E4. Award Lower Zone Storage Tank 2 ProjectCITY OF KALISPELL MEMORANDUM To: Jarod Nygren — Interim City Manager From: Keith Haskins, PE — Deputy Director Public Works CC: Susie Turner, PE — Public Works Director Re: Lower Zone Storage Tank 2 Replacement Project Meeting Date: 10/20/2025 BACKGROUND: The Lower Zone Storage Tank 2 Replacement Project generally consists of furnishing materials, labor, and equipment required to replace the existing 2.7 MG water reservoir which has a failing timber roof and reconstruct a 2.5 MG water reservoir and its surrounding infrastructure. The project includes demolition of the existing structure, site utility modifications, and construction of a new prestressed concrete 2.5 MG water storage tank. BIDS RECEIVED: Bids were received and opened on October 9, 2025, at 2:00 PM. Two responsive bids were received as summarized below. Contractor Base Bid Preload, LLC $7,040,000.00 DN Tanks, LLC $8,411,500.00 Engineer Estimate $7, 270, 800.00 FISCAL EFFECTS: The project was budgeted from the following line items: Budget Fund Description Amount 5210-447-430550-969 Water Lower Zone Reservoirs Roof Rep $ 2,994,636.00 5210-447-430551-971 Water Lower Zone Reservoirs #2 Replac $ 5,973,575.00 STAFF RECOMMENDATION: MMI Engineering, the engineer of record for the City, reviewed the bids, the submitted documentation, and submitted references. Based on their review, Preload LLC was determined to be a responsive and responsible contractor who has successfully completed similar projects of size and scope, including the nearly identical Reservoir 1 tank for Kalispell which is currently nearing successful completion. Based on MMI's evaluation and review of the bid and references, staff recommends awarding the bid to Preload, LLC. 201 1st Avenue E Phone (406)758-7720 Po Box 1997 Public Works Department Fax (406)758-7831 Kalispell, MT 59903 1 1 www.kalispell.com ACTION REQUESTED: Motion to award the Base Bid to Preload LLC in the amount of $7,040,000.00 ALTERNATIVES: As suggested and approved by the City Council. ATTACHMENTS: Engineer's Recommendation to Award Letter (MMI Engineering); Lower Zone Storage Tank Replacement Reservoir 2 Recommendation of Award; October 14, 2025 Morrison Maierle engineers surveyors planners scientists TO: Susie Turner, P.E., Public Works Director FROM: Jeff Cicon, P.E. DATE: October 14, 2025 JOB NO.: 0387.058 memo RE: Lower Zone Storage Tank Replacement Reservoir 2 Recommendation of Award ❑Urgent El For Review ❑Please Comment ❑Please Reply ®For Your Use Background: The Lower Zone Storage Tank Replacement Reservoir 2 Project generally consists of the construction of a new 2.5 million -gallon (MG) prestressed concrete storage reservoir located on Buffalo Hill in Kalispell. The project includes demolition of the existing 2.7 MG reservoir, site preparation, utility modifications, and construction of the new reservoir. The basis for the recommendation to install a new tank was determined in an alternative analysis report completed in April 2023. Bidding Results: Bids were received on October 9, 2025, and read aloud at 2:00 p.m. at City Hall. Two responsive bids were received from Preload, LLC ("Preload") of Louisville, KY and DN Tanks, LLC ("DN Tanks") of Grand Prairie, TX. Below is a summary of bid amounts. Bid totals are listed low to high and summarized as follows: Schedule 2: Contractor Reservoir 2 (2.5 MG) Preload, LLC $7,040,000 Louisville, KY DN Tanks, LLC $8,411,500 Grand Prairie, TX Engineers