Loading...
RFQ Central Shop and Storage FinalPREPARED FOR: City of Kalispell Public Works Department 201 1st Avenue E Kalispell, MT 59901 CONTACT: Susie Turner Director of Public Works 406.758.7852 sturner@kalispell.com PREPARED BY: Jackola Engineering & Architecture 2250 U.S. 93 South Kalispell, MT 59901 406.755.3208 | jackola.com CONTACT: Karl Henshaw, PE Project Manager 406.755.3208 khenshaw@jackola.com MAKE SOLUTIONS PERSONAL. SOQ FOR A/E DESIGN SERVICES FOR NEW CENTRAL GARAGE SHOP & SOLID WASTE EQUIPMENT STORAGE JANUARY 16, 2026 1 COVER LETTER City of Kalispell Public Works Department Susie Turner Director of Public Works 201 1st Ave E Kalispell, MT 59901 Dear Susie, Jackola Engineering & Architecture, PC (Jackola) is pleased to submit this Statement of Qualifications for Architectural and Engineering Design Services for the new Central Garage Shop and Solid Waste Equipment Storage Facility for the City of Kalispell. Based on discussions with City staff and presentations to Council, this project represents a critical investment in the City’s long-term operational efficiency, safety, and service delivery. Jackola is a full-service, in-house architectural and engineering firm with offices in Kalispell, Bozeman, and Vancouver, Washington. All primary design services for this project will be provided locally from our Kalispell office, supported as needed by staff from our other offices. Our integrated team includes architects; surveyors; civil, structural, mechanical, plumbing, and electrical engineers; BIM/CAD specialists; and experienced project managers. We bring extensive experience designing municipal maintenance facilities, vehicle storage buildings, and industrial shops for public agencies and private clients, including the Montana National Guard, Montana Department of Transportation, Flathead County, City of Kalispell, Flathead Electric Cooperative, Xanterra, Hyundai, and Nissan. Our mechanical, electrical, and plumbing team has completed design services for numerous maintenance and service facilities, including six automotive dealerships and multiple public-sector shops. Geotechnical engineering services will be provided by Alpine Geotechnical, LLC, a trusted local subconsultant with extensive experience in the Flathead Valley. Jackola is experienced in Design/Bid/Build, General Contractor/Construction Manager (GC/CM), and Design/Build delivery methods. Approximately 70–75 percent of our work is delivered using a GC/CM approach, and we are comfortable supporting whichever delivery method the City determines is most appropriate for this project. Thank you for the opportunity to submit our qualifications. We appreciate the City’s consideration and look forward to supporting the successful delivery of this important facility. ________________________________________________ Karl Henshaw, PE Project Manager Jackola Engineering & Architecture, PC khenshaw@jackola.com 406.755.3208 Jackola Engineering & Architecture, PC 2250 Hwy 93 South Kalispell, MT 59901 | P: 406.755.3208 | F: 406.755.3218 32 TABLE OF CONTENTS COVER LETTER ......................................................................................................................................................................................1 GENERAL INFORMATION & COMPANY QUALIFICATIONS ...........................................3 Company Descriptions .......................................................................................................................................................................4 Company History in the Industry ...............................................................................................................................................4 Jackola Firm Profile ................................................................................................................................................................................5 Organizational Chart .............................................................................................................................................................................6 Alpine Geotechnical Firm Profile .................................................................................................................................................7 RELEVANT COMPANY EXPERIENCE ..................................................................................................................8 Maintenance Shop Projects .............................................................................................................................................................9 Municipalities & Local Government Projects ......................................................................................................................9 Commercial Dealerships & Shops ............................................................................................................................................10 Flathead County Projects .................................................................................................................................................................11 Professional Services Performed with GCCM .................................................................................................................14 CONTRACT UNDERSTANDING & APPROACH ....................................................................................15 Understanding Your Needs for this Project ......................................................................................................................16 APPROACH TO CONTRACT MANAGEMENT ........................................................................................18 Planning, Scheduling, Estimating & Managing Manpower .................................................................................19 Litigation or Arbitration Statement .........................................................................................................................................19 Litigation or Arbitration Statement .........................................................................................................................................19 OTHERS FACTORS .........................................................................................................................................................................21 APPENDIX A ..........................................................................................................................................................................................23 Key Staff Resumes ................................................................................................................................................................................23 Certifications & Licensures Held in Montana ..................................................................................................................23 3 CENTRAL GARAGE & STORAGE FACILITY GENERAL INFORMATION & COMPANY QUALIFICATIONS 4 KALISPELL OFFICE 2250 Highway 93 South Kalispell, MT 59901 406.755.3208 BOZEMAN OFFICE 705 Osterman Dr. Ste. B Bozeman, MT 59715 406.586.0707 VANCOUVER OFFICE 702 Jefferson Street Vancouver, WA 98660 360.852.8746 STATE OF MONTANA BUSINESS LICENSE: D092890 STATE OF MONTANA ENGINEERING & SURVEY LICENSE: PEL-EF-LIC-201 OFFICE LOCATIONS STATE LICENSES KEEP CONNECTED • MAKE IT PERSONAL • EXCEED EXPECTATIONS • FIND A SOLUTION ARCHITECTURAL STRUCTURAL MECHANICAL CIVIL | SURVEY JACKOLA MULTI-DISCIPLINE TEAM ELECTRICAL ADMIN Our Heritage In 1969, Thor Jackola founded our company with a simple but powerful belief: every project should start with the people it serves. More than 56 years later, Thor’s son Shane who took over the ownership of the firm in 2007 continues the firms legacy in the community and the people first philosophy still guides everything we do. We believe our clients deserve not only expert solutions but also genuine care and personal attention. As a full-service team, we’re versatile, modest, friendly, and thoughtful. We take the time to understand your goals and processes, then guide you through the complexities of construction with clarity and confidence. At Jackola, your vision is our priority. Our rich history has taught us the value of a thoughtful approach—one that always puts you at the center. Staff for the Central Shop & Equipment Storage Facility We have over 50 employees and are actively growing. Our Kalispell office currently has 33 staff members including architects, engineers, and administrators. If additional design support is needed, those staff exist in the Vancouver and Bozeman offices as well. Jackola Engineering and Architecture PC is a Professional Corporation. We have business,engineering and survey registrations/licenses with the State of Montana as required to practice. Our architects and engineers are licensed professionally with the state, their individual registration numbers are on the resumes. JACKOLA FIRM PROFILE Co m p a n y D e s c r i p t i o n s Company History in the Industry 5 Jackola Firm Profile Jackola staff is divided into integrated multidisciplinary design studios to foster seamless communication among our expert staff of architects and engineers which allows us to work efficiently and consistently meet deadlines. Our internal process for setting and keeping deadlines involves: • Constant engagement and communication led by the Project Manager • Establishing a logical project schedule at the beginning of the project • Getting buyoff from each discipline supervisor prior to finalizing a project schedule • Weekly project specific check ins between Project Manager and design professionals • Internal coordination reviews early in the project eliminate re-work down the road Our Values At Jackola, our core values guide every interaction, decision, and design. We are a full-service team that approaches each project with humility, curiosity, and a collaborative mindset. Whether we're leading a long-range facility plan or coordinating a fire station remodel, we work to simplify the process for our clients. Core Values: Keep Connected, Make it Personal, Exceed Expectations, Find a Solution. IT'S PERSONAL Our Commitment Jackola strives to deliver an emotional investment to the clients and communities we serve. We have decades worth of experience rooted in family-values which allows us to provide excellent care to our clients. At Jackola, we take a curious approach, one that keeps your needs at the center of the project. JACKOLA FIRM PROFILE 6 ORGANIZATIONAL CHART Jackola is a comprehensive in-house A&E firm prepared to deliver the full spectrum of professional services required to successfully plan, design, bid, and oversee construction of the new Central Garage Shop and Solid Waste Equipment Storage for the City of Kalispell. Recognizing the multifaceted nature of this project, our approach begins with assembling a multidisciplinary team—drawing on our architectural, civil, structural, mechanical, electrical, plumbing, and fire protection expertise—to ensure seamless execution from programming through construction administration. We will initiate the process with a project scoping meeting to align with City stakeholders, review groundwork completed to date, clarify project drivers, and establish consensus on the project path. This collaborative kickoff will set the stage for a responsive and well-coordinated design process, tailored to the City’s operational needs and long-term goals. FIRM ORGANIZATION AND INITIAL APPROACH PROJECT ORGANIZATIONAL CHART Organizational Chart FULL TEAMS WILL BE AVAILABLE FOR SUPPORT AS NEEDED KAGAN RUTZPRINCIPAL | SENIOR ENGINEER CLIFF S. CLARKSTAFF GEOLOGICAL ENGINEER ENGINEER TECHNICIAN II BLAKE BARTUSIAK, PESUPERVISING MP TYLER HAVEN, CPDT BIM/CAD LEADSUPERVISING DESIGNER JON RUONAVAARA, PESUPERVISING ELECTRICAL LANDON GOFF, EIELECTRICAL NED HALLING, AIAARCHITECTURAL LEAD IAN TANNINENDESIGNER, MArch LISA BURCHARDTDESIGNER, MArch ARCHITECTURE MEP ANDREW HANSON, PESUPERVISING STRUCTURAL STRUCTURAL SETH SUGIMOTO, EISTRUCTURAL KEO JAMIESON, PESUPERVISING STRUCTURAL DREW DIGMAN, PESUPERVISING CIVIL JAMES CUMMINSDESIGNER GARRET MUONIO, PECIVIL TOBY MCINTOSH, PECIVIL LEAD CIVIL GEOTECHNICAL MAIN POINT OF CONTACTPROJECT MANAGERKARL HENSHAW, PESTRUCTURAL ENGINEER JACKOLA LEADERSHIP OPERATIONS OFFICERCOURTNEY CARRIER, PEMECHANICAL ENGINEER PRESIDENTSHANE JACKOLA, PEPRINCIPAL IN CHARGE BUSINESS DEVELOPMENT OFFICERRORY YOUNG, PECIVIL ENGINEER CENTRAL SHOP & STORAGE CITY OF KALISPELLCENTRAL SHOP& STORAGE TEAM 7 ALPINE GEOTECHNICAL FIRM PROFILE Company Information Alpine Geotechnical, LLC was founded in January 2015 to provide geotechnical engineering and construction materials engineering and testing services for the greater Flathead Valley. Kagan Rutz, P.E. is the owner and senior engineer. He has been practicing in this field in the Flathead Valley since 2006. Alpine Geotechnical currently employs one registered professional engineer, one staff geotechnical engineer, one laboratory manager, one senior technician, two geoscientists, four engineering technicians, driller, drillers helper, and office manager. We own and operate a Diedrich D050 geotechnical drill rig on a 4wd carrier, and a Kubota KX040 compact excavator to support field investigations. Firm Qualifications and Services Alpine provides high-quality services for a wide range of clients including architect-engineering firms, commercial and construction-related clients, and various local, state, and federal agencies. The engineering staff has geotechnical experience on projects ranging from large commercial buildings, retaining structures and roadways. We have extensive local experience with numerous past and active projects throughout the valley including Logan Health, Glacier international Airport, and Glacier Bank. Additionally, we have significant experience with the City of Kalispell including the elevated composite water storage tank for the City of Kalispell and numerous water and sewer improvement projects for the public works department. 120 Round Stone Drive, Suite 101 | Kalispell, Montana | 406.257.6479 | info@alpinegt.com Our services include: • In house subsurface exploration via company owned drilling rig and compact excavator • Design parameters for shallow and deep foundations • Slope stability analysis • Site grading and drainage • Pavement design • Infiltration testing • Asphalt Mixture Design • Concrete Mixture Design • AASHTO RE:SOURCE accredited testing laboratory Soils, Concrete, and Asphalt Alpine Geotechnical Firm Profile 8 CENTRAL GARAGE & STORAGE FACILITY RELEVANT COMPANY EXPERIENCE Ma i n t e n a n c e S h o p P r o j e c t s Mu n i c i p a l i t i e s & L o c a l G o v e r n - me n t P r o j e c t s 9 MAINTENANCE SHOP PROJECTS MUNICIPALITIES • LOCAL GOVERNMENT PROJECTS Ma i n t e n a n c e S h o p P r o j e c t s Mu n i c i p a l i t i e s & L o c a l G o v e r n - me n t P r o j e c t s STATE OF MONTANA COMBINED SUPPORT MAINTENANCE SHOP ADDITION Fort Harrison, Montana REFERRAL/REFERENCE Department of Military Affairs Jason Kolar, DMA Project Manager Fort Harrison - State of Montana 406.324.3065 The current work bays lack space for maintenance and M88A2 training. The addition in- cluded a full-coverage bridge crane. Key project elements include site circulation, lighting, security, non-combustible materials, and a 3-hour fire wall. Energy-efficient systems fea- ture ERV with occupied-only operation, LED lighting with sensors, and plumbing with an oil/sand separator. FLATHEAD ELECTRIC COOPERATION VEHICLE MAINTENANCE FACILITY Kalispell, Montana 12,400 SF masonry building includes offices, a welding bay, a vehicle wash bay, four 78 foot long drive -through service bays, parts and materials storage, and a transformer shop. The facility features two overhead bridge cranes and an innovative vehicle exhaust disposal system. The interior environment is controlled by an energy recovery ventilator along with energy saving ground source heat pump and in-floor radiant heating. Also notable is a supplemental heating system that is fueled by the vehicular waste oil. Complete compressed air and oil delivery piping was also included. REFERRAL/REFERENCE Mark Johnson Flathead Electric Cooperation 406.755.8066 The existing