Loading...
RFQ For New Central Garage Shop and Solid Waste Equipment Storage BuildingCWG Architecture + Interiors 650 Power St. Helena, MT 59601 406.443.2340 Anthony Perpigano January 16, 2026 Request For Qualifications For Architectural & Engineering Design Services For A New Central Garage Shop And Solid Waste Equipment Storage Building For The City Of Kalispell MDT Combination Facility Rendering, Kalispell, MT Potential City Site, Kalispell, MT Section 1: Cover Letter Section 2: General Information Section 3: Relevant Company Experience Section 4: Company Qualifications Section 5: Contract Understanding and Approach Section 6: Approach to Contract Management Section 7: Other Factors Appendix A: Resumes 1 2-3 4-7 8 9 10-11 12 13-21 Table of Contents Tractor & Equipment Co., Belgrade, MT January 16, 2026 Dear Susie and Project Evaluation Committee, CWG Architecture + Interiors (CWG) is pleased to submit this proposal in response to the Request for Qualifications for the City of Kalis- pell’s new Central Garage and Solid Waste Equipment Storage Buildings. Our team is uniquely qualified for this endeavor, possessing the technical expertise and institutional knowledge required to meet the City’s specific objectives and operational expectations. Through decades of partnership with the Montana Department of Transportation—including work on the current MDT Combination Facility in Kalispell—we have developed a deep understanding of the durability, specialized vehicular flow, and rigorous maintenance requirements essential to these facilities. As outlined in this proposal, our team is prepared to assist the City not only in the design of these structures but also in the critical assessment of site options and programmatic layouts to ensure long-term value. Anthony Perpignano, AIA, NCARB (Tony), will serve as your Primary Contact and Principal-in-Charge. While based in Helena, Tony works in close, daily collaboration with Ryan Mitchell, PE, PLS, of RPA in Kalispell. Together, they will manage all communications and oversee the architectural and engineering operations throughout the life of the project. As President of CWG, Tony brings over 30 years of experience in the design and management of complex industrial and municipal projects. For more than 25 years, he has been instrumental in developing long-range standards for the Montana Department of Trans- portation’s equipment storage buildings, service shops, welding facilities, and wash bays. His expertise ensures that the City of Kalispell will benefit from a proven framework of design excellence and functional reliability. We look forward to the possibility of partnering with the City of Kalispell on this foundational project. Respectfully, CWG ARCHITECTURE + INTERIORS Anthony Perpignano, AIA, NCARB President | Project Manager 1 Request for Qualifications Architectural & Engineering Design Services New Central Garage and Solid Waste Equipment Storage Building SUBJECT: City of Kalispell, Public Works Department Susie Turner, Director of Public Works 201 First Avenue East Kalispell, MT 59903 CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING LEGAL COMPANY ORGANIZATION CWG Architecture, Inc. is incorporated in the State of Mondana as a S-Corporation. We have 4 Principals which include a President, two Vice Presidents, and a Secretary/Treasurer. In total, we have 16 staff members at CWG. For this project, please see the organization chart on the following page. Company Overview DESCRIPTION OF COMPANY Founded in 1957 by Grant Crossman, and later Wayne Whitney and Dick Griffin, CWG has been providing innovative architectural design and planning services for more than six decades. At our core is a loyal client base that returns time and again seeking our consistency and time-proven quality in design and execution. Our Vision is to deliver innovation, efficiency, and quality designs which improves the working and living environments of our clients. Our personal mission is to maintain the CWG legacy of stability, collab- oration, honesty and strong customer relationships while embracing innovation and new technology in order to make a positive impact on the communities we work in. Within CWG we currently have a staff of six registered architects and seven technical support staff including interior design & LEED services. Our professional staff has accumulated over 150 years of design and construction experience. Completing building projects exceeding $450,000,000.00 over the states of Montana, Nebraska, Washington, Oregon, Idaho, Wyoming, Alaska, and South Dakota. The staff at CWG is dedicated to sharing all our years of success with a strong commitment to our community! We do this through giving back to the community we love by supporting a variety of nonprofits and just causes. The attached resumes provide a glimpse of the experience and design capabilities that our specific team of Architects and Engineers can offer. We hope you may see the skills and passion are here to do the very best job for the City of Kalispell. FIRM VISION, MISSION, & VALUES Our Vision is to combine our knowledge, experience, and diversity to build inspiring connections between people and design. Our Mission is to create a client-centered design experience through a process of collaboration. Our Values are simple: People, Teamwork, and Passion. CWG Architecture + Interiors Team 2 CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING Architectural DesignCWG Architecture + Interiors Tony Perpignano Scott Moses Structural EngineeringRobert Peccia & Associates Matt Miller Team Organization Fire ProtectionCoffman Engineers Jason Anderson MechanicalTD&H Dave Broquist Electrical TD&H Daniel Kempa GeotechAlpine Geotech Kagan Rutz City of Kalispell LIST OF APPLICABLE MONTANA LICENSES ORGANIZATION CHART Anthony Perpignano Licensed Architect Montana #1856 Scott Moses Licensed Architect Montana #24596 Ryan Mitchell Professional Engineer Montana #13928 Dave Broquist Professional Engineer Montana #7395 Matt Miller Professional Engineer Montana #14844 Holly Manning Professional Engineer Montana #15125 Jason Anderson Professional Engineer Montana #11805 Kagan Rutz Professional Engineer Montana #15417 Daniel Kempa Professional Engineer Montana #10223 PRIMARY AND SECONDARY CONTACTS: Primary: Anthony Perpignano, AIA, NCARB tonyp@cwg-architects.com, 406-443-2340 650 Power St., Helena, MT 59601 Secondary: Ryan Mitchell, PE, PLS rmitchell@rpa-eng.com, 406-752-5025 125 Schoolhouse Loop, Kalispell, MT 59901 3 Civil EngineeringRobert Peccia & Associates Ryan Mitchell Holly Manning CWG Architecture + Interiors Team RELEVANT COMPANY EXPERIENCE MDT COMBINATION FACILITIES - MISSOULA, KALISPELL, GREAT FALLS Montana Department of Transportation Size: 33,300 SF Cost: $15 M Each Completion: Est. Spring 2027 The project consists of a redesign and consolidation of MDT’s existing facilities in three different communities. Each community will build a new equipment maintenance and storage facility in addition to renovating and remodeling their existing buildings for add- ed administrative office spaces. Each of these remodeled spaces is around 10,000 SF requiring them to be carefully as-built. The first phase of these projects, (the new equip- ment maintenance and storage facilities) went out to bid in the fall of 2025. CWG has done extensive 3D scanning of MDT’s existing facilities and generated fully operational REVIT models. Features: • Radiant Heated Slabs • Integrated Welding Bay • Crane System & Tool Storage • Design Bid Build Method MURDOCHS DISTRIBUTION WAREHOUSE - BELGRADE, MT Murdochs Size: 84,000 SF Cost: $147 / SF Completion: 2022 CWG Architecture was commissioned to design and provide construction documents for an 84,000 SF pre-engineered metal warehouse. CWG collaborated with Coffman Engineers and Martel Construction under a design-build method to deliver a distribution center that included 74,000 SF of distribution area with support spaces including office, break room, shop, and parts areas. A secure storage area for high value items required additional monitoring and security prior to distribution operations. Features: • Shop and Parts Area • Advanced Security • Design - Build Method 4CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING STATION ONE, AIRPORT MAINTENANCE FACILITY - HELENA, MT Helena Regional Airport Size: 9,792 SF (Addition) Cost: $3.5 M (Addition) Completion: 2009 Located off of Airport Road, this was a remodeling and addition project to the existing Main- tenance Facility that houses the Airport Emergency and Maintenance vehicles, provides for light maintenance and training of staff. Construction included space for a lunch room, offices, restrooms, training areas, cleaning, parts and repair areas, and vehicle bays. Features: • Low Maintenance Materials • Secure Entry • Expansion of Repair Facility STATE LIQUOR WAREHOUSE - HELENA, MT Department of Revenue, State of Montana Size: 32,000 SF Cost: $15 M Completion: 2025 This heavy-duty project houses a specialized automated storage and retrieval system for stor- age of thousands of palletized boxed liquor products. The finished result required a variance for building height and parking. A close working relationship with the City Building Department solved code related issues, and working with the Fire Marshall helped to determine appropri- ate fire hydrant placement and proper access for emergencies. Features: • Expansion of Storage • Prefabricated Steel Construction CAPITAL TRANSIT - HELENA, MT City of Helena Size: 10,700 SF Cost: $2.68 M Completion: 2011 Capital Transit is a terminal and bus barn facility for the City’s transit system. The facility has a 7,900 SF Bus Barn for storage and light maintenance, as well as a 2,800 SF terminal for ticketing offices, passenger lobby, and administrative offices. The buildings are connected with a porte cochere drive through for covered loading and offloading. The building’s architecture reflects traditional forms while using modern, low maintenance finishes. Features: • Internal Wash Bay • Public Waiting Area • Maintenance Bays RELEVANT COMPANY EXPERIENCE 5CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING REPUTATION, SERVICE CAPABILITES, AND QUALITY: Nearly 70 years and three generations since our founding, our success continues to be built on a foundation of long-term relationships, collaborative teamwork, and a “client-first” philosophy. We have forged deep, sustainable partner- ships with institutions like the Montana De- partment of Transportation, a relationship that dates back to the early 1970s. Through decades of repeat work, we have gained an unparalleled understanding of the Depart- ment’s operational and maintenance needs. We have conducted extensive comparative studies on overhead door safety