Estimate $7,270,800 Morrison-Maierle, Inc. The low bid of $7,040,000 is below the Engineer's Estimate by $230,800. Morrison-Maierle has previous work experience with Preload on the City of Kalispell Lower Zone Reservoir 1 Project, currently under construction. We also have previous work experience with Preload's site work and utility contractor, LHC, Inc. of Kalispell, MT. Preload's qualification questionnaire shows they have completed recent projects of similar size and scope and are qualified to complete this project. No references were contacted; however, two references were contacted as part of the Lower Zone Reservoir 1 Project, and there were no concerns with Preload constructing this type of work. Since this is a specialized rehabilitation project, the number of qualified contractors is limited, and receiving only two bids was not unexpected. Page 1 Lower Zone Storage Tank Replacement Reservoir 2 Recommendation of Award Morrison Maierle Potential Cost Saving Alternatives No cost -saving alternatives have been identified for this project. Award Options The City has the options available in terms of awarding a contract for this project: 1. Award Schedule 2: Reservoir 2 in the amount of $7,040,000 to Preload, LLC. 2. Reject all bids and re -bid the project at a later date. Recommendation Morrison-Maierle believes that the low bid amount of $7,040,000 is a competitive bid and that the City is not likely to see a lower bid should the project be bid at a later date. Based on the qualification information submitted with their bid and reference checks, Preload is competent and capable of completing the proposed work. If considered appropriate by the City, it would be the recommendation of Morrison- Maierle to award the contract to Preload, LLC. Page 2 Lower Zone Storage Tank Replacement -Schedule 2: Reservoir 2 (N9869547) Owner: Kalispell MT, City of Solicitor: Morrison-Maierle 10/09/2025 02:00 PM MDT N0 Morrison Maierle engin e s su v planners s.ien�isis Engineer Estimate Preload, LLC DN Tanks Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension General and Surface Restoration 201 Mobilization/Demobilization LS 1 $477,000.00 $477,000.00 $350,000.00 $350,000.00 $326,700.00 $326,700.00 202 Construction Surveying LS 1 $30,000.00 $30,000.00 $35,000.00 $35,000.00 $0.00 $0.00 203 Construction Traffic Control LS 1 $5,000.00 $5,000.00 $15,000.00 $15,000.00 $10,400.00 $10,400.00 204 Exploratory Excavation HR 20 $900.00 $18,000.00 $800.00 $16,000.00 $1,130.00 $22,600.00 205 Site Preparation LS 1 $315,000.00 $315,000.00 $110,000.00 $110,000.00 $149,100.00 $149,100.00 206 Demolish Existing Tank, Booster Building, and Utilities LS 1 $350,000.00 $350,000.00 $315,000.00 $315,000.00 $516,500.00 $516,500.00 207 Asbestos Abatement - AC Pipe LS 1 $10,000.00 $10,000.00 $19,000.00 $19,000.00 $27,100.00 $27,100.00 209 Utility Crossing EA 1 $1,700.00 $1,700,00 52,000.00 $2,000.00 $2,510.00 $2,510.00 210 Asphalt Surface Restoration LS 1 $30,000.00 $30,000.00 57,500.00 $7,500.00 $6,500.00 $6,500.00 210A Logan Health Asphalt and Concrete Surface Restoration Sci Yell 1203 $0.00 $0.00 $37.00 $44,511.00 $60.00 $72,180.00 211 Landscape, Topsoil, and Reseed LS 1 $100,000.00 $_00,000.00 $60,000.00 $60,000.00 $77,900.00 $77,900.00 212 Site Electrical LS 1 $40,000.00 $40,000.00 $30,000.00 530,000.00 $29,400.00 $29,400.00 Water Main 213 12" Connection to Ex. Cast Iran Pipe EA 1 $2,100.00 $2,100.00 $2,000.00 $2,000.00 $2,190.00 $2,190.00 214 12" Connection to Ex. HDPE Pipe EA 1 $3,000.00 $3,000.00 $2,000.00 $2,000.00 $2,600.00 $2,600.00 215 12" DR18 C900 PVC Water Main LF 250 $300.00 $75,000.00 $210.00 $52,500.00 $290.00 $72,500.00 216 12" MJ Gate Valve EA 1 $5,000.00 $5,000.00 $7,300.00 $7,300.00 $10,110.00 $10,110.00 217 12" MJ Bend EA 7 $3,600.00 $25,200.00 $2,150.00 $15,050.00 $2,960.00 $20,720.00 218 12" x 12" x 6" MJ x FL Tee EA 1 $5,000.00 $5,000.00 $2,000.00 $2,000.00 $2,700.00 $2,700.00 219 16" Connection to Ex. AC Pipe EA 1 $3,000.00 $3,000.00 $2,900.00 $2,900.00 $4,040.00 $4,040.00 220 16" DR18 C900 PVC Water Main LF 5 $400.00 $2,000.00 $600.00 $3,000.00 $820.00 $4,100.00 221 24" Connection to Ex. Ductile Iron Pipe EA 2 $15,000.00 $30,000.00 $5,300.00 $10,600.00 $7,200.00 $14,400.00 222 24" Connection to Ex. Butterfly Valve EA 1 $10,000.00 $10,000.00 $5,200.00 $5,200.00 $7,170.00 $7,170.00 223 24" DR18 C900 PVC Water Main LF 255 $500.00 $127,500.00 $325.00 $82,875.00 5460.00 $117,300.00 224 24" Ductile Iron Water Main LF 12 $2,000.00 $24,000.00 $725.00 $8,700.00 5950.00 $11,400.00 225 24" MJ Butterfly Valve EA 6 $40,000.00 $240,000.00 $26,000.00 $156,000.00 $36,050.00 $216,300.00 226 24" MJ Bend EA 4 $15,000.00 $60,000.00 $7,500.00 $30,000.00 $10,460.00 $41,840.00 227 24" Flex Coupling EA 1 $20,000.00 $20,000.00 $8,500.00 $8,500.00 $11,640.00 $11,640.00 228 24" MJ Tee EA 3 $20,000.00 $60,000.00 $12,000.00 $36,000.00 $16,500.00 $49,500.00 229 24" x 12" MJ Reducer EA 2 $15,000.00 $30,000.00 $4,600.00 $9,200.00 $6,360.00 $12,720.00 230 24" x 16" MJ Reducer EA 1 $16,000.00 $16,000.00 $5,500.00 $5,500.00 $7,660.00 $7,660.00 230A Air Release Valve LS 1 $0.00 $0.00 $37,000.00 537,000.00 $56,270.00 $56,270.00 Overflow and Drain Pipe 231 12" Connection to Ex. Clay Drain Pipe EA 1 $2,100.00 $2,100.00 $500.00 $500.00 $700.00 $700.00 232 12" DR18 C900 PVC Drain Line LF 96 $300.00 $28,800.00 $225.00 $21,600.00 $320.00 $30,720.00 233 12" Ductile Iron Drain Line LF 14 $1,000.00 $14,000.00 $1,300.00 $18,200.00 $1,760.00 $24,640.00 234 12" MJ Gate Valve EA 1 $11,000.00 $11,000.00 $7,300.00 $7,300.00 $11,200.00 $11,200.00 235 12" MJ Bend EA 3 $3,600.00 $10,800.00 $2,150.00 $6,450.00 $2,950.00 $8,850.00 236 12" Flexible Coupling EA 1 $4,000.00 $4,000.00 $1,900.00 $1,900.00 $2,570.00 $2,570.00 237 12" MJ Tee EA 1 $3,600.00 $3,600.00 $2,500.00 $2,500.00 $3,470.00 $3,470.00 238 lDrain Inlet Structure LS 1 $17,000.00 $17,000.00 $20,000.00 $20,000.00 $22,900.00 $22,900.00 2.5 MG Water Tank 239 Unclassified Excavation LS 1 $260,000.00 $260,000.00 $300,000.00 $300,000.00 $343,400.00 $343,400.00 240 Remove Excess Material From the Site LS 1 $340,000.00 $340,000.00 $250,000.00 $250,000.00 $285,800.00 $285,800.00 241 Tank Backfill- Native Material LS 1 $390,000.00 $390,000.00 $255,000.00 $255,000.00 $334,400.00 $334,400.00 242 Tank Backfill- Structural Backfill LS 1 $200,000.00 $200,000.00 $120,000.00 $120,000.00 $469,900.00 $469,900.00 243 Tank Foundation Preparation LS 1 $125,000.00 $125,000.00 $120,000.00 $120,000.00 $479,800.00 $479,800.00 244 2.5 MG AWWA D110 Type III Prestressed Concrete Tank and Appurtenances LS 1 $3,700,000.00 $3,700,000.00 $4,411,214.00 $4,411,214.00 $4,431,200.00 $4,431,200.00 245 Access Stairs and Slab LS 1 1 $50,000.00 $50,000.00 $25,000.00 $25,000.00 $55,900.00 $55,900.00 Schedule 2: Reservoir 2 Total $7,270,800.00 $7,040,000.00 $8,411,500.00 N TA,The tabulation of Bids herein is beleived to "-�Q PPPPP be a true representation of the Bids received on October 9, 2025 a C. PE.oW