equipment storage building in Eureka had inadequate space for storage and maintenance of larger road mainte - nance equipment and supplies. Larger equipment in use today requires longer bays, higher ceiling and door clearances and increased maneuvering space. In the instance of the Eureka Storage facility, this required the existing building to be replaced to improve operation efficiency. The Montana Department of Transportation contracted us to design a replacement building for the outdated and inadequate Eureka building to accommodate larger equipment and increased maintenance personnel. Their requirements are being met with a new facility that is higher performance, energy efficient and constructed of lower maintenance systems and materials. FLATHEAD COUNTY BUSH PIT SHOP Marion, Montana REFERRAL/REFERENCE Bob Warfle, PE Project Manager State of Montana, Department of Administration 406.444.0771 10 Co m m e r c i a l D e a l e r s h i p s & S h o p s COMMERICAL DEALERSHIPS & SHOPS NISSAN DEALERSHIP (2016) Kalispell, Montana REFERRAL/REFERENCE G.R.L. Inc. Rob Green (Previous Owner) 928.300.5301 The architectural team adapted prototype plans to meet owner specifications and local standards, delivering stamped drawings for city permitting. Services included schematic design, detailed design development, and final construction documents. Structural, electrical, mechanical, and plumbing en- gineering were provided. The repair shop was a major part of the project with Jackola working with the owner to modify the prototype plan for Montana conditions. Repair Shop layout for vehicle lifts, alignment machine, tire balancing and tool boxes was also completed to provide the most efficiency use of the space for both building and mechanics. GREEN HYUNDAI (2017) Kalispell, Montana Shortly after completing the Nissan project, Jackola designed the new Hyundai dealership on Kalispell’s south side, providing full A/E/M/E/P services. The showroom features 75 feet of curtain wall and includes offices, customer lounge, parts department, and service bays. In-floor heat with high-efficiency boilers and a gas detection system were installed. Cooling concerns for the west-facing building were addressed with a rooftop unit using enhanced ventilation and multi-zone VRF. LED lighting was used throughout, including parking areas. Jackola also assisted with the repair shop layout. In 2021, upgrades were completed to meet Hyundai’s updated standards, adding a vehicle delivery canopy, EV charging stations, and in- terior modifications. REFERRAL/REFERENCE G.R.L. Inc. Rob Green (Previous Owner) 928.300.5301 Completed the Design and Construction administration for this 7,140 sf office and vehicle garage for the Lake County Coun- cil on Aging in Ronan. Jackola completed architectural, civil and structural design services. Facility included offices, commu- nity room and a 10 bay garage facility. Design of trench drains and required oils/sand seperator were included. GARAGE AND OFFICE BUILDING Lake County, Montana REFERRAL OR REFERENCE Lake County Council on Aging Lori Thibodeau Executive Director 406.872.2277 11 At the county’s Bush Gravel Pit in Marion we completed an expansion of the ex- isting shop. The existing Quonset hut was demolished. The foundation for the Quonset reused and expanded for the bigger facility. The framed builing building included overhead doors for equipment and in-floor heat in the slab. Also part of the project was the design and construction of a pole barn structure to cover their Salt /Sand pile. We have completed 3 more Salt/Sand sheds for the County and currently finalizing the bid package on another. FLATHEAD COUNTY BUSH PIT SHOP Marion, Montana REFERRAL/REFERENCE Dave Prunty Public Works Director Flathead County Road & Bridge Department 406.758.5790 FLATHEAD COUNTY This 2,160 SF expansion of the County’s existing vehicle maintenance shop to provide a separate area for welding that will ensure proper ventilation. Jackola examined the specific needs of the facility to identify a solution meeting the strict project budget. Systems provided include (2) welding hood exhaust arms/booms, jib cranes, and extensive electrical support for the metal fabrication equipment (Welders, Grinders, Band saws, etc.) Completed in 2014. FLATHEAD COUNTY SHOP & WELDING BAY ADDITION Kalispell, Montana REFERRAL/REFERENCE Dave Prunty Public Works Director Flathead County Road & Bridge Department 406.758.5790 Project included a small 1250 sf addition to their existing shop for storage of new and waste fluids for the shop. Architectural, structural and MEP design and drawings were completed. Tie-in to the existing old metal building and fluid storage, layout, piping coordination and modifications to the existing facility were completed. Connection to exist metal building and reloca- tion of a sewer pipe were some of the challenges with the building. FLATHEAD COUNTY SOLID WASTE SHOP ANNEX Kalispell, Montana REFERRAL/REFERENCE Dave Prunty Public Works Director Flathead County Road & Bridge Department 406.758.5790 FLATHEAD COUNTY ROAD & BRIDGE DEVELOPMENT AND SOLID WASTE DISTRICT Jackola has completed numerous project for Flathead County, all projects involve full design including owner review and managing bidding / contract award and construction administration. Flathead County Projects 12 FLATHEAD COUNTY, MONTANA Berne RSID • Columbia Falls Stage Road • Chapman Hill Road • County Senior Centers Upgrades • Bush Pit Shop Rebuild and Expansion • Four Salt Sand Shed Projects • County Welding Bay Addition • Flathead County Solid Waste Shop Annex CITY OF KALISPELL, MONTANA Fire Station 61 • Police Search Building • Public Safety Building Improvements TOWN OF EUREKA TOWN ENGINEER Midvale Sewer Phases Ib • Tobacco Road Planning • Growth Policy • Meter Replacement • 6th Street Drainage Design • Fairground Sewer • Lagoon Study • ARPA Grant Applications • Booster Pump Replacement LAKE COUNTY AND LAKE COUNTY DEVELOPMENT, MONTANA Mission Mountain Food Enterprise Renovation • Ronan Brewery • Polson Fairgrounds PER • Lake County Council on Aging Office & Garage. Berne Road Fire Station 61 Ronan Co-Op BreweryMidvale Sewer Planning MUNICIPAL 13 These are ~30,000 SF metal buildings with brick veneer and standing seam roof. This building consists of a 100’x 200’ metal building portion housing the altar, sanctuary, kitchen, dining and Sunday school rooms and two CMU wings enclos- ing nurseries, restrooms and additional Sunday school rooms. The design includ- ed creating a mechanical mezzanine above a central corridor, away from both the sanctuary and dining areas. Coordination was required to ensure the layout includ- ed adequate circulation space around main frames and a clean aesthetic interior. OALC | Winlock, WA, Moorcroft, SD, Delano, MN, Marengo, WI 16,585 SF project utilizing a mono-slope type metal building design with full length crane rails supporting the refinishing and repair work Maddox Iprovides for transformers. We studied the transformer manufacturing business, including how transformers moving in and through the facility were tested and shipped out. This proved valuable in helping design for growth, improve efficiencies and work within their business structure. This D/B project had an accelerated schedule and achieved substantial completion at 94 days, on time and within budget. MADDOX INDUSTRIAL TRANSFORMER | Battle Ground, Washington Conceptual plans, interior and exterior renderings, and construction documents were prepared for a future headquarters encompassing 22,000 square feet of of- fice space accompanied by 20,000 square feet of shop and warehouse space. The office design features a custom timber frame lodge-style exterior and interior lob- by space, while the shop and warehouse incorporate a custom premanufactured metal building design. This project was reconfigured on the existing site due to COVID-19 but the design concept was complete. MILL PLAIN ELECTRIC | Ridgefield, Washington PRE-ENGINEERED METAL BUILDINGS A new 6,000 sf Micro Process Plant was planned and designed to process small quantities of experimental hops. This process plant included the three