Loading...
10/25/02 Fraser to Amerman/Design AlternativeThomas, Dean & Hoskins, Inc. L TD&r Engineering Consultants October 25, 2002 Dick Amerman P.E./Assistant City Engineer City of Kalispell PO Box 1997 Kalispell, MT 59903-1997 Re: Mountain View Plaza Dear Dick: �E D r p 1 iL1L L CITY CL Clearly the City's delay in acknowledging the receipt of the request, of nearly six weeks, is the unnecessary delay referenced. In the early discussions relating to the infrastructure design data was presented which documented the 8 and 10 inch water mains compliance with the pressure and flow requirements of the City Standards and Water Quality Circular —1. The City instructed the developer to up size to 12 inch water mains and loop down the west side of Highway 93. This design alternative is referenced in the PUD. The PUD also provides for the developer to recover the costs of additional improvements requested by the City. We have calculated the reasonable costs of the improvement upsizing and extensions requested. Engineering and inspection costs have been estimated. We could review actual records and time to arrive at a more precise value, but honestly believe it would exceed the estimate. We are available to meet with staff late next week or the following week and will have the copies of the empirical data previously submitted to the City documenting the adequacy of the smaller utilities. Sincerely, THOMAS, EAN (H KINS, INC. V,J W Michael W. Fraser, P.E. MWF: mw K00-084-002 Cc: Stan Beard Chris Kukulski J:\2000\K00-084\K00-084-002 Utility Research\word\oct25.02.amerman.ltr.doc 690 North Mei-icliai?, Smite 101 • Kalispell, MT 59901 • (406 )752-5246 - FAX (406)752-5230