BSPARK Kalispell RFQ New Central Garage Shop & Solid Waste Equipment StorageProposal to Provide Architectural Services for
410 Central Ave #506
Great Falls, MT 59401
406.453.0001
January 16th, 2026
Submitted to:
Attn: Susie Turner
Director of Public Works
406-758-7852
sturner@kalispell.com
The City of Kalispell
New Central Garage Shop and Solid Waste Equipment Storage
2 | City of Kalispell - New Central Shop and Solid Waste Equipment Storage
Description of company, Organization Chart including
Montana licenses
Service Capabilities, similar projects with references
Qualifications
(Full resumes included in Appendix A)
Project understanding and approach
BSPARK’s proposed approach to the project, including
scheduling
Current workload and ability to proceed.
Table of Contents
3.2. Cover Letter
3.3.1. General Information
3.3.2. Relevant Company
Experience
3.3.3 Company Qualifications
3.3.4 Contract Understanding
and Approach
3.3.5 Approach to Contract
Management
3.3.6 Other Factors
pg. 3
pg. 5
& 6
pg. 7
& 11
pg. 6
pg. 8
pg. 9
& 10
pg. 9
Re: Statement of Qualifications – Central Garage and Solid Waste Facility Design Services
Dear Susie and the City of Kalispell,
Thank you for the opportunity to submit our qualifications for the Central Garage and Solid Waste Facility design
services. BSPARK Architecture and Morrison-Maierle Engineering are prepared to deliver functional, durable
facilities that will serve Kalispell’s operations efficiently for decades.
What this project demands:
We understand that the City of Kalispell is in need of two new buildings to support their operations. These
buildings include a new Central Garage Shop, including various spaces to accommodate materials, tools, parts and
equipment necessary to comprehensively maintain the city’s fleet. This facility will also have office and break room
facilities included. Also included is a new Solid Waste Equipment Storage Building that will serve as heated storage
for the city’s trucks, with no accommodation for maintenance operations.
What we bring:
BSPARK Architecture has delivered similar projects including the Great Falls Emergency Services Ambulance
Barn, Montana Fish Wildlife & Parks facilities, the Great Falls College MSU welding shop, the Great Falls Police
Department Evidence Expansion, and others. Our team has successfully managed projects of comparable
complexity using GCCM/CMGC methods where early contractor involvement and cost control were essential.
We routinely coordinate multi-site projects, integrate civil and utility improvements, and design for harsh winter
conditions.
As a women-owned, DBE-certified Public Benefit Corporation, BSPARK is dedicated to creating value for
communities through work with non-profits, housing, local municipalities and state, and federal institutions.
Our team is led by Keith Ballantyne, Principal supported by Montana-licensed specialists in architecture, civil,
structural, MEP, and fire protection engineering, committed and available to begin immediately.
You can expect:
We will be a design partner that listens, responds, and makes this project straightforward to manage, reducing risk,
respecting resources, and delivering documentation that supports a competitive bid and successful Summer 2027
construction.
We welcome the opportunity to discuss our approach and demonstrate how our experience aligns with Kalispell’s
needs.
Sincerely,
Keith Ballantyne, Principal Sophia Sparklin, Founding Principal
BSPARK Architecture BSPARK Architecture
3 | City of Kalispell - New Central Shop and Solid Waste Equipment Storage
[Section 3.2]
JANUARY 16TH, 2026
410 Central Ave #506
Great Falls, MT 59401
4 | FWP Bundle #20
Firm Information
MT FWP Region 4 Headquarters
Great Falls, MT
5 | City of Kalispell - New Central Shop and Solid Waste Equipment Storage
[Section 3.3.1]
BSPARK Architecture is a Montana-based architectural design and
planning firm with projects from Great Falls to Scotland. As a Public
Benefit Corporation, we focus on projects that make a difference. Originally
started in 2013 as Spark Architecture, BSPARK is now led by award-winning
principals Sophia Sparklin and Keith Ballantyne, each with over 20 years of
experience.
Our portfolio of architectural, interior design and planning projects spans
small-scale renovations to full-scale neighborhood development designs.
We work collaboratively with developers, government agencies, nonprofits,
companies and individuals alike and are proud to serve the Great Falls area
and beyond.
BSPARK’s team of curious, growth-oriented, friendly architects and support
staff mixes vision with pragmatism. We are motivated to support our
client’s goals with a custom approach to design excellence. To achieve
excellence, we explore deeply to understand your project’s needs and
opportunities. We push the boundaries to create designs that truly deliver
value. We bring projects to fruition that leave a legacy of inspiration.
Type of Ownership
2021 Public Benefit
Corporation
HUBZone Certified
Montana DBE Certified
Years in Business
10 as Spark Architecture
22 as Ballantyne Design
Associates
5 as BSPARK Architecture
Size of Firm
3 Licensed Architects
1 Interior Designer
1 Operations Coordinator
1 Drafter
Services
Architecture
Planning
Interior Design
Historic Preservation
Sustainable Design
Sectors
Multi-Family Housing/
Mixed-Use
Neighborhood/
Community Planning
Parks & Recreation
Education
Office & Workspace
Commercial/ Retail
Civic & Cultural
Custom Residential
Architecture that makes a
positive impact on the way
we live, work, learn, and
experience community...
and on how we interact
with natural and economic
ecosystems.
BSPARK ARCHITECTURE
410 Central Ave #506
Great Falls, MT 59401
406.453.0001
bsparkarch.com
6 | City of Kalispell - New Central Shop and Solid Waste Equipment Storage
[Section 3.3.1]
BSPARK and Morrison - Maierle*
Consultants
Northwest Precon | Cost Estimating
Dan Deymonaz, Owner/Senior Cost Estimator
Sophia Sparklin
Founding Principal | BSPARK
Keith Ballantyne
Principal/Main Client Contact - BSPARK
Itzai Bazan
Architect | BSPARK
As the main point of contact,
Keith Ballantyne will be your
direct link to a team committed
to collaboration. This structure
reflects our belief that a
successful project comes from
listening, adapting, and working
together.
* Full team resumes can be found in Appendix A
Tyece Pool
Interior Design - BSPARK
Morrison - Maierle | MEP Engineering
Sam Kuhlin, PE | Mechanical Engineer
Kevin Ireland, PE | Mehanical Engineer
Tanner Evenson, PE | Structural Engineer
Branton Sorbel, PE | Structural Engineer
Amy Galt, PE, LEED, AP BD+C | Electrical Engineer
Rick Hiebert, PE | Electrical Engineer
Pete Weber, RCDD | Senior ICT Designer
Kyler Harkins, PE | Low Voltage Engineer
Russell Williams, PE, NICET III | Fire Protection Engineer
Trent Pearson, PE | Fire Protection Engineer
CR Leisinger, PE | Civil Engineer
Dominic Goble, PE | Civil Engineer
7 | City of Kalispell - New Central Shop and Solid Waste Equipment Storage
From Left to Right: MSU Welding Shop
Great Falls, Montana. GFES Ambulance
Barn Great Falls, Montana. Project sites
throughout Montana.
