A, On -site improvements) On going conditions: 41. All utilities shall be installed underground. (Kalispell Subdivision Regulations, Section 3.17) 42. All areas disturbed during development shall be re -vegetated with a weed -free mix immediately after development. 43. A 60 foot public road and utility right-of-way located between Fox Forest Loop and Tract 1 D shall be dedicated to the City of Kalispell within Block 54 to provide road and utility connections to the property immediately west. Final location of the right-of-way shall be approved by the Public Works Department. Development of the right-of-way will be required by the developer of Tract 1 D. (Kalispell Planning Board) 1 14 REPORTREQUEST FOR SILVERBROOK ESTATES SUBDMSION PHASE 2 STAFF .. A report to the Kalispell City Planning Board and the Kalispell City Council regarding the request for preliminary plat approval for 299 lots on approximately 167 acre property located on the north end of the City of Kalispell at the intersection of Highway 93 and Church Drive. A public hearing has been scheduled before the planning board for January 27, 2009, beginning at 7:00 PM in the Kalispell City Council Chambers. The planning board will forward a recommendation to the Kalispell City Council for final action. BACKGROUND INFORMATION: In December of 2006 the Kalispell City Council annexed the 325 acre site which is located at the southwest corner of the intersection of Highway 93 and Church Drive. The council, upon annexation, assigned the property with three zoning districts; R-2 (Single -Family Residential), R-4 (Two -Family Residential) and B-1 (Neighborhood Buffer District). The council also approved a planned unit development (PUD) known as Silverbrook that master planned the 325 acre site. The PUD allowed a total of 586 residential lots comprised of 466 single family lots and 120 townhouse lots, and 12 commercial lots. The council also approved the first phase of the Silverbrook Estates subdivision which gave preliminary approval to plat 249 single family lots on approximately 160 acres. The developer received final plat approval on a portion of phase 1 in 2008. The developer is now requesting preliminary plat approval of the second phase of the Silverbrook Estates subdivision. Phase 2 includes approximately 167 acres which constitutes the remaining acreage outside of phases 1 of the 325 acre project site. Phase 2 proposes 196 single-family lots, 90 townhouse lots and 13 commercial lots. The single family lots will range in size from approximately 1 / 4 of an acre up to 1 / 3 of an acre in size. The townhouse lots will average approximately 4,250 square feet and have an average lot width of 50 feet. The 13 commercial lots will range in size from approximately 8,700 square feet to just over one acre. Open space and parkland areas will make up approximately 48 acres of the 167 acres in phase 2. Technical Assistance: 93 &. Church LLC 100 Hathaway Lane Kalispell, MT 59901 (406) 756-8077 CTA Architects Engineers 1143 Stoneridge Drive Bozeman, MT 59718 B. Location and Legal Description of Property: The property proposed for subdivision lies at the southwest corner of the intersection of Highway 93 and Church Drive. The 167t acres which make up phase 2 can be described as tract 3 and a portion of tracts 4 and 5 of Certificate of Survey 15896 located within the NE 1/4 of Section 13, Township 29 North, Range 22 West, P.M.M., Flathead County, Montana. C. Fadsting Land Use and Zoning: The property has been used for agricultural production in the recent past however with annexation into the city in 2006 that has ceased. Although the 167 acre project site is currently vacant, development of the Silverbrook Estates subdivision phase 1 is occurring immediately to the south. Improvements from phase 1 have also occurred on phase 2. This includes Silverbrook Drive and upgrades to Church Drive, located on the northern end of phase 2. Existing zoning includes a combination of R-2, R-4 and B-1 zoning districts. The R- 2 zoning district covers the majority of the 167 acre site. Approximately 25 acres of the 167 acre site is zoned R-4 and approximately 15 acres is zoned B-1. The R-2, Single Family Residential zoning district is intended to provide adequate lot areas for urban residential development. This district is also intended to have good thoroughfare access, and be in proximity to community and neighborhood facilities such as schools, parks and shopping areas. The minimum lot area required in the R-2 is 9,600 square feet. The R-4, Two -Family Residential, zoning district provides for residential development with minimum lot areas. Development within the district requires all public utilities, and all community facilities. The minimum lot size requirement in the R-4 is 6,000 square feet. The B-1 zoning district is a business district to provide certain commercial and professional office uses where such uses are compatible with the adjacent residential areas. This district is also intended to provide goods and services at a neighborhood level. The district is not intended for those businesses that require the outdoor display, sale and/or storage of merchandise, outdoor services or operations to accommodate large-scale commercial operations. The minimum lot size in the B-1 district is 7,000 square feet. North: Agricultural land including a 240 acre conservation easement, a race track and Majestic Arena; County AG-40 and SAG-5 zoning East: Single-family homes and commercial businesses; County SAG-10 and County B-1 zoning South: Single-family homes; City R-2 zoning West: Agricultural land; County AG-40 and West Valley Zoning District zoning E. General Land Use Character: The area can be described as largely agricultural in nature however there are existing commercial businesses along sections of Highway 93 east of the project site. The first phase of the Silverbrook Estates subdivision is located immediately south and permits 249 single family residential lots. This is the largest residential development in the area however recent annexations and zoning approvals for lands a mile south will continue to change 2 12 54 this area from a rural residential and agricultural area to urban scale commercial and residential development. This phase of Silverbrook Estates would be the northern most boundary of the urban scale development to occur along the Highway 93 corridor within city limits. Utilities and Public Services: Sewer: City of Kalispell Water: City of Kalispell Refuse: Private contractor Electricity: Flathead Electric Cooperative Gas: NorthWestern Energy Telephone: CenturyTel Schools: Kalispell School District #5/Whitefish School District Fire: Kalispell Fire Department Police: City of Kalispell • Phase 2 includes approximately 167 acres which constitutes the remaining acreage outside of phases 1 of the 325 acre project site. Phase 2 proposes 197 single-family lots, 90 townhouse lots and 13 commercial lots The single family lots will range in size as follows: ® 80 lots at approximately 1/4 of an acre ® 95 lots at approximately 1/3 of an acre ® 21 lots at approximately 1/2 of an acre The townhouse lots will average approximately 4,250 square feet and have an average lot width of 50 feet. The 13 commercial lots will range in size from approximately 8,700 square feet to just over one acre. Phase 2 is divided into four separate subphases; phase 2A, 2B, 2C and 2D. A map showing the location of each of the subphases is included in the application packet. A breakdown of the lots within each of the subphases is as follows: ® Phase 2A - 13 commercial building lots and 6 parking lots within the B-1 zoning district ® Phase 2B - 90 townhouse lots within the R-4 zoning district ® Phase 2C - 85 single family lots within the R-2 and R-4 zoning districts ® Phase 2D - 111 single family lots and a 2 acre park within. the R-2 zoning district. All streets within the subdivision will equal or exceed city standards. The applicants propose to provide significant buffering along US 93 including 100 - 240 feet of greenbelt containing a meandering landscaping berm and a 12 foot wide public bike path. They also propose an integrated trail system connecting a series of small open spaces as well as a large open space along the Stillwater River system. A park is proposed in the western half of the project site. Open space and parkland areas will make up approximately 48 acres of the 167 acres in phase 2 with the trails and parks open to public use. 3 Ltaku I i' Ja l IR 1, `11 • • I . 9 I• 0, A. Effects on Health and Safety: Fire: This subdivision is in the service area of the Kalispell Fire Department. The property would be considered to be at low risk of fire because the subdivision and homes within the subdivision would be constructed in accordance with the International Fire Code and have access which meets City standards. All of the lots within phase 2 will abut a street that has been constructed to City standards. Hydrants will be required to be placed in compliance with the requirements of the International Fire Code and approved by the Fire Marshal. The fire access and suppression system should be installed and approved by the fire department prior to final plat approval because of potential problems with combustible construction taking place prior to adequate fire access to the site being developed. As development occurs north of the existing city limits of Kalispell the fire department continues to plan for new fire station locations to serve future residents of the city. The proposed subdivision would be located approximately 2.5 miles north of fire station number 62 located near the intersection of Highway 93 and Reserve Loop Drive at the northern edge of our current fire service area. To help aid the fire department in it's ability to locate a future fire station north of the existing city limits, the owners proposed a 2.5 acre fire station/well site to serve the future residents in the area as part of phase 1. With the final plat approval of phase lA the city will receive the future fire station site. Flooding: Prior to submitting the subdivision the owners had PBS80 conduct a detailed flood study. The revised 100 year floodplain is shown on the preliminary plat and, as the preliminary map indicates, all proposed lots are outside of the 100 year floodplain. Access: Access to the subdivision is provided by US Highway 93 on the east side of the subdivision and Church Drive, a city roadway on the north side of the project site. The Montana Department of Transportation is currently in the process of widening this portion of Highway 93 from two lanes to four lanes with on and off ramps to serve Church Drive. This work should be completed by this summer. Internally, the subdivision has one collector roadway, Silverbrook Drive, connecting Highway 93 at the southeast corner of the subdivision in phase 1 to Church Drive. Local access roadways to serve the individual lots within phase 2 will be constructed within a 60-foot road right-of-way. In summary, the development proposes only one access along US 93. Silverbrook Drive, constructed in phase 1, will access Highway 93 at the very south end of the PUD project site. There are no additional access points proposed onto Highway 93. Along the north boundary of phase 2, 3 access points over a distance of % mile are or will be constructed onto Church Drive. Church Drive will connect to US 93 at the future interchange. The intersection of Silverbrook Drive and Church Drive is already completed. The other two access points onto Church Drive are proposed to be constructed as part of phase 2A. Noise: Highway 93 is located on the east side of the proposed subdivision. In order to mitigate noise impacts associated with the highway the owners are proposing a buffer with widths varying between 100 feet to 200 feet. Within this buffer the owners are proposing to construct an earth berm approximately 8-10 feet high as well as planting a vegetative buffer for visual screening and a 12-foot bike/pedestrian trail running the length of the highway buffer. Immediately adjacent to this buffer is a city street, providing additional distance between future residential homes and the highway. The Highway 93 North Growth Policy Amendment, Policy 1 states, "Gateway Entrance Corridors (areas of special concern) would extend up to 150 feet of either side of the existing R/W for primary highways and up to 50 feet for secondary highways." Policy 2.a of the Highway 93 North Growth Policy Amendment identifies this section of Highway 93 as being within a gateway entrance to Kalispell. Policy 3.i of the Highway 93 North Growth Policy Amendment provides the following requirements for land within the gateway entrance corridor where the adjacent gateway road speed is posted above 45 mph: i. A minimum 100 - 150 foot impact area should be provided for major entrances and a 50 foot entrance for minor entrances. ii. Within this impact area, a combination of berming, landscaping using live materials and trees as well as grass, a pedestrian trail system, limited parking and frontage roads should be incorporated. The proposed highway buffer includes the buffer setbacks listed above as well as the landscaping, berming and pedestrian trail system located within the highway buffer area. The Montana Department of Transportation (MDT) was contacted to comment on the proposed buffer from Highway 93 as part of the preliminary plat review of phase 1. The Highway Department responded that in order to effectively mitigate noise impacts from the highway any berm or wall must break the line of sight between the highway and the receiver (dwellings). This would mean that future homes built on the lots closest to the highway should not be able to see the highway traffic, including semi -trucks and recommended a berm of about 12 feet high. By providing a berm that breaks the line of sight the Highway Department's letter notes that the berm would provide at least a 5 decibel level noise difference which would be noticeable. For second stories the Highway Department suggested that acoustical architectural measures be considered when designing the home. This would include placing less sensitive noise rooms (kitchens, bathrooms, laundry rooms) on the side of the house closest to the highway. Other options would include reducing the number of doors or windows, installing triple pane windows and solid wood doors. The developer has already constructed a majority of the berm along the highway as part of phase 1. Phase 1 also has a condition requiring the berm be a minimum of 12 feet. For consistency between phases 1 and 2 the planning department recommends the berm along Highway 93 also be built to a minimum height of 12-feet. In addition to the berm, the planning department would also 5 recommend advising future residential lot owners closest to Highway 93, lots 357- 363 of block 31 and lots 305 and 334 of block 29, to utilize acoustical architectural measures as suggested by MDT when constructing their homes. This too was a condition of preliminary plat approval for phase 1. The other potential noise impact in the area of the subdivision is located approximately one -mile north. The Majestic Valley Arena and adjacent race track hold racing events and concerts that have the potential to generate noise that may be irritating to future residents within the subdivision. Therefore, the planning department recommends a note be placed on the final plat notifying residents of the subdivision of the adjacent arena and race track and noise generated by these uses may be heard from their property. On -site Improvements: The City of Kalispell has required past residential subdivisions to complete a minimum of two-thirds of the necessary infrastructure (water, sewer, roads, etc.) prior to filing the final plat. The city staff recommends this condition on each plat because staff would like to insure that prior to issuing a building permit on a new lot; there is access which meets the fire department's minimum standards as well as water and sewer services. The City has in the past allowed subdivisions to file a final plat and subsequent home construction to begin prior to a majority of the infrastructure installed. Problems have arisen in the past with insufficient water for fire suppression and sewer mains not working properly as new homes are being occupied. Therefore, in order to mitigate these potential impacts to the public's health and safety, staff is recommending a condition requiring a minimum of two-thirds of the infrastructure be installed prior to final plat. Slope Stability: The Stillwater River makes up just over half of the western boundary of phase 2. The high banks of the Stillwater River are prone to sloughing and slides. The sloughing or slides typically occur during wet cycles or in times of significant surface water events. Water soaks or trickles down through the soil until it hits an impervious clay layer. This layer then becomes super saturated and slides occur. Historically in the Stillwater and Whitefish river drainages, portions of road bed, stream banks and house foundations have been severely damaged by these events. The safest precaution is to maintain the high banks in their natural vegetation, versus irrigated lawns, and require building and rear lot setbacks. When the Silverbrook Estates project was first proposed in 2006, planning department staff conducted several site inspections. During these inspections it was noted that hillside sloughing had occurred in the area of lots 575 to 583 as shown on the preliminary plat of phase 2. The owner and his consultants were aware of this issue and hired CMG Engineering, Inc. who conducted a geotechnical investigation. The geotechnical investigation included, among other things, a slope stability assessment. The slope stability assessment states that the slopes along the western property boundary are a safety concern in their current condition and will likely fail during a design level earthquake. CMG recommended the slopes be graded to provide for an acceptable factor of safety against sliding during high groundwater conditions and the design level earthquake. They further recommend a building setback of 20 feet from the crest of the reshaped slope. 0 The introduction and background discussion included with the phase 2 application notes that the recommended grading for the unstable slopes along the Stillwater River has been completed. Planning staff is recommending a condition be included requiring an engineer's approval of the reshaped slopes for stability purposes in accordance with CMG Engineering's slope stability assessment. In addition, a note should be required on the preliminary plat indentifying those lots closest to the crest of the reshaped slope and requiring a minimum 20 foot building setback as recommended by the slope stability assessment. The slope stability assessment also noted the steeper slopes along the drainage that extends from the Stillwater River east towards the center of the subdivision. The slope stability assessment mentions a recommended 50 foot property line setback from the crest of the slope for water quality and wildlife habitat protection. The assessment states that, "In our opinion, a set -back distance of 50 feet is more than adequate for the slopes in the vicinity of the drainage that extends to the center of the site..." This setback would be adjacent to lots 561 to 573 in phase 2D and lots 408 and 409 in phase 2C. B. Effects on Wildlife and WildlifeHabitat: The Stillwater River is located along a portion of the western edge of the subdivision. In addition, a large drainage is located along a portion of the south boundary of phase 2 and flows westward into the Stillwater River. The 167 acres within phase 2 of the project includes approximately 2,300 lineal feet of Stillwater River frontage and approximately 1,800 lineal feet of the drainage. The upland portion of the property where lots are proposed has historically been used extensively as tilled cropland and therefore this entire portion of the site has been disturbed. In the area along the Stillwater River, much of it remains open and undeveloped. The Montana Department of Fish, Wildlife and Parks (FWP) commented on the proposed subdivision. Based on the current status of the riparian areas along the river and associated wetlands, FWP recommends that for a stream the size of the Stillwater River, a minimum of a 200-foot building setback with at least the first 100 feet adjacent to the stream be protected with natural vegetation. Chapter 7, The Natural Environment, of the Kalispell Growth Policy 2020 lists the following Goals and Policies: Goal 1 ENCOURAGE DEVELOPMENT THAT IS COMPATIBLE WITH OR ENHANCES NATURAL RESOURCE VALUES INCLUDING AIR, WATER, SOIL AND VEGETATION. Goal 2 DEVELOPMENT NEAR ENVIRONMENTALLY SENSITIVE AREAS SHOULD BE ACCOMPLISHED SO THAT THESE FEATURES ARE LEFT IN A RELATIVELY UNDISTURBED STATE. PROTECT WETLAND AND RIPARIAN AREAS SINCE THEY ARE IMPORTANT IN FLOOD PROTECTION, MAINTAINING WATER QUALITY AND PROVIDING HABITAT. 7 Policy 3 Development in environmentally sensitive areas including 100-year floodplain, wetlands, riparian areas, shallow aquifers and on steep slopes may pose inherent development limitations and design should be managed to avoid and mitigate environmental impacts and natural hazards. Although the owners have provided setbacks for a majority of the lots proposed in phase 2 which meet the recommended setbacks by Fish, Wildlife and Parks, several lots, the rear portion of lots 574 to 579 of phase 2D are located closer than 200 feet. In order to meet the above cited goals and policy of the Kalispell Growth Policy the planning department is recommending the lot boundaries be amended to provide for a 200 foot building setback. This will require the rear lot boundaries to be adjusted anywhere from several feet to upwards of 20 feet. The CC&R's for the Silverbrook Estates subdivision along with a recommended condition of approval will require a 30 foot building setback along the rear property boundary of these lots to obtain a building setback of 200 feet. This setback exceeds the R-2 zoning district setback which has a rear yard setback of 10-feet with a provision for 5-foot setbacks for accessory buildings. Regarding the wetlands and associated drainage along the south boundary of phase 2, phase 1 of the Silverbrook Estates subdivision was required to alter lot lines adjacent to the wetlands and drainage to provide for a minimum distance of 50-feet from the top of the bank. The contour line designating the top of the bank was determined by City staff and the developer's consultants. This minimum setback provides for the retention of native vegetation along the edge of the banks of the drainage and wetlands. Planning department staff is recommending this same condition of approval for phase 2. The CC&R's for Silverbrook establish a 30-foot rear yard setback for the single family lots adjacent to the Stillwater River Hillside and its tributaries. This setback exceeds the R-2 zoning district setback which has a rear yard setback of 10-feet with a provision for 5-foot setbacks for accessory buildings. With a property line setback of 50 feet from the top of the bank along the drainage and a 30-foot building setback for rear yards as required in the Silverbrook CC&R's the drainage bank stability and water quality would be protected. Information maps obtained from the Montana Department of Fish, Wildlife and Parks indicate the areas along the Stillwater River corridor to have high densities of whitetail deer. These areas are also used as winter range for the deer. The owners are proposing a linear park along the Stillwater River. By placing the land along the Stillwater River in a park setting, the proposed subdivision complies with the following policies in the Kalispell Growth Policy: Chapter 7, The Natural Environment, Policy 10 Protection of wildlife and wildlife habitat should be encouraged through conscientious actions such as avoiding loose dogs, feeding large wild animal species along with maintaining established important habitat areas. Chapter 7, The Natural Environment, Policy 11 Wildlife travel corridors should be conserved and maintained possibly through easements or other voluntary restrictions. Because of the very prominent presence of wildlife in the area of the subdivision H FWP recommends steps are taken to minimize attractants such as garbage, fruit trees and bird feeders. Included in the CC&R's of the Silverbrook Estates subdivision it recommends keeping garbage containers in a shed or garage and alerts property owners that fruit -bearing trees may attract wildlife. Planning department staff is recommending the language in the Silverbrook CC&R's be expanded to include the recommendations of FWP letter of January 12, 2009. The recommendations in their letter expand on the recommendations currently contained in the Silverbrook CC&R's and provide additional information to decrease the potential for human/wildlife conflicts. C. Effects on the Natural Environment: Surface and groundwater: The Stillwater River is located on the western edge of the subdivision. In addition to the river, surface waters collected on site flow to a drainage located on the southern end of phase 2. The water collected in this drainage travels west through an existing wetland into the Stillwater River. Building setbacks as well as detention ponds for the collection and treatment of stormwater will be incorporated in the subdivision to mitigate impacts to surface waters. The soils report conducted by CMG Engineering, Inc. included boring data that indicates saturated soils between 7-20 feet or more below the surface. It is the city council's policy to recommend against basement construction if groundwater is between 5-10 feet below the surface. The borings which had the highest groundwater levels were in the eastern part of the subdivision in the area of phases 2A and 2B. The planning department is therefore recommending a condition that recommends against basements within phases 2A and 2B. Drainage: As stated above, a large drainage is located on the southern end of phase 2; however the majority of the site is relatively flat. Curbs and gutters will be installed with the subdivision and an engineered storm drain management plan will have to be developed to address the runoff from the site. There is no storm drain system in the immediate area and storm water will have to be managed using on -site retention methods as part of an engineered stormwater management plan. The preliminary plat included with the application shows two storage basins, one on either side of the Silverbrook Drive immediately adjacent to the existing large drainage traversing the property. The storage basin on the east side of Silverbrook Drive will be used for phase 2C. The storage basin on the west side of Silverbrook Drive will be used for phase 2D with the park in phase 2D as a possible alternative storage basin. The drainage plan will have to comply with the City of Kalispell's standards, State standards and will be required to be reviewed and approved by the Kalispell Public Works Department. The engineering plans note that the stormwater for phases 2A and 2B has already been addressed in phase 1 of Silverbrook Estates. Wetlands: A wetland delineation report was conducted by PBS&,J. The report noted a wetland fringe along the boundary of the Stillwater River. This area is proposed to be in open space in order to limit impacts to it. Two wetland areas were also noted within phase 2. The larger of the two, approximately 4.3 acres is located along a portion of the southern boundary of phase 2. The second wetland area, approximately 0.10 of an acre is located west of lot 579 at the bottom of a small draw. Lot locations and building setbacks discussed in section B, Effects 9 on Wildlife and Wildlife Habitat would mitigate any potential impacts to the wetlands. Water: Water service to the subdivision would be provided by the City of Kalispell. The developer, as part of phase 1, extended a 14 inch water line from the intersection of Highway 93 and West Reserve Drive to the Silverbrook Estates subdivision. Within phase 1, 8 and 10 inch main lines were installed within the street right-of-ways. The application states that for the residential portion of phase 2, 8 inch water lines will be extended to serve these lots. The exact pipe size for the commercial portion of the subdivision will be determined depending on the uses there. The water system for the subdivision will be reviewed and approved by the Kalispell Public Works Department and the Kalispell Fire Department as part of the development of the subdivision. There is adequate capacity within the City's water system to accommodate this development. Sewer: In addition to installing water main lines along Highway 93 to serve the Silverbrook Estates subdivision, the owner also installed sewer lines. An 18 inch gravity sewer line was installed from the Silverbrook project site south along Highway 93. The 18 inch sewer line terminates at a sewage pumping station located north of the Stillwater River and West of U.S. Highway 93. From the lift station sewage is then taken by a force main and a gravity main to a lift station at the intersection of Highway 93 and Grandview Drive. The existing downstream sanitary sewer collection system (downstream of the Grandview pumping station) does not have the capacity to accommodate the sewer flows from this or any new development generating sewer flows toward the sewage pumping station located at the intersection of U.S. 93 and Grandview Drive. The Kalispell Public Works Department has stated that additional off -site improvements are necessary to convey sewage from the subdivision site and other development in this area to the waste water treatment plant, located approximately 5 1/2 miles south. The department is recommending that upon submitting a final plat application for this phase the developer provide the department with a plan of how sewage will be conveyed to the wastewater treatment plant. The plan, once reviewed and approved by the department, would be required to be installed prior to final plat approval. Eventually sewer from the north and west areas of Kalispell, those areas north of Four Mile Drive, will be served by a future west side sanitary sewer interceptor. The sewer interceptor will be constructed to bypass existing city infrastructure which may be at or near capacity. These existing sewer lines are expensive to expand and possibly difficult to replace because of the built up environment around them, which is why a new sanitary sewer line is needed. The west side sanitary sewer interceptor will be built west of Highway 93 and may use portions of the future Highway 93 bypass. The purpose of the new sanitary 10 interceptor is to convey sewage from future development on the north end of the city to the treatment plant. Lots within phase 2 of Silverbrook Estates will eventually use this new sewer interceptor. In order for the construction costs of the sewer interceptor to be shared by all development the interceptor will serve, the Kalispell Public Works Department is recommending a condition be placed on the fmal plat waiving the future lot owner's right to protest the creation of a special improvement district (SID). This special improvement district would be implemented by the city to cover construction and engineering costs associated with the sewer interceptor. Within the Silverbrook subdivision twelve inch gravity sewer lines were installed for phase 1 and phases 2A and 2B will utilize these existing sewer lines. A wastewater lift station will need to be installed to serve phases 2C and 2D. The lift station will be located near the southeast corner of phase 2D adjacent to Silverbrook Drive. Wastewater will travel through the lift station and a force main eventually connecting with the existing 12 inch gravity main line in phase 1. Design and construction of the mains within phase 2 will be reviewed and approved by the Kalispell Public Works Department. Roads: Phase 2 will be served by a collector roadway, Silverbrook Drive, which has been constructed and serves as the primary access into and out of the Silverbrook Estates subdivision. Silverbrook Drive connects with Highway 93 in the southeast corner of phase 1 and travels northwest, connecting with Church Drive at the northern end of the overall 325.1 acre project site. The entire length of Silverbrook Drive was constructed as part of phase 1. A number of local roads are proposed to serve the individual lots throughout phase 2. These roads will be constructed to local road standards including a 28- foot driving surface with boulevards, which vary in width between 6-7 feet, and a 5-foot sidewalk. The streets serving the neighborhood commercial portion of the project will be constructed to allow easy on -street parking and provide for wider sidewalks. These streets will be 40 feet wide with 13 foot wide sidewalks on either side of the street. Silverbrook Drive is proposed to be the only access point onto Highway 93 for both phases 1 and 2 of Silverbrook Estates. By providing only one access point onto Highway 93 for the entire project site and a well developed internal road network, the development is consistent with the following two policies in the Highway 93 North Growth Policy Amendment: Policy 3.b Access should be coordinated so as to allow only collector or arterial streets to intersect. The judicious use of right -in right -out approaches, frontage roads and good internal development street design should be the rule to reduce or eliminate the need for direct access onto major gateway roads. Policy 3.c With the construction of the Church Drive overpass on US 93, every effort must be taken to fully utilize this interchange and conversely limit direct access onto US 93 for at least 3/4 mile along areas north and south of this 11 facility to avoid congestion points and the need for future traffic signals. The judicious use of right -in right -out approaches, frontage roads and good internal development street design will mitigate the need for direct access out. A preliminary traffic impact study was conducted as part of the preliminary plat submittal for the project. The preliminary traffic study provided the number of average daily trips and AM and PM peak hour trip numbers for both phases 1 and 2. This includes all of the single family and townhomes proposed as part of the master plan development of the 32 5. 1 acre project site as well as trip estimates for potential future commercial uses in the northeast corner of the project site. Using the average daily trip numbers generated by both phases, the development would create approximately 7,847 average daily vehicle trips from the subdivision. The discussion on trip distribution notes that 40% of the traffic could be expected to travel north with 50% traveling south. The preliminary report also notes 7% of the traffic traveling east and 3% traveling west. The trip distribution section of the preliminary traffic impact study concludes that most trips are expected to utilize Highway 93. At full build out nearly all of the intersections will function within an acceptable level of service (LOS). The delay value used in determining LOS is known as control delay. Control delay is defined as the total delay experienced by a driver and includes initial deceleration delay, queue move -up time, stopped delay, and final acceleration delay. The delay a vehicle experiences is a function of the capacity of the approach, the volume of traffic, and the signal timing (if present). The LOS values of an intersection are represented by the letters A through F. LOS A represents the best control delay scenario which has little or no waiting time at the intersection. LOS F represents the worst case scenario where waiting times at a particular intersection may take 80 seconds or longer for a vehicle to execute the desired movement; making a left turn, right turn or continuing straight through the intersection. The only intersection expected to have a degraded level of service is the intersection of Highway 93 and Silverbrook Drive/Tronstad Road. The traffic study shows that at PM peak hours the eastbound and westbound approaches at the Tronstad Road intersection are expected to operate at level E. The traffic study recommends constructing right turn pockets for eastbound and westbound approaches at the intersection of Tronstad Road and Highway 93. This will improve the level of service at this intersection from E to D. Other recommendations include acceleration and deceleration lanes at the Highway 93 and Church Drive intersection, eliminating existing approaches onto Highway 93 between Church Drive and Silverbrook Drive and constructing a left turn lane for westbound traffic on Church Drive at the project's east access road. This is the road intersection serving the neighborhood commercial development. Improvements needed within the Highway 93 right-of-way have been reviewed by the Montana Department of Transportation (MDT). Necessary mitigation work within the highway right-of-way has been completed or a payment has been provided by the developer per the agreement between the developer and MDT. This includes the intersection of Highway 93 and Silverbrook Drive/Tronstad 12 Church Drive was improved as part of the construction of phase 1. The improvements included curb, gutters, sidewalks on the south side and widening the road. The road widening anticipated the future left turn lane needed at the west bound entrance. To accommodate the recommended left turn lane only striping is needed as the road has already been widened. The striping for the left turn lane will be included in the recommended conditions of approval. Church Drive, located on the northern end of phase 2, is currently experiencing light volumes of traffic which does not significantly impact the condition of the road. If the proposed subdivision is improved, it will add additional traffic on Church Drive that will cause significant impacts to the entire road. The developer has reconstructed the south side of Church Drive as part of phase 1. However, the reconstruction only included that portion of Church Drive which fronts the Silverbrook Estates subdivision. Therefore, the planning department would recommend that at a minimum a waiver to protest the creation of a special improvement district for upgrading Church Drive to City standards should be required as a plat condition. The waiver of protest would enable the city to reconstruct additional sections of Church Drive that will be impacted by this subdivision. Schools: The northern half of phase 2 is within the Whitefish School District. This includes approximately 190 residential lots. The remaining residential lots in the south half of phase 2 are within Kalispell School District #5. The school districts could anticipate that an additional 143 school aged children might be generated into the district at full build out (95 within the Whitefish School District and 48 within Kalispell School District #5). This number is used because it takes into account pre-school aged children, home school education options and private school education option. Not all of the children who live in the subdivision will be attending public schools. This subdivision may have potentially significant impact on both districts, particularly on a cumulative level with other developments pending within the districts - both urban and rural particularly with high school -aged students. Section 76-3-608(1) of the Montana Code Annotated states that the governing body may not deny approval of a proposed subdivision based solely on the subdivision's impacts on educational services. The school districts have been notified of the proposed subdivision. No comments have been received to date. Parks and Open Space: The State and local subdivision regulations have parkland dedication requirements or cash in lieu of parkland dedication in the amount of 11% of the combined area of all land to be divided into lots 1/2 acre and smaller when the density of a subdivision does not exceed 11,880 square feet per dwelling unit. The proposed subdivision does not exceed this density limit. Therefore, a minimum amount of parkland dedication of 9.6 acres is required based on 87.8 acres of land to be subdivided into residential lots. During the review of the PUD in 2006 the staff report noted that the developer proposed 80.2 acres or approximately 25% of the overall project site open space. Phase 2 includes a total of 49.83 acres of open space, 22.4 acres of suitable open 13 space (those areas outside the 100-year floodplain and with slopes less than 20%) and 27.43 acres of unsuitable open space (those areas within the 100-year floodplain and with slopes greater than 20%). The first page of the preliminary plat provides an acreage breakdown for the lots, open space and roads within the subdivision. The total acreage of open space is 48.33 acres, 1.5 acres less than what the developer proposed in the PUD plan. The decrease in open space appears to be from reduced open space areas around the commercial lots in phase 2A and the townhouse lots in phase 2B. Condition 2 of the PUD approval (Ordinance No. 1597) requires the development of the 325 acre site to substantially comply with the conceptual site plan which included more open space areas than are depicted on the PUD conceptual plan submitted with phase 2. In accordance with the PUD agreement, the PUD plan was brought before the city's site review committee for consideration of the open space modifications. The site review committee reviewed the modifications at its January 8th meeting and deemed the modifications minor. In deeming them minor the committee noted that the slight reduction in density of 15 townhouse lots would correspondingly reduce the open space/park requirements. However, it appeared that there was a significant loss of open space in the immediate area of the townhouses; therefore, the committee recommended additional open space of one acre to be placed within the townhouse development and a linear open space swath to connect the open space within the townhouse development with the commercial development to the north. The Parks and Recreation Department is recommending the one acre open space be developed with the following: ® Irrigation ® Landscaping to consist of trees, grass and shrubs ® Pedestrian paths • A focal feature such as a gazebo, art work or formal garden A pedestrian path is also recommended within the linear open space connecting the open space within the townhouse development to the commercial district to the north. Further discussion of this open space recommendation can be found under section G - Compliance with Zoning, of this staff report. Within the other open space areas along the Stillwater River, drainage, and highway the owners are proposing landscaping, water features and a pedestrian/bike path to provide recreational access to both the residents of the subdivision and the greater Kalispell community. In addition to the open space within phase 2 the developer is proposing one park approximately 2.19 acres in size located in block 46 of phase 2D. The Kalispell Growth Policy, Chapter 9, Parks and Recreation, provides the following Goals and Policy for parkland: Goal 1 PROVIDE A BALANCED DISTRIBUTION AND DIVERSITY OF RECREATIONAL FACILITIES AND PEDESTRIAN/BICYCLE PATHS THAT PROVIDES ACCESS FOR ALL AGE GROUPS. Goal 4 ASSURE ADEQUATE AND SAFE ACCESS TO PARKS FROM RESIDENTIAL 14 SUBDIVISIONS. Policy 3 Provide a balanced mix of parks and recreational facilities to meet local needs, which including mini parks, neighborhood parks, community parks, regional parks, linear parks, special facilities and conservation lands or facilities. The Kalispell City Council has also adopted a Parks and Recreation Comprehensive Master Plan. This plan provides direction as to park types (neighborhood park, community park, regional park) and general locations of park sites. Figure 7.1: Proposed Recreation Facilities, in the Parks and Recreation Comprehensive Master Plan recommends the. Stillwater River corridor be part of a natural open space area. The developer has placed the Stillwater River corridor in phase 1 within an open space setting. The open space is controlled by the homeowners association. The river corridor in phase 2 is also proposed to be within a common open space area instead of individual lots. The placement of the river corridor within a common open space area complies with the above recommendation found in the Parks and Recreation Comprehensive Master Plan. The Parks and Recreation Department already reviewed and approved the park plan for the park in phase 2D. The department has also approved the pedestrian/bike path construction designs for the entire subdivision. The department is recommending the 2.19 acre park be installed or bonded for with the final plat of phase 2D. For the pedestrian/bike paths the department is recommending the path along Highway 93 be completed with the final plat approval of phase 2A. The paths along the drainage and Stillwater River would be installed or bonded for with the final plat approval of the second phase of development. This may occur in phase 213, 2C or 2D whichever is requested for final plat approval first. This will insure the recreational paths are in place when a majority of the lots within Silverbrook Estates have been created. There are several remaining paths located in phase 2C and 2D which provide connections from the interior subdivision streets to Church Drive. These paths will need to be installed prior to final plat approval of the phase in which the path is located. The environmental assessment notes that all open space areas, once improvements have been installed by the master developer, will be maintained by the property owners association. However, as stated earlier, all open space areas and trails will be available for the use of the general public. In the event that the property owners association does not wish to continue the maintenance of the parks and open space areas within Silverbrook phase 2, the maintenance would defer to the Parks and Recreation Department. The department commented that it would take over the maintenance of the parks and open space areas but is recommending a park maintenance district be formed in order to provide funding for the on -going maintenance of the park and open space areas. Therefore, a recommended condition of approval would require a park maintenance district be formed upon final plat approval of each phase of the project. The maintenance district would not be funded however until such time as the parks and open space areas are turned over to the city by the property 15 owners association. Police: This subdivision is in the jurisdiction of the City of Kalispell Police Department. The department can adequately provide service to this subdivision, however the cumulative impacts of growth within the City further strains the department's ability to continue to provide the high level of service the department is committed to. Fire Protection: Fire protection services will be provided by the Kalispell Fire Department and the subdivision will be required to comply with the International Fire Code. The fire department will review and approve the number and location of hydrants within the subdivision as well as fire flows for compliance with applicable fire codes. Although fire risk is low because of good access and fairly level terrain, the fire department is recommending that access to the subdivision and the hydrants are in place prior to final plat approval and / or use of combustible materials in construction. Solid Waste: Solid waste will be handled by a private hauler in accordance with State statues and taken to the Flathead County Landfill. There is sufficient capacity within the landfill to accommodate this additional solid waste generated from this subdivision. Medical Services: Ambulance service is available from the fire department and ALERT helicopter service. Kalispell Regional Medical Center is close, approximately 4 miles from the site. E. Effects on Agriculture and agricultural water user facilities: The site has been traditionally used for agricultural uses including crop production. The environmental assessment for the project states that the site generally has a farmland classification of "prime farmland' when irrigated. This was confirmed by information obtained from the Natural Resource and Conservation Service (NRCS). The environmental assessment continues by stating that approximately 294 acres of the 325 acre project site have produced alfalfa with yields of 4.0 to 4.4 tons per acre. Lands to the north and west of phase 2 are still primarily used for agricultural purposes. With the approval of this subdivision water and sewer service will be extended to the site. This extension of services will impact the agricultural land use in the area. The effect this subdivision would have on adjacent agricultural land would be the potential for more land currently in agricultural production to convert to relatively higher density residential subdivisions due to the close proximity of water and sewer mains. Current policies in the Kalispell Growth Policy, Chapter 5, Land Use: Agriculture, state the following: Policy 1 Encourage and create incentives to conserve agricultural lands. Policy 2 Encourage urban growth into areas which are not environmentally sensitive or 16 productive agricultural lands. The proposed subdivision contradicts both of the above policies as the requested subdivision would not conserve any agricultural land on the site and does take productive agricultural lands out of production. However, the Kalispell Planning Board and City Council recognize the need for growth to occur in Flathead County and in particular the City of Kalispell. With the City Council's approval in August of 2006 to extend the Kalispell Growth Policy Future Land Use Map north of the current city limits approximately 2 miles and the approval of phase 1 of Silverbrook Estates, the city is taking an active role in planning for future development. By providing a greater growth area boundary, the city can entertain requests for annexation which in turn lead to the extension of water and sewer services. This enables more of the growth to come into the City of Kalispell and connect to city water and sewer, and have police and fire protection that the City offers its residents. Allowing higher density development within the City's growth policy area, it could reasonably be expected that more farmland could be conserved because the availability of residential and commercial lots the expanded growth policy area would create. Immediately north of phase 2 across Church Drive is an approximately 160 acre property in a conservation easement. The easement allows the property to be used as agricultural land but prohibits future development on the land. By creating residential and commercial lots immediately south of the conservation easement, future residents will need to be aware that farming of this land will take place and from time to time potential nuisances such as noise, dust, odors, and irregular hours of operation are to be expected. Therefore, the planning department is recommending placing a note on the final plat notifying future property owners of the agricultural nature of the surrounding lands. P. Relation to the Kalispell Growth Policy: On August 7, 2006 the Kalispell City Council adopted resolution 5129B which amended the Kalispell Growth Policy Future Land Use map north to the intersection of Highway 93 and Church Drive. On the amended land use map the 167 acre project site is designated Neighborhood Commercial in the northeast corner of the site surrounded by a narrow band of High Density Residential with the remaining acreage of the project site designated Suburban Residential. In December of 2006 the Kalispell City Council annexed the entire 325.1 acre project site which constitutes both phases 1 and 2 of Silverbrook Estates. Initial zoning provided for phase 2 includes R-2 for areas designated Suburban Residential, R-4 for areas designated High Density Residential and B-1 for areas designated Neighborhood Commercial. These zoning districts comply with their associated land uses, goals and policies contained in the Kalispell Growth Policy. G. Compliance with Zoning: The 167 acres which make up phase 2 includes three zoning districts, R-2, R-4 and B-1. The owner requested and the city council also approved a planned unit development (PUD) zoning overlay district for the entire 325.1 acre project site. The PUD, known as Silverbrook, provided the developer the opportunity to deviate from the zoning and subdivision regulations and gave the city council a master plan development of the entire 325.1 acre site. In December of 2006 the city council approved the Silverbrook PUD by Ordinance 17 1597. Condition 2 requires the development of the 325.1 acre site to substantially comply with the conceptual site plan. The conceptual site plan depicted lot and road locations, parks, pathways and open space areas on the site. Planning staff has noted two modifications from the approved PUD conceptual plan. The modifications are: 1. Increasing the number of commercial lots from 12 to 13. 2. Reconfiguring the townhouse lots and reducing the open space and paths around these lots. Section IV of the PUD agreement allows minor modifications of the PUD agreement based on the review and approval of the city's site review committee. The site review committee reviewed the modifications at its January 8th meeting and deemed the modifications minor. In deeming them minor the committee recommends placing the following conditions on the project: ® The total gross square footage for all buildings on the 13 commercial lots shall not exceed 120,000 square feet. The largest building shall not exceed 25,000 gross square feet. (This is based on the maximum commercial square footage as shown on the approved PUD plan) ® A minimum one acre of open space shall be provided within the townhouse phase of the subdivision. The open space should be located centrally in either block 29 or block 30. ® Additional open space shall be provided either north or south of the one acre open space site to provide a linear greenbelt from the intersection of Swift Creek Way and Diamond Peak Loop to Silvertip Trail. The open space should be a minimum of 50 feet in width and include a walking path. With the above recommendations on this plat the site review committee determined the revised PUD conceptual plan submitted with phase 2 would substantially comply with the approved PUD plan. Nearly two-thirds of the townhouse lots meet or exceed the minimum lot size of 6,000 square feet in the R-4 district. The R-4 district is a two family residential zoning district where a duplex may be constructed on a single lot. Townhouse lots, by definition, allow ownership of the parcel of land with one single family dwelling unit on the land. This unit is attached with another single family dwelling unit but separated with a common party wall having no doors, windows or other provisions for human passage or visibility. The concern is that a future lot buyer of a townhouse lot may question why two units would not be allowed on the lot instead of one if the lot exceeds the minimum lot area of the R-4 district. If this is allowed to happen the density of the subdivision can greatly increase and paired lots may be split apart causing problems building the intended townhouse units. To avoid these potential problems the planning staff recommends the following: IN ® Townhouse lots shall be renumbered with the A&B designations added to each lot (i.e. 305A and 305B) to further clarify the lots as townhouse lots. ® No further subdivision of the lots located in phase 2B. When the city council annexed the 325.1 acre project site the majority of the property was zoned R-2. A B-1 zoning district was approved in the northeast corner of the site which is shown as phase 2A. The R-4 zoning district was approved for land immediately south and west of the B-1 zoning district. The approved PUD plan proposed townhouse lots within the entire area zoned R-4. The revised PUD plan submitted with phase 2 shows townhouse lots south of the commercial district but has replaced the townhouse lots west of the commercial district with single family lots. These lots occupy blocks 33 and 40 on the preliminary plat and range in size from approximately 10,400 square feet to 13,000 square feet. The planning department and the city's site review committee do not see problems with changing the townhouse lots to single family lots however, the single family lots are still zoned R-4. This allows future property owners of these lots to construct either a single family home or a duplex on each of the properties. The consultant would like to maintain the single family residential nature of the area west of the commercial and townhouse blocks. To do this the consultant has agreed that prior to submitting a final plat application for phase 2C the owner will submit a zone change for blocks 33 and 40. The zone change would rezone the two blocks from R-4 to R-2 to maintain the single family neighborhood setting and avoid potential duplexes being constructed on the lots. The condition to rezone the portion of property in phase 2C has been included in the recommended conditions of approval. H. Compliance with the Kalispell Subdivision Regulations: In December of 2006 the city council reviewed and