E2. Lower Zone Storage Tank ReplCITY OF KALISPELL MEMORANDUM To: Doug Russell - City Manager From: Keith Haskins, PE — Deputy Director Public Works CC: Susie Turner, PE — Director Public Works Re: Lower Zone Storage Tank 1 Replacement Project Meeting Date: October 7, 2024 BACKGROUND: The Lower Zone Storage Tank 1 Replacement Project generally consists of the replacement of the existing wooden roof 1.7-million-gallon tank structure located within the Buffalo Hill Golf Course (BHGC) Complex in Kalispell. The project includes demolition of the existing structures, site utility modifications, and construction of a new 2.5 MG tank. BIDDING RESULTS: Bids were opened on September 26, 2024, at City Hall. Two responsive bids were received from DN Tank, LLC and Preload, LLC. The Certified Bid Tabulation is attached to Morrison-Maierle's (MMI) Engineering Bid Recommendation Memo. Schedule 1 includes demolition of the existing structures, site utility modifications, and construction of a new 2.5 MG tank. Additive Alternative A includes the replacement of the 1920 cast iron outflow main from the tank to an area outside the BHGC maintenance area. The bid totals, listed from lowest to highest, are summarized as follows: Contractor Schedule 1 and Additive Alternate A Preload, LLC $6,424,000 DN Tanks, LLC $6,593,561 RECOMMENDATION: MMI Engineering, the engineer of record for the City, reviewed the bids, the submitted documentation, and submitted references. Based on their review, Preload LLC was determined to be a responsive and responsible contractor who has successfully completed similar projects of size and scope. Based on MMI's evaluation and review of the bid and references, staff recommends awarding the bid to Preload, LLC. FISCAL EFFECTS: The total project construction cost will be funded as allocated in FY 25 budget as follows: • $3,079,929— Water Fund Capital Line Item 696 Lower Zone Reservoirs 91 & 92 Replc • $6,700,000 State Revolving Loan (SRF) — Line Item 696 Lower Zone Reservoirs 91 Replc 201 1st Avenue E Phone (406)758-7720 Po Box 1997 Public Works Department Fax (406)758-7831 Kalispell, MT 59903 1 1 www.kalispell.com ACTION REQUESTED: Motion to award the Schedule I and Additive Alternate A bid for the Lower Zone Storage Tank I Replacement Project to Preload, LLC for $6,424,000. ALTERNATIVES: As suggested and approved by the City Council. ATTACHMENTS: • Engineer's Recommendation to Award Letter (MMI Engineering); Lower Zone Storage Tank Replacement Reservoir I Recommendation ofAward; Sept 30, 2024 2 1 P a g e ®� Morrison .Maierle engineers surveyors panners scientists TO: Susie Turner, P.E., Public Works Director FROM: Jeff Cicon, P.E. DATE: September 30, 2024 JOB NO.: 0387.058 memo RE: Lower Zone Storage Tank Replacement Reservoir 1 Recommendation of Award ❑Urgent El For Review ❑Please Comment ❑Please Reply ®For Your Use Background: The Lower Zone Storage Tank Replacement Project Reservoir 1 generally consists of the construction of a new 2.5 million gallon (MG) prestressed concrete storage reservoir located on Buffalo Hill in Kalispell. The project includes demolition of the existing 1.7 MG reservoir, site preparation, utility modifications, and construction of the new reservoir. The basis for the recommendation to install a new tank was determined in an alternative analysis report completed in April 2023. Bidding Results: Bids were received on September 26, 2024 and read aloud at 2:00 pm at City Hall. Two responsive bids were received from Preload, LLC ("Preload") of Louisville, KY and DN Tanks, LLC ("DN Tanks") of Grand Prairie, TX. Below is a summary of bid amounts for each bid schedule and additive alternate. Schedule 1 is for the 2.5 MG tank and Additive Alternate A is to replace the 20" transmission main from the new tank to the new Buffalo Hill Well. Bid totals are listed low to high and summarized as follows: Schedule 1: Additive Contractor Reservoir 1 Alternate A Total Bid Price (2.5 MG) Preload, LLC $6,242,350 $181,650 $6,424,000 Louisville, KY DN Tanks, LLC $6,320,212 $273,349 $6,593,561 Grand Prairie, TX Engineers Estimate $7,138,200 $169,650 $7,307,850 Morrison-Maierle, Inc. The low bid of $6,424,000 is below the Engineer's Estimate by $883,850. Morrison-Maierle does not have any previous work experience with Preload, but has worked on projects with their site work contractor, Sandry Construction of Bigfork, MT. Preload's qualification questionnaire shows they have completed recent projects of similar size and scope and are qualified to complete this project. Two references were contacted and indicated they had no concerns with Preload constructing this type of project. Since this is a specialized rehabilitation project, the number of qualified contractors is limited and receiving only two bids was not unexpected. Page 1 Lower Zone Storage Tank Replacement Reservoir 1 Recommendation of Award ®` Morrison „Maierle Summary of Budgeted Funds The project is funded through a combination of local funds and a State Revolving Fund Loan. The construction budget is as follows: Construction: $6,424,000 Contingency: $963,600 Total Construction Budget $7,387,600 Potential Cost Saving Alternatives Potential cost saving alternatives could include the following: • Remove Additive Alternate A ($169,650) from the project Award Options The City has the options available in terms of awarding a contract for this project: 1. Award Schedule 1: Reservoir 1 + Additive Alternate A in the amount of $6,424,000 2. Award Schedule 1: Reservoir 1 in the amount of $6,242,350 3. Reject all bids and re -bid the project at a later date. Recommendation Morrison-Maierle believes that the low bid amount of $6,424,000 is a competitive bid and that the City is not likely to see a lower bid should the project be bid at a later date. Based on the qualification information submitted with their bid and reference checks, Preload is competent and capable of completing the proposed work. If considered appropriate by the City, it would be the recommendation of Morrison-Maierle to award the contract to Preload, LLC. Page 2 Uemo Lxisting I ank and Cart Storage Building LS 1 $300,000.00 $300,000.00 $300,000.00 $300,000.00 $254,350.00 $25z Utility Crossing EA 4 $500.00 $2,000.00 $800.00 $3,200.00 $2,370.00 $( Landscape, Topsoil, and Reseed LS 1 $127,000.00 $127,000.00 $90,000.00 $90,000.00 $91,920.00 $9: Site Electrical LS 1 $47,000.00 $47,000.00 $20,000.00 $20,000.00 $22,610.00 $2, 18" Connection to Ex. 18" Butterfly Valve EA 1 $15,000.00 $15,000.00 $7,000.00 $7,000.00 $5,500.00 $! 18" DR18 C900 PVC Water Main LF 148 $500.00 $74,000.00 $300.00 $44,400.00 $384.00 $5( 18" Ductile Iron Water Main LF 11 $550.00 $6,050.00 $1,500.00 $16,500.00 $2,040.00 $2, 18" MJ Butterfly Valve EA 1 $15,000.00 $15,000.00 $17,000.00 $17,000.00 $21,910.00 $2: 18" MJ Bend EA 1 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,860.00 $! 12" Connection to Ex. Clay Drain Pipe EA 1 $8,200.00 $8,200.00 $3,500.00 $3,500.00 $580.00 12" DR18 C900 PVC Drain Line LF 128 $250.00 $32,000.00 $250.00 $32,000.00 $330.00 $4: 12" Ductile Iron Drain Line LF 28 $300.00 $8,400.00 $500.00 $14,000.00 $1,400.00 $3( 12" MJ Gate Valve EA 1 $9,000.00 $9,000.00 $9,000.00 $9,000.00 $10,970.00 $1( 12" MJ Bend EA 3 $3,000.00 $9,000.00 $4,000.00 $12,000.00 $2,880.00 $! 12" MJ Tee EA 1 $3,500.00 $3,500.00 $3,000.00 $3,000.00 $3,880.00 $: Drain Inlet Structure LS 1 $10,000.00 $10,000.00 $6,000.00 $6,000.00 $25,030.00 $2! 20" Connection to Ex. Cl Water Main EA 1 $15,000.00 $15,000.00 $6,500.00 $6,500.00 $7,300.00 $; 20" DR18 C900 PVC Water Main LF 111 $600.00 $66,600.00 $300.00 $33,300.00 $430.00 $4, 20" Ductile Iron Water Main LF 13 $650.00 $8,450.00 $1,300.00 $16,900.00 $1,790.00 $2: 20" MJ Butterfly Valve EA 1 $18,000.00 $18,000.00 $27,500.00 $27,500.00 $36,430.00 $3( 20" MJ Bend EA 1 $6,000.00 $6,000.00 $13,500.00 $13,500.00 $8,360.00 $! Unclassified Excavation LS 1 $384,000.00 $384,000.00 $100,000.00 $100,000.00 $398,150.00 $39! Remove Excess Material From the Site LS 1 $294,000.00 $294,000.00 $353,000.00 $353,000.00 $346,780.00 $34( Tank Backfill - Native Material LS 1 $640,000.00 $640,000.00 $283,000.00 $283,000.00 $456,140.00 $45( Tank Backfill - Structural Backfill LS 1 $315,000.00 $315,000.00 $156,000.00 $156,000.00 $208,690.00 $2M Tank Foundation Preparation LS 1 $180,000.00 $180,000.00 $125,000.00 $125,000.00 $89,950.00 $8( 2.5 MG AWWA D110 Type III Prestressed Concrete Tank and Appurtenances LS 1 1 $3,706,000.00 $3,706,000.00 $3,879,050.00 $3,879,050.00 $3,113,300.00 $3,11: Access Stairs and Slab LS 1 $50,000.00 $50,000.00 $22,000.00 $22,000.00 $69,860.00 $6( Asphalt Surface Restoration LS 1 $0.00 $0.00 $66,000.00 $66,000.00 $51,210.00 $5: Schedule 1: Reservoir 1 Total $7,138,200.00 $6,242,350.00 $6,32( Engineer Estimate Preload, LLC DN Tanks le Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Exte alternate A Mobilization/Demobilization LS 1 $16,000.00 $16,000.00 $3,250.00 $3,250.00 $23,820.00 $2: Construction Surveying LS 1 $5,000.00 $5,000.00 $5,800.00 $5,800.00 $3,430.00 $: Exploratory Excavation HR 4 $500.00 $2,000.00 $500.00 $2,000.00 $1,050.00 $ Site Preparation LS 1 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $48,020.00 $4! Utility Crossing EA 2 $500.00 $1,000.00 $700.00 $1,400.00 $2,370.00 $ Landscape, Topsoil, and Reseed LS 1 $10,000.00 $10,000.00 $5,000.00 $5,000.00 $4,500.00 $ 20" Connection to Ex. PVC Water Main EA 1 $10,000.00 $10,000.00 $6,500.00 $6,500.00 $6,870.00 $( 20" Connection to Ex. Cl Water Main EA 1 $10,000.00 $10,000.00 $6,500.00 $6,500.00 $7,300.00 $; 20" DR18 C900 PVC Water Main LF 209 $350.00 $73,150.00 $300.00 $62,700.00 $381.00 $7( 20" MJ Butterfly Valve EA 2 $12,000.00 $24,000.00 $27,500.00 $55,000.00 $35,360.00 $7( 20" MJ Bend EA 1 $6,000.00 $6,000.00 $13,500.00 $13,500.00 $6,920.00 $( 20" MJ Tee EA 1 $7,500.00 $7,500.00 $15,000.00 $15,000.00 $13,200.00 $1: Additive Alternate A Total $169,650.00 $181,650.00 $27: arrrtt Total Schedule 1 + Additive Alternate A $7,307,850.00 $6,424,000.00 $6,59' T A I1/ PPPPPP 1 vooao �'q PPPP The tabulation of Bids herein is beleived to be