Loading...
WS 11/27/06 Annexation, Zoning, PUD & PPCity of Kalispell Planning Department 17 - 2"d Street East, Suite 211, Kalispell, Montana 59901 Telephone: (406) 751-1850 Fax: (406) 751-1858 Website: kalispellplanning.com REPORT TO: Kalispell Mayor and City Council FROM: Sean Conrad, Senior Planner SUBJECT: Annexation and Initial Zoning, Planned Unit Development (PUD) overlay district and Preliminary Plat request for Silverbrook Estates Subdivision MEETING DATE: Work Session of November 27, 2006 BACKGROUND: The Kalispell City Planning Board met on November 14, 2006 and held a public hearing to consider a request by 93 & Church LLC for initial zoning designations of R-2, R-4 and B-1 upon annexation to the City of Kalispell, a Planned Unit Development (PUD) and preliminary plat approval for 249 lots on a 325.1 acre property located north of the City of Kalispell at the intersection of Highway 93 and Church Drive. The property proposed for annexation lies at the southwest corner of the intersection of Highway 93 and Church Drive. The property can be described as Tracts 1, 2, and 3AA within the NE 1/4 of Section 13, Township 29 North, Range 22 West, P.M.M., Flathead County, Montana. At the public hearing Wayne Freeman of CTA spoke in favor of the subdivision as well as two other members of the public. After the public hearing the board discussed the proposal and a motion was made to recommend approval of the requested zoning districts of R-2, R-4 and B-1, approval of the requested PUD for the property subject to the conditions listed in the staff report and approval of the preliminary plat subject to the conditions listed in the staff report. The motion passed on a 5 to 1 vote. This project is scheduled for the Council's work session on November 27th with a hearing before the Council scheduled for December 4th. Respectfully ptb fitted, j Sean Conrad Senior Planner REQUEST• INITIAL ZONINGOF and B-1 UPON ANNEXATION REPORTSTAFF 01;1LOR4 V131114 all!' 1 • r I ! 1 tI NOVENMER! • A report to the Kalispell City Planning Board and the Kalispell City Council regarding the request for initial zoning designations of R-2, R-4 and B-1 upon annexation to the City of Kalispell, a Planned Unit Development (PUD) and preliminary plat approval for 249 lots on a 325.1 acre property located north of the City of Kalispell at the intersection of Highway 93 and Church Drive. A public hearing has been scheduled before the planning board for November 14, 2006, beginning at 7:00 PM in the Kalispell City Council Chambers. The planning board will forward a recommendation to the Kalispell City Council for final action. BACKGROUND INFORMATION: The property owners have petitioned for annexation and initial zoning classifications of R-2, Single Family Residential, R-4, Two -Family Residential, and B-1 Neighborhood Buffer District with a PUD overlay over the entire ownership. The property is in the County zoning jurisdiction and is zoned AG-40, Agricultural. The preliminary plat of phase 1, Silverbrook Estates Subdivision, creating 249 single family lots has been filed concurrently with the petition to annex and PUD request. This staff report will address all three requests, initial zoning, planned unit development overlay district and preliminary plat, that the owners are seeking on the property. Each request will be reviewed with a recommendation and unified set of conditions at the end of the report on page 27. A. Petitioner and Owners: Technical Assistance: 93 &. Church LLC 100 Hathaway Lane Kalispell, MT 59901 (406) 756-8077 CTA Architects Engineers 10180 Cottonwood Road Bozeman, MT 59718 Moore Engineering, PLLC 100 Emerald Drive Billings, MT 59105 F&H Land Surveying, Inc. 144 Second Street East, Ste 201 Whitefish, MT 59937 B. Location and Legal Description of Property: The property proposed for annexation lies at the southwest corner of the intersection of Highway 93 and Church Drive. The property can be described as Tracts 1, 2, and 3AA within the NE 1/4 of Section 13, Township 29 North, Range 22 West, P.M.M., Flathead County, Montana. C. Existing Land Use and Zoning: The property is currently in the County zoning jurisdiction and is zoned AG-40, Agricultural, a zoning designation that has a 40- acre minimum lot size requirement. The purpose of the AG-40 zoning district is to protect and preserve agricultural land for the performance of a wide range of agricultural functions. It is intended to control the scattered intrusion of uses not compatible with an agricultural environment, including, but not limited to, residential development. The majority of the property is currently being used for agricultural production. There is an existing abandoned house located in the southeast corner of the site. rr .. .T .. ., North: Agricultural land including a 240 acre conservation easement, a race track and'Majestic Arena; County AG-40 and SAG-5 zoning East: Single-family homes and commercial businesses; County SAG-10 and County B-1 zoning South: Single-family homes and agricultural land; County SAG-10 and AG-40 zoning. West: Agricultural land; County AG-40 and West Valley Zoning District zoning E. General Land Use Character: The area can be described as largely agricultural in nature however there are existing commercial businesses along sections of Highway 93 east of the project site. No residential subdivisions are located in the immediate area of the project site. The closest residential developments are located approximately 1/2 mile south of the project site. F. Utilities and Public Services: Sewer: City of Kalispell Water: City of Kalispell Refuse: Private contractor Electricity: Flathead Electric Cooperative Gas: NorthWestern Energy Telephone: CenturyTel Schools: School District #5 Fire: Kalispell Fire Department Police: City of Kalispell The project involves 325 acres of land bounded on the north by Church Drive, the 0 east by US 93, on the west by the Stillwater River and a farmstead belonging to the property owner who sold the subject site to the developer and to the south by a 5 lot subdivision and farmland. The applicants propose an upscale mixed use project to be developed in 2 phases. The first phase encompassing the southerly 160 acres would include 249 single family lots averaging 1/4 to 1/2 acre in size. The second phase will include an additional 217 single family lots across the balance of the property. In addition, in the very northeast corner of the site near the Church Drive intersection the applicants propose 120 town homes (two unit configurations) forming a ring or buffer around 12 neighborhood commercial lots averaging in size from 8,400 square feet to 17,000 square feet with one commercial lot at 39,000 square feet in size. The applicant proposes to give, as part of phase 1, a 2 1/2 acre fire station site on Church Drive in compliance with our overall fare station planning criteria. They propose to upgrade the entire length of Church Drive to city standards where it abuts their subdivision. The applicants proposed 3 access points out on to Church Drive and plan to take advantage of the new interchange at Church and 93 targeted for completion in 24 months. They propose to restrict all access directly onto US 93 except for one primary access at the southernmost corner of the project site. All streets within the subdivision will equal or exceed city standards. The applicants propose to provide significant buffering along US 93 including 100 - 240 feet of greenbelt containing an 8 foot high meandering landscaping berm and a 12 foot wide public bike path. They also propose an integrated trail system connecting a series of small open spaces as well as a large open space along the Stillwater River system. The trails will be open to public use. All development will be set back from the top of the Stillwater River bank, no development is proposed below the top of the embankment. rEVALUATION BASED ON • • - MTML ZONIINGAND PROPOSED PUD OVERLAY The statutory basis for reviewing a change in zoning is set forth by 76-2-303, M.C.A. Findings of fact for the zone change request are discussed relative to the itemized criteria described by 76-2-304, M.C.A. and Section 27.30.020, Kalispell Zoning Ordinance. 1. Does the requested zone comply with the growth policy? On August 7, 2006 the Kalispell City Council adopted resolution 5129B which amended the Kalispell Growth Policy Future Land Use map north to the intersection of Highway 93 and Church Drive. On the amended land use map the 325.1 acre project site is designated Neighborhood Commercial in the northeast corner of the site surrounded by a narrow band of High Density Residential with the remaining acreage of the project site designated Suburban Residential with typical densities of up to 4 units/acre. The zoning designations being proposed for the 325.1 acre project site are R-2, Single Family Residential which matches the suburban residential Growth Policy map designation, R-4, Two -Family Residential which matches the area of the growth policy map designated as High Density Residential at the corner of Church and 93; and B-1, Neighborhood Buffer District which matches that portion of the 3 growth policy map designated as neighborhood commercial at the corner of Church and 93. The R-2 zoning district is intended primarily for detached single-family dwellings. It has a minimum lot size requirement of 9,600 square feet and a minimum lot width of 70 feet. Setbacks are 20 feet in the front and 10 feet on the sides and rear. The vast majority of the 325.1 acre project site is designated Suburban Residential on the Kalispell Growth Policy Future Land Use Map dated August 8, 2006. The Kalispell Growth Policy 2020, Chapter 3, Policy 9 states in part that suburban housing densities should not exceed two to four dwellings per gross acre. Subsection b of Policy 9 further states that the suburban residential designation is intended to reduce density and development impacts in sensitive areas and existing rural neighborhoods. The proposed R-2 zoning district limits the land uses to primarily single-family residences with a density of approximately 3.5 dwelling units per gross acre. The proposed R-2 zoning district can be found to comply with the Suburban Residential land use designation and implement the policies regarding Suburban Housing as found in Chapter 3 of the Kalispell Growth Policy. The R-4, Two -Family Residential, zoning district allows both single-family residences and duplexes as permitted uses. The minimum lot size for the district is 6,000 square feet and a minimum lot width of 50 feet with setbacks of 15 feet in the front, 10 feet in the rear and 5 feet on the sides. Highway 93 North Growth Policy Amendment, Policy Number 5 states, "Neighborhood commercial areas would in turn be buffered from lower density and intensity residential areas through the use of higher density residential uses and office uses." The northeast corner of the project site is designated Neighborhood Commercial with a band of High Density Residential surrounding it. The proposed R-4 zoning district implements the desired types of land uses within this portion of the property and policy 5 of the Highway 93 North Growth Policy Amendment. The B-1, Neighborhood Buffer District, zoning district is a business district to provide certain commercial and professional office uses where such uses are compatible with the adjacent residential areas. This district is also intended to provide goods and services at a neighborhood level. The minimum lot size for the district is 7,000 square feet and a minimum lot width of 60 feet with setbacks of 20 feet for the front and rear property boundaries and 5-feet on the side property boundaries. Highway 93 North Growth Policy Amendment, Policy Number 4 states, "Neighborhood commercial should be used as a means to buffer key intersections and to meet immediate local needs, not to serve as a destination shopping area." The proposed B-1 zoning district is proposed in the northeast corner of the project site in relation to the Neighborhood Commercial land use designation as shown on the Kalispell Growth Policy Future Land Use Map dated August 8, 2006. The proposed B-1 zoning district implements the desired types of land uses within this portion of the property and policy 4 of the Highway 93 North Growth Policy E Amendment. In addition, development of the B-1 zone is proposed to occur in a latter phase as the area develops, not in the initial stages where it would have to survive off of outside users. Based on the above cited policies in the Kalispell Growth Policy, the requested zoning districts can be found to comply with the existing land use designations and the growth policy. 2. Is the requested zone designed to lessen congestion in the streets? It can be anticipated that the proposed zone change of the property will increase traffic impacts in the area due to the relatively low density of the area currently and the relatively higher density allowed under the proposed zoning districts. Traffic impacts to the area can be accommodated with the existing roadway systems at hand and the new internal roads that will be developed as part of the subdivision on the project site. The proposed zoning carries with it the checks and balances, including the need for subdivision review, which will insure that traffic flows and access are appropriately addressed. The potential densities afforded by this zone will the subject of a specific transportation analysis as part of the subdivision review process and as such the applicants will be required to mitigate any negative impacts created. In addition, within the next 24 months MDOT will expand US 93 to a 4-lane configuration with an interchange at Church Drive. 3. Will the requested zone secure safety from fire, panic, and other dangers? At the time this property is developed, the property owners will be required to insure that there is adequate infrastructure in the case of an emergency. There are no features related to the property which would compromise the safety of the public. New construction will be required to be in compliance with the building safety codes of the City which relate to fire and building safety. All municipal services including police and fire protection, water and sewer service is available to the property and will be utilized at the time another lot is created in the future. 4. Will the requested zone promote the health and general welfare? The requested zoning classifications will promote the health and general welfare by restricting land uses to those which would be compatible with the adjoining properties and provides a place for new housing in the community. 5. Will the requested zone provide for adequate light and air? Setback, height, and coverage standards for development occurring on this site are established in the Kalispell Zoning Ordinance to insure adequate light and air is provided. 6. Will the requested zone prevent the overcrowding of land? As previously noted, this area has been anticipated for residential and limited commercial development. The anticipated densities of the proposed zoning districts fall within the land use designations for the site. All public services and facilities will be available to serve this property. An overcrowding of land would 5 occur if infrastructure were inadequate to accommodate the development in the area. This is unlikely to occur. 7. Will the requested zone avoid undue concentration of people? An increase in the number and concentration of people in the area will likely result after this land has been converted from County agricultural zoning to a more intensive residential and commercial use. However, the intensity of the uses of the property would be in direct relationship to the availability of public services, utilities and facilities as well as compliance with established design standards. The design standards and availability of utilities would provide the infrastructure needed to insure that there will not be an overcrowding of the land or undue concentration of people. Minimum lot standards and use standards as well as subdivision development standards will avoid the undue concentration of people at the time the property is further developed. 8. Will the requested zone facilitate the adequate provision of transportation water, sewerage, schools, parks, and other public requirements? .Public service, facilities and infrastructure would be made available to the developer. The developer would need to extend the needed City services that are not currently extended to the property at the developers' expense and in accordance with the City's policies and standards. New improvements to the property such as roads, water, sewer, parks and drainage would be installed in accordance with City policies and standards at the developers' expense thereby insuring that there is adequate provision of services to the site prior to development. Fire, police, ambulance and public access are adequate to accommodate potential impacts associated with the development of this site. There will be impacts to services that can be anticipated as a result of this proposal which can be met by the City. All public services and facilities are currently available or can be provided to the property. 9. Does the requested zone give consideration to the particular suitability of the property for particular uses? The 325.1 acre site is fairly level throughout with a small drainage bisecting the site from east to west. The drainage flows west into a small wetlands area adjacent to the Stillwater River. The Stillwater River makes up the western boundary of the project site. The higher density zoning, the proposed R-4 and B- 1 zoning districts, are located in the northeast corner of the site, well away from the drainage and river corridor. These more intensive uses are proposed near the US 93 and Church Drive interchange which will be constructed within 24 months and which will greatly serve to expedite the movement of traffic on and off of US 93. The proposed R-2 zoning would encompass the majority of the project site and requires larger size residential lots. As stated previously, Chapter 3, policy 9(b) of the Kalispell Growth Policy states that the suburban residential designation is intended to reduce density and development impacts in sensitive areas. The suburban residential designation includes all the areas around the exiting drainage and areas along the Stillwater River corridor. Based on the location of the proposed zoning districts and their corresponding uses and densities, the requested zoning does give consideration to the particular X suitability of the property for particular uses. 10. Does the requested zone give reasonable consideration to the character of the district? The general character of the area is agricultural in nature today. The proposed zoning allows this development to address needs within the community for housing and support services on public services and in reasonable proximity to the City core for the future. Availability of public water and sewer to the area indicate that this type of development will continue to occur on the urban fringes of the community to be developed with similar types of uses as is proposed with this property, i.e. suburban or urban residential rather than rural or agricultural uses. It appears that the proposed rezoning gives reasonable consideration to the character of the district. 11. Will the proposed zone conserve the value of buildings? The development anticipated under the proposed zoning is more intensive than the land uses currently surrounding the project site. City standards will insure that there is high quality development which will insure the value of buildings and homes is protected, maintained and conserved. Value of the buildings in the area will be conserved because the zoning will promote compatible and like uses on this property as are found on other properties in the area. 12. Will the requested zone encourage the most appropriate use of the land throughout the municipality? Residential and commercial development is encouraged in areas were services and facilities are available or can be extended to serve such development such as the subdivision being proposed in conjunction with the annexation and initial zoning request on this parcel. The proposed zoning is consistent with the growth policy plan. M Project Narrative: Nature of the Request: This is a request for a Planned Unit Development (PUD) zoning overlay on a 325.1 acre project site requesting City R-2, Single Family Residential, R-4, Two Family Residential, and B-1, Neighborhood Buffer District, zoning. The property is currently zoned zoned AG-40, Agricultural. The property owners have requested annexation into the City of Kalispell with the initial zoning of R-2, R-4 and B-1. The PUD will be known as Silverbrook Estates subdivision and consists of 466 single family lots, 120 townhomes and 12 commercial lots. The PUD application is requesting nine deviations or relaxations from the Kalispell Zoning Ordinance and Kalispell Subdivision Regulations. The nine relaxations are as follows: 1. Kalispell Subdivision Regulations, Section 3.07, B (Blocks) This section specifies that block lengths shall not be less than 300 feet nor more than 1,200 feet. The owner is requesting to exceed the 1,200 foot block length proposing blocks up to 2,200 feet in length without a vehicle or pedestrian crossing. 2. Kalispell Subdivision Regulations, Section 3.11, A (Sidewalks) This section requires sidewalks on both sides of the street in all residential and commercial subdivisions. The owner is requesting placing a sidewalk on only one side of Diamond Peak Loop, a roadway proposed to serve the neighborhood commercial area of the project. 3. Kalispell Zoning Ordinance, Section 27.07.040 (1) (Minimum lot size in the R-4 zoning district) This section requires a minimum lot size of 6,000 square feet for new lots created in the R-4 zoning district. The owners are requesting a minimum lot size of 4,250 square feet. 4. Kalispell Zoning Ordinance, Section 27.07.040 (3) (Minimum yard setbacks in the R-4 zoning district) The section requires a front and side corner yard setback of 15 feet. The owner is requesting this setback be reduced to 10 feet for the front and side corner property boundaries. 5. Kalispell Zoning Ordinance, Section 27.22.090 (Fences, Walls and Hedges) This section allows a maximum fence, hedge or freestanding wall height of 42 inches within or boundary the front yard setback. The owner is requesting that a 48 inch tall fence be allowed within or bounding this front setback area in all areas of the proposed subdivision. 9 6. Kalispell Zoning Ordinance, Section 27.13.040 (3) (Minimum yard setbacks in the B-1 zoning district) The section requires front and rear yard setbacks of 20 feet. The owner is requesting this setback be reduced to 5 feet for the front and rear property boundaries. 7. Kalispell Zoning Ordinance, Section 27.13.040 (5) (Permitted lot coverage in the B-1 zoning district) The section permits a maximum lot coverage of 50% in the B-1 district. The owner is requesting the permitted lot coverage be increased from 50% to 100%. 8. Kalispell Zoning Ordinance, Section 27.26.040 (5) (Joint use of parking facilities) This section allows the zoning administrator to authorize the joint use of parking facilities for uses or activities under specific conditions. The owner is requesting to be allowed to create a "Silverbrook Estates Parking Regulation, Management Plan and Ordinance" to provide for direction in the planning and design of all parking facilities within the requested B-1 zoning district of the subdivision. 9. Kalispell Zoning Ordinance, Section 27.27.020 (1) - (6) (standards for loading berths) This section provides standards for off-street loading berths. The owner is requesting an alternative loading berth plan be allowed. • •IFF!'1111!I1111Fr • • • • ! - • • • • • The following information and evaluation criteria are from Section 27.21.020(2), of the Kalispell Zoning Ordinance. The intent of the planned unit development provisions are to provide a zoning district classification which allows some flexibility in the zoning regulations and the mixing of uses which is balanced with the goal of preserving and enhancing the integrity of the neighborhood and the environmental values of an area. The zoning ordinance has a provision for the creation of a PUD district upon annexation of the property into the city. Review of Application Based Upon PUD Evaluation Criteria: The zoning regulations provide that the planning board shall review the PUD application and plan based on the following criteria: 1. The extent to which the plan departs from zoning and subdivision regulations otherwise applicable to the subject property, including, but not limited to, density, bulk and use, and the reasons why such departures are or are not deemed to be in the public interest; As stated above the owners are requesting nine relaxations in the zoning and subdivision regulations. Below are the nine relaxations requested with the consultants reasoning on why such departures are deemed to be in the public interest. Planning staff has provided its comments in italics. 9 Kalispell Subdivision Regulations, Section 3.07, B (Blocks) This section specifies that block lengths shall not be less than 300 feet nor more than 1,200 feet. The owner is requesting to exceed the 1,200 foot block length. The applicant is proposing 6 blocks between phases 1 and 2 which exceed the 1,200 foot standard and which range from 1,300 to 2,200 feet in length. The application states that the applicant believes that the longer blocks are necessary to create the overall design intent and that longer blocks do not negatively impact the adjacent properties or internal lots within the subdivision. Pedestrian connections and vehicular access is provided that mitigates any concerns with connectivity within the subdivision. The Kalispell Growth Policy, Chapter 8, Urban Design, Historic and Cultural Conservation, Goal 2 states, "Encourage design that is consistent with and contributes to the character of the area and that promotes safe and accessible pedestrian access and movement." Although the developer should be commended for the pedestrian and bike trail system proposed throughout the subdivision, in order to comply with this goal of the growth policy pedestrian pathways should be located either midway on blocks exceeding 1,200 feet in length or in the area of the block exceeding 1,200 feet which would provide the best connectivity to surrounding streets or pedestrian/bike paths. 2. Kalispell Subdivision Regulations, Section 3.11, A (Sidewalks) This section requires sidewalks on both sides of the street in all residential and commercial subdivisions. The owner is requesting placing a sidewalk on only one side of Diamond Peak Loop, a roadway proposed to serve the neighborhood commercial area of the project. By placing a sidewalk on only one side of the loop road, a green space in the interior of the loop could be provided. The green space offers no building or services and functions more as a significant landscape feature. As this relaxation would apply to only one street in the commercial area of the proposed subdivision it would make sense because functionally a sidewalk surrounding a green space would have little purpose other than taking up more of the green space provided. 3. Kalispell Zoning Ordinance, Section 27.07.040 (1) (Minimum lot size in the R-4 zoning district) This section requires a minimum lot size of 6,000 square feet for new lots created in the R-4 zoning district. The owners are requesting a minimum lot size of 4,250 square feet. The consultants have clarified that the minimum lot size of 4,250 square feet would be for one townhome. Section 27.22.130(1)(b) of the Kalispell Zoning Ordinance states that in no case shall a sublot have an area less than 2, 000 square feet nor more than one dwelling unit thereon. As the owners are proposing to construct only one townhome on a 4,250 square foot lot or sublot as the zoning code would define it, the proposed plans meet the zoning code requirements of Section 27.07.040 (1). 4. Kalispell Zoning Ordinance, Section 27.07.040 (3) (Minimum yard setbacks in the R- 4 zoning district) 10 The section requires a front and side corner yard setback of 15 feet. The owner is requesting this setback be reduced to 10 feet for the front and side corner property boundaries. The owners are requesting this reduction in order to allow the townhomes to be placed closer to the street in order to have more interaction with the streetscape and the pedestrian interface. In addition, it would allow the lot to be more buildable, with less green space to maintain and appealing to a "low maintenance" buyer. The Planning Department would encourage house oriented streets instead of garage oriented streets and staff would agree that reduced setbacks would provide for better interaction with surrounding homes, the streetscape and pedestrian traffic. The Planning Department recommends however that garages be set back a minimum of 20 feet and the 10 foot setback only apply to the house. It should be noted that by reducing the lot setbacks this will not in turn increase the lot coverage on the R-4 lots thus allowing the lot to be more buildable with less green space to maintain. 5. Kalispell Zoning Ordinance, Section 27.22.090 (Fences, Walls and Hedges) This section allows a maximum fence, hedge or freestanding wall height of 42 inches within or bordering the front yard setback. The owner is requesting that a 48 inch tall fence be allowed within or bounding this front setback in all areas of the proposed subdivision. The CC&R's and design regulations for the subdivision will insure that the fences are not solid and are constructed to the specifications listed in the design regulations. The application states that the fence is meant to provide a visual separation rather than a physical barrier to adjacent areas. The Planning Department does not have an issue with the slight increase in height. However, the height increase would only apply to fences, not hedges or walls and the fence could not be solid. 6. Kalispell Zoning Ordinance, Section 27.13.040 (3) (Minimum yard setbacks in the B- I zoning district) The section requires front and rear yard setbacks of 20 feet. The owner is requesting this setback be reduced to 5 feet for the front and rear property boundaries. The intent is to provide a more "urban' street interface with store frontages and create a streetscape that is pedestrian friendly and accessible for walking and shopping comfortably. The reduced setbacks will also allow the commercial lots to be situated directly adjacent to key pedestrian plazas and gathering areas or open space. The Kalispell Growth Policy, Chapter 8, Urban Design, Historic and Cultural Conservation, Policy 5 states, "Encourage the design of urban public spaces such as local streets and public squares to be central areas framed by buildings, creating a visual quality of partial enclosure." The intent of the reduce setbacks would appear to meet this policy. 7. Kalispell Zoning Ordinance, Section 27.13.040 (5) (Permitted lot coverage in the B-1 zoning district) The section permits a maximum lot coverage of 50% in the B-1 district. The owner is requesting the permitted lot coverage be increased from 50% to 100%. The 11 application notes that the increased lot coverage would allow the buildings to be situated directly adjacent to the pedestrian streetscape, plazas, and open space. This will create a tight knit pedestrian oriented commercial area. The purpose of the 50% lot coverage is to allow the building and associated parking and landscaping to be included wholly within the individual lot. The owner is trying to create a downtown similar to that of downtown Kalispell. Buildings placed at the edge of the sidewalk with parking lots dispersed throughout the downtown area. The owners are also seeking to create a parking district to serve the commercial area of the subdivision. To compensate for the trade off of increased lot coverage on the B-1 lots, the Planning Department would recommend the minimum landscaping and screening requirements for parking areas be increased from 5% to 10%. Furthermore, at the time the owners apply for Phase IT of the subdivision plat, which includes the neighborhood commercial area, a preliminary parking lot layout plan and landscaping plan shall be submitted. The plan shall show how the minimum 10% landscaping requirement is being accomplished. 8. Kalispell Zoning Ordinance, Section 27.26.040 (5) (Joint use of parking facilities) This section allows the zoning administrator to authorize the joint use of parking facilities for uses or activities under specific conditions. The owner is requesting to be allowed to create a "Silverbrook Estates Parking Regulation, Management Plan and Ordinance" to provide for direction in the planning and design of all parking facilities within the requested B-1 zoning district of the subdivision. The Silverbrook Estates Parking Regulation, Management Plan and Ordinance states that the purpose of the plan is to provide a unified approach to the construction, maintenance and management of parking within the commercial area of the subdivision. Its purpose is to also provide surface parking that meets the needs of the Silverbrook Estates development without building large areas of underutilized parking. However, the parking regulations specifically require each use in the proposed commercial area meet the minimum parking requirements as specified in Section 27.26.050 of the Kalispell Zoning Ordinance. Planning staff would only recommend that the Silverbrook Estates Parking Regulation, Management Plan and Ordinance be amended to incorporate the use of pedestrian walkways within the parking areas to provide for needed connectivity between the commercial buildings and the sidewalk or bicycle pathways surrounding the commercial area. 9. Kalispell Zoning Ordinance, Section 27.27.020 (1) - (6) (standards for loading berths) This section provides standards for off-street loading berths. The owner is requesting an alternative loading and berth plan be allowed. The Silverbrook Estates Parking Regulation, Management Plan and Ordinance, Section 6.0, Standards, provides a number of standards including the dimension and design layout of loading docks or off-street loading berths. The Planning Department would recommend that the owner be allowed to provide alternative standards for off-street parking including loading berths within their parking regulation, management plan and ordinance, however final approval of all standards within this parking regulation, management plan and ordinance shall be approved by the City of Kalispell. These standards will need to be approved prior to any final plat approval for the commercial 12 ram," 2. The nature and extent of the common open space in the planned development project, the reliability of the proposals for maintenance and conservation of the common open space and the adequacy or inadequacy of the amount and function of the open space in terms of the land use, densities and dwelling types proposed in the plan; The entire project site is 325.1 acres and the proposed subdivision would create 120 townhouse lots, 466 single family residential lots and 120,000 square feet of commercial area within 12 commercial lots and one 2 1/2 acre lot for a future fire station. The first phase of the subdivision consists of 249 single family lots and the fire station lot. The 249 lots within the first phase of the subdivision would range in size from approximately 1/4 acre to 1/2 acre in size and include an area of 160.2 acres. The overall density within the first phase of the project would be 1.5 dwelling units per acre. The second phase of the subdivision would add an additional 217 single family lots ranging in size from 1/4 acre to 1/2 acre in size, 120 townhouse lots and 12 commercial lots. The residential density in phase 2 of the project would be 2 dwelling units per acre. F&H Surveying compiled the amount of open space proposed throughout the 325.1 acre project site. They broke up the open space into two categories, suitable (those areas outside the 100-year floodplain and with slopes less than 20%) and unsuitable (those areas within the 100-year floodplain and with slopes greater than 20%). For phase 1 there is a total of 30.44 acres of open space, 19.61 acres of suitable open space and 10.83 acres of unsuitable open space. Phase 2 includes a total of 49.83 acres of open space, 22.4 acres of suitable open space and 27.43 acres of unsuitable open space. Therefore, the overall plan calls out 80.2 acres or approximately 25% of the site in open space. Within the open space areas, both suitable areas and unsuitable areas, the owners are proposing a bike and pedestrian path which varies in width from 8-12 feet. This open space includes a drainage as well as the Stillwater River corridor along the western edge of the project site. Planning staff would recommend the Planning Board and Council find that amount of open space areas adequate given the land use type and density in the proposed subdivision. It should be noted that included in the suitable open space are the buffer areas along Highway 93 and the detention areas within the subdivision. The Parks and Recreation Department has stated that at this time it would not consider these areas to be counted towards the overall parkland dedication required as part of the subdivision. The PUD application notes that open space areas will be maintained by a property owners association. The consultants for the project are still working with the Parks and Recreation Department on the details of the exact path locations and amenities within the proposed park areas. 3. The manner in which said plan does or does not make adequate provision for public services, provide adequate control over vehicular traffic and further the amenities of light or air, recreation and visual enjoyment; The developer will be required to extend municipal water and sewer to the site. The lines will be sized to serve not only this development, but also the full build out for the surrounding area. Church Drive, located along the north end of the property, will be 13 required to be upgraded to current City standards including widening of the roadway and the installation of curb and gutters and along the south side a landscape boulevard and sidewalk. The developer will be required to develop the utilities in accordance with the Kalispell Standards for Design and Construction. Additionally, the new roadways to be constructed within the residential portion of the development will meet or exceed the design standards for streets found in the Kalispell Subdivision Regulations. This will enable on -street parking to occur however, as part of future home construction on the site, two off-street parking spaces will be required per dwelling unit. In the commercial area of the PUD the owner is requesting to create a special parking and maintenance district in order to serve the future commercial businesses. The parking district would provide for adequate off-street parking in the immediate area of the commercial area however, with the small scale of commercial retail that could locate in the proposed B-1 zone, and the close proximity of homes to the commercial area, it is more likely that pedestrian or bicycle traffic will occur in this area than heavy vehicular traffic. The proposed zoning districts of R-2, R-4 and B-1 all have limitations on height and building setback requirements. Therefore, standards are already in place to insure that adequate light and air are achieved throughout the PUD development. The proposed parkland and open space areas are discussed above in section 2 which provide the recreation component of the PUD and accompanying subdivision. Adequate provisions are made for the visual enjoyment of the PUD project by way of setbacks and buffers from both the Stillwater River corridor and a drainage running through the site. The owners have included design criteria for homes and businesses locating within the development. These design features and construction standards will help to provide a visually pleasing project. 4. The relationship, beneficial or adverse, of the planned development project upon the neighborhood in which it is proposed to be established; The project is proposed in a rural area of Flathead County with limited residential density in the immediate area. There are several businesses located along Highway 93 however there are no immediate neighborhoods that this subdivision would impact. The site is somewhat buffered. To the west lies the Stillwater River as well as a single farmstead which belongs to the individual who sold this land to the current developer. To the northwest lies a 240 acre agricultural conservation easement. To the immediate north lies farmland and just beyond the Race Track and Majestic Arena. To the east the site is buffered by US 93 currently being widened to a 4-lane configuration. 5. In the case of a plan which proposes development over a period of years, the sufficiency of the terms and conditions proposed to protect and maintain the integrity of the plan which finding shall be made only after consultation with the city attorney; The developers are anticipating that the project would be in two separate phases over the course of four years. The PUD application notes that phase 1 improvement would be installed during the summer of 2007. Phase 2 improvements would be installed during the summer of 2008 and completed by the summer of 2010. 14 Part of the requirements of PUD is that the developer would enter into an agreement with the City of Kalispell to adequately insure that the overall integrity of the development, the installation of required infrastructure, architectural integrity and proposed amenities are accomplished as proposed. 6. Conformity with all applicable provisions of this chapter. No other specific deviations from the Kalispell Zoning Ordinance can be identified based upon the information submitted with the application other than those addressed in the beginning of this report. 15 rr 1211,1XVIONr it • • r7 51'•) • - : - • • )M to) This application is reviewed as a major subdivision in accordance with statutory criteria and the Kalispell City Subdivision Regulations. Phase 1 includes the southerly 160 acres of this 2 phase project, would be zoned single family R-2 and proposed 249 single family lots ranging is size from 1/4 to 1/2 acres in size. A. Effects on Health and Safety: Fire: This subdivision would be in the service area of the Kalispell Fire Department once annexed to the City. The property would be considered to be at low risk of fire because the subdivision and homes within the subdivision would be constructed in accordance with the International Fire Code and have access which meets City standards. All of the lots within phase 1 will abut a street that has been constructed to City standards. Hydrants will be required to be placed in compliance with the requirements of the International Fire Code and approved by the Fire Marshal. The fire access and suppression system should be installed and approved by the fire department prior to final plat approval because of potential problems with combustible construction taking place prior to adequate fire access to the site being developed. As development occurs north of the existing city limits of Kalispell the fire department continues to plan for new fire station locations to serve future residents of the city. The proposed subdivision would be located approximately 2.5 miles north of fire station number 62 located near the intersection of Highway 93 and Reserve Loop Drive. Phase I will sit at the northern edge of our current fire service area. As development continues northward the fire department has looked at potential future fire station sites. To help aid the fire department in it's ability to locate a future fire station north of the existing city limits, the owners are proposing to dedicate a 2.5 acre fire station/well site to serve the future residents in the area. Flooding: Prior to submitting the subdivision the owners had PBS&J conduct a detailed flood study. The revised 100 year floodplain is shown on the preliminary plat and, as the preliminary map indicates, all proposed lots are outside of the 100 year floodplain. Access: Access to the subdivision is provided by US Highway 93 on the east side of the subdivision and Church Drive, a County roadway on the north side of the project site. The Montana Department of Transportation is currently in the process of widening this portion of Highway 93 from two lanes to four lanes with on and off ramps to serve Church Drive. This work should be completed in the next 2 years. Internally, the subdivision would have one collector roadway, Silverbrook Drive, connecting with Highway 93 at the southeast corner of the subdivision and traveling northwest, through the subdivision, and connecting into Church Drive. Local access roadways to server the individual lots within phase 1 will be constructed within a 60-foot road right-of-way. An additional future 60-foot road right-of-way is proposed off of Silverbrook Drive to connect with the agricultural land immediately south of phase 1. 16 In summary, the development proposes only one access along US 93 at the very south end lining up with Tronstad Road. The remainder of US 93 would be no - access. Along the north 3 access points over a distance of 3/4 mile will access onto Church which ultimately connects to US 93 and the site of a future interchange. Finally the development proposes a fixture access point at the south end of the site to serve future development to properties to the south. Noise: Highway 93 is located on the east side of the proposed subdivision. In order to mitigate noise impacts associated with the highway the owners are proposing a buffer with widths varying between 100 feet to 240 feet. Within this buffer the owners are proposing to construct an earth berm approximately 8-10 feet high as well as planting a vegetative buffer for visual screening and a 12-foot bike/pedestrian trail running the length of the highway buffer. The Highway 93 North Growth Policy Amendment, Policy 1 states, "Gateway Entrance Corridors (areas of special concern) would extend up to 150 feet of either side of the existing R/W for primary highways and up to 50 feet for secondary highways." Policy 2.a of the Highway 93 North Growth Policy Amendment identifies this section of Highway 93 as being within a gateway entrance to Kalispell. Policy 3.i of the Highway 93 North Growth Policy Amendment provides the following requirements for land within the gateway entrance corridor where the adjacent gateway road speed is posted above 45 mph: i. A minimum 100 - 150 foot impact area should be provided for major entrances and a 50 foot entrance for minor entrances. ii. Within this impact area, a combination of berming, landscaping using live materials and trees as well as grass, a pedestrian trail system, limited parking and frontage roads should be incorporated. The proposed highway buffer includes the buffer setbacks listed above as well as the landscaping, berming and pedestrian trail system located within the highway buffer area. The Montana Department of Transportation was contacted to comment on the proposed buffer from Highway 93. The Highway Department responded that in order to effectively mitigate noise impacts from the highway any berm or wall must break the line of sight between the highway and the receiver (dwellings). This would mean that future homes built on the lots closest to the highway should not be able to see the highway traffic, including semi -trucks. As the lots closest to the highway in phase 1 are at roughly the same elevation as the highway the Highway Department recommends a berm of about 12 feet high. By providing a berm that breaks the line of sight the Highway Departments letter notes that the berm would provide at least a 5 decibel level noise difference which would be noticeable. For second stories the Highway Department suggests that acoustical architectural measures be considered when designing the home. This would include placing less sensitive noise rooms (kitchens, bathrooms, laundry rooms) on the side of the house closest to the highway. Other options would include reducing the number of doors or windows, installing triple pane windows and solid wood doors. Another concern the Highway Department discussed in their letter was the need 17 for the berm barrier to extend past the lots the berm is designed to protect from noise impacts. If the berm is not sufficiently extended past the lots protected from the berm then noise from the highway tends to wrap around the berm and still impact lots which may have a berm between them and the highway. The lots most likely impacted by this noise wrapping would be the lots located closest to the intersection of Silverbrook Drive and Highway 93. However, at this intersection the owners are proposing a setback of 200 feet or more which aids in the reduction of highway noise due to the larger setback. The Planning Department would recommend that to mitigate noise from Highway 93 a 12-foot berm be constructed within the proposed buffer as recommended by the Highway Department. As stated previously, the cross section of the buffer indicates a berm but the height of the berm appears to be between 8-10 feet high. The Planning Department would also recommend advising future lot owners closest to Highway 93 to utilize noise reducing materials in construction of their homes. The other potential noise impact in the area of the subdivision is located approximately one -mile north. The majestic valley arena and adjacent race track hold racing events and concerts that have the potential to generate noise that may be irritating to future residents within the subdivision. Therefore, the Planning Department recommends a note be placed on the final plat notifying residents of the subdivision of the adjacent arena and race track and noise generated by these uses can be heard from their property. Slope Stability: The high banks of the Stillwater River are prone to sloughing and slides. The slippages typically occur during wet cycles or in times of significant surface water events. Water soaks or trickles down through the soil until it hits an impervious clay layer. This layer then becomes supper saturated and slippage occurs. Historically, portions of road bed, stream banks and house foundations have been severely damaged by these events. The safest precaution is to maintain the high banks in their natural vegetation versus irrigated lawns and require building and rear lot setbacks. It is suggested that all lot lines be maintained at least 50 feet back from the edges of these physical features. B. Effects on Wildlife and Wildlife Habitat: The Stillwater River is located along the western edge of the subdivision and travels the length of the western property boundary of the 325.1 acre project site. In addition, a large drainage is located in the approximate center of the 325.1 acre project site and flows westward into the Stillwater River. The 160 acres within phase 1 of the project includes approximately 800 lineal feet of Stillwater River frontage. Phase 1 abuts the south side of the drainage for approximately 2,000 lineal feet. The upland portion of the property where lots are proposed has historically been used extensively as tilled cropland and therefore this entire portion of the site has been disturbed and managed for crop land. In the area along the Stillwater River, much of it remains open and undeveloped except for an irrigation pump house used to draw water out of the Still Water River to irrigate crops. This area does provide good habitat. The Montana Department of Fish, Wildlife and Parks (FWP) commented on the proposed subdivision with their letter stating that presently the stream banks in this are have healthy riparian vegetation including mature trees and riparian IN shrubs. The natural vegetation allows for stable stream banks, creates habitat for many fish and wildlife species, and provides a natural setting. Based on the current status of the riparian areas along the river and associated wetlands, FWP recommends that for a stream the size of the Stillwater River, a minimum of a 200-foot building setback with at least the first 75 feet adjacent to the stream be protected with natural vegetation. The letter notes that some of the proposed lots in phase 1 adjacent to the wetlands are within the 200 foot setback. Chapter 7, The Natural Environment, of the Kalispell Growth Policy 2020 lists the following Goals and Policies: ENCOURAGE DEVELOPMENT THAT IS COMPATIBLE WITH OR ENHANCES NATURAL RESOURCE VALUES INCLUDING AIR, WATER, SOIL AND VEGETATION. DEVELOPMENT NEAR ENVIRONMENTALLY SENSITIVE AREAS SHOULD BE ACCOMPLISHED SO THAT THESE FEATURES ARE LEFT IN A RELATIVELY UNDISTURBED STATE. Goal 6 PROTECT WETLAND AND RIPARIAN AREAS SINCE THEY ARE IMPORTANT IN FLOOD PROTECTION, MAINTAINING WATER QUALITY AND PROVIDING HABITAT. Policy 3 Development in environmentally sensitive areas including 100-year floodplain, wetlands, riparian areas, shallow aquifers and on steep slopes may pose inherent development limitations and design should be managed to avoid and mitigate environmental impacts and natural hazards. Although the owners have provided setbacks for a majority of the lots proposed in phase 1 which meet the recommended setbacks by Fish, Wildlife and Parks, several lots located close to the wetlands could have buildings within this 200-foot setback. In order to meet the above cited goals and policy of the Kalispell Growth Policy and to maintain the stable slopes which in turn protect water quality, the Planning Department recommends that the property boundaries of proposed lots adjacent to the drainage and accompanying wetlands be altered. This alteration would include a minimum distance of 50-feet from the top of the bank along the drainage with the contour line designating the top of bank to be determined by City staff and the developer's consultants. This minimum setback would allow native vegetation to occur along ht edge of the banks of the drainage. The CC&R's for Silverbrook establish a 30-foot rear yard setback for the single family lots adjacent to the Stillwater River Hillside and its tributaries. This setback exceeds the R-2 zoning district setback which has a rear yard setback of 10-feet with a provision for 5-foot setbacks for accessory buildings. With an increased setback of 50 feet from the top of the bank along the drainage and a 30-foot building setback for rear yards as required in the Silverbrook CC&R's the drainage bank stability and water quality would be protected. 19 Information maps obtained from the Montana Department of Fish, Wildlife and Parks indicate the areas along the Stillwater River corridor to have high densities of whitetail deer. These areas are also used as winter range for the deer. The owners are proposing a linear park along the Stillwater River that includes the adjacent land with development located 200 to 400 feet back from the river. By placing the land along the Stillwater River into open space and park areas the proposed subdivision complies with the following policies in the Kalispell Growth Policy: Chapter 7, The Natural Environment, Policy 10 Protection of wildlife and wildlife habitat should be encouraged through conscientious actions such as avoiding loose dogs, feeding large wild animal species along with maintaining established important habitat areas. Chapter 7, The Natural Environment, Policy 11 Wildlife travel corridors should be conserved and maintained possibly through easements or other voluntary restrictions. A letter from Tim Thier of Montana Fish, Wildlife and Parks states that on a site visit to the project site that he observed deer, turkeys, Hungarian Partridge, and claw marks from a black bear. Because of the very prominent presence of wildlife on the site Mr. Thier recommended steps are taken to minimize attractants such as garbage, fruit trees and bird feeders. In response, as part of the CC8&R's of the Silverbrook Estates subdivision, Article 7, Property Use and Required Covenants, includes pet restrictions, prohibits free roaming of dogs and cats and requires animal proof garbage containers Surface and groundwater: The Stillwater River is located on the western edge of the subdivision. Individual lots within phase 1 would be located anywhere from 200 feet to upwards of 400 feet from the Stillwater River. In addition to the river, surface waters collected on site flow to a drainage located on the northern end of phase 1. The water collected in this drainage travels west into the Stillwater River. Building setbacks as well as detention ponds for the collection and treatment of stormwater will be incorporated in the subdivision to mitigate impacts to surface waters. A Depth to Water Table map dated March 13, 2006 indicates the water table for phase 1 varies between 10-15 feet below the surface for the lots located along the western boundary of the subdivision to between 20-50 feet below the surface as you move east towards Highway 93. Information in the Depth to Water Table was provided by the Flathead Lakers in consultation with the Flathead Lake Biological Station. Planning Department is not recommending any type of mitigation for groundwater because the subdivision will be served by public water and sewer thereby minimizing any potential impacts to the groundwater. Also, based on the Depth to Water Table map, impacts to groundwater due to basements appears to be minimal if at all. Drainage: As stated above, a large drainage is located on the northern end of phase 1; however the majority of the site is relatively flat. Curbs and gutters will 20 be installed with the subdivision and an engineered storm drain management plan will have to be developed to address the runoff from the site. There is no storm drain system in the immediate area and storm water will have to be managed using on -site retention methods as part of an engineered stormwater management plan. The drainage plan will have to comply with the City of Kalispell's standards and State standards and will be required to be reviewed and approved by the Kalispell Public Works Department. Wetlands: A wetland delineation report was conducted by PBS&,J. The report noted a wetland fringe of approximately 2 acres in size located in the southwest corner of phase 1 adjacent to the Stillwater River. This area is proposed to be in open space in order to limit impacts to it. A wetland area was also noted within the drainage located on the northern end of phase 1. Lot locations and building setbacks discussed in section B, Effects on Wildlife and Wildlife Habitat, would mitigate any potential impacts to this wetland however the main road serving the entire project site, Silverbrook Drive, is proposed to cross the drainage and associated wetland. The consultants for the project will be required to contact the Army Corps of Engineers to determine whether any mitigation is necessary. Any necessary permits from the Army Corps will be required prior to approval of road construction plans. Water: Water service to the subdivision would be provided by the City of Kalispell and designed and extended in accordance with the Department of Public Works standards. At this time however, it is uncertain what direction the water lines will be extended from existing lines in the City to serve this subdivision. A future well site is also being proposed as part of phase 2. The water system for the subdivision will be reviewed and approved by the Kalispell Public Works Department and the Kalispell Fire Department as part of the development of the subdivision. There is adequate capacity within the City's water system to accommodate this development. Sewer: Sewer service to the subdivision would be provided by the City of Kalispell and designed and extended in accordance with the Department of Public Works standards. At this time however, it is uncertain what direction the sewer lines will be extended from existing lines in the City to serve this subdivision as the city is reviewing two different routes. Design and construction of the mains will be reviewed and approved by the Kalispell Public Works Department. There is adequate capacity within the sewage treatment plan to accommodate this development. The sewer main will be designed to accommodate growth from this subdivision as well as to accommodate additional capacity for future growth in the area. Roads: Phase 1 will be served by a collector roadway, Silverbrook Drive, which would be constructed to serve the majority of the lots within phases 1 and 2 of the Silverbrook Estates subdivision. Silverbrook Drive would connect with Highway 93 in the southeast corner of the subdivision and travel northwest, connecting with Church Drive at the northern end of the overall 325.1 acre project site. The entire length of Silverbrook Drive will be constructed as part of phase 1. 