05-01-26 City Manager Report, KFD and KPD Reports1
City of Kalispell
OFFICE OF THE CITY
MANAGER
Information Memorandum
5/1/2026
Parks & Recreation
Arbor Day was extraordinarily successful this year, continuing
a long-standing tradition of fostering community engagement
and environmental stewardship. As in previous years, 275
third-grade students from School District 5 gathered at
Lawrence Park to participate in the celebration. The event
featured fourteen environmental organizations that provided
interactive, hands-on educational booths, while nineteen local
businesses demonstrated strong community support through
generous sponsorship.
Volunteer participation was exceptional, with thirty
individuals contributing their time and effort to plant thirty
trees in parks across the community, further strengthening
Kalispell’s urban forest for future generations. Representatives
from the Montana Department of Natural Resources and
Conservation were also in attendance to present the City of
Kalispell with its 39th consecutive Tree City USA
designation—an achievement that underscores the City’s
sustained commitment to responsible urban forestry
management.
Recent improvements at Lion’s Park include the conversion of
a deteriorated asphalt pathway leading to the memorial into
turf. This enhancement improves the park’s overall aesthetics
while creating a more natural setting that better complements
the surrounding landscape.
Park staff continue to make steady progress on seasonal
transition activities, with crews working diligently to bring all
park irrigation systems online. In addition, staff are actively
preparing flower beds throughout the park system, helping to
2
ensure vibrant and welcoming landscapes in the months
ahead.
At Woodland Park, reconstruction of the arbor in the rose
garden is currently underway following severe damage
sustained during the December windstorm. Upon
completion, the restored structure will once again serve as
a focal point within the garden.
Staff have secured musical performers and sponsorships
for the 35th annual Picnic in the Park summer concert
series. Promotional materials will begin to be distributed in
late May. Through the continued support of generous
sponsors, the concerts will remain free and accessible to
the public.
New this year, community art projects and games and
activities will be offered between performances each
Wednesday, enhancing overall engagement and providing additional opportunities for attendees
to participate. The official lineup is provided below.
Staff are actively recruiting for short-term summer positions at Camp Woodland while
simultaneously planning and coordinating staff training. These training efforts are designed to
equip camp leaders with the skills needed to effectively guide, supervise, and support youth
participants throughout the summer season.
In addition, staff are organizing field trips and developing weekly themed activities, positioning
the program for a safe, engaging, and enjoyable summer at Woodland Park.
The Little Dribblers program concluded on April 18, 2026, with 421 participants enrolled in this
year’s spring basketball season, an increase from 369 participants in the previous year. The
program’s success is supported by more than forty volunteer coaches, along with a dedicated
team of recreation leaders who oversee daily operations across three sites: Rankin, Peterson, and
Russell Elementary Schools. Kalispell Parks and Recreation (KPR) continues to partner with
Kalispell Public Schools for facility use.
The Spring Soccer program commenced on April 22 amid typically cold and wet Montana spring
conditions. Participation has grown to 419 registrants, compared to 361 in 2025. The program is
held at the Dan Johns Youth Athletic Complex.
Staff are actively interviewing and hiring for multiple positions at Woodland Water Park. In
partnership with Logan Health Medical Fitness Center, staff are facilitating lifeguard
certification courses, with the next session scheduled to begin May 20. Lifeguard recruitment
continues to be a challenge nationwide; however, staff are making strong local efforts to connect
with both currently certified individuals and those interested in obtaining certification.
Considerable progress has been made with improvements at Woodland Water Park, including the
installation of a new lazy river pool liner. The project involved removing approximately 20 years
3
of accumulated paint from the river, completing necessary concrete repairs, and installing the
new liner. Following installation, staff will begin preparations to ready the facility for the
upcoming season.
On April 16, staff participated in the Northwest Montana Job Fair, where they engaged with high
school students and community members. Numerous on-the-spot interviews were conducted
with prospective applicants, providing valuable recruitment opportunities and strengthening
community connections. Kalispell Parks and Recreation were also recognized for having the
most interactive booth at the event.
Public Works
AWWTP Biosolid Dewatering Project: The biosolids dewatering project is progressing well and
remains on schedule. With the removal of the east and west DAF tanks and the existing belt filter
press, the dewatering room has been fully opened to accommodate new equipment. Installation
of four new screw presses is underway, along with two new waste activated sludge (WAS)
pumps and associated piping systems.
Conveyor systems have been installed and are currently undergoing final adjustments, with an
initial test run targeted for May 11. Preparations are also in progress to reconfigure the non -
potable water system, including the addition of upstream strainers to remove algae and debris
and improve pump performance. Upcoming work includes transitioning the digested sludge feed
lines from the existing dewatering system to the new presses in preparation for full operational
startup.
Electrical upgrades and telemetry integration are ongoing to support the new equipment. In the
chemical room, significant upgrades have been completed. A new boiler, heat exchanger, and
alum feed system have been installed following the removal of outdated sodium acetate and dry
polymer systems. The addition of the boiler will improve polymer activation by supplying warm
water, increasing efficiency and reducing chemical dosing requirements. A new polymer skid has
also been installed to support the screw presses. Electrical infrastructure is being modernized
with the replacement of old panels, conduit, and piping.
4
Planning
The City Council has been working through several parts of the Montana Land Use Planning
Act. As part of the implantation of the new land use plan, the Council is updating both the
zoning and subdivision regulations. The updates passed on first reading on April 20 and second
reading is scheduled for May 4.
At the Planning Commission meeting on April 14, there was a public hearing for South Town
Plaza Subdivision, a commercial subdivision consisting of ten (10) lots on approximately 36.993
acres of real property located at 2295 U.S. Highway 93 South. It is a portion of the western part
of the Gardner/Anderson Ranch Planned Unit Development, which also contains the Amazon
site. The Commission recommended approval on a unanimous vote and Council will consider
the project at its May 4 meeting.
At the next Planning Commission meeting on May 12, there will be a public hearing regarding
an update to the public participation plan which outlines public outreach and engagement for
land use processes. The existing participation plan was adopted in 2024 and focuses primarily
on the land use plan. This proposed public participation plan update expands the details
regarding notice and public comment for site-specific development, such as subdivisions and
conditional use permits, by more specifically providing for notice in the newspaper and/or by
mail and for access to documents on the city website.
Building
On May 13, the Building Department will be attending the Flathead Building Association
meeting to give a presentation on truss bracing. The session will break down how truss bracing
is meant to function, why it must be installed exactly as specified, and the real-world
consequences of getting it wrong, especially on gable end trusses where errors are most frequent.
In the last 2 weeks we have issued permits for 3 single-family homes and 4 townhouses. That
will keep the total of new single-family/duplex and townhouse units for the year at 72 compared
to 35 last year at this time. There have been 24 multi-family housing units issued so far this year
compared to 32 last year at this time.
There were a total of 263 combined building and/or fire inspections completed in the last 2
weeks.
Residential – 61 Plumbing – 16
Commercial – 52 Mechanical – 28
Electrical – 14 Fire – 92
5
Community Development
The US Department of Transportation has released the notice of funding opportunity for the Safe
Streets and Roads for All (SS4A) program for the fiscal year 2026 round. This year, a total of
$687,809,874 has been allocated for implementation grants and applications are due May 26.
Eligible projects include any identified projects from the Main Street Safety Action Plan that the
City of Kalispell adopted in 2024. A work session with the City Council was on April 27, where
staff outlined a potential path forward for a grant application. Council was supportive of the idea
and staff will present a Resolution of Support for an Implementation Grant in the coming weeks.