Loading...
Drainage ReportDRAINAGEREPORT TETON TERRACEDEVELOPMENT FLATHEAD COUNTY GENERAL: The proposed cluster development subdivision is located in the NE '/a of Section 12, Township 28 North, Range 22 West. The site is currently undeveloped land within the city limits of Kalispell. The land is bordered on three sides by multi -family residential housing and suburban agricultural land on the fourth side. Teton Terrace Subdivision is approximately 4.2 acres and will consist of seven duplex and four triplex units. Two asphalt paved access roads with concrete curbs, gutters and sidewalks are planned. Individual driveways and walkways will also be concrete or asphalt. Topography of the site slopes approximately one or two percent downward towards the southwest corner. Minimal site grading will be required for drainage purposes. SOILS: The soils of the proposed site were analyzed based on findings of three exploratory test pits. In general, the soil conditions encountered in the test pits consist of approximately 0.8 to 1.4 feet of topsoil and organic material underlain by 1.8 to 2.1 feet of silty sand and sandy silt. The sand and silt were underlain by lean clay which extends down to a depth of 7.3 to 8.2 feet. Silty sand was encountered below the lean clay in Test Pit TP-1 (see attached test pit logs). No groundwater was encountered in the test pits which were excavated to a maximum depth of 9.0 feet. Infiltration is expected to be moderate to slow in the topsoil and silty sand and nonexistent in the lean clay. In general, runoff will be directed to the road gutter system or drainage swales and will flow to the southwest corner of the site. At the southwest corner, the drainage swale will connect to an existing grassy drainage ditch. The existing drainage ditch flows south to Two Mile drive then west approximately '/a mile where it empties into Spring Creek. Rational Formula: Storm runoff is determined using the following rational formula: Q = C*I*A where: Q = Runoff in cfs C = Runoff Coefficient Unimproved land - 0.1-0.3 Lawns (silty soil) up to 2 % slope - 0.13-0.17 Asphalt - 0.7-0.95 Concrete - 0.8-0.9 Roofs - 0.75-0.95 (Runoff coefficient values from: Lindeburg, C.E. Reference Manual, pg.6-24) I = Rainfall Intensity in inches/hour A = Drainage area in acres DRAINAGE AREAS AND CALCULATIONS: The 4.2 acre site is divided into 4 drainage zones for storm runoff calculations (see Plan Sheet No. 5). Storm runoff is calculated for Zones I -IV for both pre -development and post - development. The undeveloped site was formerly farmland, and currently consists of grasses and weeds at slopes generally less than 2%. Drainage area for the developed site is divided into street/driveway/sidewalk, roof, and lawn areas. Assumptions: 37' wide paved road surface, including curb & gutter 5' wide sidewalks 12' wide driveways, except drive for units 24, 25 & 26, which is as shown on the plans. Roof areas are the full building envelope as shown on the enclosed Site Plan (dashed line). All areas not included above will be lawn. The rainfall intensity for the 2 year - 6 hour design storm is 0.11 inches per hour (see Rainfall Intensity -Duration -Frequency Curve, attached) . The calculations for each drainage zone are attached in spreadsheet format. Runoff from Zones I, III & IV will be directed to the road gutter system or drainage swales. Zone III will flow to the existing gutter in Hawthorne Avenue and will then flow south to the existing drainage ditch along Two Mile Drive. Zones I & IV flow to the southwest corner of the site, where the existing drainage ditch flows south to Two Mile Drive then west approximately 1/ mile where it empties into Spring Creek. Zone II runoff is minimal and will be retained on -site in a small retention/infiltration area. The Developed Site runoff for each zone will be collected as noted above and transported via the existing grassy drainage ditch system to Spring Creek. Erosion is not expected to be a problem due to the flat site conditions. Ian J. Baile 4P. 11137 Thomas, Dean & Hoskins, I c. cW (D v cv w w v. w W 0 0 O pjZ 00 O Q O O O z7 N ay/u! JJ ISNAINI .-l-lbANIV8 3.5-15 I V ti co ro 1— U O O H m m N in �4 m U N u u G z 7 0 v — �4 Q G O �y lL A D O �I T O G u O G H r-1 ,--1 ca 44 N Qi t .^ OD t%. I to 14 Teton Terrace - STORM DRAINAGE CALCULATIONS - Jan., 1996 lJob #: K94-46-5 lComputed by: IJB DRAINAGE ZONE: III DESCRIPTION AREA (acres) RUNOFF COEFF. (C) RAINFALL INTENSITY (in./hr.) RUNOFF (cfs) UNDEVELOPED SITE: 0- 0 0,11 0.000 Unimproved 0.268 0.2 0.17 0.009 0 0 0.17 0.000 j 0 0 0.17 0.000 TOTAL UNDEVELOPED SITE RUNOFF ---------------------------------- 0.009 DEVELOPED SITE: 0 0 0.17 0.000 Lawn/Pasture 0.076 0.25 0.17 0.003 Roof/Decks, etc. 0.111 0.9 0.17 0.017 Street/Driveway/Pkg. 0.081 1 0.9- 0.17 0.012 1 0 0.17 0.000 TOTAL DEVELOPED SITE RUNOFF --------------------------------------- 0.033 NET RUNOFF (Developed Site - Undeveloped Site) ---------------- 0.023 DRAINAGE ZONE: IV DESCRIPTION AREA (acres) RUNOFF COEFF. (C) RAINFALL INTENSITY (in./hr.) RUNOFF (cfs) UNDEVELOPED SITE: Unimproved 0.687 0.2 0.17 0.023 0 0.25 0.17 0.000 0 0.9 0.17 0.000 0 0.9 0.17 0.000 I TOTAL UNDEVELOPED SITE RUNOFF ---------------------------------- 0.023 DEVELOPED SITE: 0 0 0.17 0.000 Lawn/Pasture 0.404 0.25 0.17 0.017 Roof/Decks, etc, 0.253 0.9 0.17 0.039 Street/Driveway 0.030 0.9 0.17 0.005 TOTAL DEVELOPED SITE RUNOFF ------------------------------------- 0.061 - NET RUNOFF (Developed Site - Undeveloped Site) --------------0.037 Teton Terrace - STORM DRAINAGE CALCULATIONS - Jan., 1996 Job #: K94-46-5 lComputed by: IJB DRAINAGE ZONE: 1 11 DESCRIPTION AREA (acres) RUNOFF COEFF. (C) RAINFALL INTENSITY (in./hr.) RUNOFF (cfs) UNDEVELOPED SITE: 0 0 0.17 0.000 Unimproved 3.136 0.2 0.17 0.107 0 0 0.17 0.000 0 0 0.17 0.000 TOTAL UNDEVELOPED SITE RUNOFF ---------------------------------- 0.107 DEVELOPED SITE: 0 0 0.17 0.000 Lawn/Pasture 1.443 0.25 0.17 0.061 Roof/Decks, etc. 0.678 0.9 0.17 0.104 Street/Driveway/Pkg. 1.015 0.9 0.17 0.155 0 1 0 0.17 0.000 TOTAL DEVELOPED SITE RUNOFF ------------------------------------- 0.320 NET RUNOFF (Developed Site - Undeveloped Site) --------------- 0.214 DRAINAGE ZONE: 11 DESCRIPTION AREA (acres) RUNOFF COEFF. (C) RAINFALL INTENSITY (in./hr.) RUNOFF (cfs) UNDEVELOPED SITE: Unimproved 0.109 0.2 0.17 0.004 0 0 0.17 0.000 0 0 0.17 0.000 0 0 0.17 0.000 TOTAL UNDEVELOPED SITE RUNOFF -------- ----------------- ---- 0.004 DEVELOPED SITE: 0 0 0.17 0.000 Lawn/Pasture 0.109 0.25 0.17 0.005 Roof/Decks, etc. 0 0.9 0.17 0.000 Street/Driveway 0 0.9 0.17 0.000 TOTAL DEVELOPED SITE RUNOFF ------------------------------- --- 0.005 NET RUNOFF (Developed Site - Undeveloped Site) --------------- 0.001 U ac3 0 C J SURfACL: Native Grasses and Ver on APPROX SURFACE LLEVATION 25, .,.3 SOIL_ ULSCRIIJTION _ o 1:NFTRATION RESISTANCE/101STURE CONiCNi 2 L,,J n- n_ A = Riows per toot UJ ® = Moisture content o °= 0 10 20 30 TOPSOUORGANICS 1.4 Silty SAND, moist, brown 2 25 Sandy SILT, slightly moist, light brown / 3.5 Lean CLAY, varved, moist, variegated reddish, greenish to yellowish brown 7.3 Bottom of Test Pit: 7.3 Feet Started: 12/08/95 Completed: 12/08/95 Logged by: Terry Stonehocker Excavated by: Nupac c 0 i U X W 0) C C 0 U C W 0 Z 0 3 C 0 u 40 5 , L 1_I_ a _'__'_ J _I 5 �-�-r- � -�-� � _® -� Y-r-r- Try - - r-r _� _ 1. J _ _. _ - L 1 J _ _ _ L J J 10 - — — - -- - -- ;----- 1 i 1 1 1 i l l 1 I I I I I I I I I I I I i r i , -r- r Ti -I- 1 i 1 11 1 1 1 1 1 1 -r, --- rim-- rti-r r1 rr,'- . I 1 1 J 1 I i l l 1 1 j i 1 tI TTTT- r -I-I — -, y-+-I- r1-1-1- tY-i-- r♦ -I- _I_i ----- L 1 1 _ 1 � ;-- 15 I--- , 1 1 1 i 1 1;-- 1 1 1 1 11 1 1 1 I 1 1 1 1 1 r I -I - - r i -1 -I- r 1 -I -I- r 1 -1 -r-- -+-I--r,'Y L 1 _I J _I_ L 1 J_ _ L 1_ I 1 I 1 1 1 1 1 r t - r I I -r r I i-I- r r I-- L 1__ 1 L 1 J _1_ _ L 1 J_- - r, r , 20 I--r� LUG—LN D NOTE The st,216cotton t,ne5 represent opproumate bounCoaes bctaecn A, SI'1 tllows iao! Atter ber Luni_,5_Plostw- Limit sal tyxs. ACto01 boundorics moy be grodua1 or t*onvGoccl p^r . 0 Field ma1;11Jr^ �arltnnl Y �_-_--- -- water Content Log of Test Pit TP-3 v_ Or")und titer jjg:nd Llm'l Proposed Housing Project Ic `no nplc Teton Terrace I_ i SIB mf h -O sornpler 1L 2 Inct, I t) sornpler Kalispell, Montana IIIk 2 1/2- Imh I.O. ring sampler December, 1995 K94-46-7 jfjr 3--inch ID thin--vtolled sompler THOMAS, DEAN & HOSKINS Figure 4 a No sample recovery & Engineering Consultants Sheet 1 of 1 9 SURi-ACC: Native Grasses