systems, specifically tailored to heating configurations. While pneumatic safety edges are the pre- ferred standard for facilities with radiant heat- ed slabs to maintain threshold integrity, we implement photo-eye sensors in environments utilizing overhead heating. Our programming also accounts for the high-intensity needs of maintenance per- sonnel. We prioritize spatial clearances that exceed simple vehicular circulation, ensuring ample room for tool storage, undercarriage access, and high-visibility lighting arrays posi- tioned between vehicle bays. Furthermore, we provide integrated ceiling coordination, me- ticulously mapping structural members, hose reels, exhaust systems, and fire suppression to ensure zero interference with overhead door operation. We don’t just design facilities; we provide added value by anticipating challeng- es before they arise. By evaluating every project to see what works and what can be improved, we have built a vast library of institutional knowledge. We will bring this same approach to the City of Kalis- pell. Whether it is mastering odor control for solid waste, implementing advanced pest-con- trol barriers, or specifying high-performance overhead doors and operators, we know the questions our competition hasn’t even thought to ask. PROFESSIONAL SERVICES TO OTHER MUNICIPALITIES For over 35 years, CWG Architecture has cultivated a strategic partnership with the Montana Department of Transportation (MDT), designing dozens of facilities tailored to spe- cialized vehicle maintenance and equipment storage needs. Our comprehensive service model spans the entire project lifecycle—from initial Programming and Schematic Design through Construction Administration, Closeout, and Warranty. We have refined the MDT operational model by working directly with the personnel who utilize these spaces daily. This “boots-on-the- ground” approach allows us to master the critical nuances of heavy-equipment mainte- nance and storage facilities, including: • Spatial Logistics: Optimizing truck clearances, vehicular circulation, and tool storage. • Technical Systems: Implementing ad- vanced radiant slab heating for snow-melt efficiency and specifying high-perfor- mance overhead doors and operators. • Human Factors: Engineered lighting levels and optimal illumination for safety and precision. We have successfully translated this expertise to the Department of Military Affairs (DMA), where we have designed over 20 large-scale and free-standing facilities. Additionally, our partnership with the Helena Regional Airport since the late 1950s has resulted in numerous maintenance, storage, and manufacturing structures. This decade-long history with state and regional agencies proves our commitment to creating durable, low-maintenance facilities that serve the public for generations. Relevant Company Experience REFERRALS AND REFERENCES Department of Military AffairsMike Murolo, O&M Bureau Chiefmichael.l.murolo.nfg@army.mil406-324-3000 (Formerly with Montana Department of Transportation) State of Montana, Architecture & Engineering DivisionBob Warfle, Engineering Managerrwarfle@mt.gov406-444-0771 Helena Regional Airport AuthorityJeff Wadekamper, Airport Directorjwadekamper@helenaairport.com406-442-2821 6 CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING LITIGATIONS AGAINST FIRM In almost 70 years of business, there have been NO legal actions or claims brought against CWG Architecture, Inc. GC/CM DELIVERY METHOD EXPERIENCE CWG Architecture offers decades of experience across diverse project delivery models, with a particular emphasis on the GC/CM (General Contractor/Construction Manager) method. We believe the GC/CM process is most effective when a cohesive team is established early, fostering an environment of trust and transparency from pre-construc- tion through project closeout. We are very comfortable with the GC/ CM project delivery method, having completed 10+ projects in recent years. Our firm has successfully executed several large-scale GC/CM proj- ects, including a 60,000 SF facility in Belgrade for Tractor & Equipment Company in partnership with Dick Anderson Construction. Additionally, we have maintained a long-term GC/CM relationship with the Helena Regional Airport Authority and have completed extensive educational work under this model, such as our collaboration with Swank Enterprises for the Dillon School District. We provide expert guidance in GC selection and help define the essential framework of roles between the Owner, Architect, and Con- tractor. By prioritizing open communication and early team integration, we eliminate surprises and ensure the project remains aligned with the Owner’s budget and schedule. Relevant Company Experience 7 GC/CM DELIVERY METHOD ORGANIZATION CHART Prime/Sub-Contractor OWNER Agreement Plans & Specifications General Contractor Mechanical Subcontractor Structural Design Geotechnical Architect Civil Design Electrical Subcontractor Plumbing Subcontractor Concrete Subcontractor Site Subcontractor Steel Subcontractor Roof Subcontractor Ma j o r S u b c o n t r a c t o r s Mech./Elec./Plumb./Fire Tractor & Equipment Co., Belgrade, MT Helena Regional Airport, Helena, MT Dillon Middle School, Dillon, MT CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING CAPACITY TO PROCEED WITHOUT DELAY We can begin this project for the City of Kalispell immediately. With a very