E25-095 Signed-Nis Fr AL
MONTANA
Electrical Permit No. E25-095
City of Kalispell
201 1st Avenue East, Kalispell, MT 59901
Phone: (406) 758-7730 Fax: (406) 758-7739
bldgdept@kalispell.com
JOB ADDRESS OWNER
1804 5TH AVE E Brent Eaton
Brent Eaton 1804 5th Ave E
CONTRACTOR
Owner
Kalispell MT 59901
Contact Phone # Fax #
Email Address
Use of Building Class of Work
Residential Remodel
Work Description
wiring remodel section of house
of Nervtce(s)
Service
Resident Int Rewire Only or New Add Fee
Commercial, Industrial, Institutional, Public and
Multi -Family (3 units and up) permits are based on the
cost to the owner of labor and materials plus issuance
fee. The project value is listed under aty above.
Kalispell MT 59901
Contact Phone #
ARCHITECT OR ENGINEER
Contact Phone # Fax #
Email Address
Required Inspections are (listed on
Page 2
City Total
1.00 $120.00
Issuance Fee $20.a0
Total Fees: $140.00
IMPORTANT -PLEASE READ BEFORE SIGNING
No plumbing or framing shall be covered until such work has been inspected and approved. Separate permits are required for electric, plumbing, heating
and vemiliation and air conditioning. This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if work
or constnuction is suspended or abandoned for a period of 180 days at any time after work has commenced. 1 hereby certify that I have read and
examined this application and know the same to be true and correct. All provisions of laws and ordinances covering this type of work will be complied
with whether specified herein or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local lau
regulating construction. /
3/5/25___
Signature - Please sign here Issue Date
Electrical Permit No. E25-095
City of Kalispell
201 1st Avenue East, Kalispell, MT 59901
Phone: (406) 758-7730 Fax: (406) 758-7739
bldgdept;a kalispell.com
Required Inspections JOB ADDRESS
24 Hour Notice Required 1804 5TH AVE E
(406) 758-7730
Brent Eaton
Inspection Type:
Residential Temp
Construction Power to Meter
Main
Commercial Temp
Construction Power to Meter
Main
Electric Rough In
Final Electrical Inspection
Inspector: Date: