Loading...
Work Session Staff ReportPLANNING FOR THE FUTURE MONTANA Date: January 20, 2009 To: Kalispell Planning Board From: Sean Conrad, Senior Planner Planning Department 201 V Avenue East Kalispell, MT 59901 Phone: (406) 7,58-7940 Fax: (406) 758-7739 www.kaUspell.com/plannin2 Re: January 2701 Work Session - Cornerstone Church PUD The attached application is a request by the Cornerstone Church to rezone their property located at the northwest corner of the intersection of Northridge Drive and Highway 93 so that the eastern half of their property is rezoned from R-3 (Urban Single Family Residential) to B-1 (Neighborhood Buffer District) to accommodate the location of a new bank. The property owned by the church along Parkway Drive will remain R-3. The church is also requesting a planned unit development (PUD) overlay zoning district on the property. The PUD request would permit a zero side yard building setback to accommodate a drive -through facility for the bank. The PUD also requests to allow a bank and drive -through facility of up to 6,000 square feet and four drive -through lanes. The B-1 zone permits drive -through facilities with no more than two lanes and an associated bank of no more than 2,000 square feet in size. The final request in the PUD application is to reduce the rear yard setback for the B-1 from 20 feet down to 15 feet to recognize the existing 15 foot setback on a portion of the church building. Section 27.21.020(5) of the Kalispell Zoning Ordinance requires the planning board to hold at least one work session on a proposed PUD plan prior to a public hearing. The work session is intended for information purposes only and is a forum for the public and planning board to hear the developer present their project in detail. No decision will be made at this meeting. I will provide a brief presentation and outline any major concerns city staff may have on the project. Planning Department 201 1st Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kalispell.com/planning APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) PROJECT NAME Cornerstone Community Church Subdivision 1. 2. 3. NAME OF APPLICANT: Cornerstone Community Church MAIL ADDRESS: 1970 US Hwy 93 N. CITY/STATE/ZIP: Kalispell, MT 59901 PHONE: 406-752-4088 NAME AND ADDRESS OF OWNER IF DIFFERENT THAN APPLICANT: 4. NAME: 5. MAIL ADDRESS: 6. CITY/STATE/ZIP: PHONE: _ 7. TECHNICAL ASSISTANCE: 8. MAIL ADDRESS: 9. CITY/STATE/ZIP: PHONE:_ If there are others who should be notified during the review process, please list those. Thomas, Dean & Hoskins, Inc., 35 Three Mile Dr., Ste.101, Kalispell, MT 59901 Check One: x Initial PUD proposal Amendment to an existing PUD A. Property Address: 1970 US Hwy 93 N. B. Total Area of Property: 3.011 Acres C. Legal description including section, township 8s range: Lot 1A, Kalispell Addition No. 15A, SEC 1, T28N, R22W, P.M.M. D. The present zoning of the above property is: R-3 E. Please provide the following information in a narrative format with supporting drawings or other format as needed: 1 (9). Location and type of landscaping; (10). Location and type of open space and common areas; (11). Proposed maintenance of common areas and open space; (12). Property boundary locations and setback lines (13). Special design standards, materials and / or colors; (14). Proposed schedule of completions and phasing of the development, if applicable; (15). Covenants, conditions and restrictions; (16). Any other information that may be deemed relevant and appropriate to allow for adequate review. If the PUD involves the division of land for the purpose of conveyance, a preliminary plat shall be prepared in accordance with the requirements of the subdivision regulations. Please note that the approved final plan, together with the conditions and restrictions imposed, shall constitute the zoning for the district. No building permit shall be issued for any structure within the district unless such structure conforms to the provisions of the approved plan. The signing of this application signifies that the aforementioned information is true and correct and grants approval for Kalispell Planning staff to be present on the property for routine monitoring and inspection during review process. (Applicant Signature) alle og (Date) 3 a. An overall description of the goals and objectives for the development of the project. The proposed Cornerstone Church PUD is located in Section 1, Township 28 North, Range 22 West, P.M.M. and on the northwest corner of the intersection of Hwy 93 North and Northridge Drive. The site contains 3.984 acres and is currently occupied by a church on the north central portion the lot with gravel parking and undeveloped grassy area on the southern portion. The property is currently zoned R-3 with the requested overlay of a City of Kalispell B-1 zone on the eastern portion of the tract. The project will contain two tracts, one of one acre to house a bank, the other, the remainder; will be maintained as the existing church and future residential in the western portion. b. In cases where the development will be executed in increments, a schedule showing the time within phase will be completed. No phasing is planned at the current time. The two entities will complete construction concurrently. No residential development is proposed at this time. c. The extent to which the plan departs from zoning and subdivision regulations including but not limited to density, setbacks and use, and the reasons why such departures are or are not deemed to be in the public interest; Departures from the current City of Kalispell R-3 zone requirements as proposed by the PUD are as follows: Existing Proposed Minimum Setbacks Front 20' No Change Side 5' 0' Side cor. 20' 15' Rear 20' 10, Building Height 35' No change Lot Coverage 40% 50% Allowed Usage Kalispell R-3 Kalispell B-1 Minimum Lot Width 60' No Change Minimum Lot Area 7000 square feet(sf) No Change Parking 71 Spaces No Change Signage 120 sf 240 sf Density 24 du total Church & Bank LEGEND FEATURE DESCRIPTION O HEW SUILOING CURB ANO GUTTER STANDARD CURB PAINT STRIPE NEW WATER SE E _.____.._._.._.._ NEW SEWER SERNCE RAIN GARDEN y TRTbFIC DIRECRpi GRADE PAROW DECIDUOUS TREE AM.— TREE TRUNCATED DOME POT 1 GREEN AREA PAVED AREA =..— EF GREEN AREA 4,600 SF 15- OF DEVELOPMENT POT 2 GREEN AREA PAVED AREA=20,5M6 SF OPEEN AREA 4,200 SF 20AI6 OF DEVELOPMENT PARKING TOTALS LOT 1 -5T LOT 2 -14 TOTAL =71 UNITED STATES HIGHWAY 93 FUTURE RESIDENTIAL DEVELOPMENT PROPOSED DEVELOPMENT TIMELINE: SPRING 2D10 - fALL .11: CON5IRUCRON OF PROPOSED STRUCTURE AND ASSOCIATED SRE MPROVEMENIS PARKWAY DRf �ml ml11 L Planning Department 201 lst Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kalispell.com / planning PETITION FOR ZONING MAP AMENDMENT NAME OF APPLICANT: Cornerstone Community Church MAIL ADDRESS: 1970 US Hwy. 93 N. CITY/STATE/ZIP: Kalispell, MT 59901 INTEREST IN PROPERTY: owner PLEASE COMPLETE THE FOLLOWING: PHONE: (406) 752-4088 A. Address of the property: 1970 US Hwy. 93 N. B. Legal Description: (Subdivision Name, Lot 8s Block and/or Tract Number (Section, Township, Range) Lot 1A, Kalispell Addition No. 15A, Section 1, T28N, R22W, PMM (Attach sheet for metes and bounds) C. Land in zone change (ac) 3.011 Ac D. The present zoning of the above property is: R-3 E. The proposed zoning of the above property is: 13-1 F. State the changed or changing conditions that make the proposed amendment necessary: Commercial/Business development has occurred on adjacent property. Applicant seeks zone change to promote buffer zone to residential and to promote better use of vacant lot. HOW WILL THE PROPOSED CHANGE ACCOMPLISH THE INTENT AND PURPOSE OF: A. Promoting the Growth Policy The City of Kalispell Growth Policy Future Land Use Map indicates/designates the subject area as urban mixed use. Proposed uses of the project fall with in the projected parameter of "Office/Residential/Commercial/Limited Industrial" as defined by the map. B. Lessening congestion in the streets and providing safe access Proposed change will promote reducing congestion and provide safe access by developing internal access, off street parking and constructing pedestrian paths 1 sidewalks throughout and around the site. C. Promoting safety from fire, panic and other dangers Proposed zone change will promote safety issues by promoting re -development built to City standard development issues. Access being a key example D. Promoting the public interest, health, comfort, convenience, safety and general welfare Proposed zone change will allow transition buffer zoning to occur between residential and other B-designations. This will promote neighborhood business and services within walking distance and adjacent to residential area. E. Preventing the overcrowding of land Growth policy and zoning ordinances of City of Kalispell and the proposed P.U.D. will prevent over crowding of the subject property. F. Avoiding undue concentration of population Proposed zone change will avoid undue concentration by re -zoning residential to business. There by removing possible options which exist in R3 which could promote crowding or over concentration. G. Facilitating the adequate provision of transportation, water, sewage, schools, parks and other public facilities Proposed zone change will facilitate new development with new development reconstruction of sidewalks, approaches, and pedestrian/bike paths will occur. Sewer and water infrastructure is already in place yet will be upgraded as deemed necessary by the City at time of development. Schools and other public facilities will be addressed from the increase in tax base funding. W, H. Giving reasonable consideration to the character of the district Proposed change will give consideration to character by promoting consistent use with adjacent property and will provide consideration by promoting a transition zone between business and residential. I. Giving consideration to the peculiar suitability of the property for particular uses Proposed changes give consideration by promoting consistency with adjoining neighborhood property uses. J. Protecting and conserving the value of buildings Proposed zone change will allow future new development in an area which is currently a vacant lot. Value will be protected and conserved by promoting the new development. Protection will be insured by C.C.R.S. K. Encouraging the most appropriate use of land by assuring orderly growth Proposed change will allow new development on the lot consistent with adjacent property uses and will promote in -fill on a vacant lot. The signing of this application signifies approval for Kalispell Planning staff to be present on the pne monitoring and inspection during approval process. l 2-, /0� (Applicant Signature) (Date) 3