similar building design going into construction this spring for MDT in Kalispell, we will be several steps ahead in planning, program- ming, understanding of the design, and will have accurate, real-time budget numbers. Company Qualifications COMPANY HISTORY CWG Architecture started with Grant Crossman in 1957. We have been practicing architecture in the state and the region since that time. Today the firm has four active principals managing the compa- ny: Anthony Perpignano, Kory Kennaugh, Jason Egeline, and Scott Deitle. We offer full architectural services including planning, program- ming, architecture, interior design, marketing, contract administration, and we’ve recently added 3-D scanning. Our founding members were rooted in a deep sense of community, serving on a variety of boards and leading non-profits across Mon- tana. Today, we consciously uphold that legacy by giving back to the communities that support us. We actively encourage our staff to pur- sue civic and professional engagement, firmly believing that investing in our people is the most meaningful way to invest in our future. CERTIFICATIONS AND LICENSURE All of the architects in the firm are current with continuing edu- cation requirements monitored and regulated through the State of Montana’s Licensing Board. All of our principals are certified through NCARB (The National Council of Architectural Registration Board and are active AIA (American institute of Architects) mem- bers. Many of our architects are also LEED Accredited Professionals. All of our principals are currently licensed in the State of Montana and hold active registrations in other surrounding states as well. CWG Architecture Office, Helena, MT Big Timber Equipment Storage Building, Big Timber, MT 8 CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING MEETING KALISPELL’S CURRENT NEEDS Through CWG Architecture and our Consulting Engineers at RPA, we have a deep under- standing and relationship with the City of Kalis- pell. We have people both “local” in Kalispell who can respond in a moment’s notice as well as designers around the state. We understand the jurisdiction’s needs, methodologies and requirements along with the general program and building typology. We are currently be- ginning construction on a very similar building design for the Montana Department of Trans-portation in Kalispell on Highway 93. As a value-add for the City of Kalispell, our design team has already conducted a pre-liminary site visit and engaged in critical dia- loge with facilities personnel. We have begun analyzing scoping and programmatic priorities, carefully balancing macro-level site strategy with micro-level operational details. Our initial assessment includes an evaluation of vehicular circulation and site security, as well as mitigation strategies for environmental factors like odor control and pest barriers. At this point we wouldn’t completely rule out the possibility of some sort of partnership or sale with MDT on their existing site, but we will also focus on looking at other potential sites on the westside in the TIF region. It may end up be-ing that the existing City site on the south side remains the best alternative, but we will help the City in evaluating the best possibilities and options. POTENTIAL ROADBLOCKS At this time, it would be hard to identify any difficulties our design team would have provid- ing services since we have team members in Kalispell, Missoula, Helena, Bozeman and Great Falls. We are more than willing to conduct site visits, coordination meetings, and be of service to the City of Kalispell. STRATEGIES TO MITIGATE SETBACKS One major advantage is that we will be actively overseeing the construction of a very similar building in Kalispell for MDT during this process, so we will already have a presence there. We will also have real-time costs and experience that will benefit the City of Kalispell. RPA’S EXPERIENCE WITH PROPERTY PROCUREMENT RPA routinely performs property procurement services for clients in conjunction with projects. RPA has provided services to the City of Ka- lispell for Right-of-Way acquisition, easement acquisition, temporary construction permits, and property procurement. Our dedicated team of surveyors, engineers and technicians work cohesively to identify needed lands, con- duct boundary surveys, prepare Right-of-Way Agreements, meet with property owners, pre- pare Easements or Certificates of Surveys, and prepare all documentation for acquisition of said lands. RPA works closely with Insured Titles and Clark Real Estate Appraisal to complete any land acquisition task. Below are specific projects showing RPA’s previous property pro- curement for City of Kalispell projects: Kalispell Upper Zone Tank and Wells Project The Kalispell Tank and Well project included two (2) new sites; one for a well on Four Mile Drive and one for a Tank and Well along High- way 93. RPA assisted the City of Kalispell with Land Acquisition, including securing temporary construction permits, purchasing an entire par- cel from NWE and creating a new parcel via a Utility Site Exemption from two (2) landowners. Work included Title Commitments, Appraisals, Negotiations, Right-of-Way Agreements, Deeds and Exhibits, Amended Plats, Boundary Sur-veying, including setting new property corner monuments, and Realty Transfer Certificates. Kalispell Water & Sewer Main Replacement