01/29/01 Kukulski to Council/Mountain View Plaza WorkshopREPORT TO:
SUBJECT:
City of Kalispell
Post Office Box 1997 - Kalispell, Montana 59903-1997 - Telephone (406)758-7700 Fax(406)758-7758
Honorable Mayor and City Council
Chris A. Kukulski, City Manager
Mountain View Plaza Workshop
MEETING DATE: January30, 2001
BACK GROUND: On January 9, 2001 the Kalispell City -County Planning Board held a public hearing
for the Mountain View Plaza PUD proposal. The public hearing was filled with debate between the applicant,
planning board and staff. As a result, several of the thirty-two (32) "conditions of approval" were altered
by the planning board. The following comments are intended to inform the City Council of the city staff
comments pertaining to each condition that was either altered, is still being debated by the developer or is
extremely important to the project.
As you read each of the conditions you will see things that are struck out, underlined and highlighted.
Strike out - language eliminated from the condition by the Kalispell City/County Planning Board.
Underline - language that was added by the Kalispell City/County Planning Board.
Highlight - Language which I am recommending be re-inserted or added to the conditions of
approval
Conditions 1, 2, 3, 4, 5, 6, 7 and 8 have been agreed to by the developer;
That the development of the site shall be in substantial compliance with application submitted,
the site plan and conditions for the PUD as approved by the city council.
2. The proposed development areas within the site shall be substantially the same as indicated
on the preliminary site plan submitted with the application or as modified by these conditions.
3. That a Phase II environmental assessment of the site be completed prior to the detailed design
of the utilities.
4. That the plans and specifications for water, sewer, drainage and grading shall be designed and
installed in accordance with the Kalispell Design and Construction Standards and shall be
subject to review and approval by the Kalispell Public Works Department.
Page 1 of 6
5. That access from the southern access road off of Highway 93 to the adjoining property to the
south should be available to accommodate future development on the property through the
execution of a development agreement and payment of a latecomers fee to the developer.
6. The fire access and suppression system shall be reviewed and approved by the Kalispell Fire
Department for compliance with the Uniform Fire Code.
7. A plan shall be developed and in place that addresses the grading, revegetation, irrigation and
maintenance of the undeveloped areas that creates a weed free, dust -free area until such time
as that phase is fully developed.
8. That the necessary easements be obtained for the extension of water and sewer services to
the site.
Condition 9 was altered by the planning board by eliminating the City's review of the traffic study and
approach permits. The developer has since agreed to this condition as originally proposed and I
recommend it be re-inserted.
9. That a comprehensive traffic impact study be completed which identifies all expected traffic
impacts and proposals for mitigation, and that appropriate approach permits be obtained from
the Montana Department of Transportation
Condition 10 was altered by the planning board. This issue should be resolved after the City reviews
the traffic study. Unless the traffic study shows an improvement in traffic flow and safety by this
northern entrance, I recommend we remove it.
10. That the northernmost access along Highway 93 near Ole's Country Store be efim hated- be
subject to the recommendations of the traffic impact study.
10. That the northernmost access along H;;hway 93 near Ole's Country Store be eliminated
unless proven to be necessary to improve safety and traffic flow by the traffic'study.
Condition 11 was eliminated by the planning board. After further review, I agree with the planning
boards recommendation.
Conditions 12, 13, and 14 have been agreed to by the developer;
12. That trees be placed within the parking lots at a rate of one tree per every 14 parking spaces
as indicated in the application narrative.
13. Street trees shall be placed at 40 foot intervals which are a minimum of a two and a quarter
inch caliper at planting along both sides of the internal roadways except where they
Page 2 of 6
immediately abut a parking lot island or planter or abut building fronts.
14. That the landscaping along Highway 93 and West Reserve Drive include street trees placed
at 50 foot intervals which are a minimum of a two and a quarter inch caliper at planting and
a minimum three foot tall hedge or shrub between the parking lots and the roadways.
Condition 15 is being contested by the developer. I believe the City needs to stand firm on this
condition. The parking lots that service the three BIG boxes include 5.34 parking spaces per 1,000
sq. ft. of gross floor area. These are huge parking lots and need to be enhanced with landscaping.
During the public hearing representatives from Home Depot suggested that they can operate efficiently
with approx. 4.5 parking spaces per 1,000 sq. ft. It is apparent that any minor loss of parking due to
the addition of landscaping will not be detrimental to the tenets.
15 That a landscape pod shall be placed at the end of each parking aisle and the parking medians
which include a minimum of one street tree at a minimum of a two and a quarter inch caliper
along with shrubs or other greenery.
Conditions 16, 17, and 18, have been agreed to by the developer;
15. The overall landscape plan shall be coordinated with the Kalispell Parks and Recreation
Director regarding the exact size and location of the plantings and species lists.
16. That pedestrian walkways be provided as indicated on the site plan that provide a continuous
and connected system with the existing walkways along Highway 93 and West Reserve
Drive including a sidewalk on both sides of the main entrance road.
17. That the landscape areas within the site be constructed as proposed that includes landscaping,
walkways and gazebos.
Condition 19 was also changed by the planning board. It is recommended that the original language
be re-inserted. Retaining walls tend to be less attractive than a terraced landscaped area.
19. That the use of retaining walls in excess of four feet tall, if possible, be avoided, butrather
steepest -grate
Condition 20 has been agreed to by the developer. I wanted to clarify some of the materials being
used in the Home Depot which must be used by the remaining tenants. Examples include: river rock,
timbers, split face block, stone, earth toned colors with corporate colors only being used on the
signage.
20. The list of materials and exterior building treatments that was part of the application for the
final development of the buildings be included in the covenants and development agreement
with the City as an exclusive list of materials and exterior building treatments to be used.
Page 3 of 6
Condition 21 has been agreed to by the developer;
21. That the east face of the large buildings not be used for advertising, display of corporate
colors or logos and shall be treated with the approved list of building materials and colors.
Condition 22 was changed by the planning board. I don't think the planning board's change causes
any problems. Lighting is a covered element in the zoning ordinance.
22. That a lighting plan be submitted which utilizes attracti-ve standard lighting fixtures with
downward directed light in compliance with the zoning ordinance. and a type and-levef-of
Condition 23 and 24 were altered substantially by the planning board. The planning boards
recommendation exceeds the City's sign ordinance in height and size. This has been one of the most
frustrating unresolved issues thus far. I recommend this be kept simple by requiring the size, height
and location of signs conform with the City's sign ordinance. Any changes from our ordinance should
reduce the height and size of signs, not increase it. Contrary to the developers opinion, our ordinance
specifically accommodates multiple tenant retail centers. Our ordinance is not considered to be overly
restrictive. I have found developments in other cities that include Home Depot, Wal-Mart, and other
big box retailers with far more restrictive signage requirements.
In addition, the signs should be integrated into an overall signage plan which includes not more than
two free standing entrance signs, one monument sign for each smaller pad and wall signs. Materials
need to be consistent with condition 20 and complimentary to the structures and landscaping plan.
��r�a[=a�w�:�Irna iniw ��uu��[��:�►�suw�rin��i�nn[:ai�[nn�rui�t`
24. That a comprehensive sign plan be submitted which indicates an integrated design of
lettering and materials. Two main entry suns shall be used which may be located at the
property boundary and not to exceed 270 square feet per face or 28 feet in height. All other
suns shall comply with the Kalispell Zoning Ordinance. Freestanding signs shall be limited
to the proposed monument signs for the businesses along Highway 93. The use of oversized
signs, garish or corporate colors, trademarks, or logos on the buildings shall be avoided as
a primary means of advertising.
Except as specifically set forth in this condition, all signage shall comply with the Kalispell Zoning
Ordinance. 'Based on present plans, it is anticipated that the total amount of sign area allowed for the
project will be 2597.5 square feet after the project is fully developed. One large pylon freestanding
sign shall be allowed along each frontage, with the size and height of the sign determined under
Section 27.24.080(d) of the Kalispell ;Zoning Ordinance. In addition, one monument sign for each of
the five smaller pads will be allowed (up to 8 feet in height and 60 square feet per, face). In addition,
a comprehensive sign plan shall be submitted and approved by the Site Development Review
Committee detailing coordination as to the number, mode of display, location, size, height, colors,
finish materials, and illumination of each sign with the other signs in Ahe development iand with the
architecture of the buildings.
