Loading...
Stauffer to Hansz/Road Detailf April 9, 2003 Mr. Jim Hansz, P.E., Director of Public Works City of Kalispell P.O. Box 1997 Kalispell, MT 59901 Re: Glacier Commons Subdivision Kalispell, Montana Dear Mr. Hansz: Pursuant to your letter dated April 1, 2003 concerning the referenced project, we submit the following information: We have provided a road detail which meets requirements of City of Kalispell Design Standard Drawing No. 3. The detail also contains a note that indicates if the sub -base and base material meet this some standard, they will remain in place. 2. The transverse slope of 2% is indicated on the road detail. 3. The road detail calls out sod in the open ditches. 4. A plan -profile sheet for Granrud Lane is included. The intersections of Granite Lane and Buffalo Stage will have 18" culverts installed for continuation of the drainage System. We understand that the proposed alternate design for Granrud Lane must be approved by the City Council prior to approval from your staff. The owner has 24 months from final plat approval to upgrade Granrud Lane, so this will be the last portion of the project to be completed. If possible, we would request that an approval from Public Works be issued for the project with the exception of Granrud Lane improvements, which would be contingent upon Kalispell City Council approval. This would allow the owner to proceed with the project. SCHWARZARCHITECTVREAND ENGINEERING, IN 100 Financial Dr., Suite 120 - Kalispell, MT 59901 - Tel: 406.755.1333 - Fax: 406.755.1: c- Jim Hansz, P.E 41912003 Glacier Commons Subdivision Page 2 of 2 Finally, we did not receive a response to our questions concerning the pipe bedding material issue. Thank you again for your consideration in this matter. Should you have any additional questions regarding the referenced project, please do not hesitate to call our office. Sincerely, RZ`ARCHITECTUREM ENGINEERING, Inc. . Stauffer Encl.: Proposed Road Cross -Section Cc: Chris Kulkulski Sent Via Fax: 406.758.7758 Frank Castles Sent Via Fax: 406.758.7831 Norm Shaw Sent Via Fax: 480.596.5173 Project File # 1066.02 C:\Schwarz Engineering, Inc\Project Files\West Won Development\Shaw Development\Rio AZ Holdings, LLC\Jim Hansz, April 9, 2003.doc Z z 4 0 � 0, L-LJ ¢ W d J } Of YQ t1] O wQ m O I- LLJv F- 5 CO a = ¢a E= OCL a as ; Lo N O o v v z w O _ N w ae .- a, UQ Ovwi > W O; v a- -J' 0 M O �! m lV W LJ 01 J LQ `- O Oaf O> ae � t 1 � W ti w a 1 U- O W N az m w m N- wzLu 7- 0 { JNN-Z W � l7 D uL W Z O :E LLi �d¢9u o�Lu �Fm Fwu_.ZZ i?>—¢ J J N W > _ Z O N w J cL La ¢ :::Eo10 O v W _ ¢ F��QcLu L u] 0zoDQQt- d Ou ¢ Y w J Q U 0 0 Iz