main phases of the existing process: picking, drying and baling. The plant was designed with a freezer and space for a pellet plant which will be completed based on funding. ELK MOUNTAIN FARMS MICRO PROCESSING PLANT | Bonners Ferry, Idaho The growth of new construction in the area created a demand for building mate - rials which strained Western Building Center’s ability to serve its customers due to lack of space. As a result Jackola master planned the site for improved cir- culation, addition of a drive-thru lumber storage facility, improved drainage and additional retail space. Additionally, the street-side façade along with the ends of the building were architecturally improved to present a fresh appearance. Some minor non-structural modifications to the existing facility were also included in the project, most notably to meet current life safety and accessibility requirements. WESTERN BUILDING CENTER | Kalispell, Montana 1514 Pr o f e s s i o n a l S e r v i c e s P e r f o r m e d w i t h G C C M Approximately 70–75% of our work is delivered using the General Contractor / Construction Manager (GC/CM) project delivery method, with the remainder completed through Design/Bid/Build, Design/Build, and Owner/Contractor methods GCCM. We view GC/CM not as an alternate method, but as a preferred delivery approach. Jackola has completed GC/CM projects with multiple contractors and regularly assists owners with the RFQ process, including both qualification-based and pricing- inclusive selections GCCM. Current GC/CM projects include a 12,000 SF shop expansion in Kalispell, a medical clinic in Libby, and a bank in Columbia Falls, with completed work spanning schools, offices, maintenance facilities, banks, and retail centers GCCM. At the Flathead Electric Cooperative Headquarters Expansion, all phases were delivered under GC/CM, including site, yard, office, and maintenance facilities. The integrated team approach resulted in a multi-year program completed ahead of schedule GCCM. PROFESSIONAL SERVICES PERFORMED WITH GC/CM BENEFITS OF GC/CM On a recent medical clinic project in Libby, early contractor input led to the use of cross-laminated timber (CLT), enabling faster enclosure during winter construction and minimizing schedule risk GCCM • Improved schedule reliability through early contractor involvement • More accurate cost estimating throughout design • Early procurement of long-lead materials • Schedule savings of up to 2–3 months with pre-engineered metal buildings • Improved constructability and value engineering, reducing RFIs and delays 15 CENTRAL GARAGE & STORAGE FACILITY CONTRACT UNDERSTANDING & APPROACH 16 UNDERSTANDING YOUR NEEDS FOR THIS PROJECT PROJECT APPROACH 1 PROJECT SCOPING / KICK-OFF MEETING The project scoping and kick-off meeting is intended to align Jackola and City stakeholders on the overall project approach and expectations. This discussion allows Jackola to develop project-specific Owner Project Requirements (OPRs) and an overall Basis of Design (BOD), which serve as guiding principles throughout the project. The intent of this effort is to better understand what is important and truly required of the facility. The OPRs and BOD may include considerations such as the number and types of vehicles the facility must serve. Site investigation services include obtaining background information such as a pre-engineering survey, available utility information, and relevant City master plans for the property. A geotechnical investigation will be completed by a qualified subconsultant. This information provides the foundation for planning and eventual design of the facility. 2 SITE INVESTIGATION 3 DESIGN WORKSHOP With site-specific information and review of existing facilities completed, Jackola would develop several high-level concepts for discussion during a design workshop with the City. City participation would include a range of stakeholders, from engineers to operations staff who will ultimately use the facility. The workshop is intended to present concepts, ask questions, and gather feedback on topics including access, circulation, frequency of users, year-round operations, and maintenance needs. Input from this workshop will be incorporated into refinement of the preferred alternative. Understanding Your Needs for this Project Jackola understands the City of Kalispell’s need for a modern, durable, and efficient Central Garage Shop and Solid Waste Equipment Storage Facility that supports fleet maintenance, equipment storage, and Public Works operations. The facility must safely accommodate large vehicles and equipment, provide efficient circulation and workflow, support year-round use, and comply with applicable safety, environmental, and permitting requirements. 17 4 DESIGN SERVICES The City’s RFQ provides a clear outline of the required design services. Following direction from the City on the preferred alternative, Jackola will prepare design submittals at the 30%, 50%, 70%, and 90% levels, culminating in final construction documents. Deliverables will vary by phase as outlined in the RFQ and will ultimately include plans, a project manual, engineering reports, cost estimates, and a preliminary construction schedule. During preparation of the project manual, Jackola will coordinate with the City to incorporate City-specific front-end bidding documents. One area requiring particular attention is permitting, as certain alternatives may require approvals beyond a standard City building permit. PROJECT APPROACH 6 CONSTRUCTION ADMINISTRATION Construction administration services will be provided generally as outlined in the RFQ. Jackola will coordinate with the City to establish appropriate inspection frequency, recognizing that full-time inspection may not be necessary for all aspects of the project. 7 PROJECT CLOSEOUT & POST-CONSTRUCTION SERVICES Jackola will work with the City and contractor to complete project closeout in accordance with the RFQ requirements. This includes ensuring record drawing markups are incorporated into final as-built documents and that complete Operation and Maintenance manuals are provided. Warranty inspections and oversight of warranty-related work will be performed as outlined in the RFQ. 5 BIDDING SERVICES During bidding, Jackola will support the City in soliciting and evaluating bids in accordance with the RFQ. Bid adjudication will include preparation of an award recommendation to the City. Addenda issued during bidding will be incorporated into a final Construction Set issued to the City and the selected contractor. 18 CENTRAL GARAGE & STORAGE FACILITY APPROACH TO CONTRACT MANAGEMENT 19 INITIATING & ESTABLISHING SERVICES Jackola initiates each project with a structured kickoff meeting involving City staff and key stakeholders. This meeting establishes communication protocols, confirms project goals, reviews schedule and budget parameters, and aligns expectations. The Project Manager serves as the single point of contact and is responsible for coordination across all disciplines. PLANNING, SCHEDULING, ESTIMATING, & MANAGING MANPOWER Our project management system includes detailed project schedules developed at project initiation, discipline-level task assignments, and regular internal coordination meetings. Cost estimating is integrated throughout design to support informed decision-making. Staffing levels are actively managed to maintain schedule commitments while preserving quality. Litigation or Arbitration Statement AVAILABILITY FEBRUARY 2026 - JUNE 2026 Great Northern Studio FEBRUARY 2026 MARCH 2026 APRIL 2026 MAY 2026 JUNE 2026 10%60%60%60%10% Planning, Scheduling, Estimating & Managing Manpower Jackola Engineering & Architecture has no claims filed against our firm or any other jurisdiction as a result of a contract dispute; nor any contract or negligence claims filed against our company; nor premature termination from a services agreement. LITGATION OR ARBITRATION Litigation or Arbitration Statement 2120 CONSTRUCTION ADMIN (CA) Here, we ensure the contractor's interpretation of the project drawings matches the design intent. A&E involve- ment in this phase ensures that the