approved the Silverbrook PUD which provided a master plan for the 325.1 acre site. Part of the PUD request allowed two deviations to the Kalispell Subdivision Regulations. The two deviations include allowing longer block lengths and providing a sidewalk on only one side of the street instead of both sides for one of the street within the neighborhood commercial phase of the subdivision which borders a significant open space area. As a required condition of approval for longer block lengths the developer is required to provide a pedestrian pathway connection at mid -block or where it deemed most appropriate given surrounding streets and paths. The preliminary plat of phase 2 provides for such connections in accordance with the PUD condition. • uw 1 1Y.V4 a to) Staff recommends that the Kalispell City Planning Board adopt staff report KPP- 08-2 as findings of fact and recommend to the Kalispell City Council that Phase 2 of Silverbrook Estates be approved subject to the conditions listed below: 19 General Conditions: 1. That the development of the site shall be in substantial compliance with the application submitted, the site plan, materials and other specifications as well as any additional conditions associated with the preliminary plat as approved by the city council. Note: Implementing the conditions of approval may reduce the number of lots shown on the approved preliminary plat. (Kalispell Subdivision Regulations, Appendix C - Final Plat) 2. The total gross square footage for all buildings on the 13 commercial lots in phase 2A shall not exceed 120,000 square feet. The largest building shall not exceed 25,000 gross square feet. (Findings of Fact, Section G, Compliance with Zoning) 3. The preliminary plat approval for phase 2 shall be valid for a period of three years from the date of approval. (Kalispell Subdivision Regulations, Section 2.06.E). Prior to final plat: 4. Prior to final plat approval of phase 2B the townhouse lots shall be renumbered with the A&B designations added to each lot (i.e. 305A and 30513) to further clarify the lots as townhouse lots. (Findings of Fact, Section G, Compliance with Zoning) 5. The following note shall be placed on the final plat for phase 2B: "Further subdivision of the lots in phase 2B is prohibited." (Findings of Fact, Section G, Compliance with Zoning) 6. Prior to submitting a final plat application for phase 2C a zone change application for blocks 33 and 40 to change the zoning from R-4 to R-2 shall be approved by the Kalispell City Council. (Findings of Fact, Section G, Compliance with Zoning) 7. Prior to final plat approval of phase 2A Church Drive shall be striped to include a left turn lane for the eastern most access point onto Church Drive. The striping shall be approved by the Public Works Department. (Findings of Fact, Section D, Roads) 8. New infrastructure required to serve the subdivision shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction and Montana Public Works Standards. The design shall be certified in writing by a professional engineer licensed in the State of Montana. All design work shall be reviewed and approved in writing by the Kalispell Public Works Department prior to construction. This infrastructure shall include but not be limited to streets, street lighting, street signage, curb, gutter, boulevard and sidewalks. (Kalispell Design and Construction Standards) 20 9. Water and sewer main extensions shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction and Montana Public Works Standards. The water and sewer main extension plans shall be reviewed and approved by the Kalispell Public Works Department. Prior to final plat, a certification shall be submitted to the Public Works Department stating that the water and sewer mains have been built as designed and approved. (Kalispell Design and Construction Standards) 10. Prior to submitting a final plat application for each phase the developer shall provide the Public Works Department with a plan of how sewage will be conveyed to the sewer treatment plant. The plan, once reviewed and approved by the Public Works Department, shall be installed prior to final plat approval. (Findings of Fact, Section D, Sewer) 11. The developer shall submit to the Kalispell Public Works Department for review and approval a stormwater report and an engineered drainage plan that meets the requirements of the current City standards for design and construction. Prior to final plat, a certification shall be submitted to the Public Works Department stating that the drainage plan for the subdivision has been installed as designed and approved. (Kalispell Design and Construction Standards) 12. The developer shall submit to the Kalispell Public Works Department prior to construction an erosion/sediment control plan for review and approval and a copy of all documents submitted to Montana Department of Environmental Quality for the General Permit for Stormwater Discharge Associated with Construction Activities. (Kalispell Design and Construction Standards) 13. A letter from the Kalispell Public Works Department shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell or a proper bond has been accepted for unfinished work. (Kalispell Design and Construction Standards) 14. The following requirements shall be met per the Kalispell Fire Department and so certified in writing by the Fire Department: (Kalispell Subdivision Regulations, Section 3.20). a. Water mains designed to provide minimum fire flows shall be installed per City specifications at approved locations. Minimum fire flows shall be in accordance with International Fire Code (2006). b. Fire hydrants shall be provided per City specifications at locations approved by this department, prior to combustible construction. c. Fire Department access shall be provided in accordance with International Fire Code (2006). d. It shall be noted on the face of the plat that hazardous weed abatement shall be provided in accordance with City of Kalispell Ordinance 10-8. e. Street naming shall be approved by the fire department. 15. A 12-foot meandering berm shall be constructed within the buffer along Highway 93. The berm shall be landscaped with the landscaping plan reviewed and 21 approved by the Parks and Recreation Department. (Findings of Fact, Section A, Noise) 16. A letter shall be submitted from an engineer licensed in the state of Montana approving the reshaped slopes along the Stillwater River and adjacent drainage way for stability purposes in accordance with CMG Engineering's slope stability assessment. (Findings of Fact, Section A, Slope Stability) 17. A note shall be shown on the face of the final plat indentifying those lots closest to the crest of the reshaped slope mentioned in condition 16 and require a minimum 20 foot building setback from the crest of the reshaped slope. (Findings of Fact, Section A, Slope Stability) 18. The Silverbrook Estates covenants, conditions, restrictions and reservations shall be amended to include the 9 recommendations from the Montana Department of Fish, Wildlife and Parks letter of January 12, 2009 to minimize the problems that future homeowners could have with wildlife, as well as helping them protect themselves, their property, and the wildlife. (Findings of Fact, Section B, Effects on Wildlife and Wildlife Habitat) 19. Phase 2B shall be amended to include a minimum one acre of open space. The open space shall be located centrally in either block 29 or block 30. Prior to final plat approve the open space location shall be approved by the Kalispell Site Review Committee. (Findings of Fact, Section G, Compliance with Zoning) 20. The one acre open space shall be developed with the following: ® Irrigation ® Landscaping to consist of trees, grass and shrubs ® Pedestrian paths ® A focal feature such as a gazebo, art work or formal garden The development plan shall be submitted to the Parks and Recreation Department for review and approval and installed prior to final plat of phase 2B. 21. Additional open space shall be provided either north or south of the one acre open space site required in condition 19 to provide a linear greenbelt from the intersection of Swift Creek Way and Diamond Peak Loop to Silvertip Trail. The open space shall be a minimum of 50 feet in width and include a walking path to be constructed per standards approved by the Parks and Recreation Department. The walking path shall be constructed prior to final plat approval. (Findings of Fact, Section G, Compliance with Zoning) 22. A letter shall be obtained from the Kalispell Parks and Recreation Director approving a landscape plan for the placement of trees and landscaping materials within the landscape boulevards of the streets serving the subdivision. The approved landscape plan shall be implemented or a cash in lieu payment for installation of the street trees and groundcover be provided to the Kalispell Parks and Recreation Department. (Kalispell Subdivision Regulations, Section 3.11). 23. The 2.19 acre area designated on the preliminary plat as open space in block 46 of phase 2D will meet the parkland dedication requirements provided that it is developed to create a recreational amenity within the subdivision. A letter from 22 the Kalispell Parks and Recreation Department shall be provided at the time of final plat that outlines the improvements and confirms those improvements have been made. (Kalispell Subdivision Regulations, Section 3.19 and Findings of Fact, Section D, Parks and Open Space) 24. The approved pedestrian/bike path plan shall be installed as follows: ® Paths within the open space along Highway 93 shall be installed prior to final plat approval of phase 2A. ® Paths within the open space along the Stillwater River, wetland and drainage shall be installed prior to final plat approval of the second phase of the subdivision. ® All other remaining paths shall be installed prior to final plat approval of the respective phase they are located in. (Findings of Fact, Section D, Parks and Open Space) 25. A park maintenance district shall be formed in accordance with section 7-12- 4001 MCA incorporating all the lots within Silverbrook Estates phase 2 subdivision. When needed the taxes levied within the maintenance district shall be determined by the Parks and Recreation Department with approvals by the Kalispell City Council. Such a district shall become effective upon recording the final plat of phases 2A, 2B, 2C and 2D. 26. The following note shall be placed on the final plat: "Construction of homes on lots 357-363 of Block 31 and lots 305 and 334 of Block 29 should incorporate acoustical architectural measures along the side of the house facing the highway. This would include placing less sensitive noise rooms (kitchens, bathrooms, laundry rooms) on the side of the house closest to the highway. Other options would include reducing the number of doors or windows, installing triple pane windows and solid wood doors. (Findings of Fact, Section A, Noise) 27. The following note shall be placed on the final plat: "Property owner(s) are responsible for the boulevard strip for the length of their property boundaries. Responsibilities include watering and mowing of the grass within the boulevard. Removal of grass or trees within the boulevard and placement of any other kind of materials is prohibited unless approved by the Kalispell Department of Parks and Recreation." 