3.3.2 a SERVICE CAPABILITIES:
BSPARK Architecture has experience in designing functional public facilities for Montana municipalities and
agencies. Our work emphasizes durability, operational efficiency, and designs suited to harsh winter conditions. We
coordinate multi-discipline teams and manage projects from programming through construction closeout.
Morrison - Maierle’s Team brings direct experience with warehouse, shop, and operations-focused facilities similar
in scale and function to the City’s proposed Central Garage and Solid Waste Equipment Storage Building. Relevant
local projects include the Kalispell School District Transportation & Maintenance Facility, and the City of Whitefish
Maintenance & Receiving Facility.
We routinely collaborate with municipal owners and architects to deliver cost-effective, constructible designs that
support long-term operations. Morrison-Maierle’s familiarity with Kalispell, Whitefish, and Flathead Valley conditions
allows us to anticipate site constraints, utility coordination needs, and challenges early to reduce risk and supporting
efficient project delivery for the City.
3.3.2 b - SEE PG 10.
3.3.2 c EXPERIENCE WITH GCCM PROJECT DELIEVERY:
The GCCM project delivery method is gaining considerable traction, and for good reason. Bringing design and
construction teams into closer collaboration from the start consistently produces better outcomes in both cost
control and project success.
While our direct experience with GCCM is admittedly limited, we’ve completed numerous projects using similar
Design/Build models that align closely with the GCCM approach. We’ve been advocates for this collaborative delivery
method for years, and we’re pleased to see it proposed for this project. This approach offers real advantages for
keeping the work on schedule and within budget.
3.3.2 d LIST AND DESCRIBE ANY LITIGATION, ARBITRATION, OR CLAIMS FILED:
BSPARK Architecture has no history of litigation, arbitration, contract disputes, negligence claims, or premature
termination from any services agreement.
3.3.3 a - SEE APPENDIX A
8 | City of Kalispell - New Central Shop and Solid Waste Equipment Storage
3.3.4 b
BSPARK Architecture is based in Great Falls, approximately 200 miles from Kalispell. While we do not maintain
a physical office in Flathead County, this distance is manageable through a combination of scheduled site visits,
virtual coordination, and our partnership with Morrison-Maierle, which has offices throughout Montana including
Kalispell.
Coordination with local permitting authorities and utility providers will require early engagement to avoid schedule
delays, particularly given the Summer 2027 construction target.
3.3.4 c
We schedule site visits to coincide with key project milestones and combine trips when multiple meetings are nee-
ded. For day-to-day coordination, we use video conferencing, cloud-based document sharing, and regular phone
communication to stay responsive without requiring travel for every decision.
Our partnership with Morrison-Maierle provides additional Montana coverage and local knowledge. We will establish
early contact with City planning staff, building officials, and utility providers to identify any permitting or infrastruc-
ture issues before they affect the schedule.
3.3.3 b LICENSES:
All of our architectural and engineering staff maintain needed licenses to
practice within the state of Montana. Many of our staff also have additional
licenses for surrounding states as well. To maintain these licenses many staff
go through hours of continuing education each year, ensuring that our staff
is always staying up to date on changing education requirements. All of our
registered architects maintain their professional records through
the National Council of Architectural Registration Boards (NCARB), which
ensures compliance with current requirements and regulations.
CONTRACT UNDERSTANDING AND APPROACH
3.3.4 a
The City of Kalispell needs two purpose-built facilities to support ongoing operations. The first is a 13,500 square foot
Central Garage Shop designed for fleet maintenance, service, and repair. This building will include a welding bay,
light duty service bay, cold tire storage, two to three working shop bays accommodating repurposed lifts, a parts and
tool room, oil storage, office space, break room, and equipment storage. Ceiling and door heights must allow staff to
service the full range of city vehicles and equipment inside the building.
The second facility is a 5,000 square foot Solid Waste Equipment Storage Building providing heated storage for four
trucks with 14’ x 14’ overhead doors. This building requires no water, sewer, or office space.
The City is evaluating two site options. The first would place both buildings on the westerly portion of the existing
city complex. The second would locate the Central Garage within the Westside Tax Increment District, taking advan-
tage of eligible WTIF funding, while the Solid Waste building remains at the city complex. This decision will shape
early design work, and if the WTIF option moves forward, our team is prepared to assist with property procurement.
The project scope encompasses full design services from programming through construction administration, with
civil, structural, mechanical, electrical, plumbing, and fire protection engineering. The City has established a timeline
calling for design completion by December 2026 and construction starting in Summer 2027.
9 | City of Kalispell - New Central Shop and Solid Waste Equipment Storage
3.3.5 a & b
APPROACH TO CONTRACT MANAGEMENT:
We begin with a kickoff meeting to confirm project goals,
stakeholder roles, communication preferences, and de-
cision-making authority. During programming, we work
directly with City staff and department users to docu-
ment operational requirements, adjacencies, and any
constraints that will shape design.
Once programming is complete and a site is confirmed,
we move into schematic design with regular check-ins
to ensure the City remains informed and in control of key
decisions. We establish a clear protocol for document
submittals, reviews, and approvals so that nothing stalls
waiting for unclear direction.
Throughout design, we coordinate with the City’s se-
lected GCCM contractor to incorporate constructability
input and maintain alignment between design intent
and budget reality.
BUDGET MANAGEMENT:
We manage budgets proactively through early collabora-
tion with third-party cost estimators to establish realistic
assumptions and identify risks. Design begins with a 20%
contingency that decreases as scope clarity increases.
We maintain updated schedules tracking milestones,
reviews, permitting, and construction timelines, shared
regularly with the City.
Cost estimates are prepared at 35%, 65%, and 95% design
completion per the RFQ and reviewed with the City and
GCCM contractor to address concerns while adjustments
are still feasible.
From Left to Right: GFES Ambulance
Barn, Great Falls, Montana. MSU Welding
Shop Great Falls, Montana. Community
Engagement throughout Montana.
A dedicated project manager is assigned at initiation
as the City’s primary contact, with workload tracking to
ensure staff availability. Decision logs and meeting notes
document key choices, ensuring continuity and protec-
ting all parties during construction.
3.3.6 CURRENT AVAILABILITY:
Morrison-Maierle’s team has current capacity to fully
support this project and meet all project schedule requi-
rements. Each member maintains availability for focused
effort on the City of Kalispell’s project. Should unplanned
circumstances arise, our deep bench of multidisciplinary
professionals across offices allows assignment of equally
qualified personnel to ensure continuity, schedule ad-
herence, and consistent quality throughout the project
timeline,
BSPARK’s small team size ensures dedicated attention
throughout the project lifecycle. With several projects
currently closing out construction administration, we
have full capacity for the City of Kalispell’s project upon
contract execution. While you’ll have a primary contact,
our collaborative structure allows all members to provide
support as needed, ensuring consistent focus and conti-
nuity to meet the City’s schedule for design completion
by December 2026.
We have generated an
assumed timeline for delivery
of this project based on our
understanding of the scope
and effort required.
SCHEDULE
Our milestone schedule is based on our
current understanding of the project.
As we move forward, the timing of key
meetings and the speed of decision
-making will affect the overall timeli-
ne. That means the schedule may shift
slightly either moving faster or taking
more time, depending on how these
elements unfold.
To make the schedule truly effective, we
will review it with you at project kick-
off and adjust it to reflect your specific
needs, milestones and approval points.
INITIAL SITE VISIT (PD)
• Define project priorities and
overall scope
• Understand budget goals
• Evaluate the site and building
• Analyze major systems (HVAC,
electrical, etc)
• Develop preliminary project
budget.
SCHEMATIC DESIGN (SD)
• Develop site & Spatial options
to optimize bulding & site effi-
ciences
• Evaulate initial systems options
• Develop Initial cost models
DESIGN DEVELOPMENT (DD)
• Finalize site & building plans
• Finalize structural & MEP sys-
tems
• Refine cost models & adjust
systems selection to respond to
needs.
• Schematic Design (SD)
CONSTRUCION DOCUMENTS (CD)
• Detailing & Documenting and
through coordination of all
disciplines in coordination with
chosen GC to ensure complete
& comprehensive package for
construction
• finalize cost models
• permitting
10 | City of Kalispell - New Central Shop and Solid Waste Equipment Storage
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Request for Proposals (RFP)
Pre-Design (PD)
Initial site investigation & project brief
Develop project budget
Schematic Design (SD)
Spatial configurations
Site development
Systems evaluation
Cost analysis (35%)
Design Development (DD)
Refine & finalize layouts
Refine & finalize structural + MEP systems
Refine & finalize site configurations
Cost analysis (65%)
Client review (2 wks) DD
Construction Documents (CD)
Detailed documentation (all disciplines)
Finalize cost analysis (95%)
Client review (2 wks) CD
Permitting / ready for construction
Delivery (end of Dec)
Construction: Summer 2027
2026
★★CONTRACT
★★ DELIVERY
MSU Welding Shop
Great Falls, MT
Firm’s Previous Project Experience
Including Project References
12 | FY 2025/26 Professional Services Qualifications Proposal
Great Falls College MSU Welding Shop
GREAT FALLS, MT
Building Area
15,000 SF
Construction Cost
$1M
Completion
2016
Team
Sophia Sparklin
Client Reference
Susan Wolff, PhD
Greats Falls College
MSU CEO, Retired
(406) 771-4300
The expansion and remodel of the Great Falls College MSU Welding
Shop supports several trade-related program components, including the
college’s Welding and Industrial Tech Programs. Our scope encompassed
two buildings and included offices, classrooms, labs, shop areas, outdoor
storage yard, and advanced industrial air filtration. Construction under
partial occupancy required careful attention to academic scheduling. The
BSPARK team provided assistance with various reporting and compliance
requirements for this state-owned, federal EDA grant-funded project.
R4HQ Garage Addition
Montana Fish Wildlife and Parks
GREAT FALLS, MT
The region headquarters needed additional storage space on their limited
campus. The existing garage had functioned well as cold storage for many
years but suffered from ongoing maintenance issues caused by persistent
woodpecker damage. The birds bore holes through the EIFS siding, a
material used across many buildings on campus. Adjacent to the garage sat
an old, undersized, and deteriorating detached structure that was removed
to make room for extending the existing facility with two additional large
storage bays.
As part of this expansion, we were tasked with re-siding the entire facility to
eliminate the constant maintenance burden caused by the EIFS. We had
recently designed the new Admin Office on this campus using a cement-
based siding material, but FWP determined they preferred metal for
future work. Using the color scheme established on the Admin Office, we
developed a siding approach that is both handsome and durable, and is
slated to be incorporated on the remaining facilities in the coming years.
Building Area
1400SF
Construction Cost
$300K
Completion
2025
Team
Keith Ballantyne
Itzai Bazan Cerda
Client Reference
Kevin Harrington, PM
Montana FWP
Kevin.Harrington@
mt.gov
406-841-4002
BEFORE
14 | FY 2025/26 Professional Services Qualifications Proposal
Great Falls Ambulance Barn
GREAT FALLS, MT
Building Area
3,500 SF
Construction Cost
$748,258
Completion
Est. 2025
Team
Keith Ballantyne
Itzai Bazan
Client Reference
Justin Grohs
Great Falls Emergency
Services
jgrohs@gfes.net
(406) 453-5300
BSPARK Architecture was hired to provide full architectural and engineering
services for adding an ambulance barn at the existing Emergency Services
campus. The building is designed to accommodate four ambulances in a
drive-through facility. No repair work is to be performed in this space, but
cleaning and equipping with adequate space to perform these tasks is
imperative. The building is a pre-engineered, moment-framed structure
with in-floor heating to help melt wintertime ice and snow that falls from the
vehicles. As part of the project, we are converting two of the former parking
bays in the existing garage into a training room for use by local and out-of-
town departments.
This warehouse consolidates and expands storage facilities previously
scattered throughout the Great Falls area. Construction is underway, with
completion scheduled for late Spring 2026.
The facility is designed for low-hazard storage and will be fully sprinklered
throughout. It features ten loading bays with dock levelers, along with
dedicated office and service areas. The building sits on a new site that re-
quired extensive soil remediation to address expansive soil conditions and
ensure long-term structural stability across the facility's footprint.
Site development includes employee and public parking, heavy vehicle
access for delivery trucks, comprehensive landscaping, and stormwater
management infrastructure. The site plan accommodates future expan-
sion as operational needs grow.
Area:
115,000 SF
Construciton Cost:
$17M
Completed:
Spring 2026
Team:
Keith Ballantyne
Itzai Bazan Cerda
Client Reference:
Blane Sherrit
Director of Operations
406-781-7777
BEFORE
Admiral Beverages Warehouse
GREAT FALLS, MT
We create solutions to build better communities | m-m.net
Morrison-Maierle provided site civil, structural, mechanical-HVAC,
plumbing, electrical, fire Protection, and ICT engineering services for three
new office/maintenance facilities for the School District in Kalispell, Montana.
