E2. Award W Wyoming St Project201 1st Avenue E PO BOX 1997 Kalispell, MT 59903 Public Works Department Phone (406)758-7720 Fax (406)758-7831 www.kalispell.com MEMORANDUM To: Doug Russell, City Manager Cc: Susie Turner, PE – Public Works Director From: Patrick Jentz, PE, Engineer 3 Re: West Wyoming Street Project Meeting Date: July 21, 2025 BACKGROUND: The project includes providing all materials, labor, and equipment necessary to reconstruct West Wyoming Street between 7th Ave WN and 4th Ave WN. Work also involves improvements for drainage via replacement/repair of curb, boulevard, sidewalk, and storm collection/ conveyance system. BIDDING RESULTS: Bids were received and opened on July 14, 2025, at 3:30 pm. Six responsive bids were received and are summarized below. Contractor Total Bid Price Montana Rockies $430,181.80 LHC, Inc. $468,595.88 Knife River $495,495.00 Lorax $505,244.00 Wesco, Inc $540,000.00 S&L Underground $876,094.00 Engineer Estimate $670,636.00 Montana Rockies was the low bidder and is considered a responsible bidder that met the requirements to complete the project as bid. Public Works recommends awarding the bid to Montana Rockies. ACTION REQUESTED: Motion to award the West Wyoming Street Project to Montana Rockies. FISCAL EFFECTS: Construction of the West Wyoming Street Improvements Project is budgeted in FY 26 and will be funded through the following sources: 1. Storm: #5349-453-430247-952 2. BaRSAA: #2420-421-430240-355 ALTERNATIVES: As suggested and approved by the City Council. ATTACHMENTS: West Wyoming Street Project Certified Bid Tab W Wyoming St Project Unit Price Total Price Unit Price Extension Unit Price Extension Unit Price Extension 1 Mobilization/Demobilization LS 1 $61,133.00 $61,133.00 $11,382.00 $11,382.00 $44,559.00 $44,559.00 $23,564.80 $23,564.80 2 Construction Traffic Control LS 1 $30,000.00 $30,000.00 $6,437.00 $6,437.00 $14,110.00 $14,110.00 $63,000.00 $63,000.00 3 Construction Survey LS 1 $15,000.00 $15,000.00 $5,935.00 $5,935.00 $12,495.00 $12,495.00 $27,900.00 $27,900.00 4 12" Storm Main with Type A Trench LF 32 $175.00 $5,600.00 $128.00 $4,096.00 $141.16 $4,517.12 $152.00 $4,864.00 5 Stormwater Catch Basin EA 2 $7,000.00 $14,000.00 $2,618.00 $5,236.00 $3,412.00 $6,824.00 $3,500.00 $7,000.00 6 Remove Catch Basin EA 1 $1,250.00 $1,250.00 $892.00 $892.00 $2,307.00 $2,307.00 $865.00 $865.00 7 Remove and Replace Storm Manhole EA 1 $8,500.00 $8,500.00 $4,807.00 $4,807.00 $13,805.00 $13,805.00 $7,640.00 $7,640.00 8 Remove Concrete Any Thickness SF 2,434 $5.00 $12,170.00 $1.80 $4,381.20 $5.27 $12,827.18 $0.70 $1,703.80 9 4" Concrete Flatwork SF 2,160 $16.00 $34,560.00 $14.75 $31,860.00 $12.30 $26,568.00 $10.60 $22,896.00 10 6" Concrete Flatwork SF 993 $20.00 $19,860.00 $18.95 $18,817.35 $14.70 $14,597.10 $13.10 $13,008.30 11 Truncated Dome Panel EA 10 $700.00 $7,000.00 $475.00 $4,750.00 $429.00 $4,290.00 $310.00 $3,100.00 12 Concrete Curb Removal LF 496 $6.00 $2,976.00 $7.35 $3,645.60 $6.76 $3,352.96 $3.30 $1,636.80 13 Concrete Curb LF 1,215 $45.00 $54,675.00 $49.35 $59,960.25 $34.00 $41,310.00 $30.30 $36,814.50 14 Landscape Restoration LS 1 $7,500.00 $7,500.00 $7,026.00 $7,026.00 $16,807.00 $16,807.00 $12,500.00 $12,500.00 15 In Place Roadway Cut CY 2,116 $92.00 $194,672.00 $37.00 $78,292.00 $42.13 $89,147.08 $30.25 $64,009.00 16 Collector Roadway SY 2,692 $70.00 $188,440.00 $64.60 $173,903.20 $54.65 $147,117.80 $71.70 $193,016.40 17 Concrete Manhole Collar EA 4 $800.00 $3,200.00 $761.00 $3,044.00 $967.00 $3,868.00 $600.00 $2,400.00 18 Type 2 Pipe Bedding LF 32 $25.00 $800.00 $30.10 $963.20 $63.49 $2,031.68 $62.70 $2,006.40 19 Type 2 Structure Bedding EA 2 $750.00 $1,500.00 $455.00 $910.00 $96.98 $193.96 $335.00 $670.00 20 Inlet Apron EA 4 $750.00 $3,000.00 $495.00 $1,980.00 $845.00 $3,380.00 $645.00 $2,580.00 21 Concrete Valve Collar EA 8 $600.00 $4,800.00 $233.00 $1,864.00 $561.00 $4,488.00 $540.00 $4,320.00 Sum of Base Bid $670,636.00 $430,181.80 $468,595.88 $495,495.00 Item DescriptionItem QuantityUnit Montana RockiesEngineer's Estimate LHC, Inc Knife River Corporation - Kal. Unit Price Extension Unit Price Extension Unit Price Extension 1 Mobilization/Demobilization LS $9,200.00 $9,200.00 $22,000.00 $22,000.00 $85,000.00 $85,000.00 2 Construction Traffic Control LS $22,000.00 $22,000.00 $36,000.00 $36,000.00 $38,000.00 $38,000.00 3 Construction Survey LS $18,400.00 $18,400.00 $8,750.00 $8,750.00 $25,000.00 $25,000.00 4 12" Storm Main with Type A Trench LF $140.00 $4,480.00 $152.34 $4,874.88 $255.00 $8,160.00 5 Stormwater Catch Basin EA $7,250.00 $14,500.00 $3,875.00 $7,750.00 $4,500.00 $9,000.00 6 Remove Catch Basin EA $3,700.00 $3,700.00 $1,250.00 $1,250.00 $500.00 $500.00 7 Remove and Replace Storm Manhole EA $9,720.00 $9,720.00 $5,750.00 $5,750.00 $5,000.00 $5,000.00 8 Remove Concrete Any Thickness SF $8.00 $19,472.00 $4.45 $10,831.30 $8.00 $19,472.00 9 4" Concrete Flatwork SF $26.00 $56,160.00 $22.65 $48,924.00 $16.00 $34,560.00 10 6" Concrete Flatwork SF $32.00 $31,776.00 $34.49 $34,248.57 $24.00 $23,832.00 11 Truncated Dome Panel EA $420.00 $4,200.00 $600.00 $6,000.00 $4,200.00 $42,000.00 12 Concrete Curb Removal LF $22.00 $10,912.00 $12.30 $6,100.80 $12.00 $5,952.00 13 Concrete Curb LF $64.00 $77,760.00 $60.00 $72,900.00 $118.00 $143,370.00 14 Landscape Restoration LS $10,400.00 $10,400.00 $3,499.93 $3,499.93 $45,000.00 $45,000.00 15 In Place Roadway Cut CY $14.00 $29,624.00 $29.84 $63,141.44 $82.00 $173,512.00 16 Collector Roadway SY $62.00 $166,904.00 $70.70 $190,324.40 $68.00 $183,056.00 17 Concrete Manhole Collar EA $1,140.00 $4,560.00 $1,537.50 $6,150.00 $2,600.00 $10,400.00 18 Type 2 Pipe Bedding LF $58.00 $1,856.00 $23.44 $750.08 $65.00 $2,080.00 19 Type 2 Structure Bedding EA $850.00 $1,700.00 $562.50 $1,125.00 $1,800.00 $3,600.00 20 Inlet Apron EA $1,260.00 $5,040.00 $840.00 $3,360.00 $250.00 $1,000.00 21 Concrete Valve Collar EA $360.00 $2,880.00 $783.70 $6,269.60 $2,200.00 $17,600.00 Sum of Base Bid $505,244.00 $540,000.00 $876,094.00 UnitItem DescriptionItem Wesco IncLorax Construction S & L Underground, Inc.