Loading...
08-12-10 Site Review MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, August 12, 2010 City Council Chambers 201 First Avenue East ATTENDING: Frank Castles, Deputy Public Works Dir. Jeff Clawson, Building Official Sean Conrad, Senior Planner Dwain Elkins, Plans Examiner Tom Jentz, Planning & Building Director P. J. Sorensen, Chairman Kathy Kuhlin, Recording Secretary HEAR THE PUBLIC: None. PERFORMANCE BOND REMINDERS: None. OLD BUSINESS: ASI, (Van Ee Apartments) — 420 Grandview Drive —Public Works is still waiting for the downstream analysis, and Planning is still waiting for the Payment In Lieu of Taxes (PILT) Agreement. Smith's — 195-3'd Avenue E.N. remodel and new pharmacy drive-thru —The committee is still concerned about traffic circulation. They have confirmed that the middle lane is not a drive-thru lane. The proposed window is only for vision, and they will have pneumatic tubes. Sorensen met with their architect on Tuesday, and they discussed options for the traffic circulation, including sliding the drive-thru down toward the main entrance. Most would prefer to try to keep it up at the existing proposed location and angle a hard pork chop with a raised curb for a forced right turn. Their engineers will take a look at our Design and Construction Standards and come back with a different design. NEW BUSINESS: None. PLANNING OFFICE ITEMS: There are three annexations going to the September Planning Board Meeting: Triple W on Hwy 93 S, Flathead Beverage on Hwy 2, and a house on 8th Avenue West, between loth and 1lth Streets. OTHER REPORTS: Conrad stated that Marquardt Surveying brought in a proposal to subdivide the property and create 2 to 4 lots near Tire Rama on N Meridian Road and Appleway. It is either zoned I-1 or B-2. Clawson suggested we encourage a zone change away from Industrial. Sorensen noted that this is a flood zone area and regulations state that flood zone property should not be subdivided. This area used to be a mill pond. Salvation Army would like to run a soup and sandwich food distribution facility in the old Syke's Restaurant for some investors. Howard Construction is still working on the Spring Creek Apartments on Appleway. Hospital Expansion — Sheldon had called Clawson and stated they are still proceeding with design work on the hospital expansion and will be bringing the drawings in soon. The meeting was adjourned at 10:25 a.m.