Hansz/Waterford on Summit Ridgea
October 6, 1999
Ryan Fisher
Billmayer Engineering
2191 Third Avenue East
Kalispell, Montana 59901
Re: Waterford on Summit Ridge
Dear Mr. Fisher:
The Public Works Department has reviewed the site, roadway and utility plans for the Waterford
project and the following are the items we discussed with you during our meeting October 5`h:
1. A cul-de-sac needs to be constructed at the end of Summit Ridge Drive.
2. A drainage and erosion control plan needs to be developed for the spoil material that is
shown on the plans to be placed adjacent to and south of the project site. Also, as we
discussed, if this property is not part of this development then documentation must be
provided that clearly indicates permission has been obtained for placement of the spoil
material on the property.
3. An easement needs to be provided for the 12-inch diameter water main along the
easterly side of the site.
4. Sidewalks are required on both sides of the streets. This is extremely important in this
type of development where an above normal amount of pedestrian traffic can be expected.
5. Provide a pedestrian path from the project to the north side of Four We Drive to
connect with the City recreation complex.
6. Parking along Waterford Loop needs to be offset from the traveled way so vehicles do
not back into the traffic lane.
Post Office Box 1997 - Kalispell, Montana 59903-1997
Telephone (406) 758-7700 • FAX (406) 758-7758
7. Four Mile Drive should be constructed with 18 inches of select sub -base, 3 inches of
crushed base and 4 inches of asphalt.
8. Waterford Loop should have 4 inches of asphalt.
9. As we discussed, the bid schedule should have an additive alternate for 950 L.F. of 12-
inch diameter water main on Four Mile Drive.
Please let us know your anticipated schedule for submitting the revised plans, and feel free to call
if you have any questions.
Sincerely,
Director of Public
er