Loading...
SIA Phase 3 dated 05/02/05 (Recorded)APPENDIX E No -13 1 t, .. 1 1 THIS AGREEMENT, made and entered into thisaV4 day of _, 2005, by and between the CITY COUNCIL, CITY OF KALISPELL, MONTANA, P rty of the First Part and hereinafter referred to as the CITY, and r, Wayne E. Turner (Name of Developer) a Individual (Individual, Company or Corporation) located at 3300 Highway 2 West Flathead County, Montana 59901 , (Street Address/P. O. Box) (City, County, State, Zip) Q Party of the Second Part and hereinafter referred to as DEVELOPER. WITNESSETH: ®" THAT WHEREAS, the Developer is the owner and developer of a new subdivision r�Sknown as Empire Estates - Phase 3 (Name of Subdivision) located at Section 1 Township 28 North Range 22 West, P.M.A. , Flathead County (Location of Subdivision) Qand, WHEREAS, the City has conditioned it's approval of the final plat of Empire Cr-Estates - Phase 3 upon the conditions as set forth in the Preliminary Plat of the Subdivision (Name of Subdivision) `.being completed and all improvements, as cited in "Exhibit A" have not been completed at this time, and the Developer wishes to bond for the completion of those improvements set forth in "Exhibit A"; and WHEREAS, the City's Subdivision Regulations require that a subdivider shall provide ® a financial security of 125 % of the estimated total cost of construction of said improvements as Oo evidenced by an estimate prepared by a licensed public engineer included herewith as "Exhibit B";and �o ® WHEREAS, the estimated total cost of construction of said improvements is the sum of $ 196,800 . NOW THEREFORE, in consideration of the approval of the final plat of said Subdivision by the City, the Developer hereby agrees as follows: 1. The Developer shall deposit as collateral with the City a Letter of Credit, or other acceptable collateral as determined by the City Council, in the amount of $ 246,000 . Said Letter of Credit or other collateral shall have an expiration date of at least sixty (60) days following the date set for completion of the improvements, certifying the following: t() a. That the creditor guarantees funds in the sum of $ 246,000 the estimated cost of completing the required improvements in Empire Estates - Phase 3 (Name of Subdivision) b. That if the Developer fails to complete the specified improvements within the required period, the creditor will pay to the City immediately, and without further action, such funds as are necessary to finance the completion of those improvements up to the limited of credit stated in the letter; 2. That said required improvements shall be fully completed by July 1 , 2005. 3. That upon completion of the required improvements, the Developer shall cause to be filed with the City a statement certifying that: a. All required improvements are complete; b. That the improvements are in compliance with the minimum standards specified by the City for their construction and that the Developer warrants said improvements against any and all defects for a period of one (1) year from the date of acceptance of the completion of those improvements by the City; c. That the Developer knows of no defects in those improvements; d. That these improvements are free and clear of any encumbrances or liens; e. That a schedule of actual construction costs has been filed with the City; and, f. All applicable fees and surcharges have been paid. 4. The Developer shall cause to be filed with the City copies of final plans, profiles, grades and specifications of said improvements, with the certification of the registered professional engineer responsible for their preparation that all required improvements have been installed in conformance with said specifications. IT IS ALSO AGREED BY AND BETWEEN THE PARTIES HERETO A S FOLLOWS, TO -WIT: I That the Developer shall provide for inspection of all required improvements by a registered professional engineer before the Developer shall be released from the Subdivision Improvement Agreement. That if the City determines that any improvements are not constructed in compliance with the specifications, it shall furnish the Developer with a list of specific deficiencies and may withhold collateral sufficient to insure such compliance. If the City determines that the Developer will not construct any or all of the improvements in accordance with the specifications, or within the required time limits, it may withdraw the collateral and employ such funds as may be necessary to construct the improvement or improvements in accordance with the specifications. The unused portions of the collateral shall be returned to the Developer or the crediting institution, as is appropriate. IN WITNESS WHEREOF, the Parties have hereunto set their hands and seals the day and year herein before written. Empire Estates - Phase 3 (Naive of Subdivision/Developer/Finn) by -v -- -- Developer (Title) STATE OF MONTANA COUNTY OF FLATHEAD On this 2nd day of May , 2005, before me, a Notary Public for the State of Montana, personally appeared Hurbert J. 'burner , known to me to be the Developer of Empire Estates , whose name is subscribed to the foregoing instrument and acknowledged to me that he/she executed the same. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my Notarial Seal this day and year first above written. Notary Public for the State of Montana Residing at \4.P e -,(' y A Is - —All My Commission Expires c9`� ��`"`• =P`' OR, CITY OF KALISPELL ATTEST: MAYOR C/--k/ C—LPRK' EXHIBIT 1 EMPIRE ESTATES PHASE 3 PROJECT CONSTRUCTION COSTS PAID FOR AND/OR TO BE COMPLETION IMPROVEMENTS COMPLETED COMPLETED DATE Sub -Grade Excavation $ 14,000 Road Base $ 30,000 3/4 Crushed Gravel $ 0 Curb/Gutter $ 0 Water $ 79,250 Sewer $ 64,050 Storm Drainage $ 29,000 Telephone $ 15,971 Power $ 42,632 Conduit $ 0 Gas $ 24,866 Misc. Materials (Pipe, $ 115,000 catchbasins and appurtenances) Landscaping/Bike Path $ 9,900 Paving $ 0 Sidewalks $ 0 Signs $ 0 TOTAL $ 412,069 SUMMARY Completed To Date $ 412,069 To Be Completed $ 196,800 Total Project Cost $ 608,869 Percent Completed = 67.6% $ 1,500 $ 9,500 $ 30,500 $ 1,000 $ 1,000 $ 1,000 $ 24,000 $ 23,300 $ 47,600 $ 57,000 $ 400 $196, 800 Total Collateral Required = 125% of $196,800 = $246,000 CITY OF KALISPELL ATTN: T WHITE DRAWER 1997 KALISPELL,MT 59903 7/ 1 /05 7/ 1 /05 7/l/05 7/ 1 /05 7/ 1 /05 7/ 1 /05 STATE OF MOOT NA COUNT`( OFF ! A:[HE D) ss ':..T G p C { TE OP 4#C , . COPY RECORDED N "1 HE RECO S STACON ATMREQUESOF t 6 PAO n it CC �!L R;-rr.� R Ey P,%U_A Fi Jyl. CLEF a fa RE i hN ,,1CU€JENT 3