28. The following note shall be placed on the final plat: "Property owner(s) shall waive their right to protest the creation of a special improvement district for road upgrades to Church Drive." (Findings of Fact, Section D, Roads) 29. The following note shall be placed on the final plat: "Property owner(s) shall waive their right to protest the creation of a special improvement district for sanitary sewer upgrades which will serve the subdivision." (Findings of Fact, Section D, Sewer) 30. The following note shall be placed on the final plat: "This subdivision is located in an agricultural area and potential nuisances such as noise, dust, odors, and irregular hours of operation are to be expected. As such, the right to farm on adjoining properties shall not be restricted as a result of the development or occupancy of this subdivision." (Findings of Fact, Section E, Effects on 23 Agriculture) 31. The following note shall be placed on the final plat: "Be aware that an existing arena and race track are located to the north of the subdivision. Noise generated by the arena and race track may be heard from your property." (Findings of Fact, Section A, Noise) 32. The rear property boundaries of lots 574-579 of Block 53 shall be amended to provide a minimum distance of 170 feet from the bank of the Stillwater River to the rear property boundary. (Findings of Fact, Section B, Effects on Wildlife and Wildlife Habitat) 33. The rear property boundaries of lots 569-572 of Block 53, lots 561-568 of Block 52 and lot 409 of Block 34 shall be amended to provide for a minimum distance of 50-feet from the top of the bank along the drainage to the rear property boundary. The contour line designating the top of bank shall be determined by City staff and the developer's consultants. (Findings of Fact, Section B, Effects on Wildlife and Wildlife Habitat) 34. A 30-foot rear yard setback shall be required for all structures on lots adjacent to the Stillwater River Hillside and its tributaries. This would include lots 574-579 of Block 53, lots 569-572 of Block 53, lots 561-568 of Block 52 and lot 409 of Block 34. (Findings of Fact, Section B, Effects on Wildlife and Wildlife Habitat) 35. The roads within the subdivision shall be named and signed in accordance with the policies of the Kalispell Public Works Department and the Uniform Traffic Control Devices Manual and be subject to review and approval of the Kalispell Fire Department. A letter shall be obtained from the Kalispell Public Works Department stating the naming and addressing on the final plat have been reviewed and approved. (Kalispell Subdivision Regulations, Section 3.09) 36. All existing and proposed easements shall be indicated on the face of the final plat. Utility easements for City water and sewer shall be provided to allow for the logical extension of utilities from this subdivision to adjoining properties. A letter from the Kalispell Public Works Department shall be obtained stating that the required easements are being shown on the final plat. (Kalispell Subdivision Regulations, Section 3.18) 37. Prior to filing the final plat a letter from the US Postal Service shall be included stating the Service has reviewed and approved of the design and location of the mail delivery site. The mail delivery site shall be installed or bonded for prior to final plat. In addition, the mail delivery site and improvements shall also be included in the preliminary and final engineering plans to be reviewed by the Public Works Department. The mail delivery site shall not impact a sidewalk or proposed boulevard area. (Kalispell Subdivision Regulations, Section 3.22) 38. Street lighting shall be located within the subdivision and shall have a full cutoff lens so that it does not intrude unnecessarily onto adjoining properties. (Kalispell Subdivision Regulations Section 3.09(L)) 39. The following statement shall appear on the final plat: 'The undersigned hereby 24 grants unto each and every person, firm or corporation, whether public or private, providing or offering to provide telephone, telegraph, electric power, gas, cable television, water or sewer service to the public, the right to the joint use of an easement for the construction, maintenance, repair, and removal of their lines and other facilities, in, over, under, and across each area designated on this plat as "Utility Easement" to have and to hold forever." Developer's Signature (Kalispell Subdivision Regulations, Section 3.18(E)) 40. That a minimum of two-thirds of the necessary infrastructure for each phase of this subdivision shall be completed prior to final plat submittal. The minimum of two-thirds of the necessary infrastructure shall include the extension of water and sewer mains from the city to the site and necessary lift stations to transport effluent back to the city. (Findings of Fact, Section A, On -site improvements) On going conditions: 41. All utilities shall be installed underground. (Kalispell Subdivision Regulations, Section 3.17) 42. All areas disturbed during development shall be re -vegetated with a weed -free mix immediately after development. 25 r Afontaga T" Sk9 �VtkWe (& TWI s . rkP'i 14 2009 KALISPELL PLANNING DEPARTMENT Sean Conrad City of Kalispell Planning Department 201 1 st Avenue East Kalispell, MT 59901 Dear Mr. Conrad, 490 N. Meridian Road Kalispell, MT 59901 (406) 752-5501 FAX (406) 257-0349 January 12, 2008 REF: JV001-09 Thank you for the opportunity to comment on the preliminary plat for Phase 2 of Silverbrook Estates along the Stillwater River near Church Drive. We appreciate the developer adopting our recommendations in Phase 1, and suggest similar but slightly modified setback recommendations for Phase 2 as follows: A minimum 200-foot building setback with at least the first 100 feet adjacent to the Stillwater River in protected natural vegetation. In our comments on Phase 1 we suggested 75 feet adjacent to the Stillwater River in protected natural vegetation. However, in review, a 100-foot natural vegetation buffer is much more serviceable for streambank protection, large mammal movement, small mammal dens and foraging, and bird nesting and foraging. Also, as in our comments regarding Phase 1, the proposed development should include a sizable homeowners' or public park along the Stillwater River and associated wetlands. In addition, to reduce the potential for human/bear, human/mountain lion, human/deer, and other human/wildlife conflicts associated with development, Montana FWP prints several brochures that can be helpful in preventing/reducing human/wildlife conflicts. These brochures include such titles as Living With Black Bears, Living With Grizzlies, Why Is This Bear In My Backyard, Living With Mountain Lions, Living With Deer, Living With Skunks, Living With Raccoons, Living With Woodpeckers, Living With Bats, Putting Out the Unwelcome Mat, and Living With Dogs & Cats. Montana FWP encourages developers or homeowners' associations to provide copies of the above brochures to all new property owners. The following conditions are recommended to minimize problems that future homeowners could have with wildlife, as well as helping those individuals protect themselves, their property, and the wildlife. a) Homeowners must be aware of the potential for vegetation damage by wildlife, particularly from deer feeding on lawns, gardens, flowers, ornamental shrubs, and trees in this subdivision. Homeowners should be prepared to take the responsibility to plant nonpalatable vegetation or protect their vegetation (fencing, netting, repellents) in order to avoid problems. Landscape plantings of certain species of native vegetation are less likely to suffer damage by deer. b) Fruit -producing trees and shrubs should not be allowed because they attract bears. If present they must be fenced with electric fencing to deter bears. Keep produce and any fruit picked and off the ground. Ripe or rotting fruit or vegetable material attracts bears, deer, skunks, and other wildlife. To help keep wildlife such as deer out of gardens, fences should be 8 feet or taller or electric fences utilized. c) Garbage must be stored either in secure, bear -resistant containers or indoors (or both) to avoid attracting wildlife such as bears. If stored indoors, garbage cans may not be set out until the morning of garbage pickup and must be brought in no later than that same evening. If home sites are occupied seasonally or if the occupants are to be away from the household for 7 days or more, garbage from the home, other buildings, or containers must be removed from the property prior to their departure. d) Do not feed wildlife or offer supplements (such as salt or mineral blocks), attractants, or bait for deer or other wildlife. Feeding wildlife results in unnatural concentrations of animals that can lead to overuse of vegetation, disease transmission, and other adverse effects to wildlife (such as foundering of deer). Such actions unnecessarily accustom wild animals to humans, which can be dangerous for both. It is against state law (MCA 87-3-130) to purposely or knowingly attract bears with supplemental food attractants (any food, garbage, or other attractant for game animals) or to provide supplemental feed attractants in a manner that results in "an artificial concentration of game animals that may potentially contribute to the transmission of disease or that constitutes a threat to public safety." Also, homeowners must be aware that deer might attract mountain lions to the area. e) Birdseed is an attractant to bears and deer. Use of bird feeders is not recommended from April 1 through November 30. If used, bird feeders must: a) be suspended a minimum of 10 feet above ground level (measured from bottom of catch plate), b) be at least 4 feet from any support poles or points, and c) be designed with a catch plate located below the feeder and fixed such that it collects the seed knocked off the feeder by feeding birds. Hummingbird feeders will follow the same criteria. 