07/11/01 Beard to Kukulski/Secure BondCROSSWELL PROPERTIES Fax:713-266-9278 Jul 11 '01 9:49 P.02 -T _ DEVELOP MENT,LLC 1-hw rucw*n t+Daveelopwnr Servlcev July 11, 2001 Mr. Chris Kukulski City of Kalispell '312 1 " Avenue Last Kalispell, Montana 59901 Dear Chris: Per the requirements of the PUD Agreement, infrastructure improvements at Mountain View. of the Agreement. we are working on securing a bond for the These improvements are defined in section 1.15 Notwithstanding the "Engineer's Estimate" attached as Exhibit D, I have attached a revised estimate based upon unit pricing of our construction contract. It is also more reflective of the items required to be bonded per section 1,15. Because a majority of the bonded items will be completed in this first phase, we are requiring our contractor to bond 125% of the contract amount in favor of the City. As you can see from the spreadsheet, the remaining sum is $437,825. That difference is made up mainly of the paving required for phase 2 of the development. It will not be possible for us to bond work that we do not currently have under contract to be completed. Therefore, we are asking that the city a) accept the phase one bond amount of $1,825,000 and, b) allow for the bonding of the phase 2 items when that contract is let. Considering the tanning involved for securing a bond, we would appreciate your written response by the end of the week. If you have any questions or need additional information, please feel free to contact me. Thanks for your assistance. Sincerely Stan Beard, Jr. For Mountain View, LP Cc: Mike Fraser, fax Pf Sorensen, fax Scott Deskias, fax 2121 Sage Road, Suite 380 Houston, Texas 77056 tel 713 266 9200 fax 713 266 9278 CROSSWELL PROPERTIES F=,c713-266-9278 Jul 11 '01 Paving Quantity Unit Unit Cost Total Asphalt4' 35,600.00 BY 8.60 306.160.00 Base Course 4,020.00 CY 15.16 60,903.00 Sub Base 12,300.00 CY 11.90 146,370.00 Concrete Walk 4,700.00 SY 21.60 101,050.00 Curb & Gutter 4,300.00 LF 8.13 34,9%.00 Straight Curb 1,150.00 LF 10.00 11,600.00 Signal 1.00 LS 200,000.00 200,000.00 W. Reserve Intersection 1.00 LS 25,000.00 25,000.00 Subtotal 885,942.00 Off -Site Water 12" PVC DR 18* 7,300.00 LF 19.90 145,270.00 Fittings 2,100.00 LBS 3.20 6,720.00 12" Gate Valves 10.00 EA 1,140.12 11,401.20 Blow Off Assembly 4.00 EA 1,424.85 5,699.40 Air Release Assembly 4.00 EA 640.26 2,561.04 Connect to Exist 2.00 EA 417.00 834.00 Jack & Bore-4 Mile Dr. 110.00 LF 199.89 21,987.90 Jack & Bore-93 110.00 LF 199.89 21,987.90 Clean-up & Seeding 1.00 LS 5,250.00 6,250.00 Pavement Remove/Replace 300.00 LF 34.65 10,395.00 Subtotal 232,106.44 Off -Site Sewer Excavation 6,600.00 CY 4.31 28,446.00 12" PVC DR 35 2,600.00 LF 16.32 42,432.00 8" PVC DR 35 1,500.00 LF 14.11 21,155.00 Manholes 16.00 EA 919.40 13,791.00 Manholes -Vertical Feet 110.00 VF 111.17 12,228.70 Connect to Exist 1.00 EA 946.71 946.71 Jack & Bare -College 60.00 LF 235.95 14,217.00 Clean-up & Seeding 1.00 LS 5,250.00 5,250.00 Subtotal 138,476.41 On -Site Water 12" PVC DR 18 6,000.00 LF 19.90 119,400.00 8" PVC DR 18 1,500.00 LF 16,00 24,000.00 Fittings 6,000.00 LBS 2.87 17,220.00 8" Gate Valves 4.00 EA 800.00 3,200.00 12' Gate Valves 8.00 EA 1,418.14 11,345.12 Fire Hydrants 11.00 EA 2,364.31 26,897.41 Fire Service 260.00 LF 23.28 6.052.80 Subtotal 207,115. 33 On -Site Sewer Excavation 6,600.00 CY 4.90 26,950.00 B" PVC DR 35 5,300.00 LF 13.26 70,278.00 Manholes 15.00 EA 1,042.28 15,634.20 Manholes -Vertical Feet 40.00 VF 98.17 3,925.80 Connect to Exist 1.00 EA 2,802.96 2,802.96 Force Main - 4" PVC 1,450.00 LF 13.93 20,198.60 Lift Station 1.00 LS 116,829.47 116,829.47 Subtotal 256,619.93 NuPac Demolition 1.00 LS 90,000.00 90,000.00 Subtotal 90,000.00 1125% Bonded Amount 2,262,825.14 Phase One Contract 1,460,000.00 125% Bonded Amount 1,826,000.00 BOND REQUIREMENT 2,262,825.14 Less Phase One Amount (1,825.000.00 TOTAL BOND REQUIRED 437,825.14 CROSSWELL PROPERTIES F x:713-266-9278 Jul 11 '01 9:48 P.01 q ''Iiiiiii qi]1111111�jo �111��11111�111qiijiiii ►� j� To: C �r :5 u 11k ,..Ask; With: Fax #: _ AbG - -75S, -7-7S- J®r2�SP.� With: Stan Beard, jr. it 3 Im9 , Hard COPY to . 2- � -10 , S �o S� 22�0.vV, �ZS .This transmission may contain confidential information. If the reader of this message is not the intended recipient, please do not distribute this transmission. Notify us immediately in case of error or unintended receipt; 713.266.9200. comments: 2 2121 -Sage Road- SW#4 380 Houston, TX 77056 713266.9200 EEL 103 Fax 266.9278