Loading...
Various Latecomer Fee CalculationsLatecomers ell"" Project Name -Holiday Inn Express Date: 8/7726®8... v Calculated By: Susie Turner WATER LATECOMER FEE Maximum Day Demand Per EDU = Reimbursement Amount per EDU 0.62 GPM/EDU $194.54 $/EDU TYPE OF DEVELOPED AREA UNITS EDU FEE 1 2. ISingle Family Residence 0 0.00 $ Apartment, Duplex or Multi -Family 0 0.00 $ - Commercial Construction I GPM EDU FEE 3. Maximum Day Demand (GPM) 26.6 1 42.94 1 $ 8,352.67 Fire Flow GPM I EDU I FEE 4. lCurrent Set Aside Fire Flow 1000 5. JAdditional Development Fire Flow 500 806.45 1 $156,887.10 Total Water : 42.94 $165,239.77 SEWER LATECOMER FEE Maximum Peak Hour Flow Per EDU = Reimbursement Amount per EDU 2007 Year 0.66 GPM/EDU $527.73 $/EDU TYPE OF DEVELOPED AREA UNITS EDU FEE 1. 2. JApartment, Sin le Famil Residence 0 0.00 $ - Duplex or Multi -Family 0 0.00 $ - Commercial Construction GPM EDU FEE 3. Maximum Peak Hour Flow (GPM) 1 0.0 0.00 $ - Total Sewer: 0.00 $ - Total Latecomers Fee: $165,239.78 Latecommers Fee Project Name: Tally Lake Ranger Station Date: 9/24/2007 Calculated By: Susie Turner Maximun Day Demand Per EDU = Reimbrusment Amount per EDU 2008 , Year 0.62 GPM/EDU $194.54 $/EDU TYPE OF DEVELOPED AREA UNITS EDU FEE 1. 2. Single Family Residence 0 0.00 $ - JApartment, Duplex or Multi -Family 0 Q Commercial Construction GPM ' EDU FEE 3. Maxumum Day Demand (GPM) 0.0 635.61 $123,651.57_ Fire Flow GPM EDU FEE 4. lCurrent Set Aside Fire Flow 1000 5. 11froposed Devlepment Fire Flow 1500 0.00 $ - Total Water: 635.61 $123,651.57 Maximun Peak Hour Flow Per EDU = Reimbrusment Amount per EDU 2008 Year 0.66 GPM/EDU $556.44 $/EDU TYPE OF DEVELOPED AREA UNITS EDU I FEE 1. 2. ISingle Family Residence 0 0.00 1 $ JApartment, Duplex or Multi -Family 0 0.00 $ - Commercial Construction 3. Maximun Peak Hour Flow (GPM) GPM 10.5 EDU 15.91 FEE $ 8,852.45 Total Sewer: 15.91 $ 8,852.45 Total Latecomers Fee: $132,504.03 Latecomers Fee Project Name: DNRC/DEQ Co -Location 655 Timberwolf Parkway Dabs: 8/15/2008 Calculated By: Susie Turner WATER LATECOMER FEE .�Year Maximum Day Demand Per EDU = 0.62 GPM/EDU Reimbursement Amount per EDU $194.54 $/EDU TYPE OF DEVELOPED AREA UNITS EDU FIEE Commercial Construction I GPM EDU FEE Fire Flow GPM E U I FEE T( Nater : /1,216.45 $ 236,64t 178 Maximum Peak Hour Flow Per EDU = Reimbursement Amount per EDU 2008, Year 0.68 GPM/EDU TYPE OF DEVELOPED AREA UNITS- EDU FEE Commercial Construction I GPM J EDU I FEE Total Latecomers Fee: $241'9G2.1O Latecomers Fee Project Name: DNRC Fire Cache-655 Timberwolf Parkway Date: 9/16/2008 Calculated By: Susie Turner WATER LATECOMER FEE Maximum Day Demand Per EDU = Reimbursement Amount per EDU 2008 Year 0.62 GPM/EDU $194.54 $/EDU TYPE OF DEVELOPED AREA UNITS EDU FEE 1. 2. ISingle Family Residence 0 0.00 $ - JApartment, Duplex or Multi -Family Q 0.00 $ - Commercial Construction GPM EDU FEE 3. Maximum Day Demand (GPM) 7.70 12.42 $ 2,416.19 Fire Flow GPM EDU FEE 4. Development Fire Flow above 1000 GMP 5Q0 . 806.45 $156,886.78 Total Water: 12.42 $159,302.97 Maximum Peak Hour Flow Per EDU = Reimbursement Amount per EDU 2008, ;Year 0.66 GPM/EDU $556.44 $/EDU TYPE OF DEVELOPED AREA UNITS EDU FEE 1. 2. ISingle Family Residence 0' 0.00 $ - JApartment, Duplex or Multi -Family 0 0.00 $ - Commercial Construction GPM EDU FEE 3. Maximum Peak Hour Flow (GPM) 15.1 22.88 1 $ 12,731.35 Total Sewer: 22.88 $ 12,731.35 Total Latecomers Fee: $172,034.32 n- water and sewer through Section 36 WATER Maximum Day Demand Per EDU = 0.62 GPM/EDU Yearly Reimbursement Factor -Water Reimbursement Amount per EDU Year $184.50 2007 $194.54 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2020 (FIRE FLOW Existing Fire Flow for Owl Corp 1000 GPM * fire flows from Jeff at Stelling Engineering 9/16/08 SEWER Peak Hour Flow Per EDU = 0.66 GPM/EDU Yearly Reimbursement Factor -Sewer Reimbursement Amount per EDU Year $527.73 2007 $556.44 2008 2009 2011 2012 2014 2015 2016 2017 2019 2020 2020