design shown on paper is built correctly, and decisions made in the field are to your best interest. . Discovery is a critical phase that lays the project’s foundation. Here, we clarify your vision, budget, and goals while addressing AHJ, codes, and timelines—anticipating and resolving potential obstacles. DISCOVERY (DI) CONSTRUCTION DOCUMENTS (CD) During this phase, the final set of drawings is issued for bidding and construction. These drawings, along with related specifications and contract documents, form the b asis for agreements between you and the general contractor, and between the general contractor and subcontractors. SCHEMATIC (SD) By aligning design, scope, and budget, Schematic Design turns Discovery into a well-defined conceptual drawing pack- age. Using f easibility studies, your feedback, and BIM models, we work with you and the contractor (if applicable) to keep the project on track. PROJECTKICKOFF PROJECTCLOSEOUT DDHALF CHECKPOINT 50%CD 100%CD PERMIT BIDPROCESS FLEXIBILITY LOW COST IMPLICAT IONS HIGH FLEXIBILITY VERY HIGH HIGHCOST IMPLICAT IONS DI PAGE TURN VERY LOW FLEXIBILITY COST IMPLICATIONS LOW FLEXIBILITY VERY LOW FLEXIBILITY VERY LOW COST IMPLICAT IONS VERY HIGH COST IMPLICAT IONS VERY HIGH LONG FUNDRAISING ENTITLEMENTS Clear communication with you during this labor-intensive phase is essential. We’ll k eep you updated as all systems are verified and the architectural program is finalized, explaining any change limitations and how changes may a ffect budget, schedule, and AHJ requirements. SD PAGE TURN DD PAGE TURN DESIGN DEVELOPMENT (DD) PROJECT ROAD MAP 21 CENTRAL GARAGE & STORAGE FACILITY OTHERS FACTORS 2322 PROPOSED SCHEDULES DESIGN BID BUILDSCHEDULE GC/CM SCHEDULE 2 0 2 6 2 0 2 7 RFP DUE - JAN 16 EXISTING DECANT FACILITY REVIEW A&E SELECTION A&E CONTRACT NEGOTIATION SITE INVESTIGATION, PLANNING & PROGRAMMING SCHMATIC DESIGN OWNER REVIEW OWNER REVIEW DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS CONTRACTOR BIDDING CONTRACTOR AWARD PEMB AWARD & BUILDING DESIGN CONSTRUCTION STARTS CONSTRUCTION COMPLETE FOUNDATION DRAWINGSCITY PERMIT PROCESS JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC FEB MAR APR DEC OWNER REVIEW 2 0 2 6 2 0 2 7 RFP DUE - JAN 16 EXISTING DECANT FACILITY REVIEW A&E SELECTION A&E CONTRACT NEGOTIATION SITE INVESTIGATION & PROGRAMMING SCHMATIC DESIGN, OWNER REVIEW& CONTRACTOR RFQ OWNER REVIEW & CONTRACTOR PRICING DESIGN DEVELOPMENT PEMB AWARD BID PACKAGE PEMB AWARD & BUILDING DESIGN CONSTRUCTION DOCUMENT (+ FOUNDATIONS) CITY PERMIT PROCESS CONSTRUCTION COMPLETE CONTRACTOR SUBCONTRACTOR BIDDING POTENTIAL CONSTRUCTION START JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV JAN OCT 23 CENTRAL GARAGE & STORAGE FACILITY PROPOSED SCHEDULES APPENDIX A Certifications & Licensures Held in Montana Key Staff Resumes 24 KARL HENSHAW, PE SUPERVISING STRUCTURAL ENGINEER Karl is a licensed Structural Engineer with longstanding experience and familiarity with multiple materials and systems. This allows him to recognize problems before they arise. He factors longevity, durability, envelope, and value before he presents an option to a client. He has experience with high snow loads, seismic design, and wind design with structural systems including wood, steel, concrete, and masonry. From design to closeout, Karl has the client’s best interest in mind. He provides an unmatched client experience prioritizing client engagement, communication, and trust. FLATHEAD COUNTY | Various Locations Karl serves as structural engineer and project manager on a wide range of projects for the County’s Road and Bridge Department and Solid Waste District. Work has included a 2,160 sf county shop expansion at Willon Glen for a dedicated welding bay; a 3,040 sf remodel and expansion of the Bush Pit shop; four pole-barn salt/sand storage buildings (2,500–3,700 sf); and a 1,250 sf addition to the Solid Waste District shop for fluid storage. Services included full multi-discipline design, owner coordination, preparation of bidding documents, and construction administration (OAC meetings, pay application review, and site visits). Karl is currently working on a fifth salt/sand shed scheduled for bidding in February, as well as initial programming and cost analysis for a tire storage building at the County Shop. GLACIER PRECAST CONCRETE | Kalispell, MT Karl is currently providing structural engineering services for a 12,000 sf expansion consisting of a pre-engineered metal building with two 20-ton cranes and a 50’ x 30’ hangar door. Work includes layout studies, coordination with the existing precast facility, and collaboration with the GC/CM contractor to expedite delivery. Karl also completed the original structural design of the precast plant nearly 20 years ago, along with several subsequent expansions. CONFEDERATED SALISH AND KOOTENAI TRIBES & MISSION MANAGEMENT | Various Locations Karl has been the structural engineer and project manager on numerous Tribal projects, including a commodity building remodel; a 12,000 sf Division of Fire office building; an expansion and remodel of the Tribal Court; a 4,000 sf maintenance shop expansion; a motel remodel; a cultural center expansion and remodel; a 13,266 sf Powwow pavilion; a 22,000 sf Division of Engineering water resources office building (currently under construction); and a meat processing facility with holding pens, modular processing plant, garage, and office/sales building (under construction). Services included full design for all disciplines, programming, bidding documents, and construction administration for publicly bid projects. SKILLS • Project Management • Construction Administration • Cost Estimation • Value Engineering • Structural Assessments • Architectural Design Coordination 32 YEARS of EXPERIENCE LOCATION Kalispell, MT REGISTRATION Structural Engineer MT PE-16018 EDUCATION Bachelor of Engineering, Civil National University of Ireland, University College Dublin KEY STAFF RESUMES 25 KEY STAFF RESUMES NED HALLING, AIA LEED AP ARCHITECTURAL LEAD Ned’s tenure with Jackola has provided a broad experience base and strong skills in materials and methods of construction in design. Ned has 19 years of experience in developing building concepts and working to provide their feasibility within project constraints. Ned is also a member of the American Institute of Architects and National Council of Architectural Registration Boards. SKILLS • Pre-Design & Programming • Code Analysis • Feasibility Analysis • Design & Documentation • Project Management 19 YEARS of EXPERIENCE LOCATION Kalispell, MT REGISTRATION Architect MT - 3329 EDUCATION Master of Architecture University of Minnesota Bachelor of Arts in Architecture University of Minnesota NWE ADDITION | Kalispell, Montana Project manager and architect of record of this 5,000 SF addition to a metal building for vehicle storage, Ned worked with NWE to recently complete a design of the metal panel addition along with remodeled welding room, staff restrooms, locker rooms, and office modifications. Construction was a combination of CMU, wood framing pre-manufactured metal building. The project also included adding overhead doors to an outbuilding for equipment storage INTERBEL OFFICE ADDITION AND REMODEL | Eureka, Montana Jackola’s full discipline design team developed this project consisting of approximately 5,500 SF of a wood framed two-story office addition and remodel of 3,000 SF of existing office and vehicle storage/warehouse space in a pre-manufactured metal building. Ned is the Project Manager and Architect of Record. The client has two separate facilities and are combining them into one facility. MONTANA AG RESEARACH STATIONS | Conrad, Montana Ned was Architect of Record on this project for the State of Montana to build three pesticide handling facilities and two vehicle maintenance facilities at four different Montana State University Agricultural Research Centers. The design team customized prototypes of the pesticide handling and vehicle maintenance facilities to meet the unique architectural and functional needs of each center while staying within a limited budget. PURSUIT ACCESSORY BUILDINGS | West