E3. Recommendation for Award PFAS Water Main Improvements 2025crr•v or KALISPELL MEMORANDUM To: Jarod Nygren, Interim City Manager Cc: Susie Turner, PE — Public Works Director From: Keith Haskins, PE - Deputy Public Works Director Re: Emerging Contaminant PFAS — Water Main Improvements - 2025 Meeting Date: September 15, 2025 BACKGROUND: This project is the water transmission main phase of the larger project to secure alternative PFAS-free water sources for the public water supply. The scope includes construction of the following schedules: Schedule 1: Buffalo Hill Tank Piping • This schedule involves upsizing an existing water main to improve conveyance between the two lower pressure zone storage tanks at Buffalo Hill Golf Course. Schedule 2: Noffsinger Transmission Main • This schedule includes constructing a transmission main to deliver water from the Noffsinger Springs future well source to the lower pressure zone storage tanks near Buffalo Hill Golf Course. Schedule 3: Woodland Avenue Connector • This schedule entails installing a transmission main along Woodland Avenue, between E Center Street and Albina Street, to enhance system efficiency in preparation for a future water source at Dry Bridge Park. This phase replaces the existing 1920's era undersized cast iron main and 1970's era AC water mains currently installed in Woodland Avenue. The project will also replace existing water services to the edge of right-of-way, install water meter pits, and replace fire hydrants. BIDDING RESULTS: Bids were received and opened on September 4, 2025, at 2 pm. Four responsive bids were received and are summarized below. Contractor Schedule 1 Schedule 2 Schedule 3 Neumann Construction $420,550.00 No Bid No Bid Sandry Construction $481,625.00 $1,398,057.00 $3,847,954.00 Western Municipal Construction $1,298,850.00 $3,347,097.00 $5,504,980.00 LHC, Inc No Bid No Bid $5,073,274.89 Engineer Estimate $349,670.00 $1,287,670.00 $4,370,370.00 Neuman Construction and Sandry Construction were the low bidders, and both are considered responsible bidders that met the requirements to complete the project as bid. Public Works recommends awarding Schedule 1 to Neumann Construction and Schedules 2 and 3 to Sandry Construction. 201 1" Avenue E IPhone (406)758-7720 Po Box 1997 Public Works Department Fax (406)758-7831 Kalispell, MT 59903 1 1 www.kalispell.com E.C. PFAS — Water Main Improvements - 2025 Meeting Date: 9/15/25 Page 2 ACTION REQUESTED: Motion to award the PFAS Water Main Improvements bid schedules, contingent on DEQ and funding agency approval, as follows: • Schedule 1: Buffalo Hill Tank Piping to Neumann Construction for $420,550.00 • Schedule 2: Noffsinger Transmission Main to Sandry Construction for $1,398,057.00 • Schedule 3: Woodland Avenue Connector to Sandry Construction for $3,847,954.00 FISCAL EFFECTS: Expenditure for the Emerging Contaminant PFAS — Water Main Improvements are budgeted in FY 26 and will be funded through the Emerging Contaminate Response Grant and Forgiveness Bond in the Water Fund 9 5210-447- 430551-939. ALTERNATIVES: As suggested and approved by the City Council. ATTACHMENTS: • RPA Recommendation Memo (9/9/25) • Project Certified Bid Tab (9/5/25) TO: Susie Turner, PE Keith Haskins, PE City of Kalispell Public Works Department FROM: Neal Levang, PE Senior Design Team Leader DATE: September 9, 2025 SUBJECT: Emerging Contaminant PFAS — Water Main Improvements — 2025 Bid Recommendation Project Overview The Emerging Contaminant PFAS — Water Main Improvements - 2025 is broken into three schedules described below: Schedule 1: Buffalo Hill Tank Piping This schedule involves upsizing an existing water main to improve conveyance between the two lower pressure zone storage tanks at Buffalo Hill Golf Course. Schedule 2: Noffsinger Transmission Main This schedule includes constructing a transmission main to deliver water from the Noffsinger Springs future well source to the lower pressure zone storage tanks near Buffalo Hill Golf Course. Schedule 3: Woodland Avenue Connector This schedule entails installing a connector along Woodland Avenue, between E Center Street and Albina Street, to enhance system efficiency in preparation for a future water source at Dry Bridge Park. Pre -Bid Meeting A pre -bid meeting was held on August 19, 2025, at 9:00 AM in the Council Chambers at Kalispell City Hall. The meeting covered project requirements and the electronic bidding process via QuestCDN. A recording was posted to QuestCDN. An additional virtual Q&A session was held on August 28 at 3:00 PM. Bid Opening Bids were received on September 4, 2025 and opened through QuestCDN (#9826433) at 2:00 PM, local time, in First Floor Conference Room at City Hall in Kalispell, MT. A total of four (4) bidders submitted bids for the project and all required items were submitted with each bid. 406.447.5000 3147 Saddle Dr. Helena, MT 59601 www.rpa-hln.com HELENA KALISPELL BOZEMAN Emerging Contaminant PFAS — Water Main Improvements - 2025 September 9, 2025 Summary of Bids Summary of Bids Received The Summary of Bids is attached to this memorandum. Schedule 1: Buffalo Hill Tank Piping Three (3) bids were received for Schedule 1. The bids for Schedule 1 were 20.3%, 37.7%, and 271.5% higher than the Engineers Estimate. The low bidder for Schedule 1 is Neumann Construction. Schedule 2: Noffsinger Transmission Main Two (2) bids were received for Schedule 2. The bids for Schedule 2 were 8.6% and 159.9% higher than the Engineers Estimate. The low bidder for Schedule 2 is Sandry Construction. There was a large discrepancy in the directional drilling bid item between the two bids received. Sandry Construction (low bidder) utilized Kenfield Industries as the subcontractor with a bid price for the drilling listed at $399,324; while Western Municipal Construction utilized Blue Mountain Directional Drilling for this subcontract with a bid price at $1,368,400. Kenfield Industries has successfully completed recent directional drilling projects with RPA and the City of Kalispell. No other bid irregularities were identified. Schedule 3: Woodland Avenue Connector Three (3) bids were received for Schedule 3. The bids for Schedule 3 were 12.0% lower, 16.1 % higher, and 26.0% higher than the Engineers Estimate. The low bidder for Schedule 3 is Sandry Construction. No bid irregularities were found. Recommendation of Award Schedule 1: Buffalo Hill Tank Piping RPA has confirmed with the low bidder for Schedule 1, Neumann Construction Company (Kevin Neumann), and verified they are content with their bid and would be glad to be awarded the project. Neumann Construction has recently completed a sewer main replacement project for Columbia Falls and the City of Kalispell. After completing the reference check, discussing the bid results, and reviewing the budget, RPA recommends that the City of Kalispell award Schedule 1 to Neumann Construction Company for $420,550. Schedule 2 and 3: Noffsinger Transmission Main and Woodland Avenue Connector RPA has spoken to the low bidder for Schedule 2 and 3, Sandry Construction Company Inc. (Chuck Pisk), and verified they are content with their bid and would be glad to be awarded the project. Sandry Construction has recently completed water main replacements for Bigfork, Columbia Falls, and Whitefish. After completing the reference check, discussing the bid results, and reviewing the budget, RPA recommends that the City of Kalispell award Schedule 2 to Sandry Construction Company Inc. for $1,398,057 and Schedule 3 to Sandry Construction Company Inc. for $3,847,954. Page 2 of 2 0% 8888888888 0000000000 0 0 00000000000000000 88888898988888888 0 0 Ll 000000000000000000000 000000000000000000000 0 0 m 2 3 O Z O O 2 O O 2 O • O 2 O 2 3 9 888999999 ..... 0 0 6 00000000000000000 00000000000000000 0 0 000000000000000000000 000000000000000000000 0 0 0000000000 0000000000 00000000000000000 00000000000000000 000000000000000000000 000000000000000000000 - c Qm c E E s E 'E 'E 2 E - - 2- 0 2u u u E E a M w w w 3E 0 E > 2 w I 2 2 U OF U O F U O F