Loading...
SIA Phase 2SUBDIVISION IMPROVEMENT AGREEMENT �1 THIS AGREEMENT, made and entered into this day of6�'dZliLt___, 2043, by and between the CITY COUNCIL, CITY OF KALISPELL, MONTA A, Party of the First Part and hereinafter referred to as the CITY, and NORMAN SANDERSON, of APEX 1, LLC, located at 10 E. Roanoke Street #8, Seattle, Washington 98102, Party of the Second Part and hereinafter referred to as DEVELOPER: WITNESSETH: THAT WHEREAS, the Developer is the owner of a new subdivision known as "STRATFORD VILLAGE, PHASE 2", located in the West Half of Section 19, T28N, R21W, PM,M, Flathead County and, WHEREAS, the City has conditioned it's approval of the final plat of "STRATFORD VILLAGE, PHASE 2", upon the conditions as set forth in the Preliminary Plat of the Subdivision being completed and all improvements, as cited in "Exhibit A" have not been completed at this time, and the Developer wishes to bond for the completion of those improvements set forth in "Exhibit A"; and WHEREAS, the City's Subdivision Regulations require that a subdivider shall provide a financial security of 125% of the estimated total cost of construction of said improvements as evidenced by an estimate prepared by a licensed public engineer or the contractor included herewith as "Exhibit A", and WHEREAS, the estimated total cost of construction of said improvements is the sum of $506,632.00. NOW THEREFORE, in consideration of the approval of the final plat of said Subdivision by the City, the Developer hereby agrees as follows: 1. The Developer shall deposit as collateral with the City a Letter of Credit, or other acceptable collateral as determined by the City Council, in the amount of $11,837.50. Said Letter of Credit or other collateral shall have an expiration date of at least sixty (60) days following the date set for completion of the improvements, certifying the following: a. That the creditor guarantees funds in the sum of $11,837.50, the estimated cost of completing the required improvements in "STRATFORD VILLAGE, PHASE 2". b. That if the Developer fails to complete the specified improvements within the required period, the creditor will pay the City immediately, and without further action, such funds as are necessary to finance the completion of those improvements up to the limited of credit stated in the letter; 2. That said required improvements shall be fully completed by OCTOBER 1, 2004. 3. That upon completion of the required improvements, the Developer shall cause to be filed with the City a statement certifying that: a. All required improvements are complete; b. That the improvements are in compliance with the minimum standards specified by the City for their construction and that the Developer warrants said improvements against any and all defects for a period of one (1) year from the date of acceptance of the completion of those improvements by the City: c. That the Developer knows of no defects in those improvements; d. That these improvements are free and clear of any encumbrances or liens; e. That a schedule of actual construction costs have been filed with the City; and f. All applicable fees and surcharges have been paid. 4. The Developer shall cause to be filed with the City copies of final plans, profiles, grades and specifications of said improvements, with the certification of the registered professional engineer responsible for their preparation that all required improvements have been installed in conformance with said specifications. IT IS ALSO AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS, TO -WIT: That the Developer shall provide for inspection of all required improvements by a registered professional engineer before the Developer shall be