FW: Kalispell City Airport Master Plan Update
Fred and Jane, Attached is the detailed fee estimate/planning cost breakdown. We (Sponsor and Consultant) need to agree on fee before sending off to the FAA for concurrence. Our total fee is $99,800 for the revised SOW. I have deliberately set our fee below $100,000 so we do not need to conduct an IFE (which takes time and costs additional money). We are prepared to live with this fee for the duration of the planning study; we cannot amend the planning grant. My initial fee for this work was approximately $110,000 prior to the additional requirements requested by the FAA. Key additions requested by the FAA include: 1) an update of the specific sites in the original Site Selection Study, and 2) new aerial photography of the airport. Ideally, our fee would be about $115,000 but for the sake of timing we have shaved off some cost to get this project under contract soon. Please review and let me know if you are OK with this estimate. Once I get your concurrence in fee, I will forward the estimate to the FAA and request their concurrence with fee. Then we can prepare and submit the grant application. Thanks Jeff Walla, PE Stelling Engineers, Inc. phone: 406-755-8602 -----Original Message----- From: Gary.Gates@faa.gov [mailto:Gary.Gates@faa.gov] Sent: Tuesday, June 08, 2010 10:23 AM To: Jeff Walla Cc: Fred Leistiko (airport@kalispell.com); Jane Howington; Mitch Stelling Subject: RE: Kalispell City Airport Master Plan Update Jeff, I do not have any further comment regarding the SOW and concur in the revised scope. We also recommend that the City/consultant contact GPI Airport staff and give them a heads up regarding the study and development alternatives that may include relocating S27 operations to GPI. Please provide our office a copy of the detailed planning cost estimate/task matrix when available. thanks, Gary M. Gates, P.E. Airport Engineer and Planner FAA, Helena Airports District Office 2725 Skyway Drive, Suite 2 Helena, MT 59602 |------------> | From: | |------------> >--------------------------------------------------------------------------------------------------------------------------------------------------| |Jeff Walla <Jwalla@stellinginc.com> | | | >--------------------------------------------------------------------------------------------------------------------------------------------------| |------------> | To: | |------------> >--------------------------------------------------------------------------------------------------------------------------------------------------| |Gary Gates/ANM/FAA@FAA | >--------------------------------------------------------------------------------------------------------------------------------------------------| |------------> | Cc: | |------------> >--------------------------------------------------------------------------------------------------------------------------------------------------| |"Fred Leistiko (airport@kalispell.com)" <airport@kalispell.com>, Jane Howington <jhowington@kalispell.com>, Mitch Stelling | |<MitchStelling@stellinginc.com> | >--------------------------------------------------------------------------------------------------------------------------------------------------| |------------> | Date: | |------------> >--------------------------------------------------------------------------------------------------------------------------------------------------| |06/06/2010 02:04 PM | >--------------------------------------------------------------------------------------------------------------------------------------------------| |------------> | Subject: | |------------> >--------------------------------------------------------------------------------------------------------------------------------------------------| |RE: Kalispell City Airport Master Plan Update | >--------------------------------------------------------------------------------------------------------------------------------------------------| Gary, I believe I have addressed all of your comments in the SOW for Kalispell City Airport. Attached is the revised agreement. Please turn on "Track Changes" to view all of the changes made to the original SOW. As soon as we receive your concurrence on Scope, we will proceed to fee negotiations with the Sponsor. Thanks Jeff Walla, PE Stelling Engineers, Inc. phone: 406-755-8602 -----Original Message----- From: Gary.Gates@faa.gov [mailto:Gary.Gates@faa.gov] Sent: Friday, May 21, 2010 11:57 AM To: Jeff Walla Cc: Fred Leistiko (airport@kalispell.com); Jane Howington; Mitch Stelling Subject: Re: Kalispell City Airport Master Plan Update Jeff, We have reviewed the draft scope of work and as amended 5/17/10 and have the following initial comments: The Master Plan update provides the basis for describing all reasonable alternatives summarized in a subsequent Environmental Assessment. The alternative analysis is a core element of the EA and the NEPA process (see attached citizens guide to NEPA). Page 1 (and subsequent sections referencing the 1999 master plan) - the scope should include and reference the previous recent planning studies, including the 2001 site selection study that was completed by RPA and the subsequent EA (concluded in 2003). The alternative airport sites should be summarized (rather than using 1999 "generic" off-site evaluation) and reviewed for current feasible alternatives for development. We recommend that this scope include additional site(s) for evaluation in the event that the previous site alternatives are no longer feasible etc. Page 2 - an IFE may be required depending on fee negotiations and similar work scopes funded by FAA and will be required if the cost exceeds $100,000. Page 3 - not clear what is meant by "review and amend airspace and flight procedure changes at GPI" Forecasting (current task 1.7), indicates that a pilot survey will not be conducted (1.5 indicates a survey)? (see attached guidance for forecasting) Task 1.8 (noise) indicates NEM preparation in "full compliance with Part 150", not sure why this is necessary as this noise analysis is not being completed under FAR Part 150 study? Task 1.10 (review alternatives), see previous Page 1 comment regarding alternatives Task 1.13, recommend that CIP include an updated financial plan to reflect realistic revenues and cashflow from local and federal sources (similar to 1999 master plan). In addition to AC 150/5070-6B, reference should be made to AC 150/5325-4B (Runway Length) as significant guidance in analyzing the alternatives and confirming the recommended runway lengths (see attached FAA ANM R/W guidance) Regarding the ALP task, recommend that you consider incorporating an aerial photo underlying the colored ALP drawing, eg. ("screened" or light gray aerial view), given the amount of development surrounding the airport. The exhibit A, should also be printed in color. The scope should include reference to all areas of development including the mitigation plan for the south AM radio towers. As previously advised, the scope of work should also include an element to inform the community and sponsor regarding Federal AIP grant assurances/obligations and identify areas that may conflict with grant assurances. See attached general work scope, "planning for compliance". Based on the project schedule (time of performance), we anticipate that the City will pursue an Environmental Assessment for the recommended alternatives in FY 2012-2013 (upon completion of the Master Plan) This planning grant may not be amended or funds increased following issuance of the grant offer to the City. Also, no planning work may begin prior to issuing the grant offer. We hope to issue the grant offer in June or July pending approved contract grant application. Recommend that the consultant prepare the grant application package. Let me know if we need to discuss. Thanks, Gary M. Gates, P.E. Airport Engineer and Planner FAA, Helena Airports District Office 2725 Skyway Drive, Suite 2 Helena, MT 59602 406-449-5230 (See attached file: Compliance Planning Task Draft.DOC)(See attached file: Runway Extension Justification Considerations.pdf)(See attached file: Citizens_Guide_Dec07.pdf) |------------> | From: | |------------> >--------------------------------------------------------------------------------------------------------------------------------------------------| |Jeff Walla <Jwalla@stellinginc.com> | | | >--------------------------------------------------------------------------------------------------------------------------------------------------| |------------> | To: | |------------> >--------------------------------------------------------------------------------------------------------------------------------------------------| |Jane Howington <jhowington@kalispell.com>, "Fred Leistiko (airport@kalispell.com)" <airport@kalispell.com> | >--------------------------------------------------------------------------------------------------------------------------------------------------| |------------> | Cc: | |------------> >--------------------------------------------------------------------------------------------------------------------------------------------------| |Mitch Stelling <MitchStelling@stellinginc.com>, Gary Gates/ANM/FAA@FAA | >--------------------------------------------------------------------------------------------------------------------------------------------------| |------------> | Date: | |------------> >--------------------------------------------------------------------------------------------------------------------------------------------------| |05/11/2010 01:03 PM | >--------------------------------------------------------------------------------------------------------------------------------------------------| |------------> | Subject: | |------------> >--------------------------------------------------------------------------------------------------------------------------------------------------| |Kalispell City Airport Master Plan Update | >--------------------------------------------------------------------------------------------------------------------------------------------------| Jane/Fred, Please find attached a draft scope of work for discussion at tomorrows meeting. This SOW is fairly comprehensive and may be more work than the City had planned for this effort. I thought it better to start with a thorough SOW and weed it down if desired. By copy of this email, I am forwarding the SOW to Gary Gates at the FAA also. I will be calling Gary after we meet to discuss his comments and any requested changes from the FAA. Once I have the FAA's concurrence on SOW, we will put the fee estimate together and final fee negotiations. As I discussed in my prior email, we will need to get the Agreement in front of Council on Monday in order to submit a grant application to the FAA by June 1st. Thanks Jeff Walla, PE Stelling Engineers, Inc. 1372 Airport Road Kalispell, MT 59901 phone: 406-755-8602 fax: 406-755-8710 email: jwalla@stellinginc.com [attachment "0043 Kalispell City Amend #1-Master Plan.doc" deleted by Gary Gates/ANM/FAA] [attachment "0043 Kalispell City Amend #1-Master Plan.doc" deleted by Gary Gates/ANM/FAA] 곥膛ຎ졟骀ၢ햖乎�筷᭻萬忀ᠫ嗶䛂ⴶᴃ蝄퍑䯶⭛�뭏퉾걄嶊볱蛗Š뿛䪔蒱帏ꄅ➵䯢㫬⯣봶�对�鋊ᑲ㚇鰥軎ᆃ䇜侂ĕ飌匇㾿㖑홂黡渮ꆎ衆ڼ⨋�橶㺄ⴳ孷绚苾ჺꇐ��淛웋☢輍慠揘㰓鬕ൣ㦬鞫攸篱栯݊耓䅭褧㗚ꋲ嵎꒨Ձᑵ뱞ﵱ࢟ࢄ⍔彪썽©銫釓봃ㄬဳ낁㙹躞趙劅砭ъ鯕艏㳧蕰쳬멆슧게筽䖟绫ꞔ‥틆濗풲컍퇲㣈ẗ銑끮撝芢㢈鑳邍싉ᩂ鿴ƾこ咽鸻졈䲧蹞╕敫�쪅⥧㙏縋ꄓ薍벏艺 ꜍�꜃骈鍖⥯䑉Ậ݈法뢤믢喒쒉�쿧ί먿佯Ҷ諆Ꞷ䋭醻娻ဒ콥⮈Ⴞ̝ﴜ㏼�┋裍솘큖⤛鈦晝쒊嫯簃㶊ঈ᭘싏龳啡毐첩熾橅爯룫鹜㹷艙肴ꣲ駱䈞ⱁﬥ╜顃㭢�颛璭瞱槵サﺱ믗ᅭ轃뾚퇩텯廇妼Ǻ䞽䍟�㷛�ᦜ욇鬡༈睧邧菱ꥼ�Ꮢ蟑ꈞ쿗伱Ὥॵ䧱쀸��淇�ᚱ懩羍Ș뽚鞓⪓鿥밠砏硸ᇯ릑ዿ퍘甇垕⇹᧰ဴ�À㽲䍲뷘孀掵䈣ㆤ鰳䪰뇘튍蓬ꤓ鉗홠冊埢鋧鈳ч믇䖅츟鑈㹬컘擓紹�易斯镕镕몝᪄蝑캼ᜡ帻ᔞ醜 Ѳ攥㛞♴洶梽贑됔漑᎖뙦슑㱊毥귖�銖쥓눛ᤤމ₶茹鑻க▵萶䚖猪久镨砢̑茹ܢҹ얃悤⊐复ᄰ醳ꂒ薚୵ꉶ綔ꕛዻ≐䙊ߎ搶庘을ꙥ䜞뭥ꏮ喖旝濧㾠䛸祹姄ⲟ쑏᠌刌ꩻ�嗟荔뤾ᆙ㹿㦹絽㺸Ꞓ鈨漶ዚ쮿ﴟᆭ岲⍈곎ᆃ픺㹠鱒跍煦석雛ᷞ늘썾䘺똗鵴Ɨ鳖藶㰸蠍풯蹮⌾䷍阼ᦔ胂鴡ੈ횘艀訒㡉꼞㩸窬睜咳炜色㧰ቍ玜╹᧨娬〜唢죆닉=麋ᝑ닰悴釿줂텻붖₥㐦壵ᒃ逮ྺ⒥묊婳猉磚⃫ᢥ�ꥇ䶒䄈嵈ᒘᨇ噄еふ騎鱠㮉ꋀ 춶憵ꭕ沛ፏ썁跳ⱘ뚼䰔툕ሟᐪ酨苞ꄥ趓휖�℥∥伝㫾ᘃ璐њ켪犈번扮䊃꘩擳醹ꢹ엪鵳ᩯ鐝蘌薴碠끨啶狳{낞觸纲쁍ᐼ跲礘䓺Ⲥ⣣诋甪હ蹲∗鵱澻ꣂ�칀↨鱷瑁拿췑褪세䞝㮃쒡莢⋇ၴྋ摴牲듎⧽값⨪珞潮戎巾﹞�∝鴥❿낦奺✈힙ṅᮯ辳髇쐯簭蚊�ใꖦ࠲藓尅ႅ튛じ씠㥃㼩꼆ઁ럡ぅ䜧荰컷稛湘⤜粜㢾骊ſ꜖愊账셗︁求堵䟑뵰䨹⻩㷥⍋ḯᕈ陵堆㽖炓꒩䠓ℕ㲛讯赾鷞黫枡뎨놰拡�푵烍莩ꇝ靲摓ᦗ﮼钻隋䝆墭嬜⛜ 샩졅骚相戒羳쉵⥨乗㎒屼⺿㏧涢됆㥬ℭ주蚈゜纞槊൷୨䠵Ṍݡ䱥蔸㑔錔⿓ㆄꑼ佳石䜜訴졠曜豬넼ꩶఄ쏨留褧䵛襅襡鮩漶⚗₤铤Ⓖ鑥焬勅蹤㉼䡢깖봭킐灠崓밭饸✑씠链䷌䰌蠜앢뙵㹁欎ꪪ狳枮ᩈ⯒Ἆㇺ裫賆퐳ﶅ脿囆ٸ콗憏뤟簄왯雾㷩쏬냇㼝鈔ᑾꨇ㚅瘡熤븥萯菻ᄄ䏽耐ᘂ“澗꛷歡뀫䟦胠녳⸋숐𤋮찥腾∣ﴊ被ᾍ鲏켈웳萒ိ沶ዀ뼠ྙ↴蘄⪃ጂ옄腧˾쳾⬷밭ֆ찑kȉЋ�선㟤䉣셿极썉䶁㘐윎↴귦쥊籟ꂎ谕汙瓼 윹ៈ捭袖῎㸬鑖啛叺稅샌鈘佤ࠡЌᥰ냞¸䀛㊁쀵X밑㦵Ḷ雌뤭➉ﷁⲾﰎ别䛘恃ꑿᥐൾᣮ퓩�頺䝧뽡떜湃ﵫԗ䴮貘ᣰ떄䱏댽�㶥ޤꉵ튖鯚䵕⼹谑ꁂ胕亻㌕檉唉퇋ꄓ䔿餝䡃笰곻씔肦뢨ᐠᒊ䧙寥뙊䐿冯量ꎮ뎧䩪啎褑虗﹃⯪羕⩻薷�穂嗻ꊖ혍ﻶ識剴⚑ᄮ퉨ྃ꽿缯쫉鲼轏�肖鬌鍡폩聆둎ⴽə狀濴랭ﴪ辬鏄誱欄蓘⏀渙惣栆챀填剃븀ಀ唏爖芈䨢矟❪縣慵䥫ૠ佽�긅镡矷㩨輍㕽䠕螑þ佉퍘龬㯞诧滪菫햚㱃훆녙䠢邢Ṇ㛌ᗐ喥 쿮簾댲Ⲵ㳻驢싋㤗蘄铍᭮ⷔഘ䜌㡊㋼潸搬燧ݹ蒜൘ሔ⦤䐏ȸᘘ퉻ৠ䋍ᆳ愄揉멠しᓯ봔ﴃᱷ䏺羥眔�᧤⥻漼툉䙳牎◟謾瘕藈碙헅㼋蹋㾬銒ꖳꤠ먌溉㒖崴⥭䝪ﲫ�ᦃ壝荐ၵ贞�䧪괓⼦뫅㌈숌埪�뜞冷☠뵁叿饇ﻢ꼨㽵鹬⚏嶧첮◹২胺吾�硾൭ꐰ볰ꢳ䛍襞⎋顼뼈蔀ㄜ॑◙࠙⤝㺑㎆᱂肻劽犱䮝뾨嘴伡䚈㼷ⱽ㯽Ꝥ⤳ꐒ◧浨忩ꌌؽ䊤ꇐ龏쬫䆮꿌⬵쾧寴룩밠�ḣ�撚鄡侠䢟栃ḃ䚹ⶾ倲ྚ䊦ᄄ蝆ᡌ闒䵛ꋒ␌ऐꑺ牚搜 ﳔ싄쯐╮‿㐫�⇟⧀㙩Ⳃ嫂៊瞟ၽ蓼湬堋棂ퟫ쭘㠫쟉멏⇿蝂㉊꭛鬪ᵑ锺퉸㆗䯃�⯕�⳹瓵毷뚸鎷祭ଃᤈࣳᤗؘꁡ빉✉㣻下㶗禕ꎱᎢꃺꄲ輋ꏄ�啢拧훿襰쾸⿆饼㺵ҳ〳篭洞쉏沛╪뀶矢檷陂帋ꛕ쪚籞ᖖ뗷珌癵꿶룫字웟Ꮋ�ԙ搌풓ث逽蚓እ�壽狰栖ឡ붨者䕞�牗䌧䥽毝紛㤟쵖爠혰ࣜኛ㌁鴁돲덇ꓲ퉇௳氙笲硵줞칳붋뵛뼜䇮뮗ꮺ�檒ᕳ煼컶䆧്플ⵁ䍝ః檏剨ᅯĀ⣮૪湥獤牴慥੭湥潤橢㜊″‰扯੪㐴㤹攊摮扯੪㐷 〠漠橢㰊⼼畓瑢灹⽥祔数䌱䘯汩整⽲汆瑡䑥捥摯⽥敌杮桴㜠‵‰㹒猾牴慥੭鱸坭堉圔꺶먖ᒪ䣄䚧ꋊ梨誌ᜆ䠂᜔䁔ږꖚ暁陫䅮萢䆽⡀ŀ쑙言屛⢘霓風쓅ቭ錓즘麩瞾㌋�뺯뻪콵ड़㹥銁⑈㸖棪ﱕ뜂ꢘ鎧䌰찢ₜ㋌잋ﻯ腣郩ᙴ燥㩔夙↚馦齓哴黨蜂ꃞⓌ崒덩䱻詬ᵖ鸖璠맘락ﳣ仹녧讋㊋⮟碪页楆湇咒ㅑ톱䴪⫂㮥㩹䨪객謌襊輍ٗ蒆䊨淄ʻ咣쪑用汬鉌쇒凝쒹秙˱奲ꗢຎ豊湗規퐎봨屢Ẕ佊衕ㄺ㿺⠗骊뇯轮宧꾌ﮗᯞ渶潿⛇춟뜻� 璨끚텰䯅廞컺尫剖˔㙪䋥ꐭꋞꦼ풕樢쵌ᚥ癓㶔㛵䃥ꔭꤜ꡷푹樲딾犜⚢鍒न餵ꊲ傦偯橒攪쥍㞨踩ᏺ贵ꆲꥬ퓩쨌饎뭓�㒒焉ؓᛍᶚ鼶Ṥ繨ﴥ庄i�ﳋ櫎⇘ꪉᾉ뉍璝퉼୳譻ᙹⷻⵢⰊⴚ宗塖ㅾ쵹ﻤ翉㪲䩤铜�膰⭢⋓毄䷛演᯽鬬謦夵㉃ꆧ尣ꎓ⏂䊃ꑷ䚬鞬몮⅟ㅄ둨益⏛輬텿뜲軲ꆦ躘㶠ಆ䎷隬양ꌊ閴鐩沘휃쉓ۆ奫榏켃퇥⠡톭☗磡즡蘦�䆱싕쫙땢䀐蒑푊ꪂ迆ꞌ㺑嫩蘕夒ⱙ㉊虤뀗麲摜퐨鮓ެꌾ茡꾤뜝첚歹ꍙ뵩թ讇璵慹⨙ ꠫萺凢䙒ﻒ妭ঙ�称켰탆偐ꪂ捐奕懷卲協幄⟮팭徝�읶텱�嬜ᐭ賳楗ղ퇢蚱ﮎ笯�購喗쫩凣궆ì䵊�螘ਲ蔍ᚬ몌봨�뱝먅빭댄샯ꖲ똇v轘፸䯍ﭾ桐䖃Ꙧ슕맟励ῐ魜癍썾긳餕噓拰巐फ़괉솄쟻ⅾ詊땋뷴媜�軍ヅ魨ꃡᙫ柙᧠劗㵝쾺ᄊ鐌㶌뚕꿒�⌁ꀧ蓥랖վ셋尙Ჰ他疓ዕ뒜謁툿ᾤ쭴錒࢙㒣芸⣹݈ꝵ�퐧ෆ噆Җ짬폾꘏뫿⫰╞싷뢏됓匿碝볂�ƕ疩ਃ좡陜淔㺬ꝵ샣�ㄑ䩸�졊럗긋ይㅡ鯘ᇁ騡㋃�♸㧻രᾸ腞鐂忳乡ᑑ巅⯁싰 �篯弧㬀罘앵鹸ᶠ首뚙覉햎㟒邲⃚虬洽▰ឤ⎖ꭤ優笥壌婶៎祉鷼㦖큙殢썐ﱖඍ架宐虆袋䯠悂晙䄅㰐�⌁ꛆ쫺▓쒶䩫빣ퟨ헺〾㙍꤈ⴰ胝틪뚇掳䘚䎦폛⋵’枙靖풧⦋掴荤軂펱㛒ᇡ꺍坖뗿撂刳�껏䉏姫赼䍵覦ঝ혍惧㓃淙峓㶼ܴ爣큢ꗑꢹ꒹访뉞㰐ጂ罬ꪊ�툟턔蚵槥ूⱃྣ죏ꇐ⡃䣽բ묫꾽�밌㬏藢øȎ汻섇ຟ噜ᱴ혻砰떞픲㫫㙍銝�뼀ۃ愳좫ܖ舜즃笖☈笟⁰ϗᇘ揦䔿ѡጇꁈ鸧ᦀ磌ꢒ⇼۪グ痱뒢쉝鎫쁞꠲뜀뉩ឺ㥏ꀔ 繍䂿눬련䍍찔㤁ᰱ閄ᔰ⦧畤髸ẖ꧉䝏Ȿ欬擢䵑唍衞磘�ꮺෆ䜭쥎䓯氥걁ꆿ偺╡ᱶ뭚䫠焗鋸尸帹惢⮄찜㨨㱙ﭡ쟀㏨뙖堌侧뫊꣰뺖厓蚓뀶幣Ⲍ礔鈚늰粮妔䆐蒂祯�䎊⬞취쭥㪪쀌잔啁艜㸼∹㵻「剐炸찒섛털ꊈ௶䡏貕ퟝᅭ飦ᾬ훭걧望꩙ᗰߝ툡㨘卪䱲욘퐯洧戍誷சಹ큈郩찪ⶲ㓰于瓇ᡈ誦䡘穧쮫숯珲汪쯋穹燿䋾勸㹴崼尿ᣃⳏ鈺蕒댮枠⥾২↭确꩸厥ᴰ渞䒏눯竟⮪㰮丛漍ᾗ囓훆끸꿍ḥ睎秀ᏑӐ귩暰⦡遒㒡᪳䇻춯㵰�ῆ굯䏭것 ะ륖ꇬ龜�璚⻤蹂㋜崳왅ﴼ黁ٖ刧ꐈ뛇⼊吸쑺屘汊鑔雖㏰頜㖽䤲霑캪卞뫸ꆂឈ鄘㵁貤舯礳卿ⴇ⣽飗皁뎲㶙쒚ṍᇽ胲䤫ႏ뉘몠昁擄胒徼ꓕ쵾螥짿ឥ诿䅋䮄硶萎૾ᇞ젅劈噗隍嚱◂ꝝ�⬈痚혍 ᲁ₰ࣰ℺莆棨㬦⬮锫춘丨⌬武䟷ꪖ⮙捖럫稯얀앶죍˯滐跛ﵻ뽗쯯原揉ꦝ塷䘍빒벬锖쪡揼筓﮲뉉帜;ꏖꍾ㭛뻊Ṅ�~몇滐짹嫰썍ᄖ鈩辻䋎⼻㯹屉턎ꅐ블烠茪꛶䗪霛祻㕚윺ꐊ칠퐷ዞ쿛❳↷懶㢲쫸焝觥릖玙鴴袬똅�䆰鸓 ⭱굋嘡锠낇ᆫ㚖ꁈ㢔霥靚�䳰댼㒴ʣ怽暅ꘆ巤꯴ᛃ燬ºꓼ⽣糨⟬丽臗업ᇆ뀂῭䀭娪ﺒ⇀ᓟ磽ﳧ枕铖櫨에탱㘯�☯︁斪﨓䊉칻㼥�㨰晠ጲ灮롨皦푄㉤籗펞貐䓜왍㬎戶릋쏾匰�꠲놘ꪦ탈叨䚂镶풁☰蹫箍฿ਘ䤟螹ꏮ윻篺笆ṛ툤識⚝广絯䈥崽슸뮡옵ᅑ�체ﳃ㴆착䮱ꞌ鬟嵒噟婜╞㊯霖⌡૮贉ꭐ�俼젥蝽䣺閪ῷ寀撖즚䱋误䢍ꖭ촿昵䢣隔みõ沯鍈囿頷蕗뚌즨�왋ꌢ혼쮳碳⠟ײַꛁڕ쵟毗⾪ⱄ熑❴ඊ芶듧᥅إ븣堦胙 鑟樟몙髂鋂鐬튌덲ꊢ㑰�р㺃혵赹ꎼᓿ록뵧趮⨿괰氼직营똑ꃈ跏 ẃ诒퐳왣Ḋ냁୩᧧錑ሔ沴ᾑ䂶䎘ﳎꆒ朵ﯜ羃更飛�雚솤柺昈逡ﳗ욗뾖뇴罤縫뮗��嗢돑怳בֿ�뼃ᳺ�⡪涯㿴姡Ⴓ駡쬈盵�Β熴苛誽焷�\稉�㨎춻∷ퟂ䓯罤⥉⨪ផᴗ蝆嬑癙ꃈݒ�Ⴍ幣갃宅﵄쏉쓑䰊朅俎꾿僬콯뎙厪짻䚺拓诂⻭熦翆闯ℾ麒䨶美珲悘갦ሕ댳䶿쵚敱狼猓劢≽皣༡㞼�찣骺쇠ꁈຒ惛甫칳糵俲埌叆ᵵ鷭甝ᨊ㮏��଼첑榧ƽⱙ槇韜헾梩躎㣰�뛥樵턺㐙틔ꍲ걖䍨즛䶶恋Ⱖ茱퍢湺�လ Ụ鏩¸悭큱죟惀ꙋ瀹㼄㿘貏鰋훼⡘벇岳씏桦蠉헵茍ʃᡒ徘浿峨➃ា䑧泔↲硘莁�꘡ॱ䢖飣쏢ᖭ裕⯥옫ظⒹ㪧눔英㍅糣픸婈炻ᆓ肍됉⸄䳁䄳愋㱜熭頿ᜳ碱�ᚰㅾ痚㴓ﶰ䰃๋霋蒇ꬤ홣液ﭴ黵辶Ð퓪ଝ䪫謪ु䀨Ꮷ瞹殏⁸쎶泎낂瑔ޢ欇ۨ떻佀嶓⚺瀴᾽㙷䑝跬셓鬞쏃ꊝꤕퟌ캚滔㤵됖蹫ᛛꮯ裬螐誜趮걆㘪뵞枰ર䡬딫錻꿞勩㔤嚧ἅ敥䚗핎ﺞ峂떇玾왼樁⦄♠ֈÓ쵳朄헯䷸檼ꋳ乭墶䔊㖤藍ꐹㆷ塏荅츊쥋ၰ耖Ɍ슎น遾㴨/緸 Ɯ飣�曑䝶쁀蒎섓ϲ턝燕ඈ펋ᚺ恜䯢궫扟뭉啂甙ꗄ뱤娬津擤¡㌧䈡鱌캭焳滍빬ᯚ⎛쭬痢䣏䩠俩犤묦蹽죩㳄둃뿬ࡾ❶鱘侉㝱粛�퉸ঽᔩ駵풊쳎먹穞菵늒髒㔣ᶈ䅇숰褬✐㡎가ﵴ獈旣逢㓁⤹䭵ឿ摉ヨ禽뫜☍ৣ釀ᗘ囘웬惷簣淆◗겴맬☦ᕝ細㟮臯ᐌ뿏쬄坜鋞烽죴쟴깫ୠ挼蛉毙系莖迥뽾笊뮶ຕ흿姽ᄉ爁챇뉲⃧歱岎紷䑓仐낯轋圯謍㎩똹婊觀홬�議糿韸㻏᷺貁疅䂋閊ݢ଼멏ષ봤┭괵ϲ様믥蹸▆鹇ᱛ尹搗틲゙ 칌汒觕米䙝ꕂᣂ녓괁녇鄅ﻹ젙츑尞搥︖ꑿ渇ﮛ咩篾䎻캇メ襺├࠷ඁ뮰Ҝ譊从䭋㙐乙ꢦǿퟞ햨攊摮瑳敲浡攊摮扯੪㔷〠漠橢㐊㜰湥潤橢㜊‶‰扯੪㰼䰯湥瑧ㅨ㔠㘲⼴楆瑬牥䘯慬整敄潣敤䰯湥瑧㜷〠删㸾瑳敲浡砊歘ᱬᗕ朾㬞뻎庽컵붮亻쿛뉵䉰Ꮘ⒛⚄鄦ۭ娢ᔕ⠪䨅䂥ꁩꩄ呚ਊ汱鐜㐦ᚈ␂ᅀꅑ鑐ᓒ煄꣔ࢢ콬綝䋐︥齜릙홷黷믯糧컷Ȁᆀͮ툞휫掆ᶠ�퓨㿛럐嬻ષ렀羡냏妷龊蚤摓�现⛸絭轛㦃踀푵볘ެ赊糴픧띫ఏ鋟→ 樭닛坳彿溶Ѻ뮀ꁾ雯칵콋絍�뽲䋟骧믝蚆疳⭇빻灻靧�ꈟ侺'ߔ辱숋ﰠ└萼뱱�뎀으쉕�ⷁ㣥灛渷렫㞐峢揔瘷⵰쉖㠥⦄쯘犕硶冃ቼ븁㏱쬼솽蜽鰈⯄㓡ᗼ蛞밾踛⯂⫝̸縷︘瘆⻂ᕸ蓮샅✼ꖮ햗耈賡傚㓟쨼晚棆ߨ㠁접ꡤ榆伃遐忽鸄ꗁ뷟몷ᘌﰮ➱쐜鞩拓촏Ҫ듾푅⡱㱈ʈ萤ᓝ슳�墪撃�土襏袟缋撻찅囼냺琟ᤐ觗켂㐡ཥᄘ烸냪꧂䣔泤枍䄔Ⳡ꥓騑伬戴硗�﷽溨ꮌ냇ﵟ㪉ກ⣂鎑퓽༫퇾靼숰体ꋿꔣ莟⪍⺰輘 ⌔᧢솃솴�昬⡑횸ᓔ穮梚걮㲌龃磕㱫횐翓裺㘜�全붴㏆냢蟧颴㭥㤍ਪ堲提냨恳鲷愸딟悡��ᆢϤ뼁폢뱉첮⮌ⷍኼЈ脃ꉤ�틜�鸢溩髫㺧䵸涫�髤ᮏ壯殱흐맑皷置㽑㒭굎둮젶氺⽒鋰檵䥸鞠୧ଔጯ돎펄眍궤坮펹鉡ꖍዺ暉ࢲڭ冘憨眬쓎鉨⌉禇ꖠ奺䁦ङ꣨搛㓧鍠ޜᑬ㴥㰃ዪᧈɖ껏䊒짍偄葡臰呞뙗䤮ꠌ휹֪⻛ᅝ㠊锿㞘㼴థꎫ䶜ὑ음Ỻ駾蝨吒쪧졤⋯嚤㱈㕭䯫쁴蔠遳뎬䶦赎뺡礫쮦䝍⧁껾轓茄⫬ꓶ癌�ꆽ솹屩ጊ 쌚椃巙腁ᬤ鈍譎炥妞蛦�䭰⊺㑇왗㛬膣༯욧�ᵥ霢釆﨎�냪�吝づ嗳ᡲ풳�휬焇鿇ᥤज़嬨퓎므錦㉺㧒签쎴∛霼৶짺ሧ㎭ﴱめ萩ऩ폻撖鳃앺嵛뛥ᓩᜉ蛂ᯱ�粆䲮䭧ᙲ嗭੮㦢瓵拒씧묫켯⪛湷흗⥻䙸⅃麹⣃瓈쨭ᴢ轡넫杲莙邦◕뒤冊┪縓祪ዅ긫㱓ᬍ傯梕䦽굲ρ䴃�眆�﮶膭햶雙捚쫕甖̼歕ꌻ홻꩒낭鮔쵺㦱毭᛫㾫熿测ನ骳⣑謞쓯疎䎛唵�奄龷༿〵ⶥ胁靔갹荆非뭍ᅰ᪅떃ꬉ긫鲻ᙁ씑樌塩죦皩⌢ᴺ㠌팍爤➘ᰑ䓕懚쁽 熫❗븩噠䑭꣔ᒓ袉ﮤ╲誆鳆�贕⛫砟諨虵㚡燔̓ꇃ犵靅旞垕맠ꦡ碽땥뛡쭺潛浽컅릺꯸悿쇒ꛢ뭚⯍㰈ᯮ�ﻢ�駑鵨貜ᭇ芆锵丕僒䆣↜௩媥帪걓Ⳉ䊧鱁厝䘣ᄃ奔ꝁ蛆絩樦ꊈꓦႳ楧嘽偖獔Ꙡ⪼獯ꆌ膳᳥�筨�擀豫畖뉈掼ꝩ䉨ꋁ꿌Ⴔ乗휦吭ﯳ˲腎싖았ⱸ邛鄚䔬ﲝ츥䥎㩹ৢ컹竤苋㗔䐔弦꼍尟岰櫧⹏瓶㟏䎩嶃汫떈랙觹헔鎽ḟ幚屾揇톹竓ꁻ䦲ꦹ㐳�诬ꇱꦶ웖鱞쪷㢼办৯艛듕晘囐᭴ꓴ测劖㒽᪽㓧涊沵운ᄗ讚劻鹽 ็詋듲㽔ꄭ押ᵄ唋⋇줌돨ﮄ닇ⶉ塛ﺪ碥㞇ꩈ귃둈K鵒葡㐼芑貛鄺ꆟꛠ剙Ꭲ芙ァ츼㨜뺢䛊蠭뭘Ⱂ㥖䑢丼�뜈춥玍櫫啽꓅诏㡜恜⊆㲯龡礝ꊍ饰힚嫕䰭돍啜ꞹ浣�芳达礱䪣椢䠪ㅘ䂌瘡�鞸㕜쮝�韷爭飝癣�ꡠ폟㘑鷟䴃鬓簺隫냟嫠䝵㰎弞ࡨנּ쟔ᦱ柴ჹጎ픟▰걭靶根ꈹ芝팀颙읟䮪쮤乲┓碖塣죦્넭岆贺턡졪ꗣ퇼ǻ僭襵杂鏠ᵝ췲ꃅ፪䵵靛䞨粢ꨠ戦ꊳ痨햚䈮脑틇䢶䍓굽叟奝㋡䨛漿櫵㩪潂昂峉큟폞첍뤊圊颺ᢖ孊�䮵嫑孿湑롔 �䊀噩驑荨顚浻⌝족聇達ꘗ짅笄퀜뫤䦅�ᩕ꺿嵏좿씓ℭ뱇㸱쇤哲Nj枼奩揄웶櫫䯖績䏢⦧铡嶓岯௧빖탯��㙚졿㻫�뛏खレ슃偋茅䘣狞ⴢ륗뢉ꝲ⹝觖�ଢ଼ꪃ휊慥ᬠ⑳펍ሶ㲝쩘萋웈层⮸笱숻ⴛᠧ訋逦磱㚌뺆曼�漒鎩莄畱盨殡곗坪宍ꙋ�嫶㼔鸧릳忞绳륙罎븓ﳷ㶯푿竞ﻪ奭故韷᳠쾮ޕ┊⾓臜ⸯ⍼辕迸的ಭ륒⛢ꋱᆴ꾿煨쓞됝늾㉊יִ熆鞫ꇱ庞䍳怴ナ䎱뒀ᙶ㼘Ⱇಙ醝ꦝ뻎㑌헃ැ愫갹斆巄稈ហ탌儀䀈⺖ᶤ䜋庅聊臞몮 兪煴Ⱬ踙둄≯㽸很ꏚ馒ⅰꌳ蕅讆ᤗ⟼鯆⼳晨㚫㕱㕸쵫劼�霧溛晉뙼辉�䫹韬퉠藬緌료饓֓鈻츹ﱌ猬�ࢄ㵝�欉굨뿡鹠㳘⸠㤙퓴췑퓦耿仏徯㚹�⚪咦ꏃԒᤧ劝湥獤牴慥੭湥潤橢㜊‷‰扯੪㜲㠴攊摮扯੪㤱〠漠橢㰊⼼慂敳潆瑮䰯䵗奎⭚呔㉅䉁䉃㡁ぴ⼰潆瑮敄捳楲瑰牯ㄠ‸‰⽒祔数䘯湯ੴ䘯物瑳桃牡ㄠ䰯獡䍴慨ㄲ圯摩桴孳㔠㈠㌷㐠㘵㐠㘵㐠〱㐠㘵㐠㘵㈠㠲ㄠ㈸㈠㠲㔠㜴㜠㐷㐠㘵㔠㈹㔠㜴㐊㘵㐠〱㔠㈹㐠〱ㄠ㈸㘠㌸䔯据摯湩㠷〠 删匯扵祴数启畲呥灹㹥ਾ湥潤橢㜊‸‰扯੪㰼启灹⽥湅潣楤杮䈯獡䕥据摯湩⽧楗䅮獮䕩据摯湩⽧楄晦牥湥散孳ㄊ启爯愯港猯瀯漯琯椯猯慰散䄯圯支眯匯甯振䐯瘯氯洯㹝ਾ湥潤橢㈊‱‰扯੪㰼䈯獡䙥湯⽴䭅乙䍊匫浹潢⽬潆瑮敄捳楲瑰牯㈠‰‰⽒祔数䘯湯ੴ䘯物瑳桃牡㌠⼲慌瑳桃牡ㄠ㌸圯摩桴孳㈊〵〠〠〠〠〠〠〠〠〠〠〠〠〠〠〠《〠〠〠〠〠〠〠〠〠〠〠〠〠〠〠《〠〠〠〠〠〠〠〠〠〠〠〠〠〠〠《〠〠〠〠〠〠〠〠〠〠〠〠〠〠〠《〠〠〠〠〠 〠〠〠〠〠〠〠〠〠〠《〠〠〠〠〠〠〠〠〠〠〠〠〠〠〠《〠〠〠〠〠〠〠〠〠〠〠〠〠〠〠《〠〠〠〠〠〠〠〠〠〠〠〠〠〠〠《〠〠〠〠〠〠〠〠〠〠〠〠〠〠〠《〠〠〠〠〠〠㐠〶䔯据摯湩㤷〠删匯扵祴数启灹ㅥ㸾攊摮扯੪㤷〠漠橢㰊⼼祔数䔯据摯湩⽧慂敳湅潣楤杮圯湩湁楳湅潣楤杮䐯晩敦敲据獥ਜ਼㠱⼳畢汬瑥㹝ਾ湥潤橢㐊‴‰扯੪㰼䈯獡䙥湯⽴䭑乆坆䠫汥敶楴慣䘯湯䑴獥牣灩潴㌴〠删启灹⽥潆瑮⼊楆獲䍴慨㈳䰯獡䍴慨㘸圯摩桴 孳㈊㠷〠〠〠〠㠠㤸〠〠〠〠〠〠〠〠〠〠㔊㘵〠〠〠〠〠〠〠〠〠〠〠〠〠〠〠《㘠㜶㘠㜶〠㜠㈲㘠㜶〠〠㜠㈲〠〠〠㔠㘵〠〠㜠㠷《〠㜠㈲㘠㜶㘠ㄱ㜠㈲㘠㜶䔯据摯湩⽧楗䅮獮䕩据摯湩⽧畓瑢灹⽥祔数㸱ਾ湥潤橢ㄊ″‰扯੪㰼䈯獡䙥湯⽴呗䱆䕓含浩獥刭浯湡䘯湯䑴獥牣灩潴㈱〠删启灹⽥潆瑮⼊楆獲䍴慨㈳䰯獡䍴慨㈱⼱楗瑤獨ਜ਼㔲‰‰〴‸‰〵‰㌸″㜷‸‰㌳″㌳″‰㘵‴㔲‰㌳″㔲‰㜲ਸ〵‰〵‰〵‰〵‰〵‰〵‰〵‰〵‰〵‰〵‰㜲 ‸‰‰‰‰ਰ‰㈷′㘶‷㘶‷㈷′ㄶ‱㔵‶㈷′㈷′㌳″‰㈷′ㄶ‱㠸‹㈷′㈷ਲ㔵‶‰㘶‷㔵‶ㄶ‱㈷′‰㐹‴㈷′‰ㄶ‱‰㜲‸‰‰ਰ‰㐴‴〵‰㐴‴〵‰㐴‴㌳″〵‰〵‰㜲‸㜲‸〵‰㜲‸㜷‸〵‰〵ਰ〵‰‰㌳″㠳‹㜲‸〵‰〵‰㈷′〵‰〵崰⼊湅潣楤杮圯湩湁楳湅潣楤杮匯扵祴数启灹ㅥ㸾攊摮扯੪‹‰扯੪㰼䈯獡䙥湯⽴午婎卋含䕔䄲㕁㠵琸〰䘯湯䑴獥牣灩潴‸‰⽒祔数䘯湯ੴ䘯物瑳桃牡ㄠ䰯獡䍴慨㘳圯摩桴孳㤠㠸㤠㌷㤠㈵㤠㔸㈠㌱㈠ ㌷㜠㐹㘠㐶ㄠ㤰‸㠶‰〱㈰㈠㌱㤠㠳㔠㘶㈠㌱㤊㘶㐠㜶㌠㠴㈠㈱㐠㜰㔠㔰㔠〱㐠㘴㐠㜷㔠㔱㌠㠳㔠㐷㔠ㄱ㜠㔴㔠㜶㤠㤸㔊ㄶ㔠ㄲ㐠㈳㜠㌵㈠〰䔯据摯湩〸〠删匯扵祴数启畲呥灹㹥ਾ湥潤橢㠊‰‰扯੪㰼启灹⽥湅潣楤杮䈯獡䕥据摯湩⽧楗䅮獮䕩据摯湩⽧楄晦牥湥散孳ㄊ䐯䄯启䔯振汯湯䤯刯倯伯䨯䌯猯慰散丯漯瀯牥潩⽤⽓⽣⽴⽩⽶⽹⽡⽳⽫⽥⽲⽰⽮⽌⽢⽈⽤⽵⽸⽆嵬㸾攊摮扯੪㔱〠漠橢㰊⼼慂敳潆瑮匯乃块⭄效癬瑥捩ⵡ潂摬䘯湯䑴獥牣灩潴㐱〠删 启灹⽥潆瑮⼊楆獲䍴慨㈳䰯獡䍴慨㈱⼱楗瑤獨ਜ਼㜲‸‰‰‰‰‰‰‰㌳″㌳″‰‰㜲‸㌳″㜲‸㜲ਸ㔵‶㔵‶㔵‶㔵‶㔵‶㔵‶㔵‶‰㔵‶㔵‶‰‰‰‰‰ਰ㜹‵㈷′㈷′㈷′㈷′㘶‷ㄶ‱㜷‸㈷′㜲‸㔵‶㈷′ㄶ‱㌸″㈷′㜷ਸ㘶‷㜷‸㈷′㘶‷ㄶ‱㈷′㘶‷‰‰㘶‷‰‰‰‰‰ਰ‰㔵‶‰㔵‶ㄶ‱㔵‶㌳″ㄶ‱ㄶ‱㜲‸㜲‸㔵‶㜲‸‰ㄶ‱ㄶㄶ‱‰㠳‹㔵‶㌳″ㄶ‱㔵‶㜷‸㔵‶㔵崶⼊湅潣楤杮圯湩湁楳湅潣楤杮匯扵祴数启灹ㅥ㸾攊摮扯 ੪ㄱ〠漠橢㰊⼼慂敳潆瑮䘯䙌偆⭊楔敭潂摬䘯湯䑴獥牣灩潴〱〠删启灹⽥潆瑮⼊楆獲䍴慨㈳䰯獡䍴慨ㄱ⼱楗瑤獨ਜ਼㔲‰‰‰‰〵‰‰‰‰㌳″㌳″‰‰㔲‰㌳″㔲‰㜲ਸ〵‰〵‰〵‰〵‰〵‰〵‰〵‰〵‰〵‰〵‰㌳″‰‰‰‰ਰ‰㈷′㘶‷㈷′㈷′㘶‷ㄶ‱㜷‸㜷‸㠳‹〵‰㜷‸㘶‷㐹‴㈷′㜷ਸㄶ‱‰㈷′㔵‶㘶‷㈷′㈷′‰㈷′㈷′‰‰‰‰‰ਰ‰‰‰‰‰‰‰‰‰‰‰‰‰‰‰〵崰⼊湅潣楤杮圯湩湁楳湅潣楤杮匯扵祴数启灹ㅥ㸾攊 摮扯੪㜱〠漠橢㰊⼼慂敳潆瑮嘯剌坆⭈呔ㅅ㡆㐲〸ぴ⼰潆瑮敄捳楲瑰牯ㄠ‶‰⽒祔数䘯湯ੴ䘯物瑳桃牡ㄠ䰯獡䍴慨㘱圯摩桴孳㜠㘰㔠〴㜠㠰㌠㤳㌠〵㜠㘴㜠㈲㈠〵㘠㈵㔠㌲㘠〴㌠㈸㌠㤶㜠㔸㘠㔶㌊㌸䔯据摯湩ㄸ〠删匯扵祴数启畲呥灹㹥ਾ湥潤橢㠊‱‰扯੪㰼启灹⽥湅潣楤杮䈯獡䕥据摯湩⽧楗䅮獮䕩据摯湩⽧楄晦牥湥散孳ㄊ匯琯支氯椯港术猯慰散䔯爯猯振浯慭䤯丯䌯瀯牥潩嵤㸾攊摮扯੪㠱〠漠橢㰊⼼祔数䘯湯䑴獥牣灩潴⽲潆瑮慎敭䰯䵗奎⭚呔㉅ 䉁䉃㡁ぴ⼰潆瑮䉂硯せⴠ㤱‸㘷‶㈷崸䘯慬獧㐠⼊獁散瑮㜠㠲⼊慃䡰楥桧⁴㈷ਸ䐯獥散瑮ⴠ㤱ਸ䤯慴楬䅣杮敬〠⼊瑓浥⁖ㄱ䴯獩楳杮楗瑤㈲ਸ䘯湯䙴汩㉥㘠′‰㹒ਾ湥潤橢㈊‰‰扯੪㰼启灹⽥潆瑮敄捳楲瑰牯䘯湯乴浡⽥䭅乙䍊匫浹潢⽬潆瑮䉂硯せ〠㐠〱㔠㠱⽝汆条䄯捳湥⁴ㄵਸ䌯灡效杩瑨㔠㠱⼊敄捳湥⁴ਰ䤯慴楬䅣杮敬〠⼊瑓浥⁖ㄶ⼊楍獳湩坧摩桴㈠〵⼊桃牡敓⡴戯汵敬⽴灳捡⥥䘯湯䙴汩㍥㘠‴‰㹒ਾ湥潤橢㐊″‰扯੪㰼启灹⽥潆瑮敄捳楲 瑰牯䘯湯乴浡⽥䭑乆坆䠫汥敶楴慣䘯湯䉴潂學‰㈭″㔸‹㐷崱䘯慬獧㐠⼊獁散瑮㜠ㄴ⼊慃䡰楥桧⁴㐷䐯獥散瑮ⴠ㌲⼊瑉污捩湁汧ਰ匯整噭ㄠ㠲⼊楍獳湩坧摩桴㈠㠷⼊桃牡敓⡴䰯䄯䈯伯䐯䔯刯匯䠯启唯嘯猯慰散稯牥⽯数捲湥⥴䘯湯䙴汩㍥㘠‶‰㹒ਾ湥潤橢ㄊ′‰扯੪㰼启灹⽥潆瑮敄捳楲瑰牯䘯湯乴浡⽥呗䱆䕓含浩獥刭浯湡䘯湯䉴潂學㜭‰㈭㠱㤠㈳㜠㜲⽝汆条䄯捳湥⁴㈷䌯灡效杩瑨㜠㜲⼊敄捳湥⁴㈭㠱⼊瑉污捩湁汧ਰ匯整噭ㄠ㤳⼊楍獳湩坧 摩桴㈠〵⼊桃牡敓⡴琯潷䰯䄯礯港振堯琯牨敥䴯䈯漯搯是畯⽲⽎⽃⽰⽥⽚楦敶伯䐯是猯硩倯䔯爯术戯捡獫慬桳猯癥湥䘯猯栯支杩瑨刯䜯琯椯港湩⽥⽓⽈⽵⽪潣潬⽮⽔⽉⽶⽫⽕⽷⽬⽡⽋⽸⽭⽢⽗慰敲汮晥⽴慰敲牮杩瑨瀯畬⽳灳捡⽥潣浭⽡票桰湥焯潵整扤⽬数楲摯猯慬桳搯汯慬⽲敺潲瀯牥散瑮漯敮愯灭牥慳摮⼩潆瑮楆敬″㠶〠删㸾攊摮扯੪‸‰扯੪㰼启灹⽥潆瑮敄捳楲瑰牯䘯湯乴浡⽥午婎卋含䕔䄲㕁㠵琸〰䘯湯䉴潂學㠭ⴠㄴ″〱㘴㠠㔲⽝汆条䄯捳湥 ⁴㈸ਵ䌯灡效杩瑨㠠㔲⼊敄捳湥⁴㐭㌱⼊瑉污捩湁汧ਰ匯整噭ㄠ㘵⼊楍獳湩坧摩桴㈠㌱⼊潆瑮楆敬′〷〠删㸾攊摮扯੪㐱〠漠橢㰊⼼祔数䘯湯䑴獥牣灩潴⽲潆瑮慎敭匯乃块⭄效癬瑥捩ⵡ潂摬䘯湯䉴潂學‰㈭㤱㤠㜴㜠㔴⽝汆条䄯捳湥⁴㐷ਵ䌯灡效杩瑨㜠㔴⼊敄捳湥⁴㈭㤱⼊瑉污捩湁汧ਰ匯整噭ㄠ㈴⼊楍獳湩坧摩桴㈠㠷⼊桃牡敓⡴琯潷䰯䄯礯港振琯牨敥䴯䈯漯搯夯是畯⽲⽎⽃⽰⽥瑡是癩⽥⽏⽄⽦楳⽸⽐⽅⽲⽧⽑⽆⽳⽨楥桧⽴⽒⽇⽴⽩楮敮匯䠯甯 樯启䤯瘯欯唯䨯眯氯愯嘯䬯砯瀯牡湥敬瑦瀯牡湥楲桧⽴灳捡⽥潣浭⽡票桰湥瀯牥潩⽤汳獡⽨敺潲漯敮⼩潆瑮楆敬″㈷〠删㸾攊摮扯੪〱〠漠橢㰊⼼祔数䘯湯䑴獥牣灩潴⽲潆瑮慎敭䘯䙌偆⭊楔敭潂摬䘯湯䉴潂學㈭‴ㄭ㠶㤠ㄲ㜠〵⽝汆条䄯捳湥⁴㔷ਰ䌯灡效杩瑨㜠〵⼊敄捳湥⁴ㄭ㠶⼊瑉污捩湁汧ਰ匯整噭ㄠ㠳⼊楍獳湩坧摩桴㈠〵⼊桃牡敓⡴琯潷䰯䄯堯琯牨敥䴯䈯漯夯是畯⽲⽎⽃楦敶伯䐯猯硩倯䔯猯癥湥䘯支杩瑨刯䜯港湩⽥⽓⽈潣潬⽮⽔⽉⽕⽊⽖ ⽋慰敲汮晥⽴慰敲牮杩瑨猯慰散振浯慭栯灹敨⽮数楲摯猯慬桳搯汯慬⽲敺潲漯敮⼩潆瑮楆敬″㐷〠删㸾攊摮扯੪㘱〠漠橢㰊⼼祔数䘯湯䑴獥牣灩潴⽲潆瑮慎敭嘯剌坆⭈呔ㅅ㡆㐲〸ぴ⼰潆瑮䉂硯ⵛ㘵ⴠ㠱‶㜸‰㘶崶䘯慬獧㐠⼊獁散瑮㘠㘶⼊慃䡰楥桧⁴㘶ਸ਼䐯獥散瑮ⴠ㠱ਸ਼䤯慴楬䅣杮敬〠⼊瑓浥⁖㌱ਰ䴯獩楳杮楗瑤㔲ਰ䘯湯䙴汩㉥㜠‶‰㹒ਾ湥潤橢㈊〠漠橢㰊⼼牐摯捵牥䜨䱐䜠潨瑳捳楲瑰㠠ㄮ⤵⼊牃慥楴湯慄整䐨㈺〰〶ㄹ㌱㔴⤵⼊潍䑤瑡⡥㩄〲〱㘰 㤰ㄱ㐳㔵启瑩敬〨㐰″䍋⁁偍䌠湯畳瑬湡⁴潈牵䱘⥓⼊牃慥潴⡲卐牣灩㕴搮汬嘠牥楳湯㔠㈮㈮䄯瑵潨⡲敊晦㸩放摮扯੪牸晥《㠠ਲ〰〰〰〰〰㘠㔵㔳映ਠ〰〰㌰〰㈴〠〰〰渠ਠ〰〰㈱㈵㜴〠〰〰渠ਠ〰〰㈰㤹㘴〠〰〰渠ਠ〰〰㈰〹㠷〠〰〰渠ਠ〰〰〰〰㔱〠〰〰渠ਠ〰〰〰ㄲ㘹〠〰〰渠ਠ〰〰㌰〰〹〠〰〰渠ਠ〰〰㈱〴㈴〠〰〰渠ਠ〰〰㈱㈱㈳〠〰〰渠ਠ〰〰㈱㘴㠵〠〰〰渠ਠ〰〰㈱ㄲ㘵〠〰〰渠ਠ〰〰㈱㔳㔷〠〰〰渠ਠ〰〰㈱㜰㔵〠〰〰渠 ਠ〰〰㈱㈴〵〠〰〰渠ਠ〰〰㈱㘱㈹〠〰〰渠ਠ〰〰㈱〵㠳〠〰〰渠ਠ〰〰㈱㔲㠵〠〰〰渠ਠ〰〰㈱㠲㠹〠〰〰渠ਠ〰〰ㄱ㔹〶〠〰〰渠ਠ〰〰㈱ㄳ㔰〠〰〰渠ਠ〰〰ㄱ㤹ㄲ〠〰〰渠ਠ〰〰㌰〳〳〠〰〰渠ਠ〰〰㌰ㄳ〠〰〰渠ਠ〰〰㌰㌱㌶〠〰〰渠ਠ〰〰㌰㘳㜹〠〰〰渠ਠ〰〰㌰〲㤲〠〰〰渠ਠ〰〰㌰㘰㔹〠〰〰渠ਠ〰〰㌰㘲㘹〠〰〰渠ਠ〰〰㌰〱㤲〠〰〰渠ਠ〰〰㌰㌳㌶〠〰〰渠ਠ〰〰㌰㘱㘹〠〰〰渠ਠ〰〰㌰㌰㈶〠〰〰渠ਠ〰〰㌰㌲㌶〠〰〰 渠ਠ〰〰㌰〴㈶〠〰〰渠ਠ〰〰㌰㠵〠〰〰渠ਠ〰〰㌰〹〠〰〰渠ਠ〰〰㌰㈰〲〠〰〰渠ਠ〰〰㌰〴〳〠〰〰渠ਠ〰〰㘰㤹㘴〠〰〰渠ਠ〰〰㈰㈹㠹〠〰〰渠ਠ〰〰〰㈲㘱〠〰〰渠ਠ〰〰〰㜹㤴〠〰〰渠ਠ〰〰㈱㌳ㄲ〠〰〰渠ਠ〰〰㈱㐰ㄶ〠〰〰渠ਠ〰〰㜰〰㈴〠〰〰渠ਠ〰〰㜰〰㈷〠〰〰渠ਠ〰〰㈰㐹〶〠〰〰渠ਠ〰〰〰㜹〷〠〰〰渠ਠ〰〰〶㈲〠〰〰渠ਠ〰〰㜰㜳〠〰〰渠ਠ〰〰㜰㜶〠〰〰渠ਠ〰〰㈰㘹㈲〠〰〰渠ਠ〰〰〶㌴〠〰 〰渠ਠ〰〰㈰㤲㌹〠〰〰渠ਠ〰〰㜰㈰㈳〠〰〰渠ਠ〰〰㜰㈰㈶〠〰〰渠ਠ〰〰㈰㜹㐸〠〰〰渠ਠ〰〰㈰〳㐱〠〰〰渠ਠ〰〰㈰〹㜵〠〰〰渠ਠ〰〰㜰㌰㜲〠〰〰渠ਠ〰〰㜰㌰㜵〠〰〰渠ਠ〰〰㜰㐰㈲〠〰〰渠ਠ〰〰㜰㜸㈶〠〰〰渠ਠ〰〰㜰㜸㌸〠〰〰渠ਠ〰〰㜰㈹㠹〠〰〰渠ਠ〰〰㜰㌹㠱〠〰〰渠ਠ〰〰㠰㘰㤸〠〰〰渠ਠ〰〰㠰㜰〱〠〰〰渠ਠ〰〰㠰〸㈶〠〰〰渠ਠ〰〰㠰〸㌸〠〰〰渠ਠ〰〰〱㠷㠹〠〰〰渠ਠ〰〰〱㤷〲〠〰〰渠ਠ〰〰ㄱ㔲㔰〠 〰〰渠ਠ〰〰ㄱ㔲㘲〠〰〰渠ਠ〰〰ㄱ㘶㘸〠〰〰渠ਠ〰〰ㄱ㜶㜰〠〰〰渠ਠ〰〰ㄱ㔹㤳〠〰〰渠ਠ〰〰ㄱ㜹㔹〠〰〰渠ਠ〰〰㈱㌰㈷〠〰〰渠ਠ〰〰㈱㔱㜲〠〰〰渠ਠ〰〰㈱㜲㌷〠〰〰渠ਠ牴楡敬ੲ㰼⼠楓敺㠠′刯潯⁴‱‰⁒䤯普′‰䤯⁄⡛棼䒧砼跐襓瀄⠩棼䒧砼跐襓瀄崩㸊ਾ瑳牡硴敲੦㈱㐵㠴┊䔥䙏