Loading...
E25-504 SignedJOB ADDRESS 1045 3RD AVE W Marrk Paulson Electrical CONTRACTOR Owner Kalispell MT 59901 Contact Phone # Fax # Email Address Use of Building Class of Work Residential New Work Description Add 100 amp service to the garage. of services) Electrical Permit No. E25-504 City of Kalispell 201 1st Avenue East, Kalispell, MT 59901 Phone: (406) 758-7730 Fax. (406) 758-7739 bidgdept@kalispell.com OWNER Mark Paulson 1045 3rd Ave w Kalispell Mi 59901 Contact Phone # ARCHITECT OR ENGINEER Contact Phone # Fax # Email Address Required Inspections are listed on Page 2 Service 21ty Total Single Family 100-200 Amp Service Fee 1.00 $200.00 Commercial, Industrial, Institutional, Public and Issuance Fee $20.00 Multi -Family (3 units and up) permits are based on the cost to the owner of labor and materials plus issuance fee. The project value is listed under Qty above. Total Fees: $220.00 MPORTANT - PLEASE READ BEFORE SIGNING plumbing or framing shall tw covered until such work has been inspected and approved. Separate permits are required for electric, plumbing, hey ventdiation and air conditioning_ This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if, construction is suspended or abandoned for a period of 180 days at any lime after work has commenced I hereby vertify that 1 have read mined this application and know the same to be true and correct. All provisions of laws and ordinances covering this type of work will be corn i whether specified herein or not Granting of a�perr4t does not presume to give authority to viulate or cancel the provisions of any state or local 9/23/25 Signature - Please sign here Issue Date Electrical Permit No. E25-504 City of Kalispell 201 1st Avenue East, Kalispell, MT 59901 Phone: (406) 758-7730 Fax: (406) 758-7739 bldgdept(a,kalispell.com Required Inspections JOB ADDRESS 24 Hour Notice Required 1045 3RD AVE W (406) 758-7730 Marrk Paulson Electrical Inspection Type: Residential Temp Construction Power to Meter Main Commercial Temp Construction Power to Meter Main Electric Rough In Final Electrical Inspection Inspector: Date: