01/26/01 Kukulski to Beard/BondTo: Stan Beard & Mike Fraser
From: Chris Kukulski
Subject: Mountain View Plaza Proposal
Date: January 26, 2001
This memo is in reference to Condition 29 requiring that all "infrastructure and
Improvements" be bonded for. Because we do not have a final detailed design of the
project to reference, I would clarify the bonding requirements to include 125% of
the cost of everything EXCEPT: building construction; parking lot paving; final
landscaping in and around the buildings and parking lots; fighting; signage; and the service
lines to each building.
Therefore, those things that we would expect to be bonded for include but are not limited
to (without the final design): grading for the entire site; all necessary water, sewer lines
available to service all of the pads within the development; access roads and sidewalks
withinj the site; cost of removing the MDOT maintenance facility and equipment, the cost
of removing the NuPack batch plant equipment and offices;
Hopefully this will help you understand your cost associated with the bonding
requirements. We also need to sign off on the four year time line for making all of the
bonded improvements. J P "' — ,