SIA Phase 1 (Recorded)Return R' to: Theresa White Kalispell City Clerk - 4 5-��-- El P.O. Box 1997 Ai. LA R0a),N. 0N1 TIAE� AM CON `I N MO,,JAN(I Kalispell, MT 59903 &1 .1a0& f I 10 f APPENDIX SUBDIVISION''t AGREEMENT THIS AGREEMENT, made and entered into this 5 day of .Tune , 20 06, by and between the CITY COUNCIL, CITY OF KALISPELL, MONTANA, Parry of the First Part and hereinafter referred to as the CITY, and Touchstone LLC. (Name of Developer) a LIMITED LIABILITY PARTNERSHIP (Individual, Company or Corporation) located at 1289 N. MERIDIAN RD, KALISPELL, MT. 59901 , (Street Address/P. O. Box) (City, County, State, Zip) Party of the Second Part and hereinafter referred to as DEVELOPER. WITNESSETH: owner and developer of a new subdivision known as (Name of Subdivision) located at PARCELS A&B OF CERTIFICATE OF SURVEY, LOCATED IN SECTION 2, TOWNSHIP 28 NORTH, RANGE 22 WEST, P.M.M., FLATEEAD COUNTY, ONTANA. , (Location of Subdivision) and, WHEREAS, the City has conditioned it's approval of the final plat of MOUNTAIN VISTA PHASE 1 , upon the conditions as set forth (Name of Subdivision) -57-47- in the Preliminary Plat of the Subdivision being completed and all improvements, as cited in "Exhibit A" have not been completed at this time, and the Developer wishes to bond for the completion of those improvements set forth in "Exhibit A"; and WHEREAS, the City's Subdivision Regulations require that a subdivider shall provide a financial security of 125% of the estimated total cost of construction of said improvements as evidenced by an estimate prepared by a licensed public engineer included herewith as "Exhibit A" • and WHEREAS, the estimated total cost of construction of said improvements is the sum of $ 348,568.29 NOW THEREFORE, in consideration of the approval of the final plat of said Subdivision by the City, the Developer hereby agrees as follows: Mountain Vista Subdivision, Phase 1 Subdivision Improvement Agreement Page 1 of 3 1. The Developer shall deposit as collateral with the City a Letter of Credit, or other acceptable collateral as determined by the City Council, in the amount of $ 435 710.36 . Said Letter of Credit or other collateral shall have an expiration date of at least sixty (60) days following the date set for completion of the improvements, certifying the following: a. That the creditor guarantees funds in the sum of $ 435 710.36 , the estimated cost of completing the required improvements in MOUNTAIN VISTA PHASE 1 (Name of Subdivision) b. That if the Developer fails to complete the specified improvements within the required period, the creditor will pay to the City immediately, and without further action, such funds as are necessary to finance the completion of those improvements up to the limited of credit stated in the letter; 2. That said required improvements shall be fully completed by December 2, 20 06 3. That upon completion of the required improvements, the Developer shall cause to be filed with the City a statement certifying that: a. All required improvements are complete; b. That the improvements are in compliance with the minimum standards specified by the City for their construction and that the Developer warrants said improvements against any and all defects for a period of one (1) year from the date of acceptance of the completion of those improvements by the City; c. That the Developer knows of no defects in those improvements; d. That these improvements are free and clear of any encumbrances or liens; e. That a schedule of actual construction costs has been filed with the City; and, f. All applicable fees and surcharges have been paid. 4. The Developer shall cause to be filed with the City copies of final plans, profiles, grades and specifications of said improvements, with the certification of the registered professional engineer responsible for their preparation that all required improvements have been installed in conformance with said specifications. Mountain Vista Subdivision, Phase 1 Subdivision Improvement Agreement Page 2 of 3 IT IS ALSO AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS, TO -WIT: That the Developer shall provide for inspection of all required improvements by a registered professional engineer before the Developer shall be released from the Subdivision Improvement Agreement. That if the City determines that any improvements are not constructed in compliance with the specifications, it shall furnish the Developer with a list of specific deficiencies and may withhold collateral sufficient to insure such compliance. If the City determines that the Developer will not construct any or all of the improvements in accordance with the specifications, or within the required time limits, it may withdraw the collateral and employ such funds as may be necessary to construct the improvement or improvements in accordance with the specifications. The unused portions of the collateral shall be returned to the Developer or the crediting institution, as is appropriate. IN WITNESS WHEREOF, the Parties have hereunto set their hands and seals the day and year herein before written. MOUNTAIN VISTA / TOUCHSTONE LLC , (Name of Subdivision/Developer/Firm) by -, , (Title) STATE OF MONTANA COUNTY OF <'ie- On this day of , 20 do, before me, a Notary Public for the State of Montana, personally appeared known to me to be the `t �� -, of , whose name is subscribed to the foregoing instrument and acknowledged to me that he/she executed the same. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my Notarial Seal this day and year first above written. o Public for the State o ontana = 1 d c at Kal:,;el', Idonk Resi m at Z n My Commission Expires ATTEST: CITY CLERK Mountain Vista Subdivision, Phase 1 Subdivision Improvement Agreement Page 3 of 3 EXHIBIT "A" CERTIFICATION OF WORK TO BE COMPETED MOUNTAIN VISTA PHASE I SUBDIVISION ROADS & OVERLOT GRADE Completed To Date May 26, 2006 Item No. Description Unit Measure Estimated Quantity Unit Price Total Price Quantity Completed Total Cost Completed 101 Topsoil Removal/Replacement C.Y. 17,000 $1.68 $28,560.00 17,000 $28,560.00 102 Excavation / Subgrade Prep C.Y. 94,698 $2.08 $196,971.84 94,698 $196,972.05 103 Stabilization Fabric S.Y. 10,449 $1.10 $11,493.90 10,449 $11,493.90 104 Select Subbase C.Y. 2,821 $16.94 $47,787.74 2,821 $47,787.74 105 3/4" Crushed Gravel C.Y. 1,622 $19.12 $31,012.64 1,622 $31,012.64 106 4" Ashpaltic Cement S.Y. 9,858 $8.75 $86,257.50 0 $0.00 107 Curb & Gutter L.F. 6,144 $8.05 $49,459.20 6,144 $49,459.20 108 Valley Gutters LF 126 $25.88 $3,260.88 0 $0.00 109 5' x 4" Concrete Sidewalks / Gravel S.F. 24,920 $3.49 $86,970.80 0 $0.00 110 5' x 6" x 20' Concrete Sidewalks / Gravel S.F. 5,800 $4.64 $26,912.00 0 $0.00 SUBTOTAL ITEMS 101 - 110 $568,686.50 $365,285.53 WATER SYSTEM Item No. Description Unit Measure Estimated Quantity Unit Price Total Price Quantity Completed Total Cost Completed 201 12" Water Main L.F. 232 $28.21 $6,644.72 20 $564.20 202 8" Water Main L.F. 2,996 $19.86 $59,500.56 2,773 $55,071.78 203 12" Gate Valves & Boxes EACH 2 $1,917.30 $3,834.60 1 $1,917.30 204 8" Gate Valves & Boxes EACH 15 $1,190.20 $17,863.00 14 $16,662.80 205 12' & 8" Ductile Iron Fittings EACH 12 $483.77 $5,805.24 13 $6,289.01 206 Fire Hydrants w/ Tee, Pipe, Aux. Valve & Box EACH 8 $3,416.40 $27,331.20 7 $23,914.80 207 Water Services EACH 59 $614.38 $36,248.42 57 $35,019.66 SUBTOTAL ITEMS 201 - 207 $157,117.74 $139,439.55 SEWER SYSTEM Item No. Description Unit Measure Estimated Quantity Unit Price Total Price Quantity Completed Total Cost Completed 301 8" Sewer Main L.F. 1,884 $18.01 $33,930.84 1,786 $32,165.86 302 4' Diam. Manholes w/ Ring & Cover EACH 13 $1,649.49 $21,443.37 12 $19,793.88 303 4" Sch. 40 PVC Sewer Services EACH 39 $623.67 $24,323.13 38 $23,699.46 304 2" HDPE Force Main L.F. 820 $15.00 $12,300.00 820 $12,300.00 305 2" HDPE Force Main Cleanouts EACH 2 $539.06 $1,078.12 2 $1,078.12 306 E1 Sewer Service Assembl EACH 18 $802.20 $14,439.60 18 $14,439.60 SUBTOTAL ITEMS 301 - 306 $107,515.06 1 $103,476.92 DRAINAGE & MISCELLANEOUS WORK Item No. Description Unit Measure Estimated Quantity Unit Price Total Price Quantity Completed Total Cost Completed 401 8" PVC Storm Drain / FE L.F. 257 $17.63 $4,605.21 270 $4,733.10 402 12" PVC Storm Drain / FE L.F. 780 $22.08 $17,222.40 514 $11,349.12 403 12" CMP Storm Drain / FE L.F. 0 $19.52 $0.00 0 $0.00 404 12" RCP Storm Drain/FE L.F. 60 $46.08 $2,764.80 0 $0.00 405 18" RCP Storm Drain / FE L.F. 205 $50.00 $10,250.00 0 $0.00 406 24" CMP Storm Drain / FE L.F. 70 $29.83 $2,088.10 0 $0.00 407 Catch Basin w/ Inlet EA. 11 $644.30 $7,087.30 11 $7,087.30 408 Precast Drywell Structures EA. 2 $1,113.26 $2,226.50 2 $2,226.50 409 Pond Outlet Structure EA. 1 $1,445.00 $1,445.00 0 $0.00 410 Riprap C.Y. 70 $30.00 $2,100.00 0 $0.00 411 Silt Fence LF 2,779 $3.02 $8,392.58 2,779 $8,392.58 412 Tracking Pad LS. 1 $1,335.00 $1,335.00 1 $1,335.00 413 Bike Path 16" base LF 484 $9.89 $4,786.76 0 $0.00 414 Bike Path /With 6 Bollards/12" base LF 484 $13.34 $6,456.56 0 $0.00 415 Mail Boxes Bases W/ Gravel EA. 4 $1,200.00 $4,800.00 0 $0.00 416 CBU Mailboxes EA. 11 $1,225.00 $13,475.00 0 $0.00 417 OPL Mailboxes EA. 4 $1,225.00 $4,900.00 0 $0.00 418 Seeding LS. 1.00 $2,500.00 $2,500.00 0 $0.00 420 Traffic Control LS. 1.00 $750.00 $750.00 50% $375.00 421 Mobilization LS. 1.00 $7,500.00 $7,500.00 100% $7,500.00 422 Construction Surveying LS. 1.00 $27,000.00 $27,000.00 85% $22,950.00 423 Street Si na a LS. 1.00 $1,512.50 $1,512.50 85% $1,285.63 SUBTOTAL ITEMS 401 - 423 $133,097.71 $67,234.23 UTILITIES - TRENCHING, CONDUIT, VAULTS & LIGHTS Completed To Date May 26, 2006 Item No. Description Unit Measure Estimated Quantity Unit Price Total Price Quantity Completed Total Cost Completed 501 Common Trench LF 5,360 $ 5.25 $28,140.00 6,279 $27,714.75 502 Street Light Conduit Trench LF 110 $ 5.25 $577.50 310 $1,627.50 503 3 Phase Vaults EA 5 $ 1,100.00 $5,500.00 5 $5,500.00 504 Single Phase Vaults EA 11 $ 726.25 $7,988.75 11 $7,988.75 505 Light Pole Bases (FEC) EA 10 $ 500.00 $5,000.00 10 $5,000.00 506 5" Conduit LF 2 161 $ 8.67 $18,649.17 2,123 $18,406.41 507 4" Conduit LF 300 $ 3.34 $1,002.00 220 $734.80 508 3" Conduit LF 8,757 $ 2.79 $24,432.03 7,860 $21,929.40 509 2" Conduit LF 8,400 $ 2.25 $18,900.00 7,170 $16,132.50 510 1" Conduit LF 623 $ 3.17 $1,974.91 370 $1,172.90 511 5" Steel or Fiberglass Sweeps EA 7 $ 340.00 $2,380.00 6 $2,040.00 512 3" Steel or Fiberglass Sweeps EA 8 $ 148.76 $1,190.00 11 $1,636.25 513 4" PVC Sweeps EA 1 $ 50.00 $50.00 2 $100.00 514 3" PVC Sweeps EA 120 $ 50.00 $6,000.00 107 $5,350.00 615 2" PVC Sweeps EA 226 $ 38.00 $8,588.00 228 $8,664.00 616 Secondary Pedestals EA 34 $ 50.00 $1,700.00 31 $1,550.00 517 Bresnan 2" Roll Pie Bresnan Supplied) LF 2000 $ 2.00 $4,000.00 1,723 $3,446.00 518 6" Sleeves for Gas Company LF 120 $ 8.00 $960.00 79 $632.00 519 4" Sleeves for Gas Conmany LF 120 $ 3.34 $400.80 356 $1,189.04 SUBTOTAL REVISED UTILITIES SCHEDULE1 $130,814.30 Total Construction Completed to Date $806,250.52 SERVICE COSTS, FEES, ENGINEERING & SURVEYING Item No. Description Unit Measure Estimated Quanti Unit Price Total Price7 QUANTITY COMPLETED TOTAL COST COMPLETED 601 Flathead Electric SUN 1 $ 94 154.00 $ 105 841.00 100% $94154.00 602 -LUMP Northwest Energy LUMP SUN 1 $ 32 000.00 $ 32 000.00 100% $32 000.00 603 Genturytel LUMPSUN 1 $ 54 266.80 $ 54 266.80 100% $54 266.80 604 Engineering, Design]LUMP SUN 1 $ 112 233.16 $ 112 233.16 100% $112 233.16 605 Engineering,Construction UMP SU 1 $ 56 116.63 $ 56 116.63 30°/ $16 834.99 606 Surveying,Legal UMP SU 1 $ $ $0.00 SUBTOTAL ITEMS 601 - 608 1 1 $ 360,457.59 $309,488.95 TOTAL PROJECT BUDGET TOTAL ESTIMATED COST OF CONSTRUCTION AMOUNT COMPLETED PRIOR TO BONDING AMOUNT OF REMAINING WORK PRIOR TO BONDING AMOUNT OF BOND (126% OF REMAINING WORK) AMOUNT OF WORK COMPLETED TO DATE PERCENTAGE OF WORK COMPLETED TO DATE AMOUNT OF WORK REMAINING ORIGINAL BOND AMOUNT AMOUNT OF BOND TO BE RETAINED (125% OF REMAINING WORK) BOND AMOUNT TO BE RELEASED AMOUNT PREVIOUSLY RELEASED AMOUNT TO BE RELEASED AT THIS TIME $1,464,307.76 $1,115,739.47 $ 1,464,307.76 $ 1,115,739.47 $ 348,568.29 $ 435,710.36 1,115,739.47 76 % 348,568.29 $ 435,710.36 $ 436,710.36 $0.00 $0.00 ��$0.00 AS PROJECT ENGINEER FOR THE MOUNTAIN VISTA SUBDIVISION PHASE 1, 1 CERTIFY THAT THE WORK LISTED HEREIN IS CORRECT. IN ADDITION, 1 CERTIFY THAT THE ASSOCIATED COSTS ARE REASONABLY ACCURATE ESTIMATES OF THE RESPECTIVE COSTS OF THE WORK. THE VALUE OF CONSTRUCTION AND OTHER WORK COMPLETED TO DATE IS ESTIMATED TO BE: $ 1,115,739.47 THE TOTAL VALUE OF REMAINING WORK, SERVICES AND FEES IS ESTIMATED TO BE: $ 348,568.29 SECURITY HELD AT 125% OF THE REMAINING COSTS SHOULD BE IN THE AMOUNT OF: $ 436,710.36 THEREFORE, IT IS IN ACCORDANCE WITH THE SUBDIVISION IMPROVEMENTS AGREEMENT TO REDUCE THE TOTAL AMOUNT OF THE SECURITY HELD BY: $0.00 BRETT WALCHECK, P.E. ---',,*ALL IMPROVEMENTS SHALL BE COMPLETED BY: 12/212006 CONSENT DATE 6/1/2006 BANK BOND DATEBRETT W. CK 1/31/2007 1 6 iW W) No. 14872FPE1jjj \ �v �9 EXHIBIT "A" CERTIFICATION OF WORK TO BE COMPLETED MOUNTAIN VISTA PHASE I SUBDIVISION ROADS & OVERLOT GRADE Completed To Date May 26, 2006 Item Unit Estimated Quantity Total Cost No. Description Measure t Quantity Unit Price Total Price Completed Completed 107 Curb & Gutter not completed by the Catch Basins L.F. 1761 $8.051 $1,416.80 0 $0.00 TOTAL ESTIMATED COST OF CONSTRUCTION $1,416.80 AMOUNT COMPLETED PRIOR TO BONDING $ AMOUNT OF REMAINING WORK $ 1,416.80 AMOUNT OF CASHIERS CHECK (125% OF REMAINING WORK) $ 1,771.00 AS PROJECT ENGINEER FOR THE MOUNTAIN VISTA SUBDIVISION PHASE I, 1 CERTIFY THAT THE WORK LISTED HEREIN IS CORRECT. IN ADDITION, 1 CERTIFY THAT THE ASSOCIATED COSTS ARE REASONABLY ACCURATE ESTIMATES OF THE RESPECTIVE COSTS OF THE WORK. THE VALUE OF CONSTRUCTION AND OTHER WORK COMPLETED TO DATE IS ESTIMATED TO BE: $ THE TOTAL VALUE OF REMAINING WORK, SERVICES AND FEES IS ESTIMATED TO BE: $1,416.80 BRETT WALCHECK, P.E. *ALL IMPROVEMENTS SHALL BE COMPLETED BY 12/2/2006 CONSENT DATE 61512016 BANK BOND DATE 1¢3V2 r