Project The Kalispell Water & Sewer Main Replacement project included acquiring a Utility Easement from the Montana Department of Transporta- tion (MDT) for a sewer main across MDT’s facility located at 85 5th Ave EN in Kalispell. Westside Interceptor ProjectThe Westside Interceptor project was approx-imately 8.5 miles in length. RPA assisted the City of Kalispell with Land Acquisition, including securing entire parcels, easements and tempo- rary construction permits from a total of fifteen (15) landowners. Work included Title Commit-ments, Appraisals, Negotiations, Right-of-Way Agreements, Deeds and exhibits, Easement Documents and Exhibits, and Realty Transfer Certificates. Schematic Site Layout Above is a quick study showing an example of how our team will work with the City of Kalis-pell in developing a successful concept. The QR code links to an animation of the building massing and proposed site circulation concept on the City Shop complex site. Contract Understanding and Approach 9 CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING Approach to Contract Management PROJECT ORGANIZATION & CONDUCT Tony Perpignano, as the Project Architect, will be responsible for the project’s organization and conduct. Tony with the assistance of other team members and disciplines will prepare an agreement, task orders, the schedule, and list of deliverables. Regularly scheduled meetings between CWG, our consultants and the City to discuss the project, prog- ress, ongoing work schedule and deliverables. APPROACH We will have an initial scoping and program meeting to establish ser- vices and magnitude of work. This meeting will define the scope and expectations of the project. We will establish an agreement with the City based on this meeting and define the individual task orders and level of work. This will be arrived at collaboratively with the City to ensure that the project deliverables, schedules, and project components align with the goals and expectations of the City. This approach ensures that the City maintains control of the project and only mutually agreed upon work is completed. PROPOSED SCOPE OF WORK, TASK ORDERS, AND DELIVERABLES TASK ORDER 1: PROJECT MANAGEMENT CWG will perform project management and administration for the project throughout the duration of the project. CWG will prepare agreements and task orders with fee estimates. As the consultant, CWG will maintain the project and all project files on our computer and network system. At the end of the project CWG will archive the electronic and hard copies of the project records. We will coordinate all comments from the City, the Contractor and any changes during construction. TASK ORDER 2: BUILDING AND SITE DESIGN CWG will prepare Construction Documents, including all drawings, specifications, reports, code evaluations, and cost estimates. Sub- missions will be made at 35%, 65%, and 95% prior to completion of 100% Bid Documents. Each submission will be accompanied by an overall cost estimate, an updated schedule and review comments. Design will include coordinating with utility companies, as well as surveying and Geotechnical investigations. At the completion of the construction document phase we will submit 100% Contract documents to the City for permitting and Final Submittal. TASK ORDER 3: BIDDING ASSISTANCE Once the Final Submittal is complete, these Construction Documents (Drawings, Specifications, and Reports) will be uploaded to the City’s QuestCDN website. CWG will conduct a pre-bid meeting with interested contractors to give an overall explanation of the project and answer any specific questions. Throughout the bidding process, CWG will be available to answer questions and provide clarifications to bidders and suppliers. Addenda will be issued as required during the bidding phase.DELIVERABLES: Agreements and Task Orders Project Schedule Monthly Invoicing Project Meeting Agendas and Minutes DELIVERABLES: Bid Tabulations Bid Recommendation Letter DELIVERABLES: 35% Submittal (Drawings and Cost Estimate) 65% Submittal (Drawings Specifications, and Cost Estimate) 95% Submittal (Drawings, Specifications and Cost Estimate) Final Submittal 100% Application for Building Permits & Associated Permitting 10 CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING Approach to Contract Management TASK ORDER 4: CONSTRUCTION PHASE Tony Perpignano, with assistance from Scott Moses will lead contract administration during the construction phase of the project. The design team will be overseeing construction contracts, review submittals, respond to Request For Information (RFI’S), processing payments, reviewing progress, and monitoring the schedule. We will also facilitate regularly scheduled construction progress meetings (OAC Meetings) Owner, Architect, Contractor. Scott Moses will lead Contract Administra- tion services in the field during construction. He will coordinate all work with the contractor. CWG will develop a final punchlist outlining necessary work items to be completed prior to issuing final payment. TASK ORDER 5: POST CONSTRUCTION & FINAL CLOSE OUT Once the contractor has completed all the work identified in the Construction Documents, CWG will assist the City and prepare final record documents and collect from the contractor all closeout docu- ments including warranties, O&M Manuals and final reports. Prior to the expiration date of one year