Glacierl, Montana ed was the Architect of Record for these five buildings including a bathhouse, laundry, service building, maintenance building, and registration/dwelling unit building. The projects included various parameters from positioning for best proximity/ functionality for the users to storing of vehicles to being able shut the buildings down for winter season. It was important that maintenance was minimized so metal roofing and water blow out/drain systems were planned. One of the buildings had a residence above it, so fire ratings were required to separate it from the registration/retail area below it. 26 KEY STAFF RESUMES ANDREW HANSON, PE SUPERVISING STRUCTURAL ENGINEER Andrew’s experience as a construction inspector throughout university was beneficial for understanding the construction process and relationships. Using his background and his knowledge of structural practices, he always works to find the very best solution for each situation. SKILLS • Project Management • Construction Administration • Seismic Design • Wood Design 4 YEARS of EXPERIENCE LOCATION Vancouver, Washington REGISTRATION Structural Engineer MT-PEL-PE 105761 EDUCATION Bachelor of Science Civil Engineering Montana State University GESA CREDIT UNION REMODEL | Vancouver, Washington Andrew was on the structural design team for this remodel and addition project, which involved careful analysis and integration with the existing building framework. The project required extensive coordination with architectural, mechanical, and other engineering disciplines to ensure modifications did not compromise the integrity of the existing structural support system. Through this collaborative approach, Andrew and the team minimized the impact on the original structure, eliminating the need for major structural upgrades and maintaining overall project efficiency. CABINET PEAKS MEDICAL CENTER PT BUILDING | Libby, Montana Andrew is part of the structural design team for this new cross-laminated timber (CLT) building currently under construction. The project emphasizes sustainable design and precision engineering to leverage the efficiency of CLT panels. The structural scope includes detailed analysis of load paths, connections, and integration with mechanical and architectural systems to ensure durability and performance. Coordination across disciplines has been critical to maintain construction efficiency while delivering a modern, resilient structure tailored to the client’s operational needs. AL & ERNIE'S BAKERY TI | Battle Ground, Washington Andrew was on the structural design team for this 5,200 SF corner market building renovation. Jackola structural team provided revised structural engineering plans, notes details and calculations replacing a previous structural engineer's efforts on the project to successfully respond to the City of Battle Ground’s permit review comments enabling the client to obtain a building permit. MADDOX ADDITION BUILDING DESIGN | Battle Ground, Washington Andrew was on the structural design team for the cold-formed steel framing of a two-story, 6,000SF addition, which stands structurally independent from the original building his team designed several years prior. The addition required detailed structural analyses for newly introduced openings in the existing building, essential modifications to improve access and seamless workflow between the new and original spaces. These interventions were carefully engineered to maintain the integrity and safety of the entire structure while keeping its functional connectivity. 27 KEY STAFF RESUMES BLAKE BARTUSIAK, PE SUPERVISING MECHANICAL ENGINEER Blake has field experience in HVAC, and this familiarity helps him understand the practicality of accessing units and system constructibility. He has experience in a range of commercial design, from office tenant improvements to airports. Detail-oriented and a good time manager, he has great communication skills. SKILLS • HVAC and Plumbing Design • Progressive Building Methods • Energy Efficiency 8 YEARS of EXPERIENCE LOCATION Kalispell, Montana REGISTRATION Mechanical Engineer MT-PEL-PE 87431 EDUCATION Bachelor of Science Mechanical Engineering Montana State University YAKAMA POWER BUILDING DESIGN | Toppenish, Washington Blake worked with the client to provide designs for the MEP systems for this new facility. He designed a VRF system to help meet the client’s requirement for maximum system controllability while still maintaining a high efficiency system. Blake assisted on plumbing design for shower/locker rooms as well as a nice breakroom space. Future provisions were provided for a future outdoor patio space. CLARK COUNTY EVENT CENTER KITCHEN | Vancouver, Washington Blake led the mechanical and plumbing system design for tenant improvement including structural design support to upgrade the concession stand into a full kitchen. Blake designed new kitchen exhaust system that integrated into existing mechanical systems to provide appropriate grease exhaust / make up air for the kitchen. Blake also assisted the County with permitting process and health department review and construction coordination. MADDOX ADDITION BUILDING DESIGN | Battle Ground, Washington Blake led the mechanical and plumbing design of this 6,000 SF two-story addition off the original transformer refurbishment shop designed in 2023 and constructed in 2024. The addition includes several private offices, an open office space, conference rooms, additional flammable and parts storage rooms, along with a large break room for both the shop and office workers. YAKAMART | Toppenish, Washington Blake led mechanical and plumbing design on this project including design for a proposed two-story addition, new fuel island and tank, two demolished buildings, and relocating equipment for the existing C-store. While budget constraints ultimately limited construction, a small vestibule addition to the main convenience store entrance was made a standalone design and was constructed in late 2023. Cost estimating was provided for the vestibule prior to construction. AL & ERNIE’S CAFÉ AND BAKERY TI | Battle Ground, Washington Blake was Project Manager and led mechanical and plumbing system design for this 5,200 SF corner market renovation. Blake reused most existing HVAC equipment but added mini-split units to condition back areas. A new kitchen Type 1 exhaust hood was ducted to a roof-mounted exhaust fan. New restrooms tied into the existing waste service. Existing domestic water pipes were demolished and replaced with new cold and hot water piping. 28 KEY STAFF RESUMES JON RUONAVAARA, PE ELECTRICAL ENGINEER With over seven years of direct experience as an Master Electrician, Jon never loses sight of the constructibility of his designs. He will find ways to deliver power that save space and cost, and knows from his installation experience if they will work in the field. He also understands contractors and makes sure his drawings are effective in the field. BLM DEAN S RESERVOIR RECREATION MASTER PLAN AND SITE DESIGN | Miles City, Montana Jackola designed this recreation facility near Miles City including the access road, a day use parking area, vault toilet, camp host site, 10 camp sites, and a walking trail system. Jon was the Electrical Engineer of Record on Jackola’s team. Electrical design included providing power and electrical hook ups to camp sites. All elements of the project followed the BLM Manual Guidelines for a Quality Built Environment. A construction contract for this project was awarded in April 2025 with a completion date of October 31. BLM FORT BENTON EQUIPMENT STORAGE FACILITY | Fort Benton, Montana Jon provided comprehensive electrical design services for a 3,300 SF equipment storage warehouse facility that included a shop/garage, office, and storage space. His responsibilities covered powering specialized equipment, implementing energy- efficient LED lighting systems, and integrating modern communications infrastructure to support operations. Jon performed detailed electrical load calculations to ensure reliability, safety, and compliance with applicable codes. He also coordinated