I received a copy of the letter sent to Jeff Houle, Target's architect. Please see the following:
1. The NuPac offices should be demolished by the and of the month. As I've said before, the
actual demolition of the building is inevitable regardless of short-term schedules. We'll have
a real problem if Target's final permit is held up for this contingency alone.
2. As we know, the fire station pad's location has always been preliminary. Considering our
recent discussions, the likelihood that the station is ultimately located on our property has
diminished somewhat. Regardless ofthe final outcome, we require that this contingency be
removed from this list.
3. Fire access has been provided..A. fire hydrant will be provided prior to combustibles
delivered to site.
4. Marceile Sigler with the local office of the MDEQ has provided the Helena office with a
final closure recommendation. We will provide the final closure letter from the state when.
we receive it. This -is the last and only evidence of cleanup required per section 2.02(a). I
need immediate verification that this is indeed the final report required.
5. Any and all public works issues must be timely presented by the department and any re -
submittals should be timely responded to.
6. The height concern is being handled by Target.
7. I'm surprised a fighting plan was not included in. either Target's or the civil set of drawings.
I will make sure you receive them.
8. Our engineer will address this.
9. Our. engineer will address this.
Please let me know immediately if these responses do not coincide with your understanding.
Thanks for your attention.
cc: C. Kukulski
M. Munsinger
J. Edlund
2121 Sage Rao Salve 380
Hannan. TX 776"
713.266.9Z00 Fst 103
Fax 266.9278
sbeard@crossweUproperdes.com
CROSSWELL
IES
Ent"By: KAUSPELL BLOC CUM.URVE-L.; ,: �xr 1 4 2c66-9e278,yi Ju1JUnr-19 ^?�--I r- - - _ -
w.
City of Kalispell
Post Office Bose 1997 - Xa&%*Z. Mm=a W03-1997 - Telephone (400758-770o Fa "758-775S
Juut 14, 2002
JeffHoule
KKR Architects
300 First Avenue North
Mmaeapol % MN 55401
Re: TargevYjXspetl, MT
Der Jeff.
We are prepared to issue a foundation only bu%iing pamm L far the Target store here in
K,alispeil. It is my undwstarldhV that we wM be receri ft the check shortly. At this poiffi v c
need to focus on the rcmakWor permit. The Site Developmem R yiew Commrt'bee discus d tbrc
status of the pmjeCt yesterday, and I warded to provide you with a anrzlocaary of the itrms that
need to be wvered. prior to issttiw the reawiisd permit. Pkm keep in mind that tbn,9 Vet is not
neee336i`k a complete itemization, as each depal't M will cone to work on those items
related to their funedom Also, you should continue to work with our Plans Examiner, Jeff
Clawson, an all building code issues.
(1) The remaining offims, sGcttmms, do. at NUPA,C nn*1 be removed pursuant to
Section 2-01(C) of the developM= fit.
(2) Tho firm AaWa pad is d*patad an the PM site plan hi as area nOW dVdV ed for a
szorm"ar retention pond. Our City IVJauger, in conjunction with the Fire Q d4 are
dWuasing the matter with giaDBM d of CTOMVelL
(3) The Fire Deparcmut will nred to approve the imt =ftl ft supprmwn system as weft
a.4 fire access to the site during the oonstrudion phase. AddWoftUy, their comctdCM
regami . hy+drarrts will be addressed through the Pubic Works Deparhmeat.
(4) The envi=onrrra l t provided for under Section 2.02(A) of rite devclopmm t
agt4c t' nm shoerld be corl>#rleted.
(5) Any Public works issues should W addmsed through the Pub& Works Dgxuktx Ux`>
(6) The archkoctuml feetures over the entrance of the buWiag exceed the maximum
heiglax limit cantahwd in Soction 2.01(b). Please note that bcight cakubdons under our
CROSSWELL PROPERTIES c7Rx:713-266-9278 Jun 19 'n? 13:32 P.04
nt '� KALXSFhLL 13L1Jt3/CQifd'.l hV11 L.; 1 406 769 7739; Jun-14-02 ` 33AM; Rage 313 •
cky zoning ordinance use the average firdsW gre& in an am 20 a strudure
a9the n-
lighting plan n= 1`sibmittedpumumf'. Section
c Underour t t ordinance,•! loading areas i x 35 i we ♦ W
,loading area in t1w front is m4e slightly wider, aH f bur wouW bo provided.
<(9) 1.regard ' • parking, t:.+! _are threeminorI .7♦ti First, snDw storage shouM be
a' _ 1 :.• 1amer %4&h 1 • R tot mwine math eq• "♦ padmS ipa ins or driving
aisles. Second. the coaparut spaces o-n the wed end of the site am be gandard spams (up
♦ a two foot overhang is allowed and imluded in the 20 foot minimum ta+► 1 ► • ♦-'
21
,I.. 1 1• t U f 1: F
Non In n 14,.-
CROSSWEH PROPERTIES =x:713-266-9278 Jun 19 13:31 P.01
2\ -�Sa rQ
Fox M cjt. '7sb. `7 7'° 'i
Cc: With:
Fox��, -758. TKB
Date: : -4
Follow:Hard Copy to
Ais transmission may contain confidential information ,If the reader of this message is not the
intended recipient, please do not distribute this transmission. Notify us immediately in case of error
or unintended receipt, 713. 266.9200.
comments: