Stillwater Bend Ph2 PUD Amendment431 1st Avenue West
Kalispell, MT 59901
406.756.4848
www.wgmgroup.com
W:\Projects \230303 \50 Planning & Landscape Architecture \Planning \PUD Minor Amendment Request \Minor PUD Amendment Request.docx
MEMORANDUM
DATE: August 13, 2025
TO: Jarod Nygren, Director of Development Services
FROM: WGM Group on behalf of Boundary Development
CC: PJ Sorensen, Assistant Director of Development Services
RE: Stillwater Bend Phase 2 Planned Unit Development (PUD) – Minor Amendment
Request
On August 6, 2025, we met with PJ Sorensen to discuss a proposal to make minor modifications to
the approved Stillwater Bend Phase 2 PUD. The request is to modify the overall layout to vary from
the conceptual layout approved with the PUD update in 2023 (CK Ordinance 1917). The proposed
layout update does not require any additional deviations beyond those approved with the original
PUD.
The following Deviations were approved with the 2023 PUD update:
1. Setbacks along Rose Crossing reduced from 15 to 10 feet.
2. Maximum Building height of 60 feet to accommodate topography and tuck under garages
3. Water Course setback reduction to minimum 100 ft per geotechnical recommendations
a. 100 ft setback area shall be restored with native riparian habitat.
4. Block Length and Connectivity to allow connections shown in excess of 600 feet.
The approved layout and the proposed layouts are included in the following figures to demonstrate
the comparison. Full sized attachments are included as supplements to this memorandum.
The layout changes being proposed are being requested for several reasons:
1. The owner and project architect have changed, and different building types are being
proposed.
2. The new buildings and parking configuration work better with the site topography vs the
previously proposed large “L” shaped buildings.
3. Fire Access at eastern property line is more direct to the site and allows better fire truck
mobility through site.
City of Kalispell
August 13, 2025
Page 2 of 3
Figure 1: Approved Layout
Figure 2: Proposed Updated Layout
City of Kalispell
August 13, 2025
Page 3 of 3
In regard to the approved deviations, the proposed modifications remain in compliance with the
deviations allowed or are not utilizing them.
1. Setbacks along Rose Crossing reduced from 15 to 10 feet.
a. The development will continue to utilize the setback reduction. The proposed
buildings will continue to have street fronting units with patios and create visual
interest along the Rose Crossing corridor by providing gaps in the buildings and
linear parkway open space between the buildings.
2. Maximum Building height of 60 feet to accommodate topography and tuck under
garages
a. The updated buildings are proposed as three level walk ups with approximate
heights of 42 feet (within the existing zoning regulations). No tuck under parking is
being proposed and the full 60 feet height deviation is not being utilized. Due to
topography of the site, this deviation may still be applicable and be determined
during site grading design.
3. Water Course setback reduction to minimum 100 ft per geotechnical
recommendations and setback area shall be restored with native riparian habitat.
a. No changes to the setbacks have been proposed and the approved setback lines are
still being utilized.
4. Block Length and Connectivity to allow connections shown in excess of 600 feet.
a. This condition appears to be only relevant to the external ring roads that were
included with the approved conceptual layout for fire and parking access. These
roads are no longer being proposed.
No detriment to public welfare would be created by allowing the layout update. The unit numbers
will remain the same and this request does not intend to modify the approved number of units or
change the site traffic generated. This proposed layout modification should be considered a minor
change to the approved Stillwater Bend Phase 2 PUD.
Stormwater Pond
Parkland
Clubhouse
Activity Areas
Pool and Spas
1/2 mile Activity Trail
Overlook
Sign
STILLWATER BEND PUD
Overall Site Plan
Project Number: 230303
September 2023
N
0 75 150 300’
S
T
I
L
L
W
A
T
E
R
R
I
V
E
R
1
1
2
3
3
2D
2E
2D
2D
2D
2D
2D
2C
2C
2B2B
2B
2B
2A
2A
Legend
2E
STILLWATER BEND | HOLST | BOUNDARY 06 AUGUST 2025
SITE PLAN
FEC
ME
T
E
R
13890
13993
13994
13996
13997
13999
14002
138903022.949
3020.560
3020.983
3022.067
3022.016
3021.946
3021.814
3022.94913890
13993
13994
13995
13996
13997
13998
13999
14000 14001
14002
FH3022.95
W-VLV3020.56
W-VLV3020.98
CUL-INV3019.68
W-VLV3022.07W-VLV3022.02
CUL-INV3019.92
W-VLV3021.95
CUL-INV3020.07 CUL-INV3020.27
H-VLV3021.81
PAV
I
L
I
O
N
0.76 AC
0.81 AC
0.80 AC
0.81 AC
0.75 AC
0.75 AC
0.75 AC
1.66 AC
0.86 AC
0.85 AC
0.84 AC
0.86 AC
1.
3
7
A
C
0.75 AC
0.75 AC
6.
0
5
A
C
1.41 AC
1.15 AC
FH
W-VLV
W-VLV
W-VLV
W-VLV
W-VLV
H-VLV
FH
18
"
P
V
C
20
0
8
18
"
P
V
C
20
0
8
18
"
P
V
C
20
0
8
18
"
P
V
C
20
0
8
18
"
P
V
C
20
0
8
18
"
P
V
C
20
0
8
18
"
P
V
C
20
0
8
18" PVC200818" PVC2008
8" PVC
2013
16" PVC
2008
14
"
P
V
C
20
0
8
14
"
P
V
C
20
0
8
14
"
P
V
C
20
0
8
14
"
P
V
C
20
0
8
14
"
P
V
C
200814" PVC 2008
12" PVC
2013 10" PVC
2013
DYH
18
"
CM
P
18
"
CM
P
18
"
CM
P
18
"
CM
P
18
"
CM
P
36"
CMP
18
"
CM
P
18
"
CM
P
16
"
CM
P
18"CMP278280279304
247
248 245
277
240
241
242
249
250
253
254
239
243
251252
255256
236
238
237
257
232
234
258
259 233
235
260
231
261
3022.943023.273026.273023.39
3018.76
3018.27 3021.67
3021.82
3011.14
3012.21
3013.02
3014.79
3013.76
3012.81
3010.40
3015.27
3017.54
3017.79
3018.41
3010.963011.42
3010.92
3011.40
3015.45
3005.27
3004.72
3005.19
3004.05
3003.69 3008.67
3010.53
3005.16
3002.91
3004.44
CUL_INVCUL_INVMH-SSW-VLV
CUL_INV
CUL_INV MH-SS
MH-SS
CUL_INV
CUL_INV
CUL_INV
CUL_INV
CUL_INV
CUL_INV
CUL_INV
MH-SS
MH-SS
W-VLVW-VLV
W-VLVW-VLV
CUL_INV
CUL_INV
MH-SS
W-VLV
CUL_INV
CUL_INV
CUL_INV
CUL_INV MH-SS
MH-SS
PROP-PIN
W-VLV
W-VLV
CONTROL POINTTEMPORARY BENCH MARKDECIDUOUS TREE (SIZE AS NOTED)EVERGREEN TREE (SIZE AS NOTED)COMMUNICATIONS PEDESTALSURVEY MONUMENTCABLE TELEVISION PEDESTALBUSHSIGN/"SIGN TEXT"MAIL BOXSANITARY SEWER MANHOLEELECTRIC PEDESTALUTILITY POLELIGHT POLEGUY WIREFIRE HYDRANTWELLBLOW OFFBURIED ELECTRIC LINECONTOUR (1 FOOT INTERVAL)AERIAL COMMUNICATIONS LINEBURIED COMMUNICATIONS LINEAERIAL CABLE TELEVISIONBURIED CABLE TELEVISIONWATER VALVEGAS MAINFENCESANITARY SEWER MAINAERIAL POWER LINEWATER SERVICESANITARY SEWER SERVICECURB AND GUTTEREDGE OF GRAVELWATER MAINGAS MAIN VALVESTORM DRAIN MANHOLEDRAINAGE SUMPSTORM DRAIN LINESANITARY SEWER CLEANOUTCURB AND GUTTER W/LAYDOWNBURIED FIBER OPTIC LINEROOF DRAIN SUMPGREASE TRAP MANHOLEIRRIGATION DITCHDRIP LINE OF TREEIRRIGATION CONTROL VALVEGAS METERELECTRIC METERPUBLIC RIGHT-OF-WAY LINESUBJECT PROPERTY BOUNDARYEXTERIOR BUILDING WALL LINECONCRETE SIDEWALKEDGE OF ASPHALTPULL BOXYARD HYDRANTWATER METERCURB BOX/WATER SERVICE VALVEELECTRIC TRANSFORMERASPHALTLOT/TRACT/PARCEL LINEEASEMENT LINETELLEGEND-EXISTINGCOELECTVWDYHMBSW/VGVDRGEMGMIRRPBWMDYHYOSWET
S
S
S
S
S
S
S
S
12
12
BE
N
C
H
BENC
H
BE
N
C
H
WM
T
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
WM
J
J
J
J
J
J
J
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
S
S
S
S
S
S
S
S
D
CB
D
D
DGEOTECH SETBACK LINE
100’ STILLWATER RIVER SETBACK
13890
13993
13994
13996
13997
13999
14002
138903022.949
3020.560
3020.983
3022.067
3022.016
3021.946
3021.814
3022.94913890
13993
13994
13995
13996
13997
13998
13999
14000 14001
14002
FH3022.95
W-VLV3020.56
W-VLV3020.98
CUL-INV3019.68
W-VLV3022.07W-VLV3022.02
CUL-INV3019.92
W-VLV3021.95
CUL-INV3020.07 CUL-INV3020.27
H-VLV3021.81
FH
W-VLV
W-VLV
W-VLV
W-VLV
W-VLV
H-VLV
FH
18
"
P
V
C
20
0
8
18
"
P
V
C
20
0
8
18
"
P
V
C
20
0
8
8" PVC
2013
14
"
P
V
C
20
0
8
12" PVC
2013 10" PVC
2013
DYH
18
"
CM
P
18
"
CM
P
16
"
CM
P
247
248 245
242
249
250
243
3018.76
3018.27 3021.67
3013.02
3014.79
3013.76
3017.54
CUL_INV
CUL_INV MH-SS
CUL_INV
CUL_INV
MH-SSS
S
TYPE COUNT Junior 1BD 1BD 2BD 3BD TOWNHOME TOT. PER TYPE
36 UNIT (BLDG B)4 6 18 12 0 144
36 UNIT (BLDG B1)1 6 18 6 6 36
TOWNHOME 2 3 6
7 30 90 54 6 6 186 TOTAL UNIT COUNT
16%48%29%3%3%
TARGET 16%44%33%0%7%
30 80 60 0 12 182 UNITS
MIN. REQ'D PARKING
TYPE PROVIDED
SURFACE 247
TOWNHOME GARAGE 6
GARAGE 40
TOTAL 293 1.58 Parking Ratio