closely with the State Historic Preservation Office, resulting in design solutions that not only met project requirements but also respected and reflected the historic Fort Benton architectural style, blending modern performance with cultural and contextual sensitivity. EUREKA STORAGE BUILDING | Eureka, Montana Jackola provided design services for this new 5,000 SF equipment storage building including vehicle maintenance and office space. Jon was part of the electrical engineering team on the project which was designed to meet Montana State High- Performance Building Requirements. Electrical design included site, power, and lighting design. FLATHEAD COUNTY BUSH PIT SHOP | Marion, Montana Jon led the electrical design for the Flathead County Bush Pit Shop. He completed load calculations and lighting and power design. He coordinated with the owners and met their project requirements. Jon completed lighting and equipment schedules and wrote electrical specifications. SKILLS • Master Electrician • Effective Lighting Design • Smart Layout • Energy Efficiency 7 YEARS of EXPERIENCE LOCATION Kalispell, MT REGISTRATION Electrical Engineer MT PE-84939 EDUCATION Bachelor of Science Electrical Engineering Montana State University 29 TOBY MCINTOSH, PE LEAD CIVIL ENGINEER Toby has over 20 years’ experience at Jackola and has been the project manager and engineer of record for Jackola’s work with public and private clients alike. He has varied experience with public and private infrastructure projects including water, sewer, stormwater, and streets. This experience starts with initial concept, preliminary engineering reports, cost estimation, funding support, design, permitting, bidding, construction administration, and project closeout. He has also worked on numerous commercial site designs coordinating the site and building design to provide functional spaces. Toby will work with the City, Jackola team members, and appropriate agencies having jurisdiction to find a solution. GSA PIEGAN LPOE WASH BAY FEASIBILITY STUDY | Babb, Montana Toby was the professional of record for the Piegan LPOE Wash Bay Feasibility Study. He played a key role in reviewing the existing site, coordinating operations of the current port with CBP, GSA, and BP. From a regulatory standpoint, coordination with the EPA and Blackfeet Tribe was critically important as the site was remote, did not have availability to centralized sewer, and the site was located in an environmentally sensitive area. It’s unknown if GSA will move into full design, but the comprehensive review of project alternatives is similar to Kalispell’s project. MADDOX INDUSTRIAL TRANSFORMER | Battle Ground, Washington Toby was the professional of record for this Battle Ground, Washington project. Maddox refurbishes electrical switchgear and transformers for industrial, commercial and utility markets. The new facility required the design and construction of the light industrial building and the associated site circulation, storage yard, and security fencing. In addition to the operational space, staff and visitor parking was designed to access the more public facing spaces. The project required close coordination with Battle Ground and the Washington Department of Ecology to ensure compliance with the Western Washington Storm Water Management Manual. Concerns over oil from process tanks and storage of transformers was a critical part of the project approvals. FLATHEAD ELECTRIC COOPERATIVE MASTERPLAN & SITE DESIGN | Kalispell, Montana Toby was the professional of record for the master plan and implementation of a number of projects at Flathead Electric’s 10-year masterplan. The masterplan relocated an existing county road that bisected their facility and planned locations and circulation for the Member Services Expansion, Line Truck Bay Expansion, Vehicle Maintenance Facility, and the storage yard for poles, transformers, conduit, wire, etc. Design efforts included the site, utility (phone, power, water, sewer, storm), and grading designs. During construction, Jackola provided periodic inspection and coordinated closely with FEC and the general contractor on the project. SKILLS • Design • Water, Stormwater Design • Campus Planning • Master Planning Support 21 YEARS of EXPERIENCE LOCATION Kalispell, MT REGISTRATION Civil Engineer MT - PE 18994 EDUCATION Bachelor of Science, Civil Engineering University of Vermont KEY STAFF RESUMES 30 RORY YOUNG, PE BUSINESS DEVELOPMENT OFFICER | PRINCIPAL IN CHARGE Rory has designed water distribution systems to meet DEQ and City of Kalispell standards including the layout of several subdivisions and site developments. Rory has years of experience working with City Standards and has collaborated with Public Works on numerous site challenges. In addition, he has coordinated and designed a one-mile water main extension near Watford City, North Dakota. Coordination with the City, neighboring developers, and WAWSA ensured the smooth installation of this water main. Relevant projects include: Eagle Valley Ranch Subdivision, Stillwater Bend Subdivision, and Pheasant Ridge Water Supply. AFFILIATIONS City of Kalispell Planning Board Member (2011-Present) Leadership Flathead Class of 2011 31 YEARS of EXPERIENCE LOCATION Kalispell, MT REGISTRATION Civil Engineer MT PE-18404 EDUCATION Bachelor of Science Civil Engineering University of Cape Town, South Africa Peterhouse College, Marondera, Zimbabwe KEY STAFF RESUMES BLM FORT BENTON EQUIPMENT STORAGE FACILITY | Fort Benton, Montana Rory is responsible for managing the IDIQ contract and associated task orders including: Hundreds of dam assessments, repairs and reconstruction across Montana and Wyoming, design and construction of the Fort Benton Storage Facility, Lewistown Fire Warehouse, Pompey’s Pillar Boardwalk accessibility redesign, SICASHE assessments, Little Sheep Cabins, and LaBarge Watershed. Rory’s diverse background in construction and design were instrumental in smoothing the path for these varied multi-discipline task orders. EAGLE VALLEY RANCH | Kalispell, Montana Jackola has provided full land planning, surveying, engineering, and construction administration services for the Eagle Valley Ranch subdivision. Rory project managed the design work and construction staking in addition to stormwater design for this multi-phase, mixed-use project. Jackola designed the sewer collection system along with the full city street improvements while evaluating the need for a sewer lift station. As PM, Rory was responsible for all stormwater design and management plans. The project involved coordination with multiple governing entities including the Montana Department of Transportation, the City of Kalispell, and the Montana DEQ to meet each entity’s design and construction requirements. STILLWATER BEND | Kalispell, Montana The Stillwater Bend project consisted of master planning for a 50-acre site as well as engineering of the 25-acre Phase 1 development to meet City of Kalispell standards. This included a lift station and traffic signal coordination as well as new utility extensions and roads to serve lots along the US 93 North commercial corridor. Public paths and buffer landscaping which met City requirements were also developed and constructed. During the final plat process, Jackola worked with the developer and the developer’s real estate agent to negotiate a major property sale to a separate developer.  Rory served as Project Manager for this subdivision. XANTERRA TRANSPORTATION FACILITY | Columbia Falls, Montana Project Manager on this 27,500 SF building designed for servicing and winter storage of the Glacier National Park Red Bus fleet. Jackola provided full design and construction administration services. The project began with a full-day design charette at the Jackola office, bringing together owners, management, and staff. Early intensive review and full team buy-in allowed design to proceed quickly with minimal backtracking, leading to fast-track construction completed under budget and two weeks early. Rory was closely involved as PM from the design charette through final walk-through. 