Loading...
SIA Phase 2 (Recorded)SUBDIVISION IMPROVEMENT AGREEMENT THIS AGREEMENT, made and entered into this day of , 2004, by and between the CITY COUNCIL, CITY OF KA.LISPELL, MONTANA, Party of the Vst Part and hereinafter referred to as the CITY, and Northview Heights LLC (Name of Developer) a Limited Liability Corporation, (Individual, Company or Corporation) located at 690 N. Meridian, Suite 210, Kalispell, MT 59901 (Street Address/P.O.Box) (City, County, State, Zip) Party of the Second Part and hereinafter referred to as DEVELOPER. WITNESSETH: THAT WHEREAS, the Developer is the owner and developer of a new subdivision known as Northview Heights Subdivision- Phase 2 (Name of Subdivision) located at Northview Heights (Location of Subdivision) and WHEREAS, the City has conditioned its approval of the final plat of Northview Heights Subdivision- Phase 2 upon the condition North Riding Lane (Name of Subdivision) be completed at this time, and the Developer feels required to bond for the completion of those improvements set forth in "Exhibit A"; and WHEREAS, the City's Subdivision Regulations require that a Developer shall provide a financial security of 125% of the estimated total cost of construction of said improvements as evidenced by an estimate prepared by a licensed public engineer included herewith as "Exhibit B' ; and WHEREAS, the estimated total cost of construction of said improvements is the sum of $272,995.00. NOW THEREFORE, in consideration of the approval of the final plat of said Subdivision by the City, the Developer hereby agrees as follows: 1. The Developer shall deposit as collateral with the City a Letter of Credit, or other acceptable collateral as determined by the City Council, in the amount of $73,227.00. Said Letter of Credit or other collateral shall have an expiration date of at least sixty (60) days following the dates set for completion of the improvements, certifying the following: JA2002\K02-010\K02-010-009\Word\jun.24.04.APPENDIX E.sub.imp-ovement.phase2.doe 2004:197 c a. That the creditor guarantees funds in the sum of $73,227.00, the estimated cost of completing the required North Riding Lane improvements. b. That if the Developer fails to complete the specified improvements within the required period, the creditor will pay to the City immediately, and without further action, such funds as are necessary to finance the completion of those improvements up to the limited of credit stated in the letter; 2. That said required improvements shall be fully completed by October 31, 2005. 3. That upon completion of the required improvements, the Developer shall cause to be filed with the City a statement certifying that: a. All required improvements are complete; b. That the improvements are in compliance with the minimum standards specified by the City for their construction and that the Developer warrant said improvements against any and all defects for a period of one (1) year from the date of acceptance of the completion of those improvements by the City; That the Developer knows of no defects in those improvements; d. That these improvements are free and clear of any encumbrances or liens; That a schedule of actual construction costs has been filed with the City; and, f. All applicable fees and surcharges have been paid. 4. The Developer shall cause to be filed with the City copies of final plans, profiles, grades and specifications of said improvements, with the certification of the registered professional engineer responsible for their preparation that all required improvements have been installed in conformance with said specifications. 5. Developer reserves the right to contest in court, the necessity of this Agreement and the City's demand for the completion of the improvements covered hereby at this time. J:\2002\K02-010\K02-010-009\Word\jun.24.04.APPENDIX E.sub.improvement.phase2.doc 2004197 i IT IS ALSO AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS, TO WIT: That the Developer shall provide for inspection of all required improvements by a registered professional engineer before the Developer shall be released from the Subdivision Improvement Agreement. That if the City determines that any improvements are not constructed in compliance with the specifications, it shall furnish the Developer with a list of specific deficiencies and may withhold collateral sufficient to insure such compliance. If the City determines that the Developer will not construct any or all of the improvements in accordance with the specifications, or within the required time limits, it may withdraw the collateral and employ such funds as may be necessary to construct the improvement or improvements in accordance with the specifications. The unused portions of the collateral shall be returned to the Developer or the crediting institution, as is appropriate. IN WITNESS WHEREOF, the Parties have hereunto set their hands and seals the day and year herein before written. Northview Heights, LLC (Name of Subdivision/Developer/Firm) by (General Partner) STATE OF MONTANA COUNTY OF FLATHEAD 41 On this day of L 2004, before me, a Notary Public for the State of Montana, personally appeared Frank R. Strickland known to me to be the General Partner of Northview Heights, LLC, whose name is subscribed to the foregoing instrument and acknowledged to me that he executed the same. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my Notary Seal this day and year first above written V-�' �. _ A 1'C � L Notary Public for the State of Mo tana Residing at My Commission Expires '7. 1(. 2 v MAYOR, CITY OF KALISPELL ATTEST: CITY CLERK 7 EXHIBIT A NORTHVIEW HEIGHTS SUBDIVISION PHASE- 2 This agreement specifically includes the following improvements, their projected construction completion date and estimated construction costs. ESTIMATED CONSTRUCTION IMPROVEMENTS STATUS COSTS Water System Complete Sewer System Complete Storm Drainage Complete Utilities FEC Complete NEW Complete CTL Complete Trenching/Vaults Complete Street Improvements Excavation Complete Subbase Complete Base Course Complete Asphaltic Concrete 4" Complete Asphaltic Concrete 2" overlay 0% Concrete Curbs & Gutter 85% Sidewalk* 0% Plantings* 0% Top Soil & Seeding 50% Total Total Financial Security (125% of cost of completion) * includes North Riding Lane J:\2002\K02-OIO\K02-010-009\Word\jun.24.04. APPENDIX E.sub. improvement.phase2.doc $3,850.00 $4,351.60 00 Al"8;'.r 400.001 LU $581- - 6b�, j � 4 t is CERTIFICATE OF ENGINEER NORTHVIEW HEIGHTS SUBDIVISION PHASE- 2 I, Michael W. Fraser, a Licensed Professional Engineer in the State of Montana, acting on behalf of Thomas, Dean & Hoskins, Inc., do hereby certify: Estimated costs in Exhibit A attached hereto are true and accurate; Done this day of, 2004. M Fraser #38,,26`" Certificate of Notary State of Montana County of Flathead On this X'day of J v , 2004, before me the undersigned, a Notary Public for the State of Montana, personally appeared Michael W. Fraser, known to me to be the person whose name is subscribed to the forgoing instrument and acknowledged to me that he executed the same. li�StlE1l1 I/q 7 e55 �[lfi��'"' �0°e�G Notary Pu is for the State of Montana �= Residing at �Q My Commission Expires on "�• (�>SEAL OF 01, ii t')L 1 } ' sTATFCFA40Nr4)kW . MUNTYOF/LATRF4Dj .ss RECORDED IN THERECC3RDs OFF'r1 D CowTY, s;"-ATEOF J:\2002\K02-010\K02-010-009\Word\jun.2i.0P subj. o uzl �d i RETURN DOCUMENT#