Both the Transportation and Maintenance buildings include office space
for school district employees as well as vehicle bays to repair, maintain, or
store district vehicles. The Transportation Building functions as the hub for
the district’s bus program and includes a 35’-0” mechanic’s pit and a wash
bay. The Maintenance Building serves as a receiving and storage facility for
the district’s building and includes a 1,000 sq. ft. print shop for all Kalispell
SD5 schools. The Storage Building is exclusively used for covered equipment
storage.
This project was completed under the General Contractor/Construction
Manager project delivery method, with Martel Construction working
as the GC/CM. The project was broken into two bidding packages: a
foundation and pre-engineered metal building package to expedite building
manufacture with the final site and a fit-out package issued separately.
• The site accommodates 50 schools buses as well as public access.
• An exhaust/ventilation system was implemented in the vehicle bays for air quality. In-floor radiant heating was also installed.
• The vehicle bays are outfitted with linear trench drains while the wash bay drained into a grated floor sump, both of which drained to a sand/oil interceptor as to not pollute our water source.
• The campus is secured with access control and cameras.
KALISPELL TRANSPORTATION AND MAINTENANCE FACILITY
KALISPELL, MT
REFERENCEMicah Hill Superintendent, Formerly Kalispell School District (now Missoula) (406) 728-2400, ext. 1022 mhill@mcpsmt.org
BUILT2023
COST$6.6M
PROJECT SIZE20,300 SF
SERVICES
PROVIDED• Site Civil• Structural• Mechanical-HVAC• Plumbing• Electrical• Fire Protection• ICT
We create solutions to build better communities | m-m.net
Morrison-Maierle provided industrial, civil, structural, mechanical,
plumbing, and electrical engineering services for the Round Mountain
Truck Shop Complex (RMT). The facility includes a 127,000 sq. ft. and a
warehouse complex. The truck shop has 10 shop bays with overhead
traveling cranes. The Lube Storage Room is 11,400 sq. ft. and houses tanks
ranging from 5,000 to 12,000 gallons in size to store the various oils and
lubes required for equipment maintenance. From the Lube Room, the
fluids are pumped into distribution pipelines to the hose and reel racks
at each of the bays. The Truck Shop and Lube Room have 27,800 sq. ft.
of concrete apron to facilitate proper drainage and provide tire storage
for the facility. The Complex also has 24,190 sq. ft. of office space for the
Mobile Maintenance management and support staff. The Truck Shop
and Lube Room have 27,800 sq. ft. of concrete apron to facilitate proper
drainage and provide tire storage for the facility. The Complex also has
24,190 sq. ft. of office space for the Mobile Maintenance management and
support staff.
ROUND MOUNTAIN TRUCK SHOP COMPLEX
ROUND MOUNTAIN, NV
BUILT2023
COST$6.6M
PROJECT SIZE20,300 SF
SERVICES
PROVIDED• Site Civil• Structural• Mechanical-HVAC• Plumbing• Electrical• Fire Protection• ICT
REFERENCEIsabel Espinoza Kinross Gold Corporation (416) 455-6457 isabel.espinoza@kinross.com
We create solutions to build better communities | m-m.net
The Ravalli Electric Co-op is a nonprofit electrical utility provider in Ravalli County, MT. Serving over 10,000 members, giving back to the community and sustainable operations are two of the Co-op’s main goals. Keeping these two priorities in mind, Morrison-Maierle provided energy-efficient and sustainable mechanical, electrical, and structural engineering designs for the 58,000-square-foot Co-op’s new multi-building workplace.
It was important to vary the structural systems to balance performance and cost. The office space was light-framed, wood construction with steel members to provide wider window bays. Prefabricated metal buildings were linked to create a continuous space for the vehicle storage areas. And the vehicle wash area was built with CMU blocks to allow long-term durability.
Morrison-Maierle installed an all-electric, cost-effective, energy-efficient HVAC system. The system was designed to ensure longevity and efficiency. Filtered fresh air gets circulated through the building through energy recovery ventilation. All air that enters the building for ventilation is now exhausted, promoting a healthy, active environment.
Lighting modeling software was used to determine lighting needs for each space. High-bay and aisle-way lighting is used in larger warehouse spaces; vapor and watertight fixtures are used in the vehicle washbays; and offices, conference rooms, and training rooms are provided with full dimming capability.
RAVALLI ELECTRIC CO-OP
HAMILTON, MT
BUILT2019
COST$12.3M
PROJECT SIZE58,264 SF
SERVICES
PROVIDED• Site Civil• Structural• Mechanical• Plumbing• Electrical
REFERENCEMark Grotbo General Manager Ravalli Electric Co-Op mgrotbo@ravallielectric.com
Dennis Schneiter Board of Directors, District 1 Ravalli Electric Co-Op rcec1@ravallielectric.com
Appendix A: Team Resumes
Great Falls Emergency Services Ambulance Barn
Great Falls, MT
Appendix A | City of Kalispell - New Central Shop and Solid Waste Equipment
Storage
Keith Ballantyne MArch, NCARB
PRINCIPAL/ DIRECTOR OF DESIGN AND CONSTRUCTABILITY
EDUCATION
• Post-graduate Research and
Teaching, University of Edinburgh,
School of Arts, Culture and
Environment, Department of
Architecture Edinburgh, Scotland,
2008
• Masters of Architecture (M. Arch),
Montana State University, Bozeman,
1992
CREDENTIALS
• Licensed Architect, Montana #2268
• Licensed Architect, Washington #7011
• Licensed Architect, Idaho #AR-
987473
• NCARB Certificate #48646
PROFESSIONAL & COMMUNITY
AFFILIATIONS
• President, Fort Benton Chamber of
Commerce, 2011- 2021
• Member, Bear Paw Development
Corporation Strategy Committee,
2017-present
• Board Member, Community
Improvement Association, Fort
Benton, MT, 2018-present
• Board Member, Tax Increment
Finance District, Fort Benton, MT,
2016-present
• Advisory Board Member, Vibrant
Futures - regional planning initiative
as part of a HUD Sustainable
Communities grant, 2012-2015
• Board Member, River & Plains Society,
Fort Benton, 2013-2019
With over 30 years of experience in the field, Keith is a knowledgeable
and intuitive architect. Prior to joining BSPARK, Keith led his Fort
Benton-based firm, Ballantyne Design Associates, for 13 years. Highly
talented at understanding separate elements of a project and
aligning them with the context of production, he provides efficient,
workable and well-designed solutions. During his career, Keith has
been able to work and teach abroad, gaining invaluable international
experience reflected in his work. His particular professional interests
lie in contemporary architecture, architectural technology and
architectural narrative.
SELECT RELEVANT EXPERIENCE
-Montana Department of Transportation Headquarters Remodel,
Wolf Point, MT
-Baatz Building Apartments, Great Falls, MT
-Parkdale 2-1 Housing Project, Great Falls, MT
-The Gibson Hotel Renovation, Great Falls, MT
-Great Falls Police Department Evidence Room Expansion, Great
Falls, MT
-Great Falls Emergency Services Ambulance Barn, Great Falls, MT
-Great Falls Family Services Salvation Army Renovation, Great Falls,
MT
COMPLETED WHILE AT BDA & PREVIOUS FIRM
-Holley Mason Building, Spokane, WA
-Chouteau County Courthouse Historic Window Replacement, Fort
Benton, MT
-Big Sandy Branch Library, Big Sandy, MT
-First Security Bank Remodel, Fort Benton, MT
-Fort Benton City Hall Remodel & Renovation, Fort Benton, MT
-Globe Hotel, Spokane, WA
-John Good Agency Offices, Fort Benton, MT
-Lacey Building, Helena, MT
-Little River Institute Remodel & Elevator Installation, MSU Northern,
Havre, MT
-Malta Opportunities Inc. Day Activity Center Renovation,
Malta, MT
-Montvale Block, Spokane, WA
-Murphy Neel Building Restoration, Fort Benton, MT
-Oddfellows Hall, Spokane, WA
Appendix A | City of Kalispell - New Central Shop and Solid Waste Equipment
Storage
EDUCATION
• Master of Architecture, Arizona State
University, Tempe, AZ, 2005
• Bachelor of Arts, Architecture,
Karlsruhe Institute of Technology,
Germany, 2003
CREDENTIALS
• Licensed Architect, Montana #3345
Licensed Architect, Arizona #51765
• NCARB Certificate #72609
• LEED and WELL Accredited
PROFESSIONAL & COMMUNITY
AFFILIATIONS
• Representative AIA Northwestern
and Pacific Region 2021
• AIA National Strategic Council
Representative Montana 2022-2023
• Board Member, AIA Montana
2013 - 2020
• President, AIA Montana, 2020
• Chair AIA NWP Region Firm Awards,
2021
• Great Falls Planning Board and
Zoning Commission, 2012-2017
• Board Member, River City Harvest
Community Garden for four years
• Great Falls “Downtown Chick” –
Organized Art Tours and developed
Event templates
• Volunteered for Great Falls Ski Patrol,
2011-2018
Sophia Sparklin AIA, LEED AP, WELL
Sophia Sparklin is actively engaged in professional dialogs about
the impact of architecture and design on health and well-being.
Growing up in a family with generations in medical practice, Sophia’s
education and experience not only encompasses architecture but
also health and psychology, hands-on fabrication, yoga, and life
coaching. Prior to starting her own firm, she worked with Tempe-
based Architekton as Project Architect and Project Manager on
several YMCAs, Recreation and Athletic Centers and classroom
facilities. As a mother to two young Montanans, Sophia feels a deep
responsibility for the resources of our community.
SELECT RELEVANT EXPERIENCE
-Montana Fish Wildlife and Parks, Region 4 Headquarter Expansion,
Great Falls, MT
-Vision Net Breakroom and Lounge, Great Falls, MT
-Vision Net East & West Office Remodels, Great Falls, MT
-Montana Department of Transportation Office Remodel, Wolf
Point, MT
-Baatz Building Apartments, Great Falls, MT
-University of Montana Western Wellness Center, Dillon, MT
-Beargrass Village Pocket Neighborhood Development,
Great Falls, MT
-Blackrock Marketplace and Village, Kuna, ID
-Community Early Education Center Expansion, Great Falls, MT
-Dorado Neighborhood Concept, Star, ID
-Habitat for Humanity Community, Idaho Falls, ID
-JJ McGraw Club Historic Renovation, Fort Benton, MT
-Lacey House Historic Renovation, Helena, MT
-Madison Heights Parks Housing, Phoenix, AZ
-Roosevelt Elementary Natural Playground, Great Falls, MT
-Westbank Landing “The Landing Dock” Park, Great Falls, MT
COMPLETED WHILE AT ARCHITEKTON
-Tempe Library Remodel, “Tempe Connections”, Tempe, AZ
-Central Arizona College Renovations & New Headstart Facility,
Coolidge, AZ
-Grand Canyon University Recreational Center, Phoenix, AZ
-Rio Vista Community Recreation Center, City of Peoria, AZ
-Ross Farnsworth YMCA on A. T. Still University Campus, Mesa, AZ
FOUNDING PRINCIPAL
Appendix A | City of Kalispell - New Central Shop and Solid Waste Equipment
Storage
EDUCATION
• Bachelor of Architecture, Instituto
Politecnico Nacional, Inicio, MX, 2009
• Construction Project Management,
Universidad Iberoamericana, Mexico
City, MX, 2012
CREDENTIALS
• LEED Green Associate
• Licensed Architect, Colorado
#00408835
• Licensed Architect, Mexico
• NCARB Certificate #114122
Itzaí Bazán LEED
Itzaí has over 12 years of experience planning, creating and
developing architectural projects, from conceptual design through
construction. Having worked on multiple residential, retail, civic
and commercial projects, he has a deep knowledge of an array of
processes, materials and methods of construction. Itzaí owned his
architecture firm in Mexico City for 8 years, before moving to Denver,
CO, with his wife and dog. In addition to being a talented designer
with a great attitude and personal drive to advance the architectural
field, Itzaí is a master of BIM software and renderings and a LEED
Green Associate. Itzaí excels at every task he is given and designs with
incredible insightfulness, creativity, and craft.
SELECTED RELEVANT EXPERIENCE
-Vision Net East & West Office Remodels, Great Falls, MT
-Great Falls Police Department Evidence Room Expansion, Great
Falls, MT
-Great Falls Family Services Salvation Army Renovation, Great Falls,
MT
-Great Falls Emergency Services Ambulance Barn, Great Falls, MT
-Lacey House Historic Renovation, Helena, MT
COMPLETED WHILE AT VEGA ARCHITECTURE
-Estes Ville Inn Concept and Visualization, Estes Park, CO
-Twin Owls Hotel Concept and Visualization, Estes Park, CO
-Los Alamos Fire Station, Los Alamos, NM
-Summit County Library Renovation and Addition, North Branch,
Silverthorne, CO
-Summit County Library Renovation and Addition, Main Branch,
Frisco, CO
-NCAR-UCAR (US National Center for Atmospheric Research/
University Corporation for Atmospheric Research) Chiller/
Mechanical Room, Boulder, CO
-NCAR-UCAR Vacuum Tunnel Waterproofing, Boulder, CO
-Epic Cycles Tenant Improvement, Denver, CO
-Lumen Breakroom Renovation, Broomfield, CO
COMPLETED WHILE WITH IB ARCHITECTURE (MEXICO)
-Cortes Mena, Lawyer Office, Mexico City, MX
-ARRGE, Accounting Office, Mexico City, MX
ARCHITECT/BIM LEAD
Appendix A | City of Kalispell - New Central Shop and Solid Waste Equipment
Storage
EDUCATION
• Associate of Arts Degree - Interior
Design & Space Planning, Helena
College University of Montana,
Helena, MT
• Advanced Certificate Environmental
Studies, Helena College University of
Montana, Helena, MT
CREDENTIALS
• NCIDQ #410399
• International Design Continuing
Education Council #21-00045620
PROFESSIONAL & COMMUNITY
AFFILIATIONS
• Founding Member, Invest In Helena
• Instructor, Montana 4-H Interior
Design
AWARDS
Helena’s 20 Under 40 Business
Professional, 2022
Tyece Pool NCIDQ
Tyece is an Interior Designer who designs spaces that are equally
functional and aesthetically pleasing, who strives to provide timeless
design solutions for her clients, and is passionate about space
planning and functionality. Tyece is a results-driven individual with a
keen eye for detail. Her project experience spans from government
and educational facilities to commercial buildings and residential
properties.
SELECTED RELEVANT EXPERIENCE
-Vision Net East & West Office Remodels, Great Falls, MT
-Baatz Building Apartments, Great Falls, MT
-Lacey House Historic Renovation, Helena, MT
-University of Montana Western Wellness Center, Dillon, MT
COMPLETED WHILE WITH OTHER FIRM
-Helena Regional Airport Terminal Remodel & Expansion, Helena,
MT
-Montana Department of Transportation (MDOT) Headquarters
Remodel, Helena, MT
-Steed Industries Shop and Administration Facility, Helena, MT -
Interior finishes, signage, and furniture selection
-Carroll College PE Center Lobby Renovation, Helena, MT
-Brother’s Tapworks, Helena, MT
-Town Pump Casinos, Rest Areas & Convenience Stores, Various
Locations, MT
-Prickly Pear Elementary School, East Helena, MT
-Cathedral of St. Helena Baptismal Font Restoration, Helena, MT
-Traffic Management Center (TMC) Relocation within MDOT
Headquarters, Helena, MT
-Helena Armed Forces Reserve Center Corridor & Lobby, Helena, MT
-MSU Northern Diesel Technology Center, Havre, MT
-White Sulphur Springs Remodel & Addition, White Sulphur Springs,
MT
INTERIOR DESIGNER
We create solutions to build better communities | m-m.net
Sam Kuhlin is a Mechanical Engineer and the Practice Area Leader for the
Mechanical group at Morrison-Maierle responsible for developing and
maintaining mechanical design standards across the firm. He focuses on
high-quality design deliverables and client satisfaction. His experience
includes HVAC, plumbing, and performance-based fire protection designs;
construction administration duties; and managing client/owner/contractor
relations throughout the design and construction life-cycle. His project
experience is comprised of institutional, multi-family, governmental,
industrial, commercial, retail, hospitality, and residential buildings.
SAM KUHLIN, PE
Mechanical Engineer
EDUCATION
University of Edinburgh
Sustainable Energy Systems
Masters of Science
Montana State University
Mechanical Engineering
Bachelor of Science
REGISTRATION
Engineer: MT, OR, WY
LOCATION
Kalispell, MT
SELECT EXPERIENCE
Kalispell School District #5 Transportation &
Maintenance Facility
Kalispell, MT
Whitefish Maintenance & Receiving Facility
Whitefish, MT
Ridge Run Baseball Stadium
Kalispell, MT
Whitefish City Hall & Parking Garage
Whitefish, MT
Bozeman Law & Justice Center
Bozeman, MT
Montana State University Wellness Center Design
Bozeman, MT
Police Department Evidence Room
Great Falls, MT
Lewis & Clark County Public Works Facility Evaluation
Helena, MT
Appendix A | City of Kalispell - New Central Shop and Solid Waste
Equipment Storage
We create solutions to build better communities | m-m.net
Kevin Ireland is a Mechanical Engineer with experience in building system
design that include heating, air conditioning, ventilation, domestic water
and sanitary plumbing. He has designed a variety of different building types
including educational, residential, multi-use, and industrial to name a few.
He has experience in hydronic heating, VRV, snow-melt and commercial
exhaust systems, including kitchen and industrial types.
KEVIN IRELAND, PE
Mechanical Engineer
EDUCATION
Montana State University
Mechanical Engineering
Bachelor of Science
REGISTRATION
Engineer: MT, WA
LOCATION
Kalispell, MT
SELECT EXPERIENCE
Kalispell School District #5 Transportation &
Maintenance Facility
Kalispell, MT
Flathead Food Bank Phase 2
Kalispell, MT
Ex-Guard Manufacturing Facility
Kalispell, MT
KM Warehouse
Kalispell, MT
Great Falls International Airport Snow Removal
Equipment Building Expansion
Great Falls, MT
Kinross Round Mountain Truck Shop
Round Mountain, NV
Gallatin County Storage Facility
Bozeman, MT
Appendix A | City of Kalispell - New Central Shop and Solid Waste
Equipment Storage
We create solutions to build better communities | m-m.net
Tanner Evenson is a structural engineer with a wide array of experience
ranging from wood-framed residential homes to large steel and concrete
structures, including airports, manufacturing facilities, and office buildings.
Tanner gets excited about building and tuning structural analysis models for
steel and concrete structures and utilizing innovative structural engineering
products or design approaches to create the best possible structure to meet
the client’s needs.
TANNER EVENSON, PE
Structural Engineer
EDUCATION
Oregon State University
Civil Engineering
Masters of Science
Oregon State University
Civil Engineering
Bachelor of Science
REGISTRATION
Engineer: MT, ID
LOCATION
Missoula, MT
SELECT EXPERIENCE
Flathead Food Bank Phase 2
Kalispell, MT
Missoula Airport Snow Removal Equipment Building
Missoula, MT
Department of Livestock Veterinary Diagnostic Lab,
Bozeman, MT
Black Coffee Seismic Evaluation & Renovation
Kalispell, MT
Mountain Line Transfer Station Renovation
Missoula, MT
Fort Missoula Building T150 – USFS Fleet & Storage
Missoula, MT
Bonner Fire Station #4
Bonner, MT
Carroll College Facilities Building
Helena, MT
Helena Fire Station #3 (Phases 1 & 2)
Helena, MT
Bend Public Works Campus
Bend, OR
Appendix A | City of Kalispell - New Central Shop and Solid Waste
Equipment Storage
We create solutions to build better communities | m-m.net
Branton Sorbel is a Senior Structural Engineer responsible for managing
and coordinating internal work efforts to meet project deadlines, develop
business relationships, and to promote growth within the structural division.
He is experienced in buildings, marine, bridges and industrial. His background
in vertical design includes healthcare, multi-family, K-12, mixed use, hotel
and renovations of existing buildings.
BRANTON SORBEL, PE
Structural Engineer
EDUCATION
University of Idaho
Civil Engineering
Bachelor of Science
REGISTRATION
Engineer: MT, AK
LOCATION
Spokane, WA
SELECT EXPERIENCE
Kalispell School District #5 Transportation &
Maintenance Facility
Kalispell, MT
Flathead Food Bank Phase 2
Kalispell, MT
Shopko Structural Evaluation
Kalispell, MT
Flathead Rapids Soccer Shed
Columbia Falls, MT
Lake County Office Building Design Build
Polson, MT
City of Troy Library Structural Assessment
Troy, MT
USFS Kootenai SO & Libby Facility
Libby, MT
City of Gillette Park Shelter Replacement,
Gillette, WY
Deptmartment of Livestock Veterinary Diagnostic Lab,
Bozeman, MT
Appendix A | City of Kalispell - New Central Shop and Solid Waste
Equipment Storage
We create solutions to build better communities | m-m.net
Amy Galt is an electrical engineer and project manager with experience
designing power distribution systems, lighting systems, utility coordination,
and fire detection and alarm of commercial and residential buildings. Her
lighting design experience includes interior and exterior lighting design
as well as site and street lighting design. Amy performs photometric
calculations for site and street lighting designs to include with City permit
applications. Her power distribution design consists of the main distribution
layout, feeder, and branch circuiting design. Amy’s well-rounded electrical
experience provides clients with confidence in their electrical and lighting
systems.
AMY GALT, PE, LEED AP BD+C
Electrical Engineer
EDUCATION
Montana State University
Electrical Engineering
Bachelor of Science
REGISTRATION
Engineer: MT, OR
LOCATION
Kalispell, MT
SELECT EXPERIENCE
Flathead County Animal Shelter
Kalispell, MT
Whitefish Maintenance & Receiving Facility
Whitefish, MT
Flathead County Library HVAC Upgrade
Kalispell, MT
Whitefish City Hall & Parking Garage
Whitefish, MT
Whitefish Emergency Services
Whitefish, MT
Columbia Falls Police Station
Columbia Falls, MT
Stillwater City Law & Justice
Columbus, MT
Appendix A | City of Kalispell - New Central Shop and Solid Waste
Equipment Storage
We create solutions to build better communities | m-m.net
Rick Hiebert is an Electrical Engineer with experience designing electrical
systems for various building classifications and uses, including professional
office buildings, K-12 schools and colleges, multi-level apartment buildings,
healthcare facilities, commercial kitchens, automated carwash facilities, and
other commercial and residential occupancies. His power system designs
offer electrical service-entrance system sizing, mechanical equipment,
electrical coordination, and the building’s general power layout. Rick’s design
background includes lighting selection and layout, photometric modeling,
and lighting control system designs. He also designs public mode, private
mode, voice-evacuation, and mixed-type fire alarm systems.
RICK HIEBERT, PE,
Electrical Engineer
EDUCATION
Montana State University
Electrical Engineering
Bachelor of Science
REGISTRATION
Engineer: MT, ND, WY, WA
LOCATION
Kalispell, MT
SELECT EXPERIENCE
Kalispell School District #5 Transportation &
Maintenance Facility
Kalispell, MT
Flathead Food Bank Remodel
Kalispell, MT
Samaritan House Administration Center
Kalispell, MT
Meadow Lark Maintenance Shed
Great Falls, MT
Kinross Round Mountain Truck Shop
Round Mountain, NV
Ex-Guard Manufacturing Facility
Kalispell, MT
Meadow Lark Country Club Maintenance Shed
Great Falls, MT
Ravalli Electric Co-Op
Hamilton, MT
Appendix A | City of Kalispell - New Central Shop and Solid Waste
Equipment Storage
We create solutions to build better communities | m-m.net
Pete Weber brings a wealth of experience in all facets of telecommunications,
and physical security design for a range of clients. His design experience
includes copper and fiber optic cabling, telecommunications room design,
wireless, voice, access control, video surveillance, and overhead paging.
Pete has a long history designing communication systems for institutional
clients, including K-12, higher education, transportation, and state and local
government.
PETE WEBER, RCDD
Senior ICT Designer
EDUCATION
Wheaton College
Psychology
Bachelor of Arts
REGISTRATION
RCDD
LOCATION
Missoula, MT
SELECT EXPERIENCE
Kalispell School District #5 Transportation &
Maintenance Facility
Kalispell, MT
Flathead Food Bank Phase 2
Kalispell, MT
Missoula County Airport Snow Removal Equipment
Building Modifications
Missoula, MT
Lewis & Clark County Public Works Complex PAR
Helena, MT
City of Helena Transfer Station
Helena, MT
Stillwater County Fairgrounds Facilities
Columbus, MT
Blackfeet Nation DOT Shop Facility
Browning, MT
UPS Facility
Billings, MT
Allied Steel Shop Buildings
Lewistown, MT
Appendix A | City of Kalispell - New Central Shop and Solid Waste
Equipment Storage
We create solutions to build better communities | m-m.net
Kyler is an electrical engineer with experience in the design of low voltage
systems for various building classifications including K-12 schools,
professional office buildings, and other commercial and residential type
occupancies. His low voltage systems experience includes general receptacle
layouts, general access control and video surveillance layouts, general
paging system layouts, wireless design, telecom room design, and fiber
optic cabling design.