31 KEY STAFF RESUMES Drew is a licensed Civil Engineer with experience in many types of projects. He has guided clients throughout the design process including working with the local and state governments to acquire funding and get plan approval. Drew’s experience involves designing site plans for commercial/retail land development, subdivision design, roadway and trail design, and stormwater runoff solutions. DREW DIGMAN, PE SUPERVISING CIVIL ENGINEER SKILLS • Civil Design • Site Utility Design • Site Earthwork Design 7 YEARS of EXPERIENCE LOCATION Kalispell, MT REGISTRATION Civil Engineer MT PE-101374 EDUCATION Bachelor of Science Civil Engineering Iowa State University SPARC | Spokane, Washington Jackola provided design-build service for Spokane Addiction Recovery Centers (SPARC) for a new 13,000 sf facility to meet growing demand for inpatient and outpatient treatment. Drew was the civil engineer on the project and designed the site layout, utility layout and stormwater design for the new building. Drew designed the site in coordination with the large existing grade change to develop a layout that fit the natural site slopes. Construction is underway and expected to complete in summer 2026. DACIA WAREHOUSE | Columbia Falls, Montana Civil Engineer on the project, Drew designed the site layout, utility layout, stormwater design, and paving design for a new warehouse building. Drew designed this site in coordination with existing buildings and utilities on site and worked with the owner to develop a layout that worked with their process and existing facilities to minimize downtime and increase efficiency. DEWR OFFICE FULL DESIGN | Ronan, Montana Civil Engineer on the project, Drew designed the site layout and paving design for a new 20,000 SF operational building for the DEWR (Department of Engineering and Water Resources) Office. Drew designed this site in coordination with the existing building on site and worked with the tribe to develop a site plan that met their needs, including locating covered parking spots with solar panels and multiple EV charging stations on the site. KALISPELL SUPERWASH | Kalispell, Montana Drew is the Project Manager and Civil Engineer for this project, leading the design of the site layout and paving for the Kalispell Superwash development. He designed the 1.14-acre site to accommodate a 90-foot car wash tunnel, an RV wash bay, a dedicated pet wash building, a 1,200 SF retail building, and two on-site 4-plex apartment buildings. Throughout the project, Drew collaborated closely with the client to refine the subdivision layout and delivered efficient, well-considered design options to maximize the site’s overall functionality and long-term use. 32 KEY STAFF RESUMES Kagan is the Principal/Senior Engineer of Alpine Geotechnical, LLC, which was founded in January 2015. Alpine practices in geotechnical consulting and construction materials testing. We provide geotechnical drilling services, geotechnical laboratory testing and analysis, and geotechnical consultation. Our testing laboratory is accredited by AASHTO RE:SOURCE in soils, concrete, and asphalt mixture. Kagan has overseen materials engineering and testing projects in the Flathead Valley since 2006, which typically include commercial and infrastructure projects. Work history includes extensive experience with laboratory testing, field testing, and project management for large and small projects. Our company strives to provide specific input for specific project needs and provide timely and accurate test results. In 2022, Alpine purchased a new Diedrich D-50 geotechnical drilling rig, and has expanded the laboratory capabilities to include unit weight, unconfined compressive strength of soils, and one-dimensional consolidation of soils. KAGAN RUTZ, PE PRINCIPAL | SENIOR ENGINEER CERTIFICATIONS • Montana Monitor Well Constructor License: #771 • FACE Certified F-Number Measurements for Floor Slabs • NRC Nuclear Densometer Operator Training 24 YEARS of EXPERIENCEE LOCATION Kalispell, MT REGISTRATION Civil Engineer MT PE-15417 EDUCATION Bachelor of Science Civil Engineering Montana State University LIFT STATION 19 REPLACEMENT AND EMERGENCY STORAGE | Evergreen, Montana Performed geotechnical drilling, laboratory testing, and geotechnical analysis for a new sewage lift station and emergency overflow storage tank. The project included subsurface investigation, geotechnical analysis and report that included foundation recommendations for a large mat foundation below the groundwater level. Subsequent additional consultation and subsurface exploration via sonic drilling occurred in 2025 and Alpine assisted with subsurface lithology and consultation relating to shoring and dewatering of this complex project GLACIER PARK INTERNATIONAL AIRPORT | Flathead County, Montana Geotechnical Engineer. Performed geotechnical drilling, laboratory testing, and geotechnical analysis for a complete rehabilitation of Runway 2/20. The project included subsurface investigation, geotechnical analysis and subcontracted nondestructive testing via Falling Weight Deflectometer and Ground Penetrating Radar. STOCKMAN BANK | Kalispell, Montana 2024 Oversaw geotechnical drilling, laboratory testing, and geotechnical analysis for a large private bank building that included substantial loading and full basement near the groundwater level over soft, compressible soils to significant depth. Analysis for long term settlement and recommendations for wick drain installation, pre loading via earth surcharge, and settlement plate installation and monitoring. KALISPELL ELEVATED COMPOSITE WATER TANK | Kalispell, Montana 2022-2023 Served as geotechnical engineer and drilling contractor for a new elevated composite 1M gallon water tank to serve north Kalispell. Provided site specific geotechnical recommendations for drilled shaft and driven pile foundations and assessed numerous alternatives for foundation support. 33 KEY STAFF RESUMES Cliff is a Staff Geological Engineer has 7 years of experience with soils, aggregates, and asphalt according to all ASTM & AASHTO standards and his education and experience provides relevant geology and engineering input to projects. CLIFF S. CLARK STAFF GEOLOGICAL ENGINEER | ENGINEERING TECHNICIAN II CERTIFICATIONS • ACI Field Testing Technician, Grade I • Nuclear Density Gauge Safety Training • Certified GIT (Geologist-in-Training) 7 YEARS of EXPERIENCE LOCATION Kalispell, MT EDUCATION Bachelor of Science Geosciences University of Montana Masters of Engineering Geological Engineering Montana Technological University ENGINEERING Cliff’s geotechnical engineering experience includes numerous site investigations and preparation of geotechnical reports, and his education and expertise in soil and rock mechanics make him highly skilled in slope stability, earth retention, and shallow and deep foundation design. SOILS Cliff has performed laboratory soils tests including sample preparation, sieve analysis, Atterberg limits, moisture-density relationship, consolidation, direct shear, and triaxial testing. He has performed nuclear field density and moisture content tests on native soils and a variety of manufactured base/subbase materials. AGGREGATES Laboratory tests performed include sample preparation, sieve analysis, coarse and fine aggregate specific gravity, clay lumps and friable particles, organic impurities, and fractured faces determination. PORTLAND CEMENT CONCRETE Cliff has performed laboratory and field quality control tests for Portland cement concrete, including compressive strength, slump, air content, unit weight, and flexural strength. ASPHALT CEMENT CONCRETE Cliff has assisted with many aspects of asphalt concrete testing, including ignition oven asphalt content, aggregate gradation, Marshall density/theoretical maximum density, core density, stability and flow. He has obtained drilled cores of asphalt concrete, trimmed, and measured their bulk specific gravity and voids. MASONRY Cliff has performed masonry mortar tests including compressive strength of mortar and grout compressive strength. KALISPELL, MT | BOZEMAN, MT | VANCOUVER, WA JACKOLA.COM MAKE SOLUTIONS PERSONAL. THANK YOU FOR THIS OPPORTUNITY