and Vegf+ Tn = o r a c3 APPROX SUR ACr LLCVAIION: 29; n_ ; 0 0. SOIL nCSCRIf'TION o cr: 0 v TOPSOILIORGANICS 0.8 Sandy SILT, moist, dark brown to light brown 2.9 Lean CLAY, varved, moist, variegated reddish, greenish to yellowish brown - thin layer of white silt with sand at 3.4 feet Bottom of Test Pit: 7.3 Feet Started: 12/08/95 Completed: 12/08/95 Logged by: Terry Stonehocker Excavated by: Nupac L LIG-DU ® SPI blows Oer too' i r:eid rno";tu-c c0'7E' (;'oundwOlC' 'eve: Tc o/cotrt 1L [ -anch 0. sornp'c- [UR 2 - 112 - Inch Lt) r- sompler UIT 5-inch I D. th*n--wc es sornpler c No somple recovery 7.3 /Atterberq t_m its Plostic Linn-! \%-------'Noter Conir r,; c 0 U X W M C W q c 0 C W 6 Z 3 .0 C Z3 U 60-1 '`%1[TRAT10N RESISTANCE/1,40ISRIRE CONirNT f1 " ® = Blows per fool W® = L1o�siurc cunte'q Ln 0 10 20 30 40 50 0 -k® ;�: 7� it 1 ---- 5 _- �, 1 1 1 1 -1- l�l - _--1- - —3- L =L1__I , I r --- - -� -' - - -- - 10 -,-1- r l l-I- r t l--t- r l -1 -1- _I TT-TTTT7 TT-�� -r—r i—r—;—TZ YYY�rT— :1:=rLL i J = 15 : ; ; - rr ,_t - -I- r t -1- ' _ i- T - -1- r T l - r 1 1 1 1 I I 1 1 1 i -rt-1'-rt-l-rr — . i J _ _ - ; J 1 1 1 1 1 t 1 r t T F I L1�_ LIJ_ _L1_ 20 Il�illl 1 NO[[ The slvotificot;on lines represent eppr irnote boundortes between 50d types. ACt J01 bo.nd.—, n,0y 0C 9r0tiv'Ci of Ir0nsd.01101. Log of Test Pit TP-2 Proposed Housing Project Teton Terrace Kalispell, Montana December, 1995 K94-46-7 THOMAS, DEAN & HOSKINS Figure 3 Engineering Consultants Sheet 1 of 1 2 NW SURI ACF._ Native Grasses and Vege+p ion AI'PROX sur;r ACF 1-1 F vnuON: 2P sou OtSCRI111ION > c) C_, > > `� i s n ni N; AI10N PISISTANCE/MOISluR CO -IfN1 A. - flows nc, too, ® A90'siu,(r "o"Ic"t 0 10 20 30 40 S 0 ; \ TOPSOIL/ORGANICS � i �. 1 0 , Silty SAND, moist, reddish brown 2.0 Sandy SILT• slightly moist, light reddish brown �d = 97.0 pcf at w 7"4% —ry-- - - 2.8 Ic Lean CLAY, varved, moist, variegated reddish to yellowish brown 1dry = 115.3 pcf at w = 14.8% - - - • - ; 8.2 I f. L ,_ _J J j Silty SAND, wet, yellowish brown 9.0 Bottom of Test Pit: 9.0 Feet I • . • . . c 10 CUT w O-T-!-�T Z _ r 1 -1 _ T 1 - -1- I- r i _, -,-- Ir 1 _ -I- _ 1 -1 -,- Started: 12/08195 _ _ r .. _. :. _ . . Completed: 12/08/95 ; -; - , Logged by: Terry Stonehocker r ; _; I ; _; ; , ,-' -;_ Excavated by: Nupac _--1 - 20 _ r �..1_ V_�-IVI NOTE The 11 H"1 UoonOrr�es 0 SPT blows per loot /Utcr,Jc:g L,((1,t_loss c _ m+I sod types. ACI-i noy be ® ^:d rno,slure content ; Y_- ____Wote: c:11 Log of Test Pit TP-1 Y �'r:)und Wol'!r level Proposed Housing Project �: ,:�:)b/cI1(n:)asite snrnplc �, Teton Terrace I s�H : , Lu snrnplcr �I ,n n I i, sample, Kalispell, Montana Illk 2 -1 /2 inch I D ring sampler December, 1995 K94-46-7 IRT S-inch 1 D. thin -walled sampler THOMAS, DEAN & HOSKINS Figure 2 No recovery & 1 1 s sample Engineering Consultants Sheet of