from Substantial Completion, CWG will conduct a warranty inspection to identify any deficiencies or issues that fall under warranty repair. PROPOSED PROJECT SCHEDULE DELIVERABLES: Record Drawings O&M Manuals (Contractor) Final Certificates and Warranties (Contractor) One-Year Warranty Inspection and Report DELIVERABLES: Executed Construction Agreement Substantial Completion Submittal Reviews Final Punchlist Regular Progress Meetings Contract Administration Project Close Out Documents (Contractor) 2026 2027 2028 Project Management & Grant Administration Task 1 Q1 Q1 Q2Q3Q4Q4Q3Q2Q1Q2 Task 5 Task 4 Task 3 Task 2 Building & Site Design Post-Construction & Warranty Construction Bidding Assistance 11 CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING CURRENT CONTRACTS AND ABILITY TO PROCEED With a 70-year resume, we are not new to this process! We manage multiple contracts at one time and dedicate the staff and experience needed for success. As previously stated, we will be actively overseeing the construction of a similar project for MDT while we design this project; which is ideal for the City of Kalispell. Our team will be ready to hit the ground running. WILLINGNESS TO ABIDE BY THE CITY’S NEEDS We believe that a successful project is rooted in early and continu- ous alignment with the Owner’s vision. By establishing clear goals and expectations during the initial programming and planning phases—and balancing them against a realistic budget—we create a roadmap for a positive project experience. Prioritizing these objectives from day one ensures that every design decision is purpose-driven. This proactive discovery process allows us to resolve potential issues early, minimizing disruptive surprises and protecting the project budget from costly late- stage changes. RELEVANT SERVICE FACTORS We can’t emphasize this enough: the relevant factor affecting the quality of our services is the fact that we just finished a design for MDT in Kalispell that is extremely similar to your project. This will benefit the City of Kalispell in having a design team that is familiar and current with the City’s requirements and familiar with the departments and person- nel. We will have real examples of what works and what doesn’t work for the MDT project to test with the City of Kalispell. We have over forty years of developing Shop Buildings for the Montana Department of Transportation, and we will have real-time costs with the MDT Facility to hone in on pricing and estimating. We also have excellent working relationships with most of the major contractors who will be bidding on this project. We believe it is a win-win scenario for all. The partnership between CWG and RPA offers the City of Kalispell an unparalleled level of confidence and peace of mind. By combining RPA’s proven, collaborative work history with CWG’s decades of spe- cialized experience serving the Montana Department of Transportation, we offer the “best of both worlds”: local stability and deep institutional expertise in this specific building type. We are not just a logical choice; we are a tested team uniquely equipped to deliver a seamless and successful project for the City. Other Factors 12 Augusta Equipment Storage Building, Augusta, MT Appendix A: Resumes Tractor & Equipment Co., Belgrade, MT • Montana Department of Transportation Combination Facilities - Missoula, Kalispell, Great Falls, MT • Multiple MDT Rest Area Projects – Statewide across MT • Multiple MDT Equipment Storage Buildings Projects – Statewide across MT • Pioneer Aerostructures – Helena, MT • Montana Craft Malt – Butte, MT • Commodities Warehouse Freezer Addition – Helena, MT • State of Montana Print & Mail Facility, Helena, MT Mr. Perpignano is a licensed architect in Montana with over thirty years of experience and over twenty years with CWG Architecture, Inc. His experience includes design, contract documents, project management, specifications, and construction administration, based on State of Montana requirements. His experience includes Educational Facilities, Military Projects, Rest Areas and Equipment Storage Buildings for Department of Transportation, Office Buildings, Retail, and Residential. Anthony Perpignano, AIA, NCARB Principal Architect, President Education: Master of Architecture - Montana State University, 2009 Bachelor of Architecture - Montana State University, 1991 Years Experience: 35 Registration: Licensed Architect, Montana #1856 Licensed Architect, Wyoming #C-2309 NCARB Certificate #53307 Professional History: CWG Architecture + Interiors, 1999 – Present Professional Societies: Helena Sunrise Rotary Group Helena Education Foundation Paul Harris Fellow Helena Area Chamber of Commerce Helena Industries The Holter Museum Related Projects 13CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING For over 25 years, Scott’s responsibilities have included programming, conceptual design, project development, estimating, specification writing, project coordination, project manage- ment, mentoring, technical detailing, high-performance design, sustainability and construction contract administration. His strengths include listening to the client’s goals, needs, and problems developing innovative and sustainable concepts that meet the project’s budget. Scott Moses, AIA, LEED AP BD+C, NCARB Project Architect Education: Bachelor of Science, Architecture; University of Idaho-1998 