21 Silverbrook Drive would be constructed within a 100-foot road right-of-way. Attached roadway profiles indicate Silverbrook Drive would have two 15-foot wide travel lanes separated by a 16-foot vegetated boulevard strip. Along each side of the roadway an additional 7-foot boulevard and 6-foot sidewalk would be installed. A bridge will be constructed where Silverbrook Drive intersects the large drainage on the north end of phase 1. As the wetland delineation report noted, a wetland is present at the bottom of the drainage and the Army Corps of Engineers will need to be contacted prior to bridge construction. A number of local roads are proposed to serve the individual lots throughout phase 1. These roads will be constructed to local road standards including a 28- foot driving surface with boulevards, which vary in width between 6-7 feet, and a 5-foot sidewalk. Silverbrook Drive is proposed to be the only access point onto Highway 93 for the entire 325.1 acre project site. By providing only one access point onto Highway 93 for the entire project site and a well developed internal road network, the development is consistent with the following two policies in the Highway 93 North Growth Policy Amendment: Policy 3.b Access should be coordinated so as to allow only collector or arterial streets to intersect. The judicious use of right -in right -out approaches, frontage roads and good internal development street design should be the rule to reduce or eliminate the need for direct access onto major gateway roads. Policy 3.c With the construction of the Church Drive overpass on US 93, every effort must be taken to fully utilize this interchange and conversely limit direct access onto US 93 for at least 3/4 mile along areas north and south of this facility to avoid congestion points and the need for future traffic signals. The judicious use of right -in right -out approaches, frontage roads and good internal development street design will mitigate the need for direct access out. A preliminary traffic impact study was conducted as part of the preliminary plat submittal for the project. The preliminary traffic study provided the number of average daily trips and AM and PM peak hour trip numbers for the entire project. This includes all of the single family and townhomes proposed as part of the master plan development of the 325.1 acre project site as well as trip estimates for potential future commercial uses in the northeast corner of the project site. Using the average daily trip numbers generated by single family detached housing phase 1 would create approximately 2,440 average daily vehicle trips from the subdivision. The discussion on trip distribution notes that 25% of the traffic could be expected to travel north with 65% traveling south. The preliminary report also notes 7% of the traffic traveling east and 3% traveling west. The trip distribution section of the preliminary traffic impact study concludes that most trips are expected to utilize Highway 93. A letter from Ed Ereth, Montana Department of Transportation (MDT), System Impact Action Section, states that the Department has begun review of the 22 preliminary traffic impact study however they still require more information to be submitted. The consultants for the project have contacted MDT and are still in the process of providing MDT with the information they need. Mr Ereth's letter concludes by stating that in order for MDT to grant an access permit to Highway 93, the developer will need to complete MDT's Systems Impact Action Process (SIAP). As a recommended condition of approval the owners would be required to have an access permit and any conditions or mitigations measures attached to the access permit completed prior to final plat approval. Church Drive, located on the northern end of the 325.1 acre project site, is currently experiencing light volumes of traffic which does not significantly impact the condition of the road. If the proposed subdivision is improved, it will add additional traffic on Church Drive that will cause significant impacts to the road. Therefore, the Planning Department would recommend that at a minimum a waiver to protest the creation of a special improvement district for upgrading Church Drive to City standards should be required as a plat condition. Schools: This development is within the boundaries of the Kalispell School District #5. The school district could anticipate that an additional 125 school aged children might be generated into the district at full build out. This number is used because it takes into account pre-school aged children, home school education options and private school education option. Not all of the children who live in the subdivision will be attending public schools. This would have a potentially significant impact on the district, particularly on a cumulative level with other developments pending within the district — both urban and rural particularly with high school -aged students. The project consultants contacted Darlene Schottle, Superintendent of Schools for School District 5. In her letter to Mr. Wayne Freeman of CTA landworks she states that the size and scope of the subdivision causes her some concern because of the growth on the north end of Kalispell in recent years and the districts ability to provide adequate school facilities. Ms. Schottle concludes her letter by stating that hopefully the developer and the school district can collaborate to come up with a creative solution that is positive for both the school district and the developer. No mitigation measures have since been requested by the school district. Parks and Open Space: The State and local subdivision regulations have parkland dedication requirements or cash in lieu of parkland dedication in the amount of 11% of the combined area of all land to be divided into lots 1/2 acre and smaller. The area in land to be subdivided totals 87.7 acres requiring a parkland dedication of 9.6 acres. As discussed in the evaluation of the proposed PUD, section 2, common open space, 80.2 acres or approximately 25% of the overall project site is proposed as open space. For phase 1 there is a total of 30.44 acres of open space of which 19.61 acres of suitable open space (those areas outside the 100-year floodplain and with slopes less than 20%) and 10.83 acres of unsuitable open space (those areas within the 100-year floodplain and with slopes greater than 20%). Within the open space areas the owners are proposing landscaping, water 23 features and a pedestrian/bike path to provide recreational access to both the residents of the subdivision and the greater Kalispell community. Within phase 1 the preliminary plat shows two open space/park areas. One approximately 2.4 acres in size located along Swift Creek Way. The other, approximately 4.9 acres, is located at the southwest corner of the subdivision. The Kalispell Growth Policy, Chapter 9, Parks and Recreation, provides the following Goals and Policy for parkland: Goal 1 PROVIDE A BALANCED DISTRIBUTION AND DIVERSITY OF RECREATIONAL FACILITIES AND PEDESTRIAN/BICYCLE PATHS THAT PROVIDES ACCESS FOR ALL AGE GROUPS. Goal ASSURE ADEQUATE AND SAFE ACCESS TO PARKS FROM RESIDENTIAL SUBDIVISIONS. Policy 3 Provide a balanced mix of parks and recreational facilities to meet local needs, which including mini parks, neighborhood parks, community parks, regional parks, linear parks, special facilities and conservation lands or facilities. The owners have proposed placing the Stillwater River corridor into a park for residents of the subdivision and the greater Kalispell community to enjoy. In addition, several other parks are located throughout phase l of the subdivision with the parks connected by sidewalks or a pedestrian/bike path. The proposed park/ open space and path system within phase 1 achieve the above cited goals and policy of the Kalispell Growth Policy. The Parks and Recreation Department has recommended that the owner provide the Department with a parks plan which would include improvements and amenities for each of the park areas. The plan would also show the pedestrian/bike path in greater detail and include width and construction materials for the paths. Specifications for the bike path construction will be determined by the Parks and Recreation Department with recommendations also provided by the Flathead Conservation District in areas where the path is located near the Stillwater River corridor. The environmental assessment notes that all open space areas, once improvements have been installed by the master developer, will be maintained by the property owners association. However, as stated earlier, all open space areas and trails will be available for the use of the general public. The Parks and Recreation Department encourages the use of the Stillwater River corridor as a linear park setting. There hope is to build on this initial park along the Stillwater River with future developments south of this project. This integration of parkland is based on policy 1, Chapter 9 of the Kalispell Growth Policy which states, "Build on the existing parks inventory to provide a unique park system that benefits residents and the regional economy." Nu Police: This subdivision would be in the jurisdiction of the City of Kalispell Police Department once annexed to the City. The department can adequately provide service to this subdivision, however the cumulative impacts of growth within the City further strains the department's ability to continue to provide the high level of service the department is committed to. Fire Protection: Fire protection services will be provided by the Kalispell Fire Department once annexed to the City, and the subdivision will be required to comply with the International Fire Code. The fire department will review and approve the number and location of hydrants within the subdivision as well as fire flows for compliance with applicable fire codes. Although fire risk is low because of good access and fairly level terrain, the fire department is recommending that access to the subdivision and the hydrants are in place prior to final plat approval and / or use of combustible materials in construction. The Fire Department is also recommending that roadways between 26 feet to 32 feet wide be posted on one side of the road as a fire lane. This would then allow parking on most of the interior streets for phase 1 on only one side of the roadway. The Fire Department strongly recommended in their response letter that streets be at least 32 feet wide to allow parking and good emergency vehicle access to the lots. Solid Waste: Solid waste will be handled by a private hauler in accordance with State statues and taken to the Flathead County Landfill. There is sufficient capacity within the landfill to accommodate this additional solid waste generated from this subdivision. Medical Services: Ambulance service is available from the fire department and ALERT helicopter service. Kalispell Regional Medical Center is close, less than 3 miles from the site. E. Effects an Agriculture and agricultural water user facilities: The site has been traditionally used for agricultural uses including crop production. The environmental assessment for the project states that the site generally has a farmland classification of "prime farmland' when irrigated. This was confirmed by information obtained from the Natural Resource and Conservation Service (NRCS). The environmental assessment continues by stating that approximately 294 acres of the 325 acre project site have produced alfalfa with yields of 4.0 to 4.4 tons per acre. Surrounding phase 1 adjacent lands are still primarily used for agricultural purposes. With the approval of this subdivision water and sewer service will be extended to the site. This extension of services will impact the agricultural land use in the area. The effect this subdivision would have on adjacent agricultural land would be the potential for more land currently in agricultural production to convert to relatively higher density residential subdivisions due to the close proximity of water and sewer mains. Current policies in the Kalispell Growth Policy, Chapter 5, Land Use: Agriculture, state the following: 25 Policy 1 Encourage and create incentives to conserve agricultural lands. Policy 2 Encourage urban growth into areas which are not environmentally sensitive or productive agricultural lands. The proposed subdivision contradicts both of the above policies as the requested subdivision would not conserve any agricultural land on the site and does take productive agricultural lands out of production. However, the Kalispell Planning Board and City Council recognize the need for growth to occur in Flathead County and in particular the City of Kalispell. With the City Council's approval in August of this year to extend the Kalispell Growth Policy Future Land Use Map north of the current city limits approximately 2 miles, the city is taking an active role in planning for future development. By providing a greater growth area boundary, the city can entertain requests for annexation which in turn lead to the extension of water and sewer services. This enables more of the growth to come into the City of Kalispell and connect to city water and sewer, and have police and fire protection that the City offers its residents. Allowing higher density development within the City's growth policy area, it could reasonably be expected that more farmland could be conserved because the availability of residential and commercial lots the expanded growth policy area would create. Immediately north of the 325.1 acre project site across Church Drive is an approximately 160 acre property in a conservation easement. The easement allows the property to be used as agricultural land but prohibits future development on the land. By creating residential and commercial lots immediately south of the conservation easement, future residents will need to be aware that farming of this land will take place and from time to time potential nuisances such as noise, dust, odors, and irregular hours of operation are to be expected. Therefore, the Planning Department is recommending placing a note on the final plat notifying future property owners of the agricultural nature of the surrounding lands. F. Relation to the Kalispell Growth Policy: On August 7, 2006 the Kalispell City Council adopted resolution 5129B which amended the Kalispell Growth Policy Future Land Use map north to the intersection of Highway 93 and Church Drive. On the amended land use map the 325.1 acre project site is designated Neighborhood Commercial in the northeast corner of the site surrounded by a narrow band of High Density Residential with the remaining acreage of the project site designated Suburban Residential. Phase 1 of Silverbrook Estates is located within the Suburban Residential land use designation on the Kalispell Growth Policy Future Land Use map. Areas designated as Suburban Residential are anticipated to be served by community water and sewer and have good access to services and public facilities. This land use designation anticipates a density of up to 4 dwelling units per acre. The subdivision has a density of approximately 1.5 dwelling units per acre. This subdivision is in compliance with the Kalispell Growth Policy and its goals and policies. mo G. Compliance withZoning: The owners have requested annexation and initial zoning of R-2, R-4 and B-1 for the entire 325. I acre project site. Phase I includes approximately 160 acres of the overall 325.1 acre project site. If annexation and initial zoning is approved for the entire project site, phase 1 would be zoned R-2, a Suburban Residential district with a minimum lot size requirement of 9,600 square feet and a minimum lot width of 70 feet. All of the proposed lots within phase 1 of Silverbrook Estates comply with the R-2 zoning district. H. Compliance with the Kalispell Subdivision Regulations: The owners have requested a PUD which, if approved, would allow two deviations to the Kalispell Subdivision Regulations. The two deviations include allowing longer block lengths than required under section 3.07, B and providing a sidewalk on only one side of the street when section 3.11, A requires sidewalks on both sides of the street in residential and commercial subdivisions. A full discussion of these deviations can be found on pages 5-12 of this report. I. Staff recommends that the Kalispell City Planning Board and Zoning Commission adopt staff report KA-06-13 and recommend that initial zoning of the 325.1 acre site be R-2, R-4 and B-1 as shown on the zoning district map for the property. II. Staff recommends that the Kalispell City Planning Board and Zoning Commission adopt staff report KPUD-06-6 as findings of fact and recommend to the Kalispell City Council the PUD for Silverbrook Estates be approved subject to the conditions listed below: III. Staff recommends that the Kalispell City Planning Board and Zoning Commission adopt staff report KPP-06-13 as findings of fact and recommend to the Kalispell City Council that Phase I of Silverbrook Estates be approved subject to the conditions listed below: 1619molvoce • -•, The Planned Unit Development for Silverbrook Estates allows the following deviations from the Kalispell Subdivision Regulations and the Kalispell Zoning Ordinance: A. Kalispell Subdivision Regulations, Section 3.07, B (Blocks) to allow blocks to exceed the 1,200 foot maximum length. B. Kalispell Subdivision Regulations, Section 3.11, A (Sidewalks), allowing a sidewalk on only one side of Diamond Peak Loop, a roadway serving the neighborhood commercial area of the project. A sidewalk shall not be required around the green space in the interior of the loop as shown on road section G 27 dated October 2, 2006 with the location of Diamond Peak Loop shown on the Silverbrook Estates Roads and Trails map dated October 2, 2006. C. Kalispell Zoning Ordinance, Section 27.07.040 (3) (Minimum yard setbacks in the R-4 zoning district), allows minimum setbacks of 10-feet for front and side corner property boundaries for a dwelling unit. Garages shall be setback a minimum of 20-feet from front and side corner property boundaries. D. Kalispell Zoning Ordinance, Section 27.22.090 (Fences, Walls and Hedges), allowing fences 48 inches tall within or bounding the front setback area in all areas of the proposed subdivision. This only applies to fences and in no case shall the fence be solid. E. Kalispell Zoning Ordinance, Section 27.13.040 (3) (Minimum yard setbacks in the B-1 zoning district), allowing a 5-foot setback to the front and rear property boundaries. F. Kalispell Zoning Ordinance, Section 27.13.040 (5) (Permitted lot coverage in the B-1 zoning district), allowing the permitted lot coverage of 100%. G. Kalispell Zoning Ordinance, Section 27.26.040 (5) (Joint use of parking facilities), allowing the creation of the "Silverbrook Estates Parking Regulation, Management Plan and Ordinance" to provide for direction in the planning and design of all parking facilities within the 13-1 zoning district of the subdivision. H. Kalispell Zoning Ordinance, Section 27.27.020 (1) - (6) (standards for loading berths), allowing deviations in the design standards for loading berths. 2. The development of the 325 acre site shall substantially comply with the following maps and elevations submitted as part of the Planned Unit Development application: A. Silverbrook Estates Conceptual Site Plan B. Silverbrook Estates Land Use Map dated October 2, 2006 C. Silverbrook Estates Proposed Zoning Map dated October 2, 2006 D. Silverbrook Estates Roads and Trails Map dated October 2, 2006 E. Silverbrook Estates Road Sections A-H dated October 2, 2006 F. Silverbrook Estates Trail Types A-C dated October 2, 2006 G. Silverbrook Estates Architectural Elevations for the Subdivision Main Entrance dated October 2, 2006 H. Silverbrook Estates Development Phasing Plan dated October 2, 2006 3. Final approval of all standards within the Silverbrook Estates Parking Regulation, Management Plan and Ordinance shall be approved by the City of Kalispell. The standards shall be approved prior to any final plat approval for the commercial area. 4. Pedestrian pathways shall be located either midway on blocks exceeding 1,200 feet in length or in the area of the block exceeding 1,200 feet which would provide the best connectivity to surrounding streets or pedestrian/bike paths. The pathways shall be located within a 20-foot wide easement with the path width and 28 construction standards determined by the Parks and Recreation Department. The pathway easements shall be shown on the final plat and the path shall be constructed or bonded for to the approved width and construction standards prior final plat approval. 