KYLER HARKINS, PE
Low Voltage Engineer
EDUCATION
Montana Tech
Electrical Engineering
Bachelor of Science
REGISTRATION
Engineer: MT
LOCATION
Kalispell, MT
SELECT EXPERIENCE
Kalispell School District #5 Transportation &
Maintenance Facility
Kalispell, MT
Flathead Food Bank Phase 2
Kalispell, MT
MSU Facilities Building
Bozeman, MT
Whitefish Maintenance & Receiving Facility
Whitefish, MT
Bayer Terminal Building Truck Shop & Offices
Pompeys Pillar, MT
Helena Fire Station #3 (Phases 1 & 2)
Helena, MT
Fort Missoula - USFS Fleet & Storage Facility
Missoula, MT
Appendix A | City of Kalispell - New Central Shop and Solid Waste
Equipment Storage
We create solutions to build better communities | m-m.net
Russell Williams is a fire protection engineer with experience planning and
designing water-base fire suppression systems and high-expansion foam
systems. His fire sprinkler design background includes both new construction
and retrofit projects for residential, commercial, and industrial. Russell’s
design background includes full 3D coordination of wet, dry, and deluge
systems, along with high expansion foam, ESFR, standpipes, and fire pumps.
RUSSELL WILLIAMS, PE, NICET III
Fire Protection Engineer
EDUCATION
Montana State University
Mechanical Engineering
Bachelor of Science
REGISTRATION
Engineer: MT, WA, OR, WY
LOCATION
Kalispell, MT
SELECT EXPERIENCE
Kalispell SD #5 Transportation & Maintenance Facility
Kalispell, MT
Solid Waste Maintenance & Parking Bldg
Billings, MT
Flathead Food Bank Remodel
Kalispell, MT
Lake County Office Building Design Build
Polson, MT
Stillwater City Law & Justice
Columbus, MT
Fort Missoula T150 New Building
Missoula, MT
Terminal Design Services
West Yellowstone, MT
Appendix A | City of Kalispell - New Central Shop and Solid Waste
Equipment Storage
We create solutions to build better communities | m-m.net
Trent Pearson is a fire protection engineer with experience in planning and
design of water-based fire suppression systems. His fire sprinkler background
includes projects requiring wet systems, dry systems, pre-action systems,
foam systems, and standpipes. He has provided fire protection services
for new and existing construction projects for clients in the education,
healthcare, government, hospitality, and industrial markets.
TRENT PEARSON, PE
Fire Protection Engineer
EDUCATION
Montana State University
Mechanical Engineering
Bachelor of Science
REGISTRATION
Engineer: MT, WY, ID, OR
LOCATION
Bozeman, MT
SELECT EXPERIENCE
Flathead Food Bank Phase 2
Kalispell, MT
Lake County Office Building
Polson, MT
Bend Public Works Campus
Bend, OR
Stillwater County Warehouse Upgrade – Phase 2
Columbus, MT
Snow Removal Equipment Building Expansion
Great Falls, MT
Fort Missoula T150 - USFS Fleet & Storage
Missoula, MT
UPS Facility
Billings, MT
Helena Fire Station #3 (Phases 1 & 2)
Helena, MT
Blackfeet DOT Shop Design
Browning, MT
Appendix A | City of Kalispell - New Central Shop and Solid Waste
Equipment Storage
We create solutions to build better communities | m-m.net
CR Leisinger brings extensive experience in site civil design for municipal
and private development projects. His expertise includes site grading
and the design of water, sewer, and stormwater infrastructure systems to
meet regulatory and operational requirements. CR’s approach combines
meticulous attention to detail with an emphasis on efficiency, ensuring
practical, cost-effective solutions that align with project goals and timelines.
CR LEISINGER, PE
Civil Engineer
EDUCATION
Montana Tech
Civil Engineering
Bachelor of Science
REGISTRATION
Engineer: MT
LOCATION
Kalispell, MT
SELECT EXPERIENCE
Kalispell School District #5 Transportation &
Maintenance Facility
Kalispell, MT
Kalispell Construction Engineering Inspection & Plan
Review (On-Call Public Works)
Kalispell, MT
Whitefish Corridor Community Project
Whitefish, MT
Agriculture Education Additions & Renovation
Kalispell, MT
Touro Osteopathic Medical School
Great Falls, MT
Site Civil Plan Review
Columbia Falls, MT
Missoula Airport - Terminal Parking Lot Expansion
Missoula, MT
Appendix A | City of Kalispell - New Central Shop and Solid Waste
Equipment Storage
We create solutions to build better communities | m-m.net
Dominic Goble is a civil engineer with experience in areas of municipal
and private engineering design and analysis including water, wastewater,
stormwater, stormwater discharge permitting, land development, bidding,
contract administration, construction administration and inspection. He
developed and instructs a Storm Water Pollution Prevention Plan (SWPPP)
Administrator certification training to certify SWPPP Administrators
throughout the State of Montana.
DOMINIC GOBLE, PE
Civil Engineer
EDUCATION
Montana Tech
General Engineering
Bachelor of Science
REGISTRATION
Engineer: MT
LOCATION
Kalispell, MT
SELECT EXPERIENCE
Finmark HQ Office/Shop Facility
Kalispell, MT
Boyce Lumber Warehouse
Missoula, MT
Flathead Food Bank Phase 2
Kalispell, MT
FedEx Parking Expansion
Kalispell, MT
City of Kalispell Lower Zone 1.7 & 2.7 MG Storage Tanks
Kalispell, MT
Colorado Lift Station
Whitefish, MT
Monegan Road Improvements
Whitefish, MT
Lake County Office Building
Lake County, MT
Appendix A | City of Kalispell - New Central Shop and Solid Waste
Equipment Storage
DAN DEYMONAZ
Owner / Senior Cost Estimator
With over 34 years of industry experience, I have partnered with all project
members to provide reliable, meaningful, and accurate cost estimating
services. I have collaborated with owners, stakeholders, and designers
to assist project teams with understanding and managing construction
costs. My focus as the owner of Sound Northwest Precon Services, is to
provide collaborative and selfless leadership to the clients and stakehold-
ers I serve.
EDUCATION
Eastern Washington University - General Physics, Mathematics Cheney, WA
SELECT EXPERIENCE
Snohomish County PM 911 Center, Everett WA
Concept Design Est.$28MM
49,266 sf Renovation of an existing building to convert it to a 911 call and support services
center
King County Harborview Hospital (Maleng Bldg), Seattle WA
CD Est. $34MM
30,000 sf Hospital Room Conversion and Renovation at Harborview Hospital. New operating,
patient, and clinic space was created on existing specific floors of the hospital.
Cascade County Juvenile Detention Gymnasium, Great Falls Montana
Schematic Design Est.: $4.5MM
7,660 sf Gymnasium addition to the existing Juvenile Detention Center. The facility houses
and full-size basketball court, multipurpose and exercise room, laundry, storage, and added
housing overflow units.
Appendix A | City of Kalispell - New Central Shop and Solid Waste
Equipment Storage
410 Central Ave #506
Great Falls, MT 59401
406.453.0001