Loading...
SIA Phase 3 (Recorded)20'04125 lo0J(�) 01 SUBDIVISION IMPROVEMENT AGREEMENT STRATFORD VILLAGE, PHASE 3 THIS AGREEMENT, made and entered into this _____ day of ____________. 2004, by and between the CITY COUNCIL, CITY OF KALISPELL, MONTANA, Party of the First Part and hereinafter referred to as the CITY, and NORMAN SANDERSON, of APEX 1, LLC, located at 10 E. Roanoke Street #8, Seattle, r( Washington 98102, Party of the Second Part and hereinafter referred to as DEVELOPER: (� WITNESSETH: THAT WHEREAS, the Developer is the owner of a the recorded subdivision known as "STRATFORD VILLAGE, PHASE 3", located in the West Half of Section Q) 19, T28N, R21W, PM,M, Flathead County and, Q, WHEREAS, the City has approved the final plat of "STRATFORD VILLAGE, PHASE 3", upon the conditions as set forth in the Preliminary Plat of the Subdivision being completed and all improvements, as cited in original "Exhibit A" had not been completed at that time, and the Developer wishes to amend the bond for the completion of those remaining improvements set forth in original "Exhibit A"; and WHEREAS, the City's Subdivision Regulations require that a subdivider shall provide a financial security of 125% of the estimated total cost of construction of said improvements as evidenced by an estimate prepared by a licensed public engineer or the contractor included herewith as new "Exhibit A", and WHEREAS, the estimated total cost of construction of said improvements is the sum of $862,798.20. NOW THEREFORE, in consideration to reduce said bond by the City, the Developer hereby agrees as follows: 1. The Developer shall deposit as collateral with the City a Letter of Credit, or other acceptable collateral as determined by the City Council, in the amount of $408,712.50. Said Letter of Credit or other collateral shall have an expiration date of at least sixty (60) days following the date set for completion of the improvements, certifying the following: a. That the creditor guarantees funds in the sum of $408,712.50, the estimated cost of completing the required improvements in "STRATFORD VILLAGE, PHASE 3". b. That if the Developer fails to complete the specified improvements within the required period, the creditor will pay the City immediately, and without further action, such funds as are necessary to finance the completion of those improvements up to the limited of credit stated in the letter; 2. That said required improvements shall be fully completed by JANUARY 15, 2005. 3. That upon completion of the required improvements, the Developer shall cause to be filed with the City a statement certifying that: a. All required improvements are complete; b. That the improvements are in compliance with the minimum standards specified by the City for their construction and that the Developer warrants said improvements against any and all defects for a period of one (1) year from the date of acceptance of the completion of those improvements by the City: C. That the Developer knows of no defects in those improvements; d. That these improvements are free and clear of any encumbrances or liens; e. That a schedule of actual construction costs have been filed with the City; and f. All applicable fees and surcharges have been paid. 4. The Developer shall cause to be filed with the City copies of final plans, profiles, grades and specifications of said improvements, with the certification of the registered professional engineer responsible for their preparation that all required improvements have been installed in conformance with said specifications. IT IS ALSO AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS, TO -WIT: That the Developer shall provide for inspection of all required improvements by a registered professional engineer before the Developer shall be released from the Subdivision Improvement Agreement. That if the City determines that any improvements are not constructed in compliance with the specifications, it shall furnish the Developer with a list of specific deficiencies and may withhold collateral sufficient to insure such compliance. If the City determines that the Developer will not construct any or all of the improvements in accordance with the specifications, or within the required time limits, it may withdraw the collateral and employ such funds as may be necessary to construct the improvement or improvements in accordance with the