Loading...
Staff Report/Final PlatTri-City Planning Office 17 Second Street East - Suite 211 Kalispell, Montana ••0 Phone: (406) 751-1850 Fax: (406) 751-1858 tri c ity(a-)c e ntu ryte 1. ne t www.tricityplanning-mt.com REPORT TO: Kalispell Mayor and City Council FROM: Narda A. Wilson, Senior Planner Chris A. Kukulski, City Manager SUBJECT Final Plat for Subdivision No. 182 MEETING DATE: March 1, 2004 BACKGROUND: This is a request for final plat approval of Subdivision No. 182, a four lot residential subdivision on approximately 1.39 acres. The subdivision is located on the east side of Fifth Avenue East and north of Eighteenth Street East. The property addresses are 713 and 715 Fifth There are three dwellings currently located on this property. Proposed Lots 1 and 3 have small single family homes while proposed Lot 4 has a single -wide mobile home which is a non -conforming structure. Proposed Lot 2 is vacant. The property was annexed into the city of Kalispell as part of the preliminary plat review process in 1999 and given an RA-1 zoning designation which is consistent with other zoning in the area. RA-1, Low Density Residential Apartment, district has a minimum lot size requirement of 6,000 square feet for single family and duplex dwelling, plus an additional 3,000 square feet for each dwelling beyond a duplex. Preliminary plat approval for this subdivision was granted by the Kalispell City Council on January 3, 2000 and they have received an extension on the preliminary plat. The property owner would like to bond for the paving on the access road and fire turnaround area and have submitted a subdivision improvements agreement and a cashier's check in the amount of $6,500 or 125 percent of the cost of the paving. The subdivision improvements agreement estimates the paving will be completed by October 31, 2004. The preliminary plat was approved by Resolution 4529 subject to seven conditions as outlined below. The following is a discussion of compliance with each of these conditions as well as findings of compliance with the City subdivision regulations and zoning ordinance. RECOMMENDATION: A motion to accept the subdivision improvements agreement and approve the final plat for Subdivision No. 182 would be in order. FISCAL EFFECTS: Potential minor positive impacts once developed. ALTERNATIVES: As suggested by the City Council. Providing Community Planning Assistance To: • City of Columbia Falls • City of Kalispell • City of Whitefish • Final Plat for Subdivision No. 182 February 25, 2004 Page 2 Respectfully submitted, ;71%/- Narda A. Witson Director Report compiled: February 26, 2004 " v Chris A. Kukulski City Manager Attachments: Letter of transmittal Final plat application and supporting documents Appendix - Page A-23 SUBDIVISION IMPROVEMENT AGREEMENT Z 1 THIS AGREEMENT, made and entered into this0.6A day of k,6K0 i.::/ -P9 by and between the CITY COUNCIL, CITY OF KALISPELL, MONTANA, Party of the` First Par# , and l preinafter referred to as the CITY, and (Name of Developer) /� a - ,, Y/ o cl L(.G—X (Individual, Company or Comoration) located attJin (Street Address/P. O�ox) (City, Co ty, State, Zip) Party of the Second Part and hereinafter referred to as DEVELOPER. WITNESSETH: THAT HEREAS, the Developer is. owner and developer of a new subdivision knoN-,n as ///%S/l�Yl ✓� �1 p (Name of Subd-vision located at ���.;��9,/�•i lei% 0 (Location of Subdivision) and, W REAS, the k ty h conditioned it's approval of the final plat of o - 1 %- . upon the conditions as set forth (Name of Subdivision) in the Preliminary Plat of the Subdivision being completed and all improvements, as cited in "Exhibit A" have not been completed at this time, and the Developer wishes to bond for the completion of those improvements set forth in "Exhibit A"; and WHEREAS, the City's Subdivision Regulations require that a subdivider shall provide a financial security of 125% of the estimated total cost of construction; of said improvements as evidenced by an estimate prepared by a licensed public engineer included herewith as "Exhibit B"; and WHEREAS, the estimated total cost of construction of said improvements is the sum of $ . 5 AO() , op NOW THEREFORE, in consideration of the approval of the final plat of said Subdivision by the City, the Developer hereby agrees as follows: 1. The Developer shall deposit as collateral with the City a Letter of Credit, or other acce table collateral as determined by the City Council, in the amount of $ M� ) U . . Said Letter of Credit or other collateral shall have an expiration date of at least sixty (60) days following the date set for completion of the improvements, certif ing the following: Feb OF, 04 02 c 38p LRRSEN ENG. & StlRV . t4061257-4051 .2 Appendix - Page A-w; IT IS ALSO AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS, O That the Developer shall provide for inspection of all required improvements by a registeree- professional engineer before the Developer shall be released from the Subdivision Improvement Agreement. That if the Cite determines that any improvements are not constructed in compliance with, the specifications, it shall furnish the Developer with a list of specific deficiencies and may withhold collateral sufficient to insure such compliance. If the City determines that the Developer Nkill not construct any or all of the improvements in accordance lAith the specifications, or Within the required rime l.irnits, it may NNiihdraw the collateral and employ such funds as may be necessary to construct The improvement or improvements in accordance cvith the specifications, The unused portions of the collateral shall be returned to the Developer or the crediting institution, as is appropriate. IN Wj/ TNT.SS Ml OF, the Parties have hereunto set their hands and seals the day and year herein fore written r;iW trite of Sihbdivision/Developel/Firm i (Title) STATE OF MON��l` COUNT 4' OF On this day of before me, a Notary Public For the State of Montana personally appeared f / known to me to be the _.5 of.2c f whose name is subscribia to the foregoing instru?rient and acknowledged to me that he/she executed the same. IN FITNESS WHEREOF, I have hereunto set my hand and at'Iixed m4_ :'notarial Seal this day a,Ayear first above r.=,ritten/—) Nagar- PublicXmhe Pa Residing My Corrn-issi• n Expires ;MAYOR. CITY OF KALISPELL ATTEST: MAYOR FLNANCE DIRECTOR Page A-24 - Appendix a. That the creditor guarantees funds in the sum of 00 t e�s imated cost o completing the required improvements ir. of completing (Name of Subdivision) b. That if the Developer fails to complete the specified improvements within the required period, the creditor will pay to the City immediately, and without further action, such funds as are necessary to finance the completion of those improvements up to the limited of credit stated in the letter; �% 2. That said required improvements shall be fully completed by d, G'� �-`7Z 3. That upon completion of the required improvements, the Developer shall cause to be filed with the City a statement certifying that: a. All required improvements are complete; b. . That the improvements are in compliance with the minimum standards specified by the City for their construction and that the Developer warrants said improvements against any and all defects for a period of one (1) year from the date or" acceptance of the completion of those improvements by the City. c. That the Developer knows of no defects in those improvements; d. That these improvements are free and clear of any encumbrances or liens; e. That a schedule of actual construction costs has been filed with the Cit<,_ and, f. All applicable fees and surcharges have been paid. 4. The Developer shall cause to be filed with the City copies of final plans, profiles, grades and specifications of said improvements, with the certification of the registered professional engineer responsible for their preparation that all required improvements have been installed in conformance with said specifications. Page A-26 - Appendix EXHIBIT A Conditions of approval as fixed to the preliminary plat by the City Council, Kalispell, Montana. This agreement specifically includes the following improvements, their projected construction completion date and estimated construction costs. CHECK CONSTRUCTION ESTIMATED APPROPRIATE COMPLETION CONSTRUCTION IMPROVEMENTS BOX Street Grading/Paving Street Base Sidewalks Curbs and Gutters Sanitary Sewers Mains Other ( ) On -Site Sewage Facilities Water Systems Mains Other ( ) On -Site Water Supply Water Storage Tanks Fire Hydrants Storm Sewer or Drainage Facilities Street Signs Street Lighting Street Monuments Survey Monument Boxes Landscaping Other ( ) TOTAL COLLATERAL (TOTALS COSTS X 125%) DATE Off-.31) Zoo4- COSTS SSoo,no SUBTOTALSC� FEES TOTALS COSTS -� a nv Sums a, 0 MO ` , N (0 co O O ¢ 0 a0 i. U W < Q la 4 U Z � rn c0 O _ — J W¢ W O ~_ I— W 0 O k - � j ®_ w r U1 W i p z I ru t Q N m NO �A 0 aU CN • U )m W o m S < z cc) °'. < rn <a i W u O 3 LJJIr ui Z J W ru Y O H a a Z ®® U) � Z - cc Q OLL.CO a .r U ui LO H U) O H v = Z now O k w i - 0 H Ln ~ c _ [C w is O cc g 0 a Trii-Clity 17 Second Street East - Suite 211 Kalispell, Montana 59901 Phone: (406) 751-1850 Fax: (406) 751-1858 tricity(i�ce nturytel. net www. tric ity p la nning-mt. February 25, 2004 Chris Kukulski, City Manager City of Kalispell P.O. Drawer 1997 Kalispell, MT 59901 Re: Final Plat for Subdivision No. 182 Dear Chris: This is a request for final plat approval of Subdivision No. 182, a four lot residential subdivision on approximately 1.39 acres. The subdivision is located on the east side of Fifth Avenue East and north of Eighteenth Street East. The property addresses are 713 and 715 Fifth There are three dwellings currently located on this property. Proposed Lots 1 and 3 have small single family homes while proposed Lot 4 has a single -wide mobile home which is a non -conforming structure. Proposed Lot 2 is vacant. The property was annexed into the city of Kalispell as part of the