E2. Airport Taxiway Pavement Bid RecommendationKALISPELL MEMORANDUM To: Jarod Nygren, City Manager From: Keith Haskins, PE, Deputy Director of Public Works Re: Kalispell City Airport Taxiway Pavement Rehabilitation Project Date: 6/1/2026 BACKGROUND: The City of Kalispell received a Montana Aeronautics Board grant administered through the Montana Department of Transportation for taxiway replacement improvements at the City Airport. The city is the sponsor of the grant and the Kalispell Airport Association will administer the project. The taxiway rehabilitation is approximately 1,244 feet in length and approximately 20 feet in width. The project will include removing and disposing of the existing materials per the plans and geotechnical report as well as installing new materials per the required cross sections. The cross section also requires the installation of a geotextile Class 1 fabric per AASHTO M 288. BIDDING RESULTS: Bids were received and opened on May 22, 2026, at 2:00 pm. Three responsive bids were received. • LHC, Inc - $348,000.00 • Pinnacle Paving — $364,713.65 • Knife River Corporation- Kalispell - $414,444.00 A2Z Engineering, representing the Kalispell Airport Association, reviewed the bids, the submitted documentation, and submitted references. Based on their review, LHC, Inc was determined to be a responsive and responsible contractor who has successfully completed similar projects of size and scope. REQUESTED ACTION: Based on A2Z Engineering's evaluation and review of the bid and references, staff recommends awarding the base bid to LHC, Inc. FISCAL EFFECTS: The project will be funded via a 2025 Montana Aeronautics Board grant, of which the City of Kalispell is the sponsor. ALTERNATIVES: As suggested and approved by the City Council. ATTACHMENTS: • Engineer's Recommendation to Award Letter (A2Z Engineering) - May 27, 2026 • City of Kalispell - Grant Award Letter 201 Pt Avenue E IPhone (406)758-7720 Po Box 1997 Public Works Department Fax (406)758-7831 Kalispell, MT 59903 1 1 www.kalispell.com A2Z Engineering, PLLC • 138 East Center Street, Suite A • Kalispell, MT 59901 Phone: (406) 755-7888 • Fax: (406) 755-7880 • www.a2z-engineering.com May 27, 2026 City of Kalispell Public Works Department Attn: Keith Haskins Re: Taxiway Pavement Rehabilitation Project Engineers Recommendation to Award Letter To Whom it May Concern We have evaluated the bid received for the Kalispell City Airport Taxiway Pavement Rehabilitation Project. The project consists of; Schedule 1: Taxiway Pavement Rehabilitation Project The Kalispell City Airport is seeking bids to replace the paving and the build-up of the base and sub base per the detailed cross section provided on the plans and referenced in the geotechnical report that was performed for taxiway rehabilitation on the airport. The taxiway rehabilitation is approximately 1,244 feet in length and approximately 20 feet in width. The project will include removing and disposing of the existing materials per the plans and geotechnical report as well as installing new materials per the required cross sections. The cross section also requires the installation of a geotextile Class 1 fabric per AASHTO M 288. The rehabilitation of the runway shall consist of the following; • Mobilization and Demobilization • Removal and Disposal of the Existing Pavement and Base/Sub-Base Materials • Preparation of Base and Sub -Base per Plans/Specifications (Approximately 2,765 Sq Yd) • Installation of the Asphalt per the specifications and plans provided (Approximately 2,765 Sq Yd) • Incidentals and Required Testing per City of Kalispell Engineering Design Standards and MPWSS The bids were received by QuestCDN until 2:00 PM on May 22, 2026. The bids were publicly opened and read aloud in the First Floor Conference Room, 201 First Avenue East, Kalispell, Montana 59901. A2Z Engineering has reviewed the low bid and evaluated the submitted documentation and references of the Low Bidder. The references provided all had favorable recommendations for the contractor on large and complex civil projects. The information reviewed shows the contractor as qualified and capable of fulfilling the project parameters. We find the bid $348,000.00 (Three Hundred and Forty Eight Thousand Dollars) to match the grant funding available and therefore is within the project budget allocated. We recommend that the City of Kalispell City Council award the project to LHC, Inc. Please call me if you have any questions or concerns. Sincerely, Matt Nerdig, PE # 17074 Project Engineer r' MONTANA Department of Transportation 9/24/2025 City of Kalispell Kalispell Airport City Hall, PO Box 1997 Kalispell, MT 59901 citymanager@kaliseell.com iohnpaul(cr�.redeagleaviation.com To Whom It May Concern, Aeronautics Division 2630 Airport Road • PO Box 200507 Christopher Dorrington, Director Helena MT 59620-0507 Recently, a check was issued for $566,396.00 into your account associated with the Kalispell City Airport. These disbursements are for an Aeronautics Division grant for $566,395.00 from our Airport Development Financial Assistance Program for the Kalispell City Airport, This grant is for general airport reconstruction efforts as outlined within your application and as approved by the Federal Aviation Administration and/or the State of Montana. The Montana Aeronautics Board and the Aeronautics Division are happy to be able to assist in your airport improvement project by making these funds available through our Airport Development Financial Assistance Program. We look forward to the successful completion of the project. Kalispell City is to be congratulated for their efforts in maintaining the Kalispell City Airport as an important link in Montana's aviation system. As a reminder, it is a requirement of Mont. Admin. R. § 18.13.407(10) "Each grant or loan recipient must submit a close-out report, on a form provided by the board; within 30 days after closure of the project or board -approved category of work, or within one year following fund distribution, whichever occurs earliest. If the project is not completed within one year following fund disbursement, the grant or loan recipient must provide a status report detailing the reason the project has not closed and projected closure date upon which the close-out report will be filed." In addition, Mont. Admin. R. § 18.13.407(14) requires "Any grantor loan recipient which fails to provide the close-out form, status report, or any requested reimbursement is not eligible for future grant or loan awards until the deficiency is remedied." Sincerely, Karen Hallenbeck, Airports Bureau Chief Montana Aeronautics Division cc: File Phone: (406) 444-2506 An Equal Opportunity Employer 77Y: (800) 335-7592 Fax: (406) 444-2519 Web Page: www.mdtmi.gov/aviation