Loading...
SIA Phase 3 (Recorded)200800011584 Return to: IIRA IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIt Fees: $5,00 Theresa White 4/29/2008 3:40 PM Kalispell City Clerk Paula Robinson, Flathead County M7 by ID P.O. Box 1997 Kalispell, MT 59903 SUBDIVISION IMPROVEMENT AGREEMENT THIS AGREEMENT, made and entered into this day of 200 , by and between the CITY COUNCIL, CITY OF KALISPELL, MONTA A, Parry of the First Part and hereinafter referred to as the CITY, and TOUCHSTONE LLC, located at 135 W. Idaho, Suite B, Kalispell, MT 59901, Party of the Second Part and hereinafter referred to as DEVELOPER. WITNESSET: 1�3- THAT WHEREAS, the Developer is the owner and developer of a new subdivision known as MOUNTAIN VISTA ESTATES PHASE III located at Parcel A, Certificate of Survey No. 16814, Section 2, Township 28 North, Range 22 West, P.M.M., Flathead County, and WHEREAS, the City has conditioned it's approval of the final plat of MOUNTAIN VISTA ESTATES PHASE 11I, upon the conditions as set forth in the Preliminary Plat of the Subdivision being completed "Exhibit and all improvements, as cited in A" have not been completed at this time, and the Developer wishes to bond for the completion of those improvements set forth in "Exhibit A"; and WHEREAS, the City's Subdivision Regulations require that a subdivider shall provide a financial security of 125% of the estimated total cost of construction of said improvements as evidenced by an estimate prepared by a licensed public engineer included herewith as "Exhibit B"; and WHEREAS, the estimated total cost of construction of said improvements is the sum of $113,755.50. NOW THEREFORE, in consideration of the approval of the final plat of said Subdivision by the City, the Developer hereby agrees as follows: II�II�II�IIII�II�II�II���III�I'II�III'IIII��III��IIIII��III�II�IIIII�IIIIIIIIIIII�II�II��I P2008 age02 of 5 84 Paula Robinson, Flathead County MT by DD Fees: $55.00 4/29/2008 3:40 PM 1. The Developer shall deposit as collateral with the City a Letter of Credit, or other acceptable collateral as determined by the City Council, in the amount of $142,194.37. Said Letter of Credit or other collateral shall have an expiration date of at least sixty (60) days following the date set for completion of the improvements, certifying the following: a. That the creditor guarantees funds in the sum of $142,194.37 the estimated cost of completing the required improvements in MOUNTAIN VISTA ESTATES PHASE III. b. That if the Developer fails to complete the specified improvements within the required period, the creditor will pay to the City immediately, and without further action, such funds as are necessary to finance the completion of those improvements up to the limited of credit stated in the letter; 2. That said required improvements shall be fully completed by JUNE 3, 2008. 3. That upon completion of the required improvements, the Developer shall cause to be filed with the City a statement certifying that: a. All required improvements are complete; b. That the improvements are in compliance with the minimum standards specified by the City for their construction and that the Developer warrants said improvements against any and all defects for a period of one (1) year from the date of acceptance of the completion of those improvements by the City; c. That the Developer knows of no defects in those improvements; d. That these improvements are free and clear of any encumbrances or liens; e. That a schedule of actual construction costs has been filed with the City; and, f. All applicable fees and surcharges have been paid. 4. The Developer shall cause to be filed with the City copies of final plans, profiles, grades and specifications of said improvements, with the certification of the registered professional engineer responsible for their preparation that all required improvements have been installed in conformance with said specifications. age: 111111111111111111111 II P3 of 584 Page: 3 of 5 Fees: $55.00 Paula Robinson, Flathead County MT by DD 4/29/2008 3:40 PM IT IS ALSO AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS, TO -WIT: That the Developer shall provide for inspection of all required improvements by a registered professional engineer before the Developer shall be released from the Subdivision Improvement Agreement. That if the City determines that any improvements are not constructed in compliance with the specifications, it shall furnish the Developer with a list of specific deficiencies and may withhold collateral sufficient to insure such compliance. If the City determines that the Developer will not construct any or all of the improvements in accordance with the specifications, or within the required time limits, it may withdraw the collateral and employ such funds as may be necessary to construct the improvement or improvements in accordance with the specifications. The unused portions of the collateral shall be returned to the Developer or the crediting institution, as is appropriate. IN WITNESS WHEREOF, the Parties have hereunto set their hands and seals the day and year herein before written. TOUCHSTONE, LLC. PHILL G. NEUHARTH, JR. DAVID J. WALKER Member of Touchstone, LLC Member of Touchstone, LLC STATE OF MONTANA County of Flathead This instrument was acknowledged before me on 0\CkCC _ � 0 , 200 , by PHILLIP G. NEUHARTH, JR. AND DAVID J. WALKER, Members of Touchstone, LLC. SH ......... -. ` .�,�2 ram. cly1 ' :O ffA'' Printed Name c Notary Public for the State of Montana Residingat \ \ My Commission Expi es CITY OF KALISPELL ATTEST: Ir AYN EXHIBIT A Conditions of approval as fixed to the preliminary plat by the City Council, Kalispell, Montana. EXHIBIT B Certification of work to be completed. �I�ll�IiiIIIIIIIIIIIIII�II)��IIII�IIIIIIII�IIIIII�III�lIIII�IIIIIII'IIIIIIIIIIIIIIIIIIN P2008 age:4of5 84 Fees: $55.00 Paula Robinson, Flathead County MT by DD 4/29/2008 3.40 PM EXHIBIT "A" CERTIFICATION OF WORK TO BE COMPLETED MOUNTAIN VISTA PHASE III SUBDIVISION ROADS & OVERLOT GRADE Completed To Date February 19, 2008 Item No. Description Unit Measure Estimated Quantity Unit Price Total Price Quantity Completed Total Cost Completed 101 Topsoil Removal/Replacement C.Y. 5,966 $1.68 $10,022.88 5,500 $9,240.09 102 Excavation / Subgrade Prep C.Y. 6,556 $2.08 $13,636.48 6,556 $13,636.48 103 Stabilization Fabric S.Y. 4,752 $1.30 $6,177.60 4,752 $6,177.60 104 Select Subbase C.Y. 1,188 $17.00 $20,196.00 1,188 $20,196.00 105 3/4" Crushed Gravel C.Y. 683 $19.25 $13,147.75 551 $10,608.92 106 4" Ashpaltic Cement S.Y. 3,914 $11.85 $46,380.90 0 $0.00 107 Curb & Gutter L.F. 2,485 $9.75 $24,228.75 2,485 $24,228.75 108 5' x 4" Concrete Sidewalks / Gravel S.F. 12,425 $3.50 $43,487.50 0 $0.00 SUBTOTAL ITEMS 101 -108 $177,277.86 $84,087.84 WATER SYSTEM Item No. Description Unit Measure Estimated Quantity Unit Price Total Price Quantity Completed Total Cost Completed 201 8" Water Main L.F. 1,246 $23.00 $28,658.00 1,246 $28,658.00 202 8" Gate Valves & Boxes EACH 1 $1,300.00 $1,300.00 1 $1,300.00 203 12" & 8" Ductile Iron Fittings EACH 2 $500.00 $1,000.00 2 $1,000.00 204 Fire Hydrants w/ Tee, Pipe, Aux. Valve & Box EACH 2 $3,800.00 $7,600.00 2 $7,600.00 205 Water Services EACH 40 $595.00 $23,800.00 40 $23,800.00 SUBTOTAL ITEMS 201 - 205 1 1 $62,358.00 $622358.00 614TA4 z&Y&Ii4i l Item No. Description Unit Measure Estimated Quantity Unit Price Total Price Quantity Completed Total Cost Completed 301 8" Sewer Main L.F. 1,157 $19.00 $21,983.00 1,157 $21,983.00 302 4' Diam. Manholes w/ Ring & Cover EACH 6 $1,600.00 $9,600.00 6 $9,600.00 303 4" Sch. 40 PVC Sewer Services EACH 40 $600.00 $24,000.00 40 $24,000.00 SUBTOTAL ITEMS 301 - 303 $55,583.00 $55,583.00 DRAINAGE & MISCELLANEOUS WORK Item No. Description Unit Measure Estimated Quantity Unit Price Total Price Quantity Completed Total Cost Completed 401 Catch Basin w/ Inlet EA. 1 $1,200.00 $1,200.00 1 $1,200.00 402 Bike Path /6" base LF 1,359 $12.00 $16,308.00 554 $6,650.40 403 Bike Path Muth 6 Bollards/12" base LF 258 $15.50 $3,999.00 0 $0.00 404 Additional Bike Path (Jackson Peak to The North) LF 124 $16.12 $1,998.88 0 $0.00 405 ISeeding LS. 1.00 $1,000.00 $1,000.00 0 $0.00 406 Traffic Control LS. 1.00 $300.00 $300.00 0.00 $0.00 407 Mobilization LS. 1.00 $3,000.00 $3,000.00 0.66 $1,980.00 408 Construction Surveying LS. 1.00 $9,000.00 $9,000.00 0.89 $8,010.00 SUBTOTAL ITEMS 401 - 408 $36,805.88 $17,840.40 IIIII�II�IIIIIIIIIIIII��IIIIII�II�III��IIIIIIIIIIIIIIIIIIIIIII�IIIII�IIIIIIIIIIIII'IIII��I Page: 5 of 5584 Fees: $55.00 Paula Robinson, Flathead County MT by DD 4/29/2008 3:40 PM UTILITIES - TRENCHING, CONDUIT, VAULTS & LIGHTS Completed To Date February 19, 2008 Item No. Description Unit Measure Estimated Quantity Unit Price Total Price Quantity Completed Total Cost Completed 501 Common Trench LF 2,480 $ 4.00 $9,920.00 2,480 $9,920.00 502 Street Light Conduit Trench LF 68 $ 4.00 $272.00 68 $272.00 503 3 Phase Vaults EA 1 $ 1,280.00 $1,280.00 1 $1,280.00 504 Single Phase Vaults EA 4 $ 730.00 $2,920.00 4 $2,920.00 505 Light Pole Bases (FEC) EA 4 $ 550.00 $2,200.00 4 $2,200.00 506 5" Conduit LF 120 $ 8.50 $1,020.00 120 $1,020.00 507 4" Conduit LF 260 $ 6.80 $1,768.00 260 $1,768.00 508 3" Conduit LF 4,068 $ 3.00 $12,204.00 4,068 $12,204.00 509 2" Conduit LF 3,024 $ 2.75 $8,316.00 3,024 $8,316.00 510 1" Conduit LF 98 $ 2.50 $245.00 98 $245.00 512 3" Steel or Fiberglass Sweeps EA 3 $ 150.00 $450.00 3 $450.00 513 3" PVC Sweeps EA 94 $ 50.00 $4,700.00 94 $4,700.00 514 2" PVC Sweeps EA 105 $ 40.00 $4,200.00 105 $4,200.00 515 Secondary Pedestals EA 19 $ 50.00 $950.00 19 $950.00 516 ISignaga LS 1 $ 605.00 $605.00 1 $605.00 SUBTOTAL ITEMS 501-516 1 $51,050.00 $51,050.00 Total Construction Total Construction Completed to Date SERVICE COSTS, FEES, ENGINEERING 383,074.74 $270,919.24 Item No. Description Unit Measure Estimated Quanti Unit Price Total Price QUANTITY COMPLETED TOTAL COST COMPLETED 601 Flathead Electric LUMP SUIV 1 $ 34,168.00 $ 34,168.00 100% $34,168.00 602 Northwestern Energy LUMP SUIV 1 $ 11,149.00 $ 11,149.00 100% $11,149.00 603 Engineering, Construction LUMP SUIV 1 $ 8,000.00 $ 8,000.00 80% $6,400.00 SUBTOTAL ITEMS 601 - 603 $ 53,317.00 $51,717.00 TOTAL PROJECT BUDGET TOTAL ESTIMATED COST OF CONSTRUCTION AMOUNT COMPLETED PRIOR TO BONDING AMOUNT OF REMAINING WORK PRIOR TO BONDING AMOUNT OF BOND (125% OF REMAINING WORK) AMOUNT OF WORK COMPLETED TO DATE PERCENTAGE OF WORK COMPLETED TO DATE AMOUNT OF WORK REMAINING ORIGINAL BOND AMOUNT AMOUNT OF BOND TO BE RETAINED (125% OF REMAINING WORK) BOND AMOUNT TO BE RELEASED AMOUNT PREVIOUSLY RELEASED AMOUNT TO BE RELEASED AT THIS TIME $436,391.74 $ 436,391.74 $ 322,636.24 $ 113,755.50 $ 142,194.37 322,636.24 74% 113,755.50 $322,636. 44 $ 142,194.37 -' $ 142,194.37 — — N $0.00 $0.00 ' ITT T W I WALC E 1< � 1 AS PROJECT ENGINEER FOR THE MOUNTAIN VISTA SUBDIVISION PHASE III, 1 CERTIFY THAT THE -"j I i ) WORK LISTED HEREIN IS CORRECT. IN ADDITION, I CERTIFY THAT THE ASSOCIATED COSTS E'v } ARE REASONABLY ACCURATE ESTIMATES OF THE RESPECTIVE COSTS OF THE WORK. THE t . '14872PE1 a 1 VALUE OF CONSTRUCTION AND OTHER WORK COMPLETED TO DATE IS ESTIMATED TO BE: $ 322:636.24 i THE TOTAL VALUE OF REMAINING WORK, SERVICES AND FEES IS ESTIMATED TO BE: $ 113755.50� /) SECURITY HELD AT 125% OF THE REMAINING COSTS SHOULD BE IN THE AMOUNT OF: $ 142,194.37 i4 r THEREFORE, IT IS IN ACCORDANCE WITH THE SUBDIVISION IMPROVEMENTS AGREEMENT TO REDUCE THE TOTAL AMOUNT OF THE SECURITY HELD BY: $0.00 BRETT WALCHECK, P.E. "ALL IMPROVEMENTS SHALL BE COMPLETED BY: 6/3/2008