2 f) Pet food must be stored indoors, in closed sheds, or in bear -resistant containers in order to avoid attracting wildlife such as bears, mountain lions, skunks, and other wildlife. When feeding pets, do not leave food out overnight. g) Barbecue grills must be stored indoors, and permanent outdoor barbecue grills shall not be allowed in this subdivision. Keep all portions of the barbecues routinely clean. Food spills and smells on and near the grill attract bears and other wildlife. h) Compost piles and beehives can attract bears and must be fenced with electric fencing to prevent access to them or not allowed in the subdivision. i) Domestic animals such as horses, cattle, pigs, sheep, goats, llama, poultry, etc. (including those kept as 4H projects), can attract bears, mountain lions, and coyotes. Animals must be housed with this in mind and livestock feeds, especially grain related, must be fed in a manner that does not allow deer or bears to have access to them. Sincerer, Mark Deleray Fisheries Biologist John Vore Wildlife Biologist 3 lortar�a C � �C D sk, W-e� ;'rtAJ p3,1 212006 490 N. Meridian RwIgfiELL PLANNING DEPARTMENT Kalispell, MT 59901 (406) 752-5501 FAX (406) 257-0349 10/23/06 REF:MD041-06.doc Sean Conrad City of Kalispell Planning Department 17 Second St. East Suite 211 Kalispell, MT 59901 Dear Mr. Conrad, Thank you for the opportunity to comment on the proposed 586-lot subdivision (Silverbrook Estates) along the Stillwater River near Church Drive. The proposal includes a significant amount of development along a relatively undeveloped section of the Stillwater River. At present, the stream banks in this area have healthy riparian vegetation including mature trees and riparian shrubs. This natural vegetation allows for stable stream banks, creates habitat for many fish and wildlife species, and provides a natural setting. As this area develops, it is important that these resources are maintained and protected. Building setbacks and vegetated buffers are means of protecting riparian areas, fish and wildlife habitat, and water quality. Generally, the wider the widths of setbacks and buffers the more resource protection they provide. For a stream the size of the Stillwater River, we generally recommend at a minimum 200 foot building setbacks with at least the first 75 feet adjacent the stream in protected natural vegetation. These widths will help filter pollutants, such as fertilizers and petroleum products that come from the upland development. Within this setback, there maybe opportunity for trails; however, these sites should be carefully chosen to maintain the protective characteristics of the filter. Unfortunately, the proposed plan includes many lots close to the Stillwater River and associated wetlands, in the vicinity of 100 feet. In addition, the subdivision sits up on a bench with steep banks down to these waters. The steepness of the bank reduces the ability of the setbacks and vegetated buffers to filter pollutants. Setbacks of 300 feet or more with wide vegetated buffer zones may be necessary on steeper slopes to remove most pollutants. We suggest the proposed development include a sizable homeowner's or public park along the Stillwater River and the associated wetlands. This would allow uniform and consistent management and protection of the stream and floodplain resources. It would eliminate the potential for vegetation removal, mowing and fertilization, grazing, and other land uses that would degrade the riparian zone, stream banks, habitat values, and water quality. All future development along the Stillwater River should be carefully planned to prevent degradation of the stream banks, natural riparian vegetation, and floodplain zones in an effort to protect water quality of these waters and Flathead Lake. We recommend the judicious use of public parks and trails, homeowner's parks, or other open space conservation tools along with significant building setbacks and wide vegetated buffer zones to maintain the high quality of the riparian community within this proposed development. Sincerely, Mark Deler Fished s to t Gael Bissell Wildlife Biologist " - -BIS24 January 14, 2009 E E V IE JAN 15 2009 Sean Conrad Kalispell Planning Department KALISPELL PLANNING DEPARTMENT 201 1" Avenue East Kalispell, Montana 59901 Mr. Conrad: RE: Silverbrook Estates preliminary plat application for phase 2 Thank you for the opportunity to comment on the above referenced subdivision. The landfill capacity currently available is from 30 to 60 years based upon an annual tonnage increase of 8% per year or 2% per year respectively. The District requests that all new subdivisions use a private hauler to bring the solid waste to the landfill. Owner hauling of solid waste from the subdivision should not be the primary method of disposal. Evergreen Disposal is the (PSC) Public Service Commission Licensed hauler in this area. Their business phone number is 406-257-1739. After reviewing the project summary, I believe that the issue of solid waste needs to be addressed more in the preliminary plat document. Please feel free to contact me with any questions. My direct number is 406-758-5773. Thank you again for the opportunity to comment on this project. Respectfully, la- cktl James Chilton Operations Manager Flathead County Solid Waste District FLATHEAD COUNTY SOLID WASTE DISTRICT 4098 Highway 93 North • Kalispell, Montana 59901 0 (406) 758-5933 • fax (406) 758.5918 • trash@co.flathead.mt.us to i F Ili - .. _ • FILE NO: '' 1' 1 1, the undersigned certify that I did this date mail via Certified Mail a copy of the attached notice to the following list of landowners a!ajoining the property lines of the property where a preliminary plat has been requested. n.- au. -- : 13-2-2 Tract/Lot: 1, 2, 3AA .: ;.. / I • :c } F-,tligfork,59911 CTA Attn: Wayne Freeman Bozeman, MT 59718 • • January 27, 2009 A special meeting of the Kalispell City Planning Board and Zoning Commission is scheduled for Tuesday, January 27, 2009 beginning at 7:00 PM in the Kalispell City Council Chambers, Kalispell City Hall, 201 First Avenue East, Kalispell. The planning board will hold a public hearing and take public comments on the following agenda items. The Board will make recommendations to the Kalispell City Council who will take final action. 1. A request by 93 & Church, LLC for preliminary plat approval of the second phase of the Silverbrook Estates subdivision. Phase 2 includes approximately 167 acres which constitutes the remaining acreage outside of phase 1 of the 325 acre project site. Phase 2 proposes 197 single-family lots, 90 townhouse lots, 13 commercial lots and one fire station lot. The single family lots will range in size from approximately 1/4 of an acre up to 1/3 of an acre in size. The townhouse lots will average approximately 4,250 square feet and have an average lot width of 50 feet. The 13 commercial lots will range in size from approximately 8,700 square feet to just over one acre. Open space and parkland areas will make up approximately 48 acres of the 167 acres in phase 2. The preliminary plat of phase 2 substantially complies with the PUD master plan the city council approved in December of 2006. The property proposed for subdivision lies at the southwest corner of the intersection of Highway 93 and Church Drive. The property can be described as Tracts 1, 2, and 3AA within the NE i/4 of Section 13, Township 29 North, Range 22 West, P.M.M., Flathead County, Montana. Documents pertaining to the agenda item are on file for public inspection at the Kalispell Planning Department, 201 First Avenue East, Kalispell, MT 59901, and are available for public review during regular office hours. Interested persons are encouraged to attend the hearing and make their views and concerns known to the board. Written comments may be submitted to the Kalispell Planning Department at the above address, prior to the date of the hearing, or you may call us at (406) 758-7940, or e-mail us at planningakalispell.com for additional information. i 4.,4 TJnVt____ Thomas R. Jentz Planning & Building D rector 93 & Church, LLC CTA Silverbrook Investment, LLC Attn: Wayne Freeman Majestic Valley, LLC P.O. Box 1028 Winter Park, 3154 Parkwood Lane 1143 Stoneridge Drive , FL 32790 Bigfork, MT 59911 Bozeman, MT 59718 Flathead Village Greens 500 Palmer Drive Kalispell, MT 59901 David & Theresa Burt 195 Hagerman Lane Kalispell, MT 59901 Northern Eagle Holdings, LLC 3577 Hwy 93 North Kalispell, MT 59901 Marilyn Noonan P.O. Box 10171 Kalispell, MT 59904 Rick 8s Rebecca Myers 15 Miranda Drive Kalispell, MT 59901 Sky Air Enterprises 1885 Stillwater Road Kalispell, MT 59901 Herbert & Lavonne Koenig Humane Society of NW Montana Moerkerke Family Trust 430 Church Drive P.O. Box 221 14550 N Frank L. Wright Blvd Kalispell, MT 59901 Kalispell, MT 59903 Suite 100 Scottsdale, AZ 85260 Northwest Property Dev, LLC Bill & Karen Franklin Richard Mullee Trust 1082 Silvertip Drive P.O. Box 3513 3595 US Hwy 93 North Bigfork, MT 59911 Kalispell, MT 59903 Kalispell, MT 59901 Gregory Limberis 157 Hagerman Lane Kalispell, MT 59901 Carol Fitzpatrick 550 Lindsey Lane Kalispell, MT 59901 Bruce 8s Karen Christiansen 3695 US Hwy 93 N Kalispell, MT 59901 Chad & Elizabeth Ballman 150 Sheafman Creek Road Victor, MT 59875 West Valley Land Use Committee Attn: Gary Krueger 805 Church Drive Kalispell, MT 59901 Ronald 8v Bonnie Kuehne 173 Hagerman Lane Kalispell, MT 59901 Neoma & Phillip Anderson 120 Highland Drive Kalispell, MT 59901 Martin & Susan Gilman P.O. Box 7274 Kalispell, MT 59904 James & Susan Syvertson 135 Highland Drive Kalispell, MT 59901 Eric & Dennis Wutke 3465 US Hwy 93 North Kalispell, MT 59901 Ronald 8v Susan McKoy 3569 US Hwy 93 N Kalispell, MT 59901 Victoria Yorton City of Kalispell P.O. Box 36933 Attn: City Clerk Albuquerque, NM 87176 P.O. Box 1997 Kalispell, MT 59903 B.J. Grieve Gordon Cross, President Flathead County Planning & Zoning Flathead County Planning Brd 1035 - 1st Avenue West P.O. Box 296 Kalispell, MT 59901 Whitefish, MT 59937 No. 13898 NOTICE OF PUBLIC HEARING KALISPELL CITY PLANNING BOARD AND ZONING COM- MISSION January 27, 2009 A special meeting of the Kalispell City Plan- ning Board and Zoning Commission is sched- uled for Tuesday, Janu- ary 27, 2009 beginning at 7:00 PM in the Kalis- pell City Council Cham- bers, Kalispell City Hall, 201 First Avenue East, Kalispell. The planning board will hold a public hearing and take public comments on the follow- ing agenda items. The Board will make recom- mendations to the Kalis- pell City Council who will take final action. 1. A request by 93 & Church, LLC for prelimi- nary plat approval of the second phase of the Sil- verbrook Estates subdi- vision. Phase 2 includes approximately 167 acres, which constitutes the remaining acreage outside of phase 1 of the 325-acre project site. Phase 2 proposes 197 single-family lots, 90 townhouse lots, 13 commercial lots and one fire station lot. The sin- gle-family lots will range in size from approxi- mately 1/4 of an acre up to 113 of an acre in size. The townhouse lots will average approximately 4,250 square feet and .have an average lot width of 50 feet. The 13 commercial lots will range in size from ap- proximately 8,700 square feet to just over one acre. Open space and parkland areas will make up approximately 48 acres of the 167 acres in phase 2. The preliminary plat of phase 2 substantially complies with the PUD master plan the city council approved in De- cember of 2006. The property proposed for subdivision lies at the southwest comer of the intersection of Highway 93 and Church Drive. The property can be de- scribed as Tracts. 1, 2, and 3AA within the NE 1/4 of Section 13, Town- ship 29 North, Range 22 West, P.M.M., Flathead County, Montana. Documents pe �Ig to the agenda ite,.. are on file for public inspec- tion at the Kalispell. Planning Department,. 201" First Avenue East, :r`_ Kalispell, MT-59.901 and are available for public review during` regular office flours Interested persons are encouraged to -offend the hearing•and>make their yiewws and con- cerns 'known to<_the4 board..Written coin merits may be:.submit ted to the Kalispeff Plan-; ning; Department=.at;:the,: above address;; p ,or;to �;- the: date: of the hearing,. or you may call us at (406)'758-7940; ore - mail us atplanning.Qka- lispelf:com for addifional information. /s/Thomas R. den tz Thomas R-.Jentz Planning:&• Building Director.. _. Jan. 11, 2009 STATE OF MONTANA � = IW-11oZKel01�'A AFFIDAVIT OF PUBLICATION RICHELLE ROONEY BEING DULY SWORN, DEPOSES AND SAYS: THAT SHE IS THE LEGAL CLERK OF THE DAILY INTER LAKE A DAILY NEWSPAPER OF 'GENERAL CIRCULATION, PRINTED AND PUBLISHED IN THE CITY OF KALISPELL, IN THE COUNTY OF FLATHEAD, STATE OF MONTANA, AND THAT NO. 13898 LEGAL ADVERTISMENT WAS PRINTED AND PUBLISHED IN THE REGULAR AND ENTIRE ISSUE OF SAID PAPER, AND IN EACH AND EVERY COPY THEREOF ON THE DATES Of Jan. 11, 2009. AND THE RATE CHARGED FOR THE ABOVE PRINTING DOES NOT EXCEED THE MINIMUM GOING RATE CHARGED TO ANY OTHER ADVERTISER FOR THE SAME PUBLICATION, SET IN THE SAME SIZE TYPE AND PUBLISHED FOR THE SAME NUMBER OF INSERTIONS. 1 Subscribed and sworn to Before me this January 12, 2009 Dorothy G Notary Public for the State of Montana Residing in Kalispell My commission expires 9/11/09