released from the Subdivision Improvement Agreement. That if the City determines that any improvements are not constructed in compliance with the specifications, it shall furnish the Developer with a list of specific deficiencies and may withhold collateral sufficient to insure such compliance. If the City determines that the Developer will not construct any or all of the improvements in accordance with the specifications, or within the required time limits, it may withdraw the collateral and employ such funds as may be necessary to construct the improvement or improvements in accordance with the specifications. The unused portions of the collateral shall be returned to the Developer or the crediting institution, as is appropriate. IN WITN S WH F, the Parties have hereunto set their hands and seals the day and herein ore written. �_L_L _z_ ------------------- STRATFORD VILLAGE, PHASE 2 NORMAN SANDERSON APEX 1, LLC STATE OF MONTANA ) SS COUNTY OF Flathead ) On this 2002before mea Notary Public for the _ �day of _Qc-Q6 __, , y State of Montana, personally appeared NORMAN SANDERSON and known to me to be the Administrator for APEX 1, LLC and whose name is subscribed to the foregoing instrument and acknowledged to me that he executed the same for said APEX 1, LLC.. IN WITNESS WHEREOF, I have hereunto set my h oida d my Notarial Seal the day and year first above written. � ,� �% €l(iv'L Cyd1.Ilk VNtary Public for the State of Montana Aga S 1ding at Kalispell, Montanaommission Expires 6/18/2003 A OF M��� MAYOR CITY OF KALISPELL By: —--- — --- Ma r ATTEST: By: ---------- Finance Director EXHIBIT A 11 /04/02 ENGINEERS ESTIMATE OF CONSTRUCTION PROGRESS PHASE 1 & PHASE II STRATFORD VILLAGE SUBDIVISION, KALISPELL, MONTANA PHASE I PHASE H ITEM ESTIMATED TOTAL COST PERCENT COMPLETE REMAINING TO COMPLETE ESTIMATED OTAL OST PERCENT COMPLETE REMAINING TO COMPLETE 1. Roads a. Base, Crush Rock 22,568.00 100% -0- 43,509.00 100% -0- b. Paving 34,020.00 100% -0- 65,589.00 100% -0- c. Sidewalks 19,809.00 100% -0- 61,245.00 100% -0- d. Site Concrete / Light Bases 6,000.00 100% -0- 14,534.00 100% -0- e. Curbs 11,600.00 100% -0- 39,832.00 100% -0- 2. Alleys a. Base, Crush 4,346.00 100% -0- 9,596.00 100% -0- b. Paving 3,370.00 0% 3,370.00 7,370.00 0% 7,370.00 3. Sewer a. Manholes 12,000.00 100% -0- Sewer total: 100% Sewer total: b. 10" Sewer Mains 16,290.00 100% -0- 45,115.00 100% -0- c. 8 "Sewer Mains 6,440.00 100% -0- 100% d. Services 10,800.00 100% -0- 100% 4. Water a. 8" Water Mains 18,176.00 100% -0- Water total: 100% Water total: b. 8" Valves 5,600.00 100% -0- 64,274.00 100% -0- c. 6" Hydrants with valves 9,000.00 100% -0- 100% d. Services 12,000.00 100% -0- 100% 5. Storm Water a. 12" Main 6,630.00 100% -0- Storm total: 100% Storm total: b. 10" Main 5,612.00 100% -0- 17,792.00 100% -0- c. 8" Main 10,304.00 100% -0- 100% d. Catch Basins 8,500.00 100% -0- 100% e. Manholes and Tankage 16,800.00 100% -0- 100% f. Retention Basin 58,646.00 100% -0- 6. Postal Service a. Mailboxes and Mounting 2,500.00 100% -0- 7.Sinae a. Street Signs 1,200.00 100% -0- 3,200.00 100% -0- b. Traffic signs 1,800.00 100% -0- 4,800.00 100% -0- 8. Landscape a. Trees 10,800.00 100% -0- 11,300.00 100% -0- b. Seeds and Repair 2,100.00 0% 2,100.00 2,100.00 0% 2,100.00 9. Utilities a. Electric 22,000.00 100% -0- 37,537.00 100% -0- b. Gas 11,000.00 100% -0- 18,538.00 100% -0- c. Telephone 14,000.00 100% -0- 13,912.00 100% -0- d. Cable 3,000.00 100% -0- 4,000.00 100% -0- e. Trench,Conduit.,Vaults 40,289.00 100% -0- Subtotal 369,011.00 5,470.00 506,632.00 9,470.00 PHASE I: Security Amount Required 1.25 x $3,370.00 $6,837.50 PHASE II: Security Amount Required 1.25 x $11,570.00 $11,837.50 TOTAL PHASE I & PHASE H $18,675.00