5. The minimum landscaping and screening requirements for commercial B-1 parking areas shall be 10%. Furthermore, at the time the owners apply for Phase II of the subdivision plat, a preliminary parking lot layout plan and landscaping plan shall be submitted. The plan shall show how the minimum 10% landscaping requirement is being accomplished. 6. The Silverbrook Estates Parking Regulation, Management Plan and Ordinance be amended to incorporate the use of pedestrian walkways within the parking areas to provide for needed connectivity between the commercial buildings and the sidewalk or bicycle pathways surrounding the commercial area. Pedestrian walkways shall be included in the preliminary parking layout plan referenced in condition 5. 7. That a development agreement be drafted by the Kalispell City Attorney between the City of Kalispell and the developer outlining and formalizing the terms, conditions and provisions of approval. The final plan as approved, together with the conditions and restrictions imposed, shall constitute the Planned Unit Development (PUD) zoning for the site. General Conditions: 8. That the development of the site shall be in substantial compliance with the application submitted, the site plan, materials and other specifications as well as any additional conditions associated with the preliminary plat as approved by the city council. (Kalispell Subdivision Regulations, Appendix C - Final Plat) 9. The preliminary plat approval for phase 1 shall be valid for a period of three years from the date of approval. (Kalispell Subdivision Regulations, Section 2.04). Prior to final plat: 10. New infrastructure required to serve the subdivision shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction and Montana Public Works Standards; and shall be certified in writing by an engineer licensed in the State of Montana. All design work shall be reviewed and approved in writing by the Kalispell Public Works Department prior to construction. This infrastructure shall include but not be limited to streets, street lighting, street signage, curb, gutter, boulevard and sidewalks. (Kalispell Design and Construction Standards) 11. Water and sewer main extensions shall be designed and constructed in accordance 29 with the City of Kalispell's Standards for Design and Construction and Montana Public Works Standards. The water and sewer main extension plans shall be reviewed and approved by the Kalispell Public Works Department. Prior to final plat, a certification shall be submitted to the Public Works Department stating that the water and sewer mains have been built as designed and approved. (Kalispell Design and Construction Standards) 12. The developer shall submit to the Kalispell Public Works Department for review and approval a stormwater report and an engineered drainage plan that meets the requirements of the current City standards for design and construction. Prior to final plat, a certification shall be submitted to the Public Works Department stating that the drainage plan for the subdivision has been installed as designed and approved. (Kalispell Design and Construction Standards) 13. The developer shall submit to the Kalispell Public Works Department prior to construction an erosion/ sediment control plan for review and approval and a copy of all documents submitted to Montana Department of Environmental Quality for the General Permit for Stormwater Discharge Associated with Construction Activities. (Kalispell Design and Construction Standards) 14. A letter from the Kalispell Public Works Department shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell or a proper bond has been accepted for unfinished work. (Kalispell Design and Construction Standards) 15. The developer shall contact the Army Corps of Engineers to obtain any necessary permits from the Army Corps for the crossing of the wetlands by Silverbrook Drive. Any mitigation required as part of the permit shall be included in the approval of the road construction plans. Such mitigation required for the road crossing shall be completed to the satisfaction of the Army Corps of Engineers prior to final plat and the Army Corps of Engineers shall so certify this in writing to the city. (Findings of Fact, Section C, Wetlands) 16. The developer shall obtain an approach permit from the Montana Department of Transportation (MDT) for Silverbrook Drive. If any improvements are necessary at this intersection, these improvements shall be completed to the satisfaction of the MDT prior to final plat and MDT shall so certify this in writing to the city. (Findings of Fact, Section D, Roads) 17. The following requirements shall be met per the Kalispell Fire Department and so certified in writing by the Fire Department: (Kalispell Subdivision Regulations, Section 3.20). a. Water mains designed to provide minimum fire flows shall be installed per City specifications at approved locations. Minimum fire flows shall be in accordance with International Fire Code (2003) Appendix B. b. Fire hydrants shall be provided per City specifications at locations approved by this department, prior to combustible construction. c. Fire Department access shall be provided in accordance with International Fire Code (2003) Chapter 5. 30 d. It shall be noted on the face of the plat that hazardous weed abatement shall be provided in accordance with City of Kalispell Ordinance 10-8. e. Street naming shall be approved by the fire department. f. Roadways between 26 feet to 32 feet wide shall be posted on one side of the road as a fire lane. 18. A 12-foot meandering berm shall be constructed within the proposed buffer along Phase 1. The berm shall be landscaped with the landscaping plan reviewed and approved by the Parks and Recreation Department. (Findings of Fact, Section A, Noise) 19. The pedestrian/bike path plan shall be reviewed by the Flathead Conservation District in order for the District to determine if any permits are required. If a permit is required, the developer shall submit a 310 application to the Flathead Conservation District prior to any construction of the pedestrian/bike path. (Findings of Fact, Section D, Parks and Open Space) 20. A letter shall be obtained from the Kalispell Parks and Recreation Director approving a landscape plan for the placement of trees and landscaping materials within the landscape boulevards of the streets serving the subdivision. The approved landscape plan shall be implemented or a cash in lieu payment for installation of the street trees and groundcover provided to the Kalispell Parks and Recreation Department. (Kalispell Subdivision Regulations, Section 3.11). 21. The area designated on the plat as "park" will meet the parkland dedication requirements provided that it is developed to create a recreational amenity within the subdivision. Those park improvements shall be addressed in accordance with a plan approved by the Kalispell Parks and Recreation Director so as to provide a recreational component within the development and, at a mm. , the park improvements shall equal 9.6 acres of land. A letter from the Kalispell Parks and Recreation Department shall be provided at the time of final plat that outlines the improvements and confirms those improvements have been made. (Kalispell Subdivision Regulations, Section 3.19 and Findings of Fact, Section D, Parks and Open Space) 22. A pedestrian/ bike path plan shall be provided to the Parks and Recreation Department which includes the pathway width and construction materials for the paths located throughout phase 1. Specifications for the bike path construction will be determined by the Parks and Recreation Department with recommendations provided by the Flathead Conservation District in areas where the path required a 310 permit as required in condition 19. (Findings of Fact, Section D, Parks and Open Space) 23. The developer shall obtain a permit from the Flathead County Road Department for access onto Church Drive. A letter from the Flathead County Road Department shall be submitted along with the final plat stating that all improvements at the intersection of Church Drive and Silverbrook Drive have been completed or bonded for. (Findings of Fact, Section D, Roads) 24. The following note shall be placed on the final plat: "Construction of homes on lots 1-15 of Block 1 and 1-11 of Block 2 shall utilize sound -absorbent materials along 31 the side of the house facing the highway bypass. (Findings of Fact, Section A, Noise) 25. The following note shall be placed on the final plat: "Property owner(s) are responsible for the boulevard strip for the length of their property boundaries. Responsibilities include watering and mowing of the grass within the boulevard. Removal of grass or trees within the boulevard and placement of any other kind of materials is prohibited unless approved by the Kalispell Department of Parks and Recreation." 26. The following note shall be placed on the final plat: "Property owner(s) shall waive their right to protest the creation of a special improvement district for road upgrades to Church Drive." (Findings of Fact, Section D, Roads) 27. The following note shall be placed on the final plat: `This subdivision is located in an agricultural area and potential nuisances such as noise, dust, odors, and irregular hours of operation are to be expected. As such, the right to farm on adjoining properties shall not be restricted as a result of the development or occupancy of this subdivision." (Findings of Fact, Section E) 28. The following note shall be placed on the final plat: "Noise generated by the arena and race track may be heard from your property. The noise may be considered a nuisance." (Findings of Fact, Section A, Noise) 29. The rear property boundaries of lots 1-9 of Block 20, lots 1-3 of Block 16 and lots 7- 13 of Block 15 shall be amended to provide for a minimum distance of 50-feet from the top of the bank along the drainage to the rear property boundary. The contour line designating the top of bank shall be determined by City staff and the developer's consultants. (Findings of Fact, Section B) 30. A 30-foot rear yard setback shall be required for all structures on lots adjacent to the Stillwater River Hillside and its tributaries. This would include lots 3-7 of Block 19, lots 1-9 of Block 20, lots 1-3 of Block 16 and lots 7-13 of Block 15. (Findings of Fact, Section B) 31. The road within the subdivision shall be named and signed in accordance with the policies of the Kalispell Public Works Department and the Uniform Traffic Control Devices Manual and be subject to review and approval of the Kalispell Fire Department. A letter shall be obtained from the Kalispell Public Works Department stating the naming and addressing on the final plat have been reviewed and approved. (Kalispell Subdivision Regulations, Section 3.09) 32. All existing and proposed easements shall be indicated on the face of the final plat. Utility easements for City water and sewer shall be provided to allow for the logical extension of utilities from this subdivision to adjoining properties. A letter from the Kalispell Public Works Department shall be obtained stating that the required easements are being shown on the final plat. (Kalispell Subdivision Regulations, Section 3.18) 33. Prior to filing the final plat a letter from the US Postal Service shall be included stating the Service has reviewed and approved of the design and location of the mail delivery site. The mail delivery site shall be installed or bonded for prior to final 32 plat. In addition, the mail delivery site and improvements shall also be included in the preliminary and final engineering plans to be reviewed by the Public Works Department. The mail delivery site shall not impact a sidewalk or proposed boulevard area. (Kalispell Subdivision Regulations, Section 3.22) 34. Street lighting shall be located within the subdivision and shall have a full cutoff lens so that it does not intrude unnecessarily onto adjoining properties. (Kalispell Subdivision Regulations Section 3.09(L)) 35. The following statement shall appear on the final plat: "The undersigned hereby grants unto each and every person, firm or corporation, whether public or private, providing or offering to provide telephone, telegraph, electric power, gas, cable television, water or sewer service to the public, the right to the joint use of an easement for the construction, maintenance, repair, and removal of their lines and other facilities, in, over, under, and across each area designated on this plat as "Utility Easement" to have and to hold forever." Developer's Signature (Kalispell Subdivision Regulations, Section 3.18(E)) 36. That a minimum of two-thirds of the necessary infrastructure for this subdivision shall be completed prior to final plat submittal. The minimum of two-thirds of the necessary infrastructure shall include the extension of water and sewer mains from the city to the site and necessary lift stations to transport effluent back to the city. On going conditions: 37. All utilities shall be installed underground. (Kalispell Subdivision Regulations, Section 3.17) 38. All areas disturbed during development shall be re -vegetated with a weed -free mix immediately after development. 33 City of Kalispell Planning Department 17 - 2nd Street East, Suite 211, Kalispell, Montana 59901 Telephone: (406) 751-1850 Fax: (406) 751-1858 APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) PROJECT NAME: Silverbrook Estates NAME OF APPLICANT: 93 & Church LLC 2. MAIL ADDRESS: 100 Hathaway Ln 3. CITY/ STATE/ZIP: Kalispell, MT 59901 PHONE: 406.756.8077 NAME AND ADDRESS OF OWNER IF DIFFERENT THAN APPLICANT: 4. NAME: N/A 5. MAIL ADDRESS: N/A CITY/STATE/ZIP: N/A PHONE: N/A 6. TECHNICAL ASSISTANCE: CTA Architects Engineers 7. MAIL ADDRESS: 10180 Cottonwood Rd 8. CITY/STATE/ZIP: Bozeman, MT 59718 PHONE: 406.556.7100 If there are others who should be notified during the review process, please list those. N/A Check One: X Initial PUD proposal Amendment to an existing PUD A. Property Address: See Legal Description B. Total Area of Property: 325.19 Acres C. Legal description including section, township & range: Tract 1, 2, 3AA within The NEI/4 of Section 13, T29N, R22W, P.M.M., Flathead County, Montana. See attached Exhibit A D. The present zoning of the above property is: County AG-40 E. Please provide the following information in a narrative format with supporting drawings or other format as needed: a. An overall description of the goals and objectives for the development of the project. b. In cases where the development will be executed in increments, a schedule showing the time within phase will be completed. C. The extent to which the plan departs from zoning and subdivision regulations including but not limited to density, setbacks and use, and the reasons why such departures are or are not deemed to be in the public interest; d. The nature and extent of the common open space in the project and the provisions for maintenance and conservation of the common open space; and the adequacy of the amount and function of the open space in terms of the land use, densities and dwelling types proposed in the plan; e. The manner in which services will be provided such as water, sewer, storm water management, schools, roads, traffic management, pedestrian access, recreational facilities and other applicable services and utilities. L The relationship, beneficial or adverse, of the planned development project upon the neighborhood in which it is proposed to be established g. How the plan provides reasonable consideration to the character of the neighborhood and the peculiar suitability of the property for the proposed use. h. Where there are more intensive uses or incompatible uses planned within the project or on the project boundaries, how with the impacts of those uses be mitigated. i. How the development plan will further the goals, policies and objectives of the Kalispell Growth Policy. j. Include site plans, drawings and schematics with supporting narratives where needed that includes the following information: (1). Total acreage and present zoning classifications; (2). Zoning classification of all adjoining properties; (3). Density in dwelling units per gross acre; (4). Location, size height and number of stories for buildings and uses proposed for buildings; (5). Layout and dimensions of streets, parking areas, pedestrian walkways and surfacing; (6). Vehicle, emergency and pedestrian access, traffic circulation and control; 2 (7). Location, size, height, color and materials of signs; (8). Location and height of fencing and/or screening; (9). Location and type of landscaping; (10). Location and type of open space and common areas; (11). Proposed maintenance of common areas and open space; (12). Property boundary locations and setback lines (13). Special design standards, materials and / or colors; (14). Proposed schedule of completions and phasing of the development, if applicable; (15). Covenants, conditions and restrictions; (16). Any other information that may be deemed relevant and appropriate to allow for adequate review. If the PUD involves the division of land for the purpose of conveyance, a preliminary plat shall be prepared in accordance with the requirements of the subdivision regulations. Please note that the approved final plan, together with the conditions and restrictions imposed, shall constitute the zoning for the district. No building permit shall be issued for any structure within the district unless such structure conforms to the provisions of the approved plan. The signing of this application signifies that the aforementioned information is true and correct and grants approval for Kalispell Planning staff to be present on the property for routine monitoring and inspection during review process. (Applicant Signature) c2 —D (Date) 3 This application is submitted concurrently for Annexation, Preliminary Plat and Planned Unit Development (PUD) within the City of Kalispell, after recent inclusion within the City of Kalispell Growth Policy area. The Silverbrook Estates project has been submitted for your review consists of approximately 325 acres. The property is generally located on the west side of Highway 93, north of the city limits of Kalispell, Montana. The project is being proposed as a PUD development. The property was previously used for production of agricultural crops. There are currently several buildings on the southeast corner of the site. These will be removed during demolition and improvement installation. The property is bordered to the north by Church Drive, to the south by agricultural land and residences, to the east by US Highway 93, and to the west by the Stillwater River. The applications for Petition for Annexation and Initial Zoning, Planned Unit Development, and Major Subdivision Preliminary Plat included here, contain all required information, with the "Adjoining Property Owner's List" and "Petition to Annex and Notice to Withdrawal from Rural Fire District" located in Appendices A and B respectively. This application includes an "Environmental Assessment" regarding existing conditions and anticipated effects of the proposed development on existing infrastructure and services. The subjects covered include geology, surface water, vegetation, wildlife, agriculture and timber production, historical, and archaeological or cultural features. In addition, the application addresses such items as sewage, water, solid waste, drainage, roads, emergency services, schools, economic benefits, land use, parks and recreation facilities, and utilities. History of Proiect Planning The Silverbrook Estates has been carefully planned with guidance and feedback from Planning Board members, City Council members, jurisdictional agencies, and the City of Kalispell Planning Staff. The planning and design process began in March of 2006. The Applicant has been carefully monitoring the City of Kalispell Growth Policy plan and its update as it applies to the project area. Throughout the process, the recommendations of the policy have been diligently adhered to. The Applicant then made a Pre -application presentation for Silverbrook Estates to the Planning Board work -session on June 13, 2006. On August 7t', the Applicant met with the Planning Staff to discuss the project in further detail, and then presented to the City Council work -session on August 14, 2006 once the Growth Policy was adopted. With the comments the Applicant then revised the design to incorporate any additional comments and concerns. Silverbrook Estates 1 This application has been submitted for Preliminary PUD Plan Review according to the "Application for Planned Unit Development (PUD)." As such, Subsection E of that document is addressed below. E_ Please provide the following information in a narrative format with supporting drawings or other format as needed: a. An overall description of the ovals and obiective for the development of the project. The Property Owner and Applicant submit this application for Preliminary PUD Plan Review with the intent of developing a residential and commercial community in Kalispell. This community would include single family, town home, neighborhood commercial, open space, trails, and other amenities. The goal is to create a community that functions much like a small town, offering living, working and commercial -oriented activities in one close location, in the beautiful setting of the Flathead Valley and the Stillwater River corridor. A "Preliminary PUD Master Plan Map" has been created to illustrate the overall design and layout of the Silverbrook Estates Subdivision including lot layout, streets, open space and trails. Reference Exhibit K. b. In cases where the development will be executed in increments, a schedule showing the time within phase will be completed. The Silverbrook Estates Subdivision will be developed utilizing two different preliminary plats, submitted separately from each other for review and approval. These two Preliminary Plats will be initiated in the following time lines: Preliminary Plat 1 installation of improvements will be initiated after Preliminary Plat approval and are planned to be competed in the summer of 2007; Preliminary Plat 2 installation of improvements will be initiated in the summer of 2008 and completed by the summer of 2010. Development Phase 1 and 2 have been graphically delineated in Exhibit 1. This is described in more detail in Section V, C of this document. However, it is understood that at this time, the Applicant is only requesting review of Preliminary Plat 1. Given the explanation above, the two Preliminary Plats. will be developed according to the following implementation initiatives: Preliminary Plat 1 Aforementioned, the first development phase will commence as soon as the preliminary plat is approved. It is anticipated that this phase will be completed by the end of the summer of 2007. This plat includes the development of the lower one-half of the development to include various residential lot sizes. All required infrastructure and utilities throughout the development will allow this plat to be self sufficient, also allowing multiple access points to the subdivision. Adjacent open space will also be included as a part of this plat. This plat will be able to be serviced by the Fire Department. Silverbrook Estates 4. 2. Preliminary Plat 2 Aforementioned, Preliminary Plat 2 is anticipated to start during the summer of 2008 and be completed in the summer of 2010, in coordination with the Fire Department's ability to accommodate the required response time. This will include the upper one- half of the overall development, including the balance of the single family residential development all the commercial and town home residential areas. The remaining interior and perimeter open space and infrastructure and utility extensions will be, included to service this final plat. Reference Table 1 below for approximate timing cf Preliminary Plat approval, initiation of improvements, completion of improvements, sale of lots and full build out of the project. PRELI APPROVAL INITIATE COMPLETE 1--LOTS FULL PLAT ANTICIPATED IMPROVEMENTS IMPROVEMENTS SOLD BUILD OUT 1 1212006 SP/2007 SU/2007 W1/2007 NOT KNOWN 2 SP/2006 SU/2008 SU/2010 FALL12010 NOT KNOWN c. The extent to which the plan departs from zoning and subdivision regulations including but not limited to density, setbacks, and use, and the reasons why such departures are or are not deemed to be in the public interest. The Silverbrook Estates PUD and Subdivision departs from the zoning and subdivision regulations as described in section IV, B of this submittal. Reference this section for a complete explanation of requested relaxations. The Applicant believes that these requested relaxations are of an extent that will not negatively affect surrounding properties or the public interest. In fact, the Applicant feels that these relaxations, which are often paired with more restrictive PUD regulations elsewhere (Design Guidelines and the CC&R's) will positively benefit the adjacent property owners, the general public and the new residents of Silverbrook Estates. d. The nature and extent of the common open space in the project and the provisions for maintenance and conservation of the common open space; and the adequacy of the amount and function of the open space in terms of the land use. densities and dwelling types oroposed in the plan. A Property Owner Association (POA) will be established in order to administer the "Covenants" and the design guidelines for all development within Silverbrook Estates, as established by the Master Developer. The POA will also provide for the maintenance of all common areas, including open space and parking district areas, installed by the Master Developer. Reference Exhibit C, "Land Use Map," for open space land use areas. Silverbrook Estates 5 The Silverbrook Design Guidelines will establish design and review guidelines for all development within Silverbrook Estates, specifically including criteria for the review of building style, material usage, landscaping design, and alterations and modifications to a lot. e. The manner in which services will be provided such as water. sewer. storm water management. schools. roads. traffic management. pedestrian access. recreational facilities and other applicable services and utilities. Infrastructure and utilities, such as power, water, sewer, cable, and phone will be provided to each lot by the Master Developer, in cooperation with local and regional utility providers and applicable regulations. The Master Developer is planning to establish a per lot assessment for all property owners within the Subdivision, in order to assist local schools with the potential impacts of new residents and students. Roads and streets will be installed by the Master Developer. Pedestrian sidewalks and trails have been designed throughout the subdivision, in order to promote exercise out-of-doors and connections to the different land uses in the community. Open space and parks have been designed to be within close proximity to major residential areas and are connected with sidewalks and trails. f. The relationship. beneficial or adverse, of the planned development project upon the neighborhood in which it is proposed to be established. The City of Kalispell Growth Policy has been recently amended to permit the type of mixed -use community development proposal such as Silverbrook Estates. The Applicant has further elected to create a PUD for the project, in order to carefully plan the project with unique features that take into consideration the surrounding land uses and features that make this location so appealing. The City of Kalispell has made it clear that this property is the ideal location for a Neighborhood Commercial component that is within close proximity to existing and proposed residential. The Applicant does not anticipate any negative relationships to be created with this proposal g. How the plan provides reasonable consideration to the character of the neighborhood and the peculiar suitability of the property for the proposed use. The vast majority of the residential lots within Silverbrook Estates are of a size and configuration that lower density is situated near existing lower density development an adjacent parcels or tracts. Higher density lot configurations are located near the Neighborhood Commercial node, in the northeast corner of the subdivision. h. Where there are more intensive uses or incompatible uses planned within the project or on the project boundaries, how will the impacts of those uses are mitigated. The possible impacts of the more intensive uses or incompatible uses planned within the project have been mitigated through land use design and separation with roads and drives, so as to designate a physical difference in land use types and architectural styles. For instance, the Neighborhood Commercial area is buffered from the single family residential area by higher -density town home units. Furthermore, areas of strategically placed open space provide "green" buffers from residential areas. Traffic is directed via a system of efficient and easy to navigate Silverbrook Estates 6 internal streets through the Neighborhood Commercial area, including access to Church Drive. i. How the develooment plan will further the goals, policies and obiectives of the Kalispell Growth Policy. The Kalispell Growth Policy was recently amended to include the Silverbrook Estates property within its long-range planning boundary. As such, the development plan has been created to embrace the growth policy's recommendations for planned growth in this area of the city, by providing a mixture of residential living opportunities and contributing to the Neighborhood Commercial node on the northeast end of the property. j. include site plans, drawings and schematics with suoportino narratives where needed that includes the following information. (1) Total acreage and present zoning classifications; As illustrated in Exhibit D, the Silverbrook Estates Subdivision contains 325 acres and is currently zoned AG-40. The applicant proposes a zoning of Neighborhood Commercial, Single Family Residential and Town Home Residential with the corresponding zoning designations of B-1, R-2 and R-4 through the PUD process. Reference Exhibit E, 'Proposed Zoning Map," for requested zoning designations for the property. (2) Zoning classification of all adjoining properties, The zoning classification of the adjoining properties include the following: SAG-10, SAG-5, B-1, and B-2. The SAG-10 zoning district is located on the east side of US Highway 93; the SAG-10 zoning district is located to the northwest and northeast of the site; the B-1 zoning district is located directly to the east of the project site on the east side of US Highway 93; and the B-2 zoning district is located just past the northeast corner of the property across US Highway 93 and Church Drive. (3) Density in dwelling units per gross acre; The density in dwelling units per gross acre has been calculated excluding the land intended for commercial development. The total acreage of the property includes 325 acres. Fifteen acres are intended for commercial development. Thus, the residential land uses include 310 acres and 586 lots of town home and single family residences. Since the subdivision has been designed with several distinct types of lot sizes and living opportunities, these have been summarized and a more specific density calculation figure provided below. Silverbrook Estates 7 •TI -to ' - SINGLE FAMILY LOT APPROX. ` NUMBER OF LOTS TOTAL ACRES DESIGNATION LOT SIZE Single Family Residential 0.50 acre 11 10.50 acres 112 acre Single Family Residential 0.33 acre 69 20.0 acres 1/3 acre Single Family Residential 0.25 acre I 386 99.50 acres 114 acre Totals 1 466 1130 Density for Single Family Residential = 3.58 units / acres (466 units/130 acres) TableResidential TOWN HOME LOT SIZE APPROX. NUMBER OF LOTS TOTAL ACRES DESIGNATION LOT SIZE Town Home Residential 0.098* 120 10.80 4,250 SF Min. Lot Size Totals 120 10.80 *4,250 SF x (1 acr143,560 SF) = 0.092 acre Density for Town Home Residential = 11.11 units / acres (120 units/10.80 acres) (4) Location. size height and number of stories for buildings and uses pr000sed for buildings: The commercial areas will include twelve buildings with footprints defined for areas of "vertical' development. These buildings will be limited to one-story construction and to a maximum of 25 feet in height. The residential uses will have a two-story height limit and to a maximum of 35 feet in height. (5) Layout and dimensions of streets. parking areas, pedestrian walkways and surfacing; The internal streets in Silverbrook Estates have been designed to accommodate traffic through a hierarchy of roads that direct traffic to the key ingress/egress points for the subdivision as well as connectors that provide access to the commercial areas, open space and common amenities. All of the internal streets have rights -of -ways of 60 feet except Silverbrook Drive and commercial entries, which has been designed as a divided road and is 100 feet in right-of-way width with a 16-foot wide center landscaped median. The Silverbrook Estates Commercial Parking District ("Parking District") has been created to provide the commercial properties within the subdivision with adequate parking to meet the needs of their establishments and patrons. The commercial properties will be assessed for regular maintenance of these parking lots based on their overall area of lot ownership. The administrative and maintenance provisions for the Parking District are outlined in the CC&R's. Silverbrook Estates 8 All single family and town home residential lots will be required to provide off- street parking per the CC&R's. On -street parking will be permitted in the Neighborhood Commercial area. Several streets within the Neighborhood Commercial area will have on -street parking that will be limited to one side of the road -way. The center -median access points off of Church Drive will be designed to City of Kalispell standards. In general, all street and parking lot design meets or exceeds the minimal requirements of the Subdivision Regulations, with the exception of Siiverbrook Drive, which has been designed aforementioned. An extensive trail system has been designed and is planned to interconnect the residential areas with the commercial areas and to other future trail connections that may occur in the future, to adjacent properties. The trail system near the Stillwater River will be constructed utilizing the most sensitive construction techniques and materials, so as to protect the natural resources of the river and the surrounding wildlife habitat. The roads and trails plan has been provided in Exhibit F of this submittal. Reference Exhibit F for street sections and illustrative images of the right-of- way vehicle and pedestrian interface, including tree boulevards, sidewalks and trails. (6) Vehicle. emergency and pedestrian access, traffic circulation and control; Vehicle traffic is concentrated on a hierarchal system of roads, which includes through streets, loop drives, cul-de-sacs and on -street parking. Emergency access is provided according to city standards. Pedestrian traffic will be concentrated on sidewalks, trails and pedestrian crossings. Traffic control will be provided via standard signage and devices, including stop and yield signs, directional signage, pedestrian warning signs and trail heads. (7) Location, size, height, color and materials of signs All signage will be designed and constructed according to the Silverbrook Estates Codes, Covenants and Restrictions (CC&R's) and the Design Guidelines. (8) Location and height of fencing and for screening; All fencing and screening will be designed and constructed according to the Silverbrook Estates Codes, Covenants and Restrictions (CC&R's) and the Design Guidelines. Common area fencing will be installed by the Master Developer and eventually maintained by the POA. This fencing is meant as a partial physical screen to lots with unique placement situations or areas that require some degree of separation. This would be for mostly aesthetic or functional purposes. These fences will be designed according to the Design Guidelines. Silverbrook Estates 9 (9) Location and type of landscaping; All landscaping will be designed and installed according to the Silverbrook Estates Codes, Covenants and Restrictions (CC&R's) and the Design Guidelines. in order to create attractive and livable lots along US Highway 93, the Master Developer will install considerable landscape improvements along this corridor. In the open space along this arterial, the Master Developer will install evergreen and deciduous tree plantings and screenings, so as to reduce negative impacts from the heavy use of US Highway 93. Earthen berms will be used to assist in the screening of the residences along this corridor. A trail will also be installed, which well meander through the open space, and connect the commercial area with the southern portion of the Subdivision. The Master Developer also intends to intensively landscape the created pond and water feature area throughout the northeast and middle of the overall property. This will feature a more manicured and maintained appearance than the visually connected natural spring -fed area down hill. (10) Location and type of open space and common areas: The open space and common areas have been designed to be accessible by all residents and users within the Silverbrook Estates Subdivision and the City of Kalispell. Approximately 12% of the overall property has been established as open space and common area. Additionally, the commercial areas will have pedestrian plazas and gathering spaces. (11) Proposed maintenance of common areas and open space: All maintenance of common areas and open space will ultimately be maintained by the Silverbrook Property Owner's Association. (12) Property boundary locations and setback lines: The property boundary and setback lines have been illustrated in Exhibit H, "PUD Boundary Map." These locations are for the entire subdivision and have been established according to the Subdivision Regulations. (13) Special design standards. materials and/or colors: Special design standards, materials and/or colors are discussed in the Silverbrook Estates Design Guidelines document, which is provided with this application as Appendix E. Silverbrook Estates 10 (14) Proposed schedule of completions and phasing of the develooment. if applicable: The Silverbrock Estates Subdivision will be developed utilizing two different preliminary plats, submitted separately from each other for review and approval. These two Preliminary Plats will be initiated in the following time lines: Preliminary Plat 1 installation of improvements will be initiated after Preliminary Plat approval and are planned to be competed in the summer of 2007; Preliminary Plat 2 installation of improvements will be initiated in the summer of 2008 and completed by the summer of 2010. Development Phase 1 and 2 have been graphically delineated in Exhibit I. This is described in more detail in Section V.0 of this document. However, it is understood that at this time, the Applicant is only requesting review of Preliminary Plat 1. Given the explanation above, the two Preliminary Plats will be developed acdording to the following implementation initiatives: 1. Preliminary Plat 1 Aforementioned, the first development phase will commence as soon as the preliminary plat is approved. It is anticipated that this phase will be completed by the end of the summer of 2007. This plat includes the development of the lower one-half of the development to include various residential lot sizes. All required infrastructure and utilities throughout the development will allow this plat to be self sufficient, also allowing multiple access points to the subdivision. Adjacent open space will also be included as a part of this plat. This plat will be able to be serviced by the Fire Department. 