Page 4 of 6
Condition 25 has been agreed to by the developer. The elimination of lumberyards does not change
the requirement that Home Depot retain their merchandise indoors. It has been suggested that casinos
be included in the list of specifically prohibited uses. I would agree with this comment. This project
could attract restaurant chains who may want gaming; however, Applebees has a full liquor licence
and NO gaming.
25. That the uses allowed within the development shall not include casinos and those other uses
which require areas for the display of large merchandise such as new and used automobile
sales, manufactured home sales, recreational vehicle sales and luuinbezyard-s. This would not
preclude incidental events associated with the other businesses on the site.
Conditions 26, 27 and 28 have been agreed to by the developer;
26. That the three large buildings proposed for the eastern portion of the site shall not exceed 38
feet in height, with an additional seven foot allowance for the screening of roof mounted
equipment and as an architectural fagade.
27. That the refuse areas be adequately screened from public view.
28. That the covenants be modified to include some language regarding the maintenance of
common areas within the development and which grant cross easement access between
the lots and throughout the development.
Condition 29 was drastically altered by the planning board. The developer has agreed to secure the
construction of infrastructure and improvements within four (4) years with a bond (February 2005).
Because we do not have a final detailed design of the project to reference, I would clarify the bonding
requirements to include 125% of the cost of everything EXCEPT: building construction; parking lot
paving; final landscaping in and around the buildings and parking lots; lighting; signage; and the
service lines to each building.
Therefore, those things that we would expect to be bonded for include but are not limited to (without
the final design): grading for the entire site; all necessary water/sewer lines available to service all of
the pads within the development; access roads, storm drainage and sidewalks within the site; cost of
removing the MDOT maintenance facility and equipment; and the cost of removing the NuPac batch
plant equipment and offices.
29. That the phasing and timing of the development shall occur as proposed. Bonding for the
proposed infrastructure and public water and sewer or other acceptable means
of insuring that the improvements will be completed as proposed shall be provided by the
developer on each phase as the project develops.
29. Bonding for 125% :of the proposed infrastructure and improvements or other acceptable
means of insuring that the improvements will be completed no later than four years from the
approval of the PUD shall be provided by the developer.
Page 5 of 6
Condition 30 has been altered in order to precisely identify when the NuPac sight would be removed.
This is consistent with the Waterford PUD.
30. That the removal and / or relocation of the batch plant, associated equipment and warehouses
located on the NuPac and the Montana Department of Transportation be accomplished prior
to ite issuance of a building permit for
phase l occupancy of Phase H.
31. That Domesite LLC / Pack and Company relinquish their interest in the existing development
agreement with the City prior to the execution of a development agreement for this project.
Condition 32 has been agreed to by the developer;
32. The developer and City of Kalispell shall execute a development agreement based on terms
and conditions included in the planned unit development.
Attached is a clean copy of the recommended new conditions of approval per this memo and the planning
documents for your review.
RECOMMENDATION: The City Council make it clear to the developer that they must agree to the
attached conditions prior to the staff dedicating any additional time to this project.
FISCAL EFFECTS Unknown at this time.
ALTERNATIVES: As suggested by the Council.
Respectfully submitted,
Chris A. Kukulski
City Manager
Report compiled January 29, 2001
Page 6 of 6
Proposed 1 i. i of Approval
January 1 2001
1. That the development of the site shall be in substantial compliance with application
submitted, the site plan and conditions for the PUD as approved by the city council.
2. The proposed development areas within the site shall be substantially the same as indicated
on the preliminary site plan submitted with the application or as modified by these
conditions.
3. That a Phase 11 environmental assessment of the site be completed prior to the detailed design
of the utilities.
4. That the plans and specifications for water, sewer, drainage and grading shall be designed and
installed in accordance with the Kalispell Design and Construction Standards and shall be
subject to review and approval by the Kalispell Public Works Department.
5. That access from the southern access road off of Highway 93 to the adjoining property to the
south should be available to accommodate future development on the property through the
execution of a development agreement and payment of a latecomers fee to the developer.
6. The fire access and suppression system shall be reviewed and approved by the Kalispell Fire
Department for compliance with the Uniform Fire Code.
7. A plan shall be developed and in place that addresses the grading, revegetation, irrigation and
maintenance of the undeveloped areas that creates a weed free, dust -free area until such time
as that phase is fully developed.
8. That the necessary easements be obtained for the extension of water and sewer services to the
site.
9. That a comprehensive traffic impact study be completed which identifies all expected traffic
impacts and proposals for mitigation, and that appropriate approach permits be obtained from
the Montana Department of Transportation and the City of Kalispell.
10. That the northernmost access along Highway 93 near Ole's Country Store be eliminated
unless proven to be necessary to improve safety and traffic flow by the traffic study.
11. That trees be placed within the parking lots at a rate of one tree per every 14 parking spaces
as indicated in the application narrative.
12. Street trees shall be placed at 40 foot intervals which are a minimum of a two and a quarter
inch caliper at planting along both sides of the internal roadways except where they
immediately abut a parking lot island or planter or abut building fronts.
13. That the landscaping along Highway 93 and West Reserve Drive include street trees placed at
50 foot intervals which are a minimum of a two and a quarter inch caliper at planting and a
minimum three foot tall hedge or shrub between the parking lots and the roadways.
14. That a landscape pod shall be placed at the end of each parking aisle and the parking medians
which include a minimum of one street tree at a minimum of a two and a quarter inch caliper
along with shrubs or other greenery.
15. The overall landscape plan shall be coordinated with the Kalispell Parks and Recreation
Director regarding the exact size and location of the plantings and species lists.
16. That pedestrian walkways be provided as indicated on the site plan that provide a continuous
and connected system with the existing walkways along Highway 93 and West Reserve Drive
including a sidewalk on both sides of the main entrance road.
17. That the landscape areas within the site be constructed as proposed that includes landscaping,
walkways and gazebos.
18. That the use of retaining walls in excess of four feet tall be avoided, but rather the
implementation of landscaped terracing be used to make the transition in areas with the
steepest grades.
19. The list of materials and exterior building treatments that was part of the application for the
final development of the buildings be included in the covenants and development agreement
with the City as an exclusive list of materials and exterior building treatments to be used.
20. That the east face of the large buildings not be used for advertising, display of corporate
colors or logos and shall be treated with the approved list of building materials and colors.
21. That a lighting plan be submitted which utilizes standard lighting fixtures with downward
directed light in compliance with the zoning ordinance.
22. Except as specifically set forth in this condition, all signage shall comply with the Kalispell
Zoning Ordinance. Based on present plans, it is anticipated that the total amount of sign area
allowed for the project will be 2597.5 square feet after the project is fully developed. One
large pylon freestanding sign shall be allowed along each frontage, with the size and height of
the sign determined under Section 27.24.080(d) of the Kalispell Zoning Ordinance. In
addition, one monument sign for each of the five smaller pads will be allowed (up to 8 feet in
height and 60 square feet per face). In addition, a comprehensive sign plan shall be submitted
and approved by the Site Development Review Committee detailing coordination as to the
number, mode of display, location, size, height, colors, finish materials, and illumination of
each sign with the other signs in the development and with the architecture of the buildings.
23. That the uses allowed within the development shall not include casinos and those other uses
which require areas for the display of large merchandise such as new and used automobile
sales, manufactured home sales, recreational vehicle sales. This would not preclude
incidental events associated with the other businesses on the site.
24. That the three large buildings proposed for the eastern portion of the site shall not exceed 38
feet in height, with an additional seven foot allowance for the screening of roof mounted
equipment and as an architectural fagade.
25. That the refuse areas be adequately screened from public view.
26. That the covenants be modified to include some language regarding the maintenance of
common areas within the development and which grant cross easement access between
the lots and throughout the development.
27. Bonding for 125% of the proposed infrastructure and improvements or other acceptable
means of insuring that the improvements will be completed no later than four years from the
approval of the PUD shall be provided by the developer.
28. That the removal and/or relocation of the Montana Department of Transportation site be
accomplished prior to the issuance of a'building permit for the first building to be developed
and that the batch plant, associated equipment and warehouses located on the NuPac site be
removed prior to the issuance of a building permit for the second building to be developed.
29. That Domesite LLC / Pack and Company relinquish their interest in the existing development
agreement with the City prior to the execution of a development agreement for this project.
30. The developer and City of Kalispell shall execute a development agreement based on terms
and conditions included in the planned unit development.