specifications. The unused portions of the collateral shall be returned to the Developer or the crediting institution, as is appropriate. IN WITNESS WHEREOF -the Parties have hereunto set their hands and seals the day and year herein befox`tten. STRA FORD VIL A E, PHASE 3 NORMAN SANDERSON APEX 1, LLC STATE OF MONTANA ) SS COUNTY OF Flathead 1 ti r On this _i' l day of _ fFllrc.UI-d _ 2004, before me, a Notary Public for the State of Montana, personally appearec-N'ORMAN SANDERSON and known to me to be the Administrator for APEX 1, LLC and whose name is subscribed to the foregoing instrument and acknowledged to me that he executed the same for said APEX 1, LLC.. IN WITNESS WHEREOF, I have hereun Seal day and year first above written. Ali Not% y Public for the State of Montana Res ing at Kalispell, Montana My Commission Expires 6/18/2007 MA R, CITY :OF KALISPELL By. �'Yv-- — — yor Gaunly aIF Flathead >� CRy o(lta6spet! '�'hrinunnuirtantti�Ma� t hereby cettNy ghat 4he ioshumert 4o which tlds � affixed is a true, oormot and compared copy of tlta od*d on Ibis the offrce of the Clerk of the City ai Kalispell. lilkness my hand the aal of the Gay KaGspeH, t" County,!on his day '" 7 mob and affixed my Notarial "TARIAL -- c VAL OF M Ota ATTEST: B— 06%1V^:1.1L06: jIuwV EXHIBIT A ENGINEERS ESTIMATE OF CONSTRUCTION PROGRESS 4/I5/04 PHASE 1 (16 Lots), PRASE II (27 Lots), & Phase III (58 Lots) STRATFORD VILLAGE SUBDIVISION, KALISPELL, MONTANA PHASE I PRASE II PHASE III EST, PERCENT EST. PERCENT EST. PERCENT REMAIN ITEM TOTAL COMP REMAIN TOTAL COMP REMAIN TOTAL COMP COST COST COST 1. Roads a. Exc and Grade to Subbase 68,000 00 100% -0 b. Base, Crush Rock 22,568.00 100% -0- 43,509.00 100% -0- 54,900.00 62% 20,862.00 c.. Paying " 34,020.00 100% -0- 65,589.00 100% -0- 80,500.00 -0- ----8-0,5-0-0-.0-01 d. Sidewalks 19,809.00 100% -0 61,245.00 100% -0- 1 74,000.00 -0- 74,000.00 e. Site Concrete / Lights 6,000.00 1000/ -0- 14,534.00 100% -0- 18,800:00 43% 10,716.00 and Bases e. Curbs 11600.00 100% -0- 39,932.00 100% -0- 54,000.00 -0- 54,000.00 2. All s a. Base, Crush 41346.00 100% -0- 9,596.00 1001% -0- 7 900.00 20% 6,320.00 b. Paying 3,370.00 1 0% 1 7.370.00 1001% -0- 8,300.00 -0- 8,300.00 3. Sewer a. Manholes 12 000.00 1 100% 1 -0- Sewer total: 100% Sewer total: 20,000.00 100% -0- b. 10"Sewer Mains 16,290.00 1 100% -0- 45,115.00 100% -0- 6 00.00 100% -0- c.8"Sewer Mains 6,440.00 100% -0- 100% 28,300.00 100% -0- d. Services 10,800.00 100% -0- 100% 49,200.00 1000/ -0-. e. Lift Station 78,000.00 84/ 12,480.00 4. Water a. 8" Water Mains 15,600.00 100% -0- Water total: 100% Water total: 43,900.00 100% .0- b. 8" Valves 5,600.00 " 100°% -0- 64,274.00 100% -0- 5,600.00 100% -0- c. 6" H drams with valves 9,000.00 1 100% -0- 100% 20,500.00 100% -0- d. Services 12000.00 1 100% -0- 100% 55,000.00 100% -0- 5. Storm Water a. IT'Main 6,630.00 100% -0- Storm total: 100% Storm total: 1,600.00 100% -0- b. 10" Main 5,612.00 100% -0- 17,792.00 100% -0- 7,200.00 100% 0- c. 8" Main 10,304.00 100% .0- 100% 17.300.00 100% -0_ d. Catch Basins 8,500.00 100% -0- 100% 12,800.00 1000/ -0- e. Manholes and Tankage 16,800.00 100% 0- 100% 18,0woo 100% -0- f: Retention Basin 5 ,646.00 100% -0- 6. Postal Service a. Mailboxes and 2,500.00 100% -0- Mounting 7.Slnae a. Street Signs 1,200.00 100V -0- 3,200.00 100% -0- 4,700.00 -0- 4,700.00 b. Traffic signs 1,800.00 100% -0- 4,800.00 100% -0- 6,01. -0- 6,000.00 8. Landscape a. Trees 10,800.00 100% -0- 11,300.00 100% -0- 18,200.00 -0- 18,200.00 b. Seeds and Repair 2,100.00 100% -0- 2,100.00 100% -0- 24,600.00 -0- 24 600.00 9. Utilities a. Electric 22,000.00 100% -0- 37,537.00 100% -0- 50,287.00 100% -0- b. Gas 11,000.00 100 -0- 18 538.00 1001/. -0- 16,21115 100% -0- c. Telephone 14,000.00 100% -0- 13,912.00 100% -0- 18,299.95 100% -0- d. Cable. 3,000.00 100% -0- 4,000.00 100% -0- 6,000.00 100% -0- e. Trench Conduit. Vaults 40,299.00 100% -0- 48,400.00 871/6 6292.00 Subtotal 310,365.00 1 100% -0- 506,632.00 100% -0- 981,444.20 326,970.00 PHASE I:' Security Amount Required -0- PHASE II: Security Amount Required -0_ PHASE III: Security Amount Required(1.25) 326,970.00 08,712. 450 STATE OF MONTANA County of Flathead RECORDED AT THE REQUEST OF THIS - C�\ _ DAY OF 20Q_ AT 10MOS O'CLOCK AND RECORDED IN THE RECORDS O LATHEAD COUNTY, STATE OF MONTANA. FEE $_ ��i PD. RECEPTION NO. t(`1 (Flathead county Jerk and Recorder) RETURN TO �Ia'c (Deputy c erk) cz_