2. Preliminary Plat 2 Aforementioned, Preliminary Plat 2 is anticipated to start during the summer of 2008 and be completed in the summer of 2010, in coordination with the Fire Department's ability to accommodate the required response time. This will include the upper one-half of the overall development, including the balance of the single family residential development all the commercial and town home residential areas. The remaining interior and perimeter open space and infrastructure and utility extensions will be included to service this final plat. Reference Table 1 below for approximate timing of Preliminary Plat approval, initiation of improvements, completion of improvements, sale of lots and full build out of the project. Silverbrook Estates 11 Table 1: Preliminary Plat Phasing PRELIM APPROVAL INITIATE COMPLETE 1 LOTS FULL PLAT ANTICIPATED IMPROVEMENTS IMPROVEMENTS SOLD BUILD OUT 1 1212006 SP/2007 SU/2007 W1/2007 NOT KNOWN 2 SP/2006 SU/2008 SU/2010 FALL/2010 NOT KNOWN (15) Covenants. conditions and restrictions; The Codes, Covenants and Restrictions have been designed and have been submitted as an integral piece of this application. They describe the overall intent of the project as well as the specifics for administration, enforcement, quality of life and legal aspects involved in the development of the Silverbrook Estates Subdivision. The Silverbrook Estates Codes, Covenants and Restrictions have been provided for reference, in Appendix D of this submittal. Also, architectural elevations and visioning illustrations have been provided in Exhibit G. These assist in expressing the overall aesthetic intent of the ultimate design and construction as envisioned by the Master Developer. (16) Any other information that may be deemed relevant and appropriate to allow for adequate review. A comprehensive Major Subdivision and submitted that encompasses the required supplementary information meant to better Silverbrook Estates Design Team. PUD application has been information in addition to describe the intent of the Silverbrook Estates 12 B. Subdivision and Zoning Relaxations for PUD The Applicant is requesting the relaxations below, from the City of Kalispell Subdivision Regulations and Zoning Regulations. These relaxations have been determined after careful determination so that the integrity of the design and vision of the overall community are positively enhanced rather than negatively influenced or impacted. Relaxation 1: From Subdivision Regulation, Section 3.07, B (Design Standards - Blocks) Description: The Applicant requests the allowance of a longer block length than the permitted maximum of 1,200 feet. The layout of lots in Silverbrook Estates contains several blocks which are in excess length, according to the specified maximums in the regulations. The Applicant believes that this is necessary to create the overall design intent and that it does not negatively impact the adjacent properties or internal lots within the Subdivision. Pedestrian connections and vehicular access is provided that mitigates any concerns with connectivity within the Subdivision. Relaxation 2: From Subdivision Regulation, Chapter 3, Section 3.11, A (Sidewalks) The Applicant has proposed to construct the loop drive, Diamond Peak Loop, in the center of the Neighborhood Commercial area with a sidewalk provided only on the exterior side of the drive itself. This is illustrated in Exhibit F, "Road Section G." This would be a relaxation to allow sidewalk for pedestrian only on the outside of the loop drive instead of on both sides, providing a green space to the interior of the loop, for landscaping. Relaxation 3: From Zoning Regulation, Section 27.07.040 (1) (R-4 Two Family Residential — Property Development Standards) Description: The Applicant requests the allowance of a smaller Minimum Lot Area than the zoning regulation permits. A Minimum Lot Area of 4,250 square feet is requested for the Town Home area within Silverbrook Estates. The zoning regulation requires a minimum of 6,000 square feet. Thus, the Applicant is requesting a lot that is 1,750 square feet in size less than the regulation dictates. The Applicant believes that this is necessary to provide a tight -knit town home community with affordability and low maintenance lots. These lots will be marketed to a developer who will invest in building all of the Town Home units within Preliminary Plat I. Relaxation 4: From Zoning Regulation, Section 27.07.040 (3) (R-4 Two Family Residential — Property Development Standards) Description: The Applicant requests the allowance of reduced front and side corner yard setbacks for the R-4 zoning district, Town Home area units. The zoning regulations require setbacks of 15 feet for both front and side corner yards. The Applicant proposes ten -foot setbacks for these yards. The Applicant is positive that this will positively influence the overall layout of the Town Home units, allowing them to be placed closer to the street, to have more interaction with Silverbrook Estates i 3 the streetscape and the pedestrian interface. In addition, it allows the lot to be more buildable, with less green space to maintain, appealing to a "low maintenance° buyer. Relaxation 5: From Zoning Regulation, Section 27.22.090 (Supplementary Regulations - Fences, Walls and Hedges) Description: The Applicant requests the allowance of a taller fence than is normally permitted in the zoning regulation. The zoning regulation permits a 42-inch tall fence. The Applicant desires to allow 48-inch tail fences in all areas within the Subdivision. These fences are controlled through the CC&R's and the Design Regulations, ensuring that they are not opaque (solid) fences and that they are constructed to certain specifications defined in those documents. Fences will be rustic in nature and will be meant to provide mostly visual separation rather physical barrier to adjacent areas. Any fences used for screening of ground -mounted mechanical equipment will be limited to five feet in height. Relaxation 6: From Zoning Regulation, Section 27.13.040 (3) (B-1 Neighborhood Buffer District - Property Development Standards) Description: The Applicant is requesting the allowance of reduced front. and rear yard setbacks for the Neighborhood Commercial areas within the Subdivision. The zoning regulations require front and rear yard setbacks of 20 feet. The Applicant desires to allow front and rear yard setbacks of five feet. This is intended to provide a more "urban" street interface with the store frontages and create a streetscape that is pedestrian friendly and accessible for walking and shopping comfortably. It will also allow the commercial lots to be situated directly adjacent to key pedestrian plazas and gathering areas or open space. Relaxation 7: From Zoning Regulation, Section 27.13.040 (5) (B-1 Neighborhood Buffer District — Property Development Standards) Description: The Applicant is requesting the allowance of increasing the Permitted Lot Coverage from 50 percent to 100 percent. In the Neighborhood Commercial area this would allow the lots, which are basically building footprints, to be situated directly adjacent to the pedestrian streetscape, plazas and open space. This will create a tight knit pedestrian oriented commercial area, possibly teaming with retail, dining, and business opportunities and experiences. Relaxation 8: From Zoning Regulation, Section 27.26.040 (5) (Off -Street Parking — Special Provisions) Description: The Applicant is requesting the allowance of the creation of a "Silverbrook Estates Parking Regulation, Management Plan and Ordinance," to provide for direction in the planning and design of ail parking facilities within the Neighborhood Commercial (B-1) area of the Subdivision. This document is intended to specifically dictate the design and layout of parking lots within the Neighborhood Commercial area, including number of spaces appropriated for each commercial use, shared parking arrangement, off-street loading, overnight parking, violations and administration. Basically, there would be four parking areas, delineated on the plat as a lot, to be used exclusively for parking in the Neighborhood Commercial area. Silverbrook Estates 14 Reference Table 1 of the document for obligations for lot owners. This document is provided in the appendix of the CC&R's. Relaxation 9: From Zoning Regulation, Section 27.27.020 (1) — (6) (Off -Street Loading — Standards) Description: The Applicant is requesting the allowance for permitting an alternative loading and berth plan for the Neighborhood Commercial District, through the "Silverbrook Estates Parking Regulation, Management Plan and Ordinance." This is described in Section 3.2 of the document. Aforementioned, the Applicant has prepared a comprehensive document entitled "Silverbrook Estates Design Guidelines." This document describes in detail the sign plan for the entire PUD. The Applicant believes that there are no obvious relaxations that are necessary in order to implement this sign plan included in these guidelines. Should the Planning Staff and review agencies discover possible relaxations necessary to implement the sign design guidelines, at that time the Applicant would address necessary amendments to this Preliminary Plat and PUD application. Silverbrook Estates 15 The proposed Silverbrook Estates Subdivision occupies land sloping to the west toward the Stillwater River. An unnamed existing drainage swale, which turns into a tributary, bisects the property from the northeast to the southwest, where steeper slopes occur. This project proposes to enhance and emphasize this drainage swale, creating gradations of park -like pond and water features as it nears the Stillwater River. In addition to this waterway, lined ponds are proposed for the subdivision. The 100-year floodplain and wetland areas currently exist on -site, adjacent to the Stillwater River. 1. Geology A topography map of the project site has been included on the "Preliminary Plat", Reference Exhibit K for topography. The project site consists of a steady slope down to the west. According to NRCS soils information, the majority of the site consists of 0-3 percent slopes with pockets of seven percent slopes. As the bisecting drainage swale approaches the Stillwater River, slopes range from 30-35 percent. Our research for this geology study consists of collecting, summarizing and analyzing geologic information that exists for the area encompassing and adjacent to the project site. Hydrogeological data (well log reports) are utilized to provide insight as to the general hydrogeology of the site and surrounding areas. Reference Appendix L. Investigation indicates subsurface Glacial Lake deposits throughout the entire site. This includes calcareous fine sandy silt, clayey silt, and minor clay; with thicknesses averaging 100 feet, but up to 270 feet. There are no known unusual conditions regarding installation of water supply/sewer collection trenches, and underground electric and telephone cables. NRCS soil maps indicate that Tally soils dominate the site, with patches of Blanchard fine sand and Kalispell loam. Areas located along the Stillwater River, where the west property line meets the river, show signs of slumping. To prevent further slumping, development will remain setback from these areas of steeper Alluvial Land (Ab) soils. Reference Appendix K for soils information. According to the "Uniform Building Code," the Flathead Valley is located in seismic Zone 3, which is rated as moderate to high for probability of seismic activity. Properly constructed dwellings provide reasonable protective measures against seismic instability. Roads or streets shown on the plat will be designed with minimum grade changes and disturbances to the natural terrain. This can be accomplished given the gentle terrain found throughout the project site and in the general vicinity. Where minimal cuts and fills are necessary, design criteria will ensure a safe slope from the shoulder and provide for the return of topsoil cover during seeding and re -vegetation. 2. Surface Water The site is situated within the Stillwater River drainage system. The surface water follows the topography from the northeast to the southwest. A culvert under Church Drive brings surface water from adjacent properties on -site, draining into an unnamed main drainage swale, turning into a tributary to the Stillwater River. While most of the on -site surface water also flows into this drainage swale, there is an additional low area on site in the southwest Silverbrook Estates 18 corner of the development, separate from the main drainage. All surface water on -site then drains to the west into the Stillwater River. The main drainage swale flows into a small wetland area just prior to releasing into the Stillwater River. There are no known artificial water,,-- wtems on site. A t.f' .aand aiineat on report has been completed by a wetland consultant, PBS&J. This indices t__it two wetlands and a "wetland fringe" are located along the west portion is develops Wetland 1, as defined in the Wetland Delineation report in Appendix F, t� -s. This wetland has a naturally occurring spring and also receives flow ue swale mentioned above. Wetland 2 is located along the northern ri ie Stillwater River meets the west property line. Wetland 2 consists of vetland fringe", a scrub/shrub area, is two acres in size and is located -;long : —erty line furthest to the south. Wetland mitigation may need to occur just Stillwater Drive crosses Wetland 1. This would be achieved with the as .':and mitigation consultant and applicable jurisdictional agency review. i, a ,-auiics Report has been prepared by a hydrology consultant, PBS&J. This report further describes the hydraulic modeling, the floodplain and stream flow data for the Silverbrook Estates property. This report has been provided in Appendix F. Areas along the Stillwater River also include a 100-year floodplain. A Floodplain Report has been included in Appendix G. 3. Vegetation The project site has historically been used for crop production, including small grain crops. As mentioned above, wetlands occur within the project area. Aforementioned, a Wetland Delineation has been completed by a wetland consultant. This report indicates that Wetland 1 is a mixture of palustdne emergent marsh and scrub/shrub wetland with some shallow open water and aquatic bed habitat included. Wetland 2 is less diverse and only supports emergent vegetation. The "wetland fringe" is comprised primarily of shrub species. Reference Appendix F for the Wetland Delineation. Along the Stillwater River and around these wetlands are some coniferous tree groupings and grassy meadows. The property's approximate peak elevation of 3,030 feet has an annual precipitation of 14 to 18 inches. The average annual precipitation of approximately 15.70 inches was estimated from weather station # 244558, Kalispell WSO Airport. The existing native vegetation adjacent to the Stillwater River will be preserved in its near entirety since development will only occur in areas historically used for agriculture. Enhancements to the main drainage -way include creating new ponds and enlarging existing ponds with periodic small waterfalls. Minimal existing vegetation will be removed. Although most of the property is used for crops, it is assumed that there is the potential for at least one or more species of noxious weeds to be present on or near the site. Control methods for noxious weeds will be used following construction activities at the site. Most likely, there will be chemical control throughout the site along disturbed areas. Other mechanical methods will be used when necessary, for conditions or when recommended. A Vegetation and Wildlife Map has been provided as Exhibit J. This map illustrates the prime areas for wildlife group inhabitation and the major vegetative covers associated with the Silverbrook Estates property. Silverbrook Estates 19 4. Wildlife The Silverbrook Estates property has been established as good wildlife habitat for birds, waterfowl, and small mammals, including raccoons, skunks, pheasant, turkey and partridge. This is especially true near the Stillwater River and the wetland areas on the site. The development plan calls for protecting the key areas of wildlife habitat for these species, while providing increased water features and vegetation for nesting and shelter. This area is not known to generally support large numbers of big game (mountain lion, elk, moose, or black bear), however occasionally these species are found to have visited. the site. It is understood that larger mammals are infrequent visitors. However, Whitetail Deer have been spotted on site frequently. Evidence of bedding down has been observed. These areas are proposed to be preserved with minimal disturbance to existing conditions. Bull Trout, an endangered species, have been sighted in the general area. No other known protected species inhabit the property. To minimize conflicts between residents and wildlife, individual waste containers shall be stored within their garages. Animal -proof waste receptacles will be provided in open spaces or park areas. Mark Deleray, Montana Fish, Wildlife & Parks (MFWP), Fisheries Biologist, indicated a few basic concerns regarding fisheries as it relates to stormwater runoff and warm water situations. In regards to stormwater runoff, adding potential pollutants created by a drainage system (comprised of curb and gutter, stormdrain inlets, culverts, retention areas, etc.) is proposed for the development as it flows into the tributary, and eventually into the Stillwater River. The second concern is the enlarging of water bodies within the spring -contributing drainage -way, potentially introducing warmer waters into the Stillwater River. Setbacks along the Stillwater River and erosion can be minimized during road construction by utilizing Best Management Practices (BMP's). Best Management Practices utilize controls to minimize possible contamination of surface water. By utilizing BMP's for construction of internal roads and other infrastructure, water quality will not be compromised. Tim Their, MFWP Wildlife Biologist, indicated additional concerns related to development and wildlife impacts. These include the cumulative effect of reduction of small -grain fields that currently support upland game birds and migrating waterfowl, water supply availability and specific improvements along the Stillwater River. With the inclusion of this parcel within the City of Kalispell Growth Policy, it is acknowledged that growth will spread to this area, reducing the amount of properties being used to cultivate small -grain fields. However, just north of this property there exists a 240-acre conservation easement under small -grain agricultural production, that will continually support wildlife. In regards to water supply for ponds, the existing natural spring will be maintained. The shape of the pond that it collects in may, however change. Lastly, the improvements along the Stillwater River will include trails. Minor regrading to accommodate safe slopes will occur. To adjust these grades, BMP's will be adhered to. 5. Agriculture and Timber Production The project site generally has a farmland classification of "prime farmland" when irrigated. Approximately 294 acres of the overall 325 acres have produced alfalfa. Historically this site has produced alfalfa with a yield of 4.0 to 4.4 tons per acres. Because this land has been used for farming, it is obvious that the proposed subdivision will remove agricultural land Silverbrook Estates 20 with existing production capacity. However, the subject property has been included in the Growth Policy for the City of Kalispell. Therefore, this area is intended to accommodate future growth, and is anticipated to be annexed. This project area would not create conflicts with nearby agricultural operations, which are currently producing alfalfa. There is currently no timber production in the area. Lot owners and residents of the subdivision will be informed, through the Covenants, that adjacent land uses may be agricultural, involving agricultural and farming practices, which can result in dust, animal odors, flies, smoke, and machinery noise (sometimes early in the morning and late into the evenings). 6. Historical, Archaeological or Cultural Features The Montana Historical Society and the State Historic Preservation Office were contacted regarding historical and cultural issues for the property. The Montana Historical Society has responded with a letter that indicates that no significant cultural resources have been found through preliminary searches. However, Damon Murdo, Cultural Records Manager, recommended that if any development should be planned for the Stillwater River area, that the Applicant be careful to not impact potential significant sites. If any prehistoric cultural material is encountered during subsurface disturbance phases of the proposed work, construction should be suspended and a professional archeologist be notified. At.this time, no known historical, archaeological or cultural features are located in the development area. With respect to surrounding cities, towns, developments, or homes, the proposed subdivision is bordered by agricultural property to the south, US Highway 93 to the east, a conservation easement to the north, and the Stillwater River to the west. Local zoning regulations along with PUD modifications will be utilized for ultimate build -out of the subdivision. Hence, visual impact as a result of this development is minimal with respect to roads, adjacent developments, or any other public facilities. Roads are planned to affect the natural terrain as little as possible with grades and alignment designed to reduce cuts and Fills. All excavated areas will be reseeded and returned to the natural vegetation. Utilities are anticipated to be underground with boxes and structures positioned out of sight as much as possible or designed to fit into the character of the land. 7. Sewage The developer will extend a city sanitary sewer mainline to the project area along US Highway 93. The proposed City of Kalispell sanitary sewer extension location, diameter and capacity are being determined in a Preliminary Engineering Report currently being prepared by the Civil Engineering consultant. The gravity collection main size, lift station capacity and force main are being sized based upon the contributing basin population projections for a 20-year planning horizon, as required by the City of Kalispell and MDEQ. The preliminary engineering design will be reviewed by the City of Kalispell, MDEQ and MDOT. The Applicant will work with the Kalispell Public Works personnel in the design and location of ail sanitary sewer lines including possible improvements of existing sewer lines at those points of connection. Morrison Maierle and HDR Engineering are currently working on design of City of Kalispell's wastewater treatment plant, Phase I expansion project. Siiverbrook Estates All sanitary mainlines within the development will follow road systems or utility easements, and would be owned and maintained by the City of Kalispell. The design and construction will be the Master Developer's responsibility. The Applicant anticipates two lift stations will be required for this development. Locations are undetermined at this time. The Applicant intends to provide sewer mains with gravity flow within the development, ultimately to lift stations as required. The layout for Silverbrook Estates Subdivision represents approximately 586 residential lots, consisting of one -quarter to one-half acres in size, with an abundance of open space. According to the 2000 Census, Flathead County data reflects approximately 2.48 people per dwelling unit. Using 100 gpd/person for wastewater generation, this corresponds to 248 gpd/dwelling unit. Ultimately, Silverbrook Estates may generate 145,328 gpd (586 dwelling units x 248 gpd/dwelling unit). The flow estimation will be defined by MDEQ requirements. The commercial area will consist of 12 buildings. Since there is a projected build -out over the next few years, specific lot uses are unknown and water demand is difficult to predict. For planning purposes, the Applicant anticipates a conservative generation per building lot to be 500 gpd. The anticipated demand at full occupancy is approximately 6,000 gpd for the commercial lots ((500 gpd/lot) x (12 lots) = 6,000 gpd). The anticipated demand at full occupancy for Silverbrook Estates is approximately 151,328 gpd for this PUD (145,328 gpd + 6,000 gpd). This number will ultimately be defined by MDEQ requirements. Currently, the Applicant is planning for two phases for the proposed Silverbrook Estates Subdivision. This would reflect 285 residential lots for Phase 1 to be constructed summer of 2007. The summer of 2010 is the estimated completion for Phase 2 and includes 301 residential units. No industrial wastewater is planned as part of this development. Moore Engineering has prepared a Preliminary Engineering Report that presents and clarifies issues regarding site drainage and proposed sewer facilities. This report has been provided as Appendix H. 8. Water City water mains are also proposed to be extended to the project area along US Highway 93, at the Master Developer's expense. The Applicant is working with the Kalispell Public Works Personnel in the design and location of all city water and fire -protection needs. The proposed water main extension location and diameter is being determined in a Preliminary Engineering Report, which is currently being prepared. The water line diameter is being sized based upon the contributing basin population projections for a 20-year planning horizon, as required by Kalispell and Montana Department of Environmental Quality (MDEQ). The preliminary engineering design will be reviewed by the City of Kalispell, MDEQ and MDOT. The Applicant is proposing a new well and pump house within this development for the purpose of supplementing the city water system and satisfying water looping requirements. Silverbrook Estates 22 The Subdivision will then connect into this City water main extension. Within the development, the water mainlines will also generally follow the road systems and will be designed to meet City of Kalispell standards. The design and construction of all water mains will the developer's responsibility. However, all water mainlines extending to the development and then within the development will be owned and maintained by the City of Kalispell. The consumptive water demand is consistent with the anticipated wastewater generation. The Applicant also has water rights from the Stillwater River for 12,000 gpm from an existing pump previously used for irrigating cropland. This will be used for irrigating open space, parks and common areas. These water rights and source will also be used to fill and replenish the ponds and water features within the Subdivision. Ground water well logs have been provided for the area and are located in Appendix L. 9. Solid Waste Solid waste collection may be serviced initially by a private hauler and then eventually by city Public Works, with disposal in the Flathead County Solid Waste Facility. Evergreen, a private hauler, has been contacted and the Applicant is awaiting responses. However, solid waste disposal will meet the requirements of the Department of Environmental Quality. Residential solid waste is anticipated to be collected from individual containers located at the street of each residence. With the exception of collection days, the individual containers shall be stored out of view. Commercial solid waste is anticipated to be collected at central trash container areas within the Neighborhood Commercial area, with individual containers placed near the lot, but within the district parking areas. 10. Drainage A drainage system comprised of curb and gutter, bridges, storm drain inlets, and culverts is proposed for the internal roads. All roads within the subdivision will be paved. Drainage facilities will be designed and installed to accommodate a two-year storm event in accordance with standard stormwater mitigation processes. The system will also be sized to allow for a 100-year event in accordance with Montana Department of Transportation standards. A detailed storm drainage plan will be submitted for review and approval to City of Kalispell. Runoff will be determined using current regulation for precipitation / frequency values. Roads or streets will be shown on the plat and will be designed with minimum grade changes and disturbances to the natural terrain. This is due to the gentle terrain found throughout the construction area. Where minimal cuts and fills are necessary, design criteria will ensure a safe slope from the shoulder and return a topsoil cover for seeding and re- veg etati on. The existing drainage system within open areas will remain intact with grading kept to a minimum, maintaining existing drainage patterns. The main drainage swale will be enhanced, creating areas of naturalized pooling water and small water falls. Some pond - lined water features, not directly connected to the main drainage swale, may act as Silverbrook Estates 23 detention facilities. The difference between pre -development and post -development storm water volume shall be used for on -site detention basin design. Erosion control can be minimized during road construction by utilizing. Best Management Practices (BMP's). Best Management Practices use controls to reduce possible contamination of surface water. Erosion control plans will be designed and reviewed in accordance with MDEQ requirements. Moore Engineering has prepared a Preliminary Engineering Report that presents and clarifies issues regarding site drainage and proposed sewer facilities. This report has been provided as Appendix H. 11. Roads This subdivision will inherently generate more traffic along Church Drive. Montana Department of Transportation (MOOT) is currently redesigning the intersection of Church Drive and US Highway 93, as well as the 750 linear feet west from the interchange along the project site. The Applicant has been in contact with MOOT for coordinating with our proposed project. Silverbrook Estates' Master Developer intends to annex the property and half of the 60-foot right-of-way of Church Drive along the property. The Master Developer plans to finance the design and construction of the rest of Church Drive west of the 750 foot extension to the intersection of Church Drive and Prairie View Road, to county standards. It is proposed that lots within the subdivision shall not have direct access onto an existing arterial road. The lots will have access directly off of the proposed interior roads. No access will be required across private property in residential areas. The commercial area is currently being evaluated for these issues. The Montana Department of Transportation (MOOT) has indicated they will grant access onto US Highway 93 as shown on the plan, with approach permits being obtained following Preliminary Plat approval. The road system network throughout Silverbrook Estates will meet or exceed the City of Kalispell standards, with minor modifications. The design and construction of the road system will be financed by the Master Developer. The road system will eventually be dedicated to the City. Future maintenance of these streets will be the responsibility of the City. A "Preliminary Traffic Impact Study" has been prepared to specifically evaluate existing and proposed daily traffic needs adjacent and within the development. Reference Appendix I for the "Preliminary Traffic Impact Study." 12. Emergency Services Upon annexation, the project site will be serviced by the Kalispell Fire Department. Randy Brodehi has been contacted about serving this development. To accommodate future growth of the area, an approximately 2.5 acre parcel will be dedicated to the City of Kalispell Fire. This parcel is conveniently located along Church Rd on the west end for quick and safe access. The Fire Department plans to use this parcel for a well site and fire station. Until the fire station parcel is operational, the phasing and timing of this project will be closely coordinated to ensure proper response time and available personnel are available. Response to the site is dependent on several factors, including, but not limited to the Silverbrook Estates 24 distance from the scene, weather, road conditions, and availability. As a component of this development, the Applicant will extend city water services to the project area. Fire hydrants are proposed to connect into this service as well as commercial areas will be required to install fire suppression sprinkler systems. The pressure required to operate, and the locations of these systems will be adequate and will meet all required local, state and federal requirements. The Applicant received a response letter from the Kalispell Police Department and is currently working with the Kalispell Police Department to discuss law enforcement concerns. Ambulance and EMS service will be provided by the City of Kalispell Fire Department. Medical services will be provided by the Kalispell Regional Medical Center, which is located five miles from the project site. 13. Schools Kalispell Public Schools has been contacted about their capacity, facilities, personnel, and bus routes, to accommodate the increase in students that may attend the schools from Silverbrook Estates. On September 20, 2006, discussions with Superintendent Darlene Schottle identified potential strategies to lessen the impact of providing service to these additional attendees. With the new high school located at West Reserve and Stillwater, her concerns basically involved elementary age children, primarily kindergarten and first grade. instead of adding to an existing facility, one creative idea discussed is to potentially provide an area within the development for a 2,500 to 3,000 square foot facility (2-3 classrooms), similar to a preschool, where teachers could conduct satellite classes. This was one of many ideas discussed. The Applicant will continue discussions with the School District. Darlene did indicate whether or not the School District #5 will be able to accommodate the projected 300 additional attendees. This number is estimated by using 0.5 students per residence. 14. Economic Benefits The expertise of an economic consultant was retained for evaluating the economic benefits and impacts of the Silverbrook Estates Subdivision. Dr. Ann L. Adair, Senior Economist, from the MSU Center for Applied Economic Research evaluated the commercial impact and the residential market. Reference this document in Appendix J. The present tax classification and designation for the subject property is "agricultural rural" with a tillable, grazing designation and one -acre farm site improvements. The change of classification to residential urban and commercial urban will greatly elevate the tax potential. The property of Silverbrook Estates in 2005 generated approximately $12,000 in general taxes. The current general tax generation under the existing classification will be provided as well as the anticipated general tax potential for the fully developed subdivision. There are no foreseen economic disadvantages to the community that will be caused by this development. 15. Land Use The current and historical use of this land is agricultural. As in compliance with the proposed Growth Policy Amendment, this development is proposing various single family residential, multi -family, and commercial land uses and concurrently seeking annexation as a part of this application. Silverbrook Estates 25 The adjacent land uses include a 240-acre conservation easement, agricultural, and arena (north), US Highway 93 (east), Stillwater river and farmstead (west), and agricultural residence (south). Access for these adjacent land uses is simplified with the proposed development. This project is maintaining no access connections to the west. However land uses to the west and north will benefit from since the Applicant proposes to make improvements along Church Drive, from US Highway 93 along the project site, and extending approximately one mile to the intersection of Church Drive and Prairie View Road. City of Kalispell collector road widths are proposed to be installed for Church Drive. The overall design of Silverbrook Estates allows for future connection to the southern property, which is currently under agricultural residential designation. However, discussions with that property owner indicates it is currently under subdivision redevelopment. Lot owners and residents of the subdivision will be informed through the Covenants, that adjacent uses may be agricultural, involving standard agricultural and farming practices, which can result to dust, animal odors, flies, smoke, and machinery noise (sometimes early in the morning and late into the evening). By following the guidance of the Kalispell Growth Policy, the community needs are being served. The commercial area is located for easy access at the newly redesigned intersection of US Highway 93 and Church Drive. The residential town home then buffers the commercial from the single-family residential. There are currently no existing developments of this nature in the area. There are no known health or safety hazards on or near the subdivision, nor any nuisances being created by the proposed development. 16. Parks and Recreation Facilities The open space within the development is proposed for' passive activities. It will be accessible for use by members of Silverbrook Estates and residents of the City of Kalispell. Areas adjacent to US Highway 93, the main drainage way, the Stillwater River area, and pocket -parks within residential areas will serve as recreation areas. A corridor along US Highway 93 has been proposed, which would include berming, water -features, landscaping, and a pedestrian/bike path to provide recreation and access for the Kalispell community as well as Subdivision residents. This pathway will have a loop, to bring users from the highway corridor, through the community, and along the main drainage way. The meandering main drainage way, with enhanced water features, spans the entire Subdivision and will serve as the main recreation corridor. Moving from east to west, the character of this corridor will transition from a manicured pastoral park to a natural park. Pedestrian pathways serving subdivision residents will provide access to two pocket parks, located within residential areas. Silverbrook Estates is proposed to have all open space to be designed and installed, at the expense of the Master Developer, and maintained by Property Owners Association as mentioned in the "Common Area Management plan." Reference Exhibit C: Land Use Map for open space area locations. 17. Utilities Utility companies have been contacted concerning providing service to the Subdivision. Flathead Electric Cooperative is anticipated to provide both gas and electric service in accordance with applicable Montana Public Service Commission rules and regulations. Silverbrook Estates 26 Telephone service will be famished by Century Tele. Cable will be provided by Bresnan Communications. The proposed location of utilities will be coordinated with the respective utility companies. It is the Applicant's intent that all of these utilities be located underground where feasible and within rights -of -ways or easements. Installation completion date for each has been discussed in the phasing discussion. All appropriate utility easements will be provided along lot lines and roads in accordance with City of Kalispell subdivision design requirements. All proposed easements will be clearly delineated on the plat. Silverbrook Estates 27 Silverbrook Estates consists of two distinct, independent Preliminary Plats, which each contain one phase for infrastructure and improvement development. The Silverbrook Estates PUD and Subdivision was submitted in this manner to allow the Applicant to install infrastructure and improvements within a schedule that met the needs of construction timing, marketing plans and projected absorption of lots. Each plat has been designed to function independently of the other, standing alone in infrastructure, utilities, site amenities, parks and open space, and circulation routes for cars and pedestrians. However, when the entire PUD is implemented, including both plats, the seamless eventual build -out and layout will facilitate connectivity of infrastructure, utilities, vehicular thoroughfares and pedestrian linkages. Reference Exhibit I for the "Development Phasing Plana Even though the two Preliminary Plats were developed for the PUD in this submittal, only Preliminary Plat 1 has been developed to the necessary submittal requirements to qualify for review and approvals at this time. This is illustrated on the Preliminary Plat maps, provided as Exhibit K of this submittal. The Preliminary Plats will be developed and finalized according to the following tentative schedule: PRELIMAPPROVAL INITIATE COMPLETE 1 LOTS FULL PLAT ANTICIPATED IMPROVEMENTS IMPROVEMENTS SOLD BUILD OUT 1 12/2006 SP/2007 SU/2007 W1/2007 NOT KNOWN 2 SP/2006 SU/2008 SU/2010 FALL/2010 NOT KNOWN The following table describes the breakdown of the timing of the development of certain land uses within the two Preliminary Plats. Table 2: Preliminary Plat and Land Use Comparison LAND USE PRELIM PLAT 1 PRELIM PLAT 2 TOTAL Single Family 114 acre 249 137 386 Single Famil 1 /3 acre 31 38 69 Single Famil 1 /2 acre 5 6 11 Town Home 0 120 120 Neighborhood Commercial 0 12 12 Parking Lots 0 4 4 TOTAL 285 317 Silverbrook Estates 28