preliminary plat review process in 1999 and given an RA-1 zoning designation which is consistent with other zoning in the area. RA-1, Low Density Residential Apartment, district has a minimum lot size requirement of 6,000 square feet for single family and duplex dwelling, plus an additional 3,000 square feet for each dwelling beyond a duplex. Preliminary plat approval for this subdivision was granted by the Kalispell City Council on January 3, 2000 and they have received an extension on the preliminary plat. The property owner would like to bond for the paving on the access road and fire turnaround area and have submitted a subdivision improvements agreement and a cashier's check in the amount of $6,500 or 125 percent of the cost of the paving. The subdivision improvements agreement estimates the paving will be completed by October 31, 2004. The preliminary plat was approved by Resolution 4529 subject to seven conditions as outlined below. The following is a discussion of compliance with each of these conditions as well as findings of compliance with the City subdivision regulations and zoning ordinance. •Aj. • r • • -• Condition No. 1. That the subdivision shall be developed in substantial compliance with the approved preliminary plat except has amended by the conditions of approval. This condition has been met. The subdivision is compliant with the approved preliminary plat. Providing Community Planning Assistance To: • City of Columbia Falls • City of Kalispell • City of Whitefish • Final Plat for Subdivision No. 182 February 25, 2004 Page 2 Condition No. 2. The access strip portions of proposed Lots 2 and 4 shall be dedicated as road and utility easement and that easement shall extend the entire length of the lot to provide for the potential extension of future access to the east. ® This condition has been met. The easement is indicated on the final plat as required. Condition No. 3. That the access to proposed Lots 2 and 4 shall be shared and that the access road shall be paved to a minimum width of 20 feet. ® This condition has been adequately addressed. Lots 2 and 4 will share access and the subdivision improvements agreement covers the cost of the required paving. Condition No. 4. That an approved fire access turnaround area to proposed Lots 2 and 4 shall be developed with either a hammerhead, T-turnaround or other arrangement that has been reviewed and approved by the Kalispell Fire Department. ® This condition has been adequately addressed. The fire access turnaround is in place and the SIA addresses the required paving. Condition No. 5. Sewer and water facilities shall be approved by the Kalispell Public Works Department and the Montana Department of Environmental Quality. ® This condition has been met. Municipal water and sewer are available to the site and an approval letter from DEQ has been submitted with the final plat. Condition No. 6. All new utilities shall be placed underground. ® This condition has been met. All new utilities have been placed underground. Condition No. 7. That preliminary plat approval is valid for three years. ® This condition has been met. An extension was granted for this subdivision. COMPLIANCE WITH APPROVED PRELIMINARY PLAT The final plat is in compliance with the preliminary plat which was submitted and approved. COMPLIANCE WITH THE SUBDIVISION REGULATIONS: This subdivision plat has been found to be in substantial compliance with the State and City Subdivision Regulations. Final Plat for Subdivision No. 182 February 25, 2004 Page 3 This subdivision complies with the Kalispell Zoning Ordinance and the RA-1 zoning for the property. • • • All of the conditions of preliminary plat approval have been adequately addressed. The staff recommends that the Kalispell City Council approve the final plat for this subdivision. Please note that the subdivision improvements agreement should be accepted along with the final plat approval. Please schedule this matter for the March 1, 2004 regular city council meeting. You may call me at 751-1852 if I can be of assistance to you regarding this matter. Sincerely, Narda A. Wilson, AICP Senior Planner Attachments: 1 opaque mylar of final plat 1 reproducible mylar of final plat 1 blueline of final plat Letter from Larsen Engineering and Surveying dated 2/ 10/04 Final plat application dated 11 / 18 / 03 Letter from MDEQ dated 5/22/00 (EQ#00-2400) Letter from Kalispell Fire Dept 7/1/03 Subdivision Improvements Agreement dated 2/6/04 Title report dated 1/ 15/04 Consent to plat dated 1/7/04 Consent to plat dated 12/22/03 Treasurer's certification dated 2/11/04 Cashiers check for $6,500 c: Jeff H. Larsen, P.O. Box 2071, Kalispell, MT 59903 Robert Rinke, P.O. Box 5244, Kalispell, MT 59903 sT � ai >• �i m m 2 m r 7 pp`��oo w?dw�U5 F. R N 00'05'41' W 357.55 191.54 N 00'20'20' W 157.45 1 O( j 109.50 y 33.54 : :::::::::75.95 45.03 —= 8104 120.98 , :LH o :.u.:qz uj M w 03 C-4 cs-� cn Ca to CA w � � o g$ - Z s N 5R o M Ow N 13 ,4g' Ofl z 120.98 166.01 N 00'0541' W All