5-week study course, University of Rome, 1994 Pre-Forestry, College of Forestry, Boise State University, 1992 Years Experience: 28 Registration: Licensed Architect, Montana #24596 Licensed Architect, Wyoming #B-0241 Professional History: CWG Architecture + Interiors, 2024 – Present Moses Architecture & Sustainable Design, 2023 – 2024 Local Element Architects, 2023 – 2023 In2itive Architecture, 2021 – 2022 A&E Design, 2015 – 2021 Plan One/Architects, 2003-2015 Ward + Blake Architects, 2001-2002 Danny Eagan Architect, 1998-2001 Professional Societies: American Institute of Architects – AIA Leadership Engineering & Environmental Design, Accredited Professional – LEED AP BD+C National Council of Architectural Registration Boards – NCARB • Montana Department of Transportation Combination Facilities - Missoula, Kalispell, Great Falls, MT • Pearl-Jackson Mixed-Use Development, USGBC LEED Certified Silver - Jackson, WY • North Cache Mixed-Use Development, USGBC LEED Registered - Jackson, WY • Rocky Mountain Bank, USGBC LEED Registered - Jackson, WY • Teton County Courthouse, USGBC LEED Registered - Driggs, ID • Northwest Pipe Facility, USGBC LEED Certified Silver - Billings, MT Related Projects CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING 14 Ryan Mitchell, PE, PLS Site Civil Senior Project Engineer/VP/Kalispell Operations Manager Since joining Robert Peccia & Associates (RPA) in 1999, Mr. Mitchell has worked in RPA’s Streets and Highways Group, Water/Wastewater Group, and Site Civil Group as a surveyor, design- er, construction on-site representative, project engineer and project manager. In 2005, Mr. Mitchell moved to Kalispell, Montana, to open and manage the Flathead Valley branch office of RPA. He is currently a Senior Project Manager within RPA’s Site Civil Group and is RPA’s Vice President of Business Management and the Kalispell Operations Manager. Over the last 26-plus years, Mr. Mitchell has managed and worked on numerous projects in Flathead County similar to the Garage Shop & Solid Waste Equipment Building Project. Education: Bachelor of Science, Civil Engineering; Montana State University-1999 Associate of Applied Science, Land Surveying; Flathead Community College, 1996 Years Experience: 26 Registration: Professional Engineer & Land Surveyor: Montana #13928 ES Private Pilots License, 1996 Professional Societies: Montana Association of Registered Land Surveyors • Montana Department of Transportation Combination Facility - Kalispell, MT • Montana Department of Transportation Combination Facility - Great Falls, MT • Corwin Motors Reconditioning Shop - Kalispell, MT • Frito-Lays Distribution Warehouse - Flathead County, MT Related Projects 15CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING Holly has been involved in the planning, design, construction observation, construction admin- istration and project management of many site development, water, and wastewater projects. Holly brings over 20 years of experience in project development, design, and construction oversight. Her site development experience includes management of several comprehensive projects that involve site grading, stormwater detention and treatment, site roads, parking lots, sidewalks, water, sewer, utilities, and compliance coordination with local, state, and federal regulations. Holly Manning, PE Site Civil Group Manager Education: Bachelor of Science, Civil Engineering; Montana State University, 2001 • New East Helena High School – East Helena, MT • Shodair Medical Office Building – Helena, MT • Shodair Children’s Hospital – Helena, MT • Colorado Springs Airtanker Base – Colorado Springs, CO • Golden Eagle Office Site – Helena, MT • Billings Limited Army Aviation Support Facility – Billings, MT Years Experience: 23 Registration: Professional Engineer: Montana #15125 Related Projects CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING 16 With 21 years of experience, Matt has served as a project manager and lead design engineer on institutional, commercial, and infrastructure projects. He is an Engineer of Record for many structures comprised of composite steel framing, wood framing – conventional and mass tim- ber, masonry systems, and concrete frame systems. Matt is experienced in providing condition assessment reports, conceptual design, and cost estimating. He is experienced in performing seismic evaluations and retrofits of existing structures according to nationally recognized stan- dards and is certified in performing benefit-cost analysis according to the FEMA’s Pre-disaster Hazard Mitigation Program. Matt Miller, PE Structures Group Manager Education: Master of Science, Civil Engineering with Structural Engineering Emphasis, Montana State University, 2002 Bachelor of Science, Civil Engineering, Montana State University, 2001 • U.S. Forest Service - Colorado Springs Airtanker Base – Colorado Springs, CO • Bighorn County Ambulance Facility – Hardin, MT • The National Building Seismic Retrofit & Adaptive Reuse – Bozeman, MT • Saint Ignatius High School Addition – Saint Ignatius, MT • Cannery District Buildings J, M, N, and O – Bozeman, MT • U.S. Dept of Transportation, Federal Highway Administration – Western • Federal Lands Highway Div. – Vancouver, WA Years Experience: 21 Registration: Professional Engineer: Alaska #12370 Colorado #44670 Montana #14844 Washington #55814 Wyoming #16164 Related Projects 17CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING Dave has completed design work for hospital additions, office buildings, shops, laboratories, central heating systems, and boiler plants. Areas of specialization include central heating and distribution systems, critical environments such as industrial and institutional systems, museums, and laboratories. Dave has been responsible for the design of higher education facilities includ- ing auditoriums, computer classrooms, vocational shops, research and clinical laboratories and greenhouses. In addition to his design experience, Dave has served on the Montana Building Codes Council for 4 years. Dave is competent in all phases of project design and management including feasibility studies, cost estimation, construction administration, and inspection. Dave Broquist, PE Mechanical Engineer Education: BS Mechanical Engineering, 1981 • MDT Big Timber Maintenance Shop – Big Timber, MT • MDT Wolf Point Maintenance Shop – Wolf Point, MT • MDT Billings Tow Plow Building – Billings, MT • MDT Missoula Office Boiler Replacement – Missoula, MT • MDT Rollins ESB Addition – Rollins, MT • MDT St. Mary’s ESB Addition – St. Mary’s, MT Years Experience: 36 Registration: Professional Engineer: MT, CA, CO, MI, WA, WY Related Projects CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING 18 Mr. Kempa is a registered professional engineer in electrical engineering. He has developed extensive experience designing lighting, power distribution, emergency power, telephone/ data, fire alarm, Security/Access control, and automated/PLC systems. He has been the Lead Engineer in the design and renovation of many different types of commercial and industrial buildings including hospitals, computer centers, office buildings, research centers, schools, water treatment plants, laboratories, and research facilities. Bucky is competent in all phases of project design and management including feasibility studies, cost estimation, construction administration, and inspection. Daniel Kempa, PE, LEED AP Principal Electrical Engineer Education: BS Electrical Engineering, 1990 • MDT Augusta Equipment Storage Building – Augusta, MT • MDT Big Timber Maintenance Shop – Big Timber, MT • Tribal Transportation Facility – Northern Cheyenne Reservation, MT • MDT Wolf Point Maintenance Shop – Wolf Point, MT • MDT Headquarter Building Energy Upgrade – Helena, MT • Repair Helicopter Hangar 1450, Malmstrom AFB – Great Falls, MT • MDT Billings Tow Plow Building – Billings, MT • MDT Data Center – Helena, MT Years Experience: 33 Registration: Professional Engineer: MT, CA, CO, ID, MI, ND, OR, UT, WA, WY LEED AP, NCEES Certified Related Projects 19CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING Kagan Rutz, PE Principal, Senior Engineer Mr. Rutz has overseen materials engineering and testing projects in the Flathead Valley since 2006, which typically include commercial and infrastructure projects. Work history includes extensive experience with laboratory testing, field testing, and project management for large and small projects. Our company strives to provide specific input for specific project needs and provide timely and accurate test results. In 2022, Alpine purchased a new Diedrich D-50 geotechnical drilling rig, and has expanded the laboratory capabilities to include unit weight, unconfined compressive strength of soils, and one-dimensional consolidation of soils. Years Experience: 20 Registration: Professional Engineer: Montana #15417 Monitor Well Constructor: Montana #771 FACE Certified F-Number Measurements for Floor Slabs NRC Nuclear Densometer Operator Training Related Projects • Lift Station 19 Replacement and Emergency Storage – Evergreen, MT • Glacier Park International Airport – Flathead County, MT • Stockman Bank – Kalispell, MT • Kalispell Elevated Composite Water Tank – Kalispell, MT Education: Bachelor of Science, Civil Engineering; Montana State University, 2002 CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING 20 As a principal and registered fire protection engineer with Coffman, Jason is responsible for engineering of fire protection projects utilizing AutoCAD, hydraulic design calculations of fire sprinkler systems utilizing various hydraulic computer programs and seismic engineering design. He is familiar with various NFPA requirements for many fire protection systems. He deals exten- sively with the production and transfer of fire protection designs into accurate working draw- ings. Jason also has extensive experience with building code analysis with respect to life safety and fire protection systems. Jason Anderson, PE, Principal, Fire Protection Engineering Education: BS, Mechanical Engineering – Montana State University • State of Montana Butte Re-Entry Services Upgrades – Butte, MT • State of Montana MSU Reid Hall Fire System Upgrade – Bozeman, MT • MSU Leon Johnson Hall – Bozeman, MT • State of Montana Liquor Warehouse Expansion – Helena, MT Years Experience: 25 Registration: MT, Professional Engineer, #11805 AZ, Professional Engineer, #50162 AK, Fire Protection Engineer, #AELF13243 WY, Professional Engineer, #12293 NV, Fire Protection Engineer, #20318 CO, Professional Engineer, #PE43603 AK, Fire Protection Designer, Class IIC-DO, #09-045 WA, Fire Protection Engineer, #52990 Related Projects 21CITY OF KALISPELL - NEW CENTRAL GARAGE SHOP AND SOLID WASTE EQUIPMENT STORAGE BUILDING