Loading...
Ace Roofing Depot Building Roof Replacement Bid®- OM NIA Roofing Proposal Depot Building Roof Replacement Kalispell, MT Prepared By Ace Roofing LLC www.aceroofingmt.com (406)578-2107 Contractor #161199 Deliver to: Kalispell City Clerk 201 First Ave East Kalispell, MT 59901 L E Ace Roofing LLC. PO Box 405 Wilsall, MT 59086, US +14065782107 Prepared By: John Taylor Hoover jthoover@aceroofingmt.com Project: Depot Building Roof Replacement, Kalispell Scope of Work Cedar Shingle Roofing Quote: 4634 / Date: 6/20/2025 Project Number: 0-198785 • Remove & Dispose of existing cedar shakes and underlayment on all roof areas down to roof deck • Supply & Install new Titanium PSU30 Ice & Water Underlayment on roof eaves, ridge and valleys • Supply & Install new #30 felt on all roof areas that are not recieving Ice & Water Underlayment • Supply & Install new #1 Blue Label 0.5" Thick 16" Cedar Shingles 5" exposure on all roof areas with #1 Blue label cedar shingle starter on roof eaves • Supply & Install new cedar ridge shingles on all roof ridges and hips 5" Exposure • Supply & Install new steel valley metal to replace existing • Supply & Install new 24Ga Steel drip edge on all roof perimeter edges • Supply & Install new 26GA steel roof to wall flashing to replace existing • Supply & Install new pipe boot flashing around all existing roof pipe penetrations to replace existing Cedar Breather Plane • Supply & Install new cedar breather plane on all roof areas Deck Sheathing Replacement • After existing roof assembly has been removed, inspect existing roof deck for damage to determine extend of required sheathing replacement. If existing deck is skip sheathing, we will need to overlay new decking on all roof areas • Remove & Dispose of any damaged decking sheets • Supply & Install new 1/2" nominal OSB Sheathing to replace existing Included (+) 1. ACM Test 2. Construction Permit 3. GIRT 4. Bond Included (+) 5. Prevailing Wage Excluded (-) 1. Quote does not include Gutters & Downspouts 2. Quote does not include Soffit or Fascia 3. Quote does not include Snow Guards Notes There may be extended lead times for cedar shingles, which could impact construction timeline for the project. Approximate lead time for cedar shingles is 4 weeks Price guaranteed for 90 days from the date shown on this estimate. • Due to high volatility in material prices and issues with availability of materials, the price(s) provided in this proposal is/are subject to change, and performance of the work may be delayed if materials are unavailable or if delivery is delayed. • This Proposal and the price(s) provided herein are conditioned upon the parties entering into a contract with mutually agreeable terms, such as an AIA construction contract document. • This Proposal is subject to revision or withdrawal by Ace Roofing for any reason until communication of acceptance and may be revised after communication of acceptance where an inadvertent error by Ace Roofing has occurred. • All work to be completed in a professional, workmanlike manner according to standard practices. • One (1) year warranty on labor craftsmanship performed by Ace Roofing, LLC • Due to the nature of Montana weather, no firm schedule requirements can be committed to between September 30 & April 1. • Ace Roofing can only provide a warranty on full systems that we provide and install. No warranty is offered or implied on repairs, partial replacements and labor only jobs (if we do not supply the materials and labor for the work, we cannot supply a warranty. Summary Roofing SOV Item Mobilization Roof Replacement Decking Replacement Cedar Breather Underlayment Total Base Bid Unit Quantity Unit Price Subtotal LS 1 $8,838 $8,838 LS 1 $137,831 $187,831 SF 150 $4.76 $714 LS 1 $15,860 $15,860 $213,243 $213,243 Accepted By Date ,' KALISPELL Depot Building Roof Replacement KALISPELL, MONTANA The Bid for the following items is for all work described in the Contract Documents. The bid price shall include all temporary or permanent equipment, materials, supplies, and labor to construct the items in accordance with the Contract Documents. Bidders shall reference Section 01150, Measurement and Payment, for a detailed description of the Bid Items for Bidding Purposes. Bidder shall include prices for all Base Bid items. RASE BID SCHEDULE Item Item Description Unit Quantity Unit Price Total 1 Mobilization/Demobilization (max 5% of Bid) LS 1 $8,838 $8,838 2 Roof Replacement LS 1 $187,831 $187,831 3 Removal and Replacement of Existing Board Decking SF 150 $4.76 $714 4 Cedar Breather Underlayment LS 1 $15,860 1 $15,860 Base Bid Total = $213,243 TOTAL BID PRICE - BASE BID (Words) Two Hundred Thirteen Thousand, Two Hundred Forty -Three Dollars and no/100 This Bid Tabulation is an accurate representation of the bids received Depot Building Roof Replacement 00301 - 1 Bid Form SECTION 00400 CONTRACTOR EXPERIENCE AND REFERENCES The Bidder shall provide the following information for three cedar shingle roof projects of a similar nature to the project currently being bid in the space provided below. PROJECT I IDENTIFICATION: Riverside Employee Cabin at Old Faithful PROJECT LOCATION: Old Faithful, Yellowstone National Park _�.. PROJECT VALUE: Approx $65k _ CLIENT AND REFERENCE CONTACT: Klayton Betz (307)344-5410 DESCRIPTION OF PROJECT: Project consisted of removal of existing cedar roofing, and install of a mixture of 60-mil Bronze IB PVC roofing on low slope areas, and class B fire treated cedar shakes or all steep slope roof areas PROJECT 2 IDENTIFICATION: Silvertip Lodge PROJECT LOCATION: Yellowstone National Park PROJECT VALUE: $42,195 CLIENT AND REFERENCE CONTACT: Mark Schell (406)223-3908 DESCRIPTION OF PROJECT: Project consisted of removal and disposal of existing cedar shakes and underlayment, and reroof with new cedar shakes PROJECT 3 IDENTIFICATION: Moose Point PROJECT LOCATION: 210 3 Bears Road, Bozeman, MT PROJECT VALUE: $364,987 CLIENT AND REFERENCE CONTACT: Mark Jordan (601)940-8111 DESCRIPTION OF PROJECT: Cedar shake removal and replacement with new cedar shakes 00400 - 1 Contractor References APPROVAL OF SUBCONTRACTORS PROJECT: Depot Building Roof Replacement CONTRACTOR: Ace Roofing LLC Listed below are the subcontractors the prime contractor proposes to use on this project. Your approval of these subcontractors is requested. We certify that these subcontractors, as listed, have been advised of the labor standards and provisions applicable to this project and that these provisions, as incorporated in the Contract between the Owner and the undersigned Contractor, will be incorporated in the contracts between the Contractor and the listed subcontractors. These provisions shall include all necessary insurance, workers compensation, and other legal requirements that the Contractor must carry. Name And Address of Subcontractor Montana Public Contractor's License Type of Work Approximate Value of Subcontract Berlin Roofing 267252 Roofing $50,000 1 TOTAL: $50,000 Any deviation from this list s conducting the w9 e% Signed Contractor Approved by City of Kalispell cox 100 1>26105 ed by the Owner prior to the subcontractor e---- Z ate Date