Loading...
2024 SIA/Parkland MeadowsIIIIIIII II II (IIIIIIII (IIIII III IIIII IIIII IIIII IIIIIIIIII IIIIIIIIIIIIIII IIII II IIIIIIII IIII Pa9eu1 of 12 j Fees: $96.00 Return to. Debbie Piersoi, Flathead County MT by DT 6/21/2024 1:01 PM Aimee Brunckhorst Kalispell City Clerk 201 1" Avenue East Kalispell, MT 59901 SUBDIVISION IMPROVEMENT AGREEMENT THIS AGREEMENT, made and entered into this 3 rc _ day of May , 2024 , by and a►'r1 between the CITY COUNCIL, CITY OF KALISPELL, MONTANA, Party of the First Part and hereinafter referred to as the CITY, and Parkland Meadows Properties, LLC (Name of Developer) a Limited Liability Corporation (Individual, Company or Corporation) located at PO Box 1432 Bi fork MT 59911 x (Street Address P. O. Box) (City, County, State, Zip) Party of the Second Part and hereinafter referred to as DEVELOPER. 0 WITNESSETH: O THAT WHEREAS, the Developer is the owner and developer of a new subdivision known as Parkland Meadows, Phase 1 (Name of Subdivision) located at �SW 1/4 of Section 20 and NW 1/4 Section 29, T 28N, R 21W, P.M. M. (Location of Subdivision) and, WHEREAS, the City has conditioned it's approval of the final plat of Parkland Meadows, Phase 1 , upon the conditions as set forth (Name of Subdivision) in the Preliminary Plat of the Subdivision being completed and all improvements, as cited in "Exhibit A" have not been completed at this time, and the Developer wishes to bond for the completion of those improvements set forth in "Exhibit A"; and WHEREAS, the City's Subdivision Regulations require that a subdivider shall provide a financial security of 125° o of the estimated total cost of construction of said improvements as evidenced by an estimate prepared by a licensed public engineer included herewith as "Exhibit B"; and WHEREAS, the estimated total cost of construction of said improvements is the sum of $293,379.49 NOW THEREFORE, in consideration of the approval of the final plat of said Subdivision by the City, the Developer hereby agrees as follows: The Developer shall deposit as collateral with the City a Letter of Credit, or other acceptable collateral as determined by the City Council, in the amount of $366,724.36 . Said Letter of Credit or other collateral shall have an expiration date of at least sixty (60) days following the date set for completion of the improvements, certifying the following: a. That the creditor guarantees funds in the sum of $ 366,724.36 the estimated cost of completing the required improvements in Parkland Meadows, Phase 1 . (Name of Subdivision) b. That if the Developer fails to complete the specified improvements within the required period, the creditor will pay to the City immediately, and without further action, such funds as are necessary to finance the completion of those improvements up to the limited of credit stated in the letter; 2. That said required improvements shall be fully completed by March 1 s2025 3. That upon completion of the required improvements, the Developer shall cause to be filed with the City a statement certifying that: a. All required improvements are complete; b. That the improvements are in compliance with the minimum standards specified by the City for their construction and that the Developer warrants said improvements against any and all defects for a period of two (2) years from the date of acceptance of the completion of those improvements by the City; c. That the Developer knows of no defects in those improvements; d. That these improvements are free and clear of any encumbrances or liens; e. That a schedule of actual construction costs has been filed with the City; and, f. All applicable fees and surcharges have been paid. 4. The Developer shall cause to be filed with the City copies of final plans, profiles, grades and specifications of said improvements, with the certification of the registered professional engineer responsible for their preparation that all required improvements have been installed in conformance with said specifications. IT IS ALSO AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS, TO -WIT: That the Developer shall provide for inspection of all required improvements by a registered professional engineer before the Developer shall be released from the Subdivision Improvement Agreement. That if the City determines that any improvements are not constructed in compliance with the specifications, it shall furnish the Developer with a list of specific deficiencies and may withhold collateral sufficient to insure such compliance. If the City determines that the Developer will not construct any or all of the improvements in accordance with the specifications, or within the required time limits, it may withdraw the collateral and employ such funds as may be necessary to construct the improvement or improvements in accordance with the specifications. The unused portions of the collateral shall be returned to the Developer or the crediting institution, as is appropriate. IN WITNESS WHEREOF, the Parties have hereunto set their hands and seals the day and year herein before written. Parkland Meadows Properties, LLC (Name of Subdivision/Developer/Firm) by (Title) STATE OF MONTANA COUNTY OF Ra�\'LCCLd On this 311d day of O-K , 20 �—� , before me, a Notary Public for the State of Montana, personally appeared QVr , known to me to be the �A%K442.YOa_ of ,V,10.,AA �X"WS rope, whose name is subscribed to the oregoing instrument and acknowledged to me that he/she executed the same. IN WITNESS WHEREOF, 1 have hereunto set my hand and affixed my Notarial Seal this day and year first above written. \ TRENA FULLER �a`�'� F9 NOTARY PUBLIC for the Notary Public for the State of Montana Printed Name Residing at My Commission Expires MAYOR, CITY OF KALISPELL MAYOR T`— State of Montana SEAL = Residing at Kalispell, MT My Commission Expires July 28, 2025. ATTEST: ;CLERK CI Y EXHIBIT A Conditions of approval as fixed to the preliminary plat by the City Council, Kalispell, Montana. EXHIBIT B This agreement specifically includes the following improvements and their estimated construction costs. Exhibit A RESOLUTION NO.6053 A RESOLUTION CONDITIONALLY APPROVING THE PRELIMINARY PLAT OF PARKLAND MEADOWS, DESCRIBED AS ASSESSOR'S TRACTS 13D, 13E AND 6J LOCATED IN THE SOUTHWEST QUARTER OF SECTION 29, TOWNSHIP 28 NORTH, RANGE 21 WEST, P.M.M., FLATHEAD COUNTY, MONTANA. WHEREAS, G23 Properties, LLC, the owner of the certain real property described above, has petitioned for approval of the Subdivision Plat of said property; and WHEREAS, the Kalispell City Planning Board and Zoning Commission held a public hearing on September 14, 2021 on the proposal and reviewed Subdivision Report #KPP-21-07 issued by the Kalispell Planning Department; and WHEREAS, the Kalispell City Planning Board and Zoning Commission has recommended approval of the Preliminary Plat of Parkland Meadows, subject to certain conditions and recommendations; and WHEREAS, the city council of the City of Kalispell at its regular council meeting of October 4, 2021, reviewed the Kalispell Planning Department Report #KPP-21-07, reviewed the recommendations of the Kalispell City Planning Board and Zoning Commission, and found from the Preliminary Plat, and evidence, that the subdivision is in the public interest. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF KALISPELL, MONTANA AS FOLLOWS: SECTION 1. That the Findings of Fact contained in Kalispell Planning Department Report #KPP-21-07 are hereby adopted as the Findings of Fact of the city council. SECTION 2. That the application of G23 Properties, LLC for approval of the Preliminary Plat of Parkland Meadows, Kalispell, Flathead County, Montana is hereby approved subject to the following conditions: 1. The Planned Unit Development for Parkland Meadows allows the following deviation from the Zoning Regulations: (1) Minimum lot size: Sec 27.09.040(1) — Minimum lot size per unit as shown on the submitted plans. 2. The preliminary plat approval for the subdivision is not effective until the ordinance approving the PUD/zone change becomes effective. 3. The development of the site shall be in substantial compliance with the application submitted, the site plan, materials and other specifications as well as any additional conditions associated with the preliminary plat as approved by the city council. 4. A development agreement shall be drafted by the Kalispell City Attorney between the City of Kalispell and the developer outlining and formalizing the terms, conditions and provisions of approval. The final plan as approved, together with the conditions and restrictions imposed, shall constitute the Planned Unit Development (PUD) zoning for the site that shall be completed and signed by the city and owner prior to the issuance of a building permit. 5. Upon approval of the preliminary PUD by the City Council, the property owner shall proceed with the preparation of the final PUD plan as provided in Section 27.19.020(7) of the Kalispell Zoning Ordinance. 6. As a PUD with an associated preliminary plat application, the abandonment or expiration of the PUD is governed by Section 27.19.020(10) of the Kalispell Zoning Ordinance. 7. The storm water ponds shall be designed in a way that they become a visual interest to the development. Chain link fencing surrounding the retention pond as the dominant fixture shall not be allowed without mitigation. The developer shall work closely with the Parks Department and Public Works to develop a design that is both visually appealing and meets the required safety guidelines. It is intended that when the project is developed the ponds will act as features, particularly along the roadways, rather than a private maintenance utility facility. 8. The preliminary plat approval shall be valid for a period of three years from the date of approval. 9. The developer shall submit to the Kalispell Public Works Department for review and approval a storm water report and an engineered drainage plan that meets the requirements of the current city standards for design and construction. Prior to final plat, a certification shall be submitted to the public works department stating that the drainage plan for the subdivision has been installed as designed and approved. 10. The developer shall submit to the Kalispell Public Works Department prior to construction an erosion/sediment control plan for review and approval and a copy of all documents submitted to Montana Department of Environmental Quality for the General Permit for Storm Water Discharge Associated with Construction Activities. 11. The developer shall submit water and sanitary sewer plans, applicable specifications, and design reports to the Kalispell Public Works Department and the Montana Department of Environmental Quality for concurrent review, with approval of both required prior to construction. 12. New infrastructure required to serve the subdivision shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction. All design work shall be reviewed and approved in writing by the Kalispell Public Works Department prior to construction. This infrastructure shall include but not be limited to streets, street lighting, street signage, curb, gutter, boulevard and sidewalks. 13. Water and sewer main extensions shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction and in compliance with the city's facilities update and extensions of services plans. The water and sewer main extension plans shall be reviewed and approved by the Kalispell Public Works Department. Prior to final plat, a certification shall be submitted to the Public Works Department stating that the water and sewer mains have been built and tested as designed and approved. 14. Any water rights associated with the property shall be transferred to the City of Kalispell. The water rights shall be allocated proportionally for each phase of the development prior to final plat. 15. An access to the sewer lift station from Cemetery Road or another route acceptable to Public Works shall be required. The lift station shall be placed within a utility lot to be created for that purpose. 16. The developer shall submit the street design to the Kalispell Public Works Department for review and approval prior to construction. Street designs shall meet the city standards for design and construction. 17. While the traffic impact study did not indicate any specific required improvements, any improvements necessary to maintain the existing level of service will be required. All improvements shall be reviewed and approved by the Public Works Department. 18. Access to the B-1 areas off of Airport and Cemetery Roads shall be from the internal street network rather than the external streets. 19. The design shall include at least two pedestrian connections providing access from the area generally near the intersection of Airport Road and Cemetery Road into the development. 20. The development's frontages on Airport Road and Cemetery Road will need to be improved in accordance with City Design and Construction Standards. Airport Road will need to be upgraded to a Minor Arterial standard and Cemetery Road to a Major Collector standard. Improvements may include widening the road surface if necessary to meet those standards and any dedications necessary to provide the specified width. The improvements may be phased with the improvements to be installed across the frontage of each phase of the subdivision. 21. The applicant shall be required to receive approval from the Montana Department of Transportation for access onto Airport Road and will also need to ensure the future Bypass/Airport Road interchange is taken into account with this development. Adjustments to the lot configurations or building layouts may be necessary, as may dedication of additional right-of-way. 22. The north -south road intersecting with Cemetery Road shall be constructed as a minor collector street, and the other internal streets shall be constructed to a local standard. The roundabout and entry median islands are subject to further review during the engineering design. 23. Temporary turnarounds will be required at the two road extensions to the north until such time as a connection is made. 24. Under the subdivision regulations, a second full access is required when 100 or more residential dwelling units are being served. Section 28.3.13(E)(2). The Phase 1 plan shows 72 units plus the B-1 area. Phase 2 shows 120 units. As part of Phase 2, the access to Cemetery Road shall be constructed. The construction of the access may be accelerated, however, depending upon the development of the B-1 lots in Phase 1. 25. The recommendations in the Geotech report shall be followed, including providing additional specific Geotech reports related to buildings and other site improvements, which are to be reviewed and accepted by the City of Kalispell prior to construction. 26. The 200-foot setback from Ashley Creek shall be provided for in the final design (Section 28.3.07 Kalispell Subdivision Regulations). Within that setback, which is measured from the ordinary high-water mark, any uses shall be limited to those outlined in the regulations. 27. Prior to final plat, a letter from the Kalispell Public Works Department shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell, any private infrastructure has been constructed per city standards, and a proper bond has been accepted for unfinished work. 28. All existing and proposed easements shall be indicated on the face of the final plat. Utility easements for city water and sewer shall be provided to allow for the logical extension of utilities from this subdivision to adjoining properties. A letter from the Kalispell Public Works Department shall be obtained stating that the required easements are being shown on the final plat. 29. Prior to any construction, the precise location of the floodplain shall be established with a stamped survey. Lot dimensions, configurations, and site development may need to be adjusted based on the survey, and the number of units may be decreased accordingly. 30. If any fencing is to be constructed as part of the development, it shall comply with height and location zoning standards and should be a consistent design throughout the development. Any fencing will be required to be reviewed and approved by the city Architectural Review Committee, which shall ensure a consistency of colors and materials to be used to present an aesthetically pleasing design. 31. The following statement shall appear on the final plat: "The undersigned hereby grants unto each and every person, firm or corporation, whether public or private, providing or offering to provide telephone, telegraph, electric power, gas, cable television, water or sewer service to the public, the right to the joint use of an easement for the construction, maintenance, repair, and removal of their lines and other facilities, in, over, under, and across each area designated on this plat as "Utility Easement" to have and to hold forever." Developer's Signature 32. Prior to filing the final plat, a letter from the US Postal Service shall be included stating the Service has reviewed and approved of the design and location of the mail delivery site. The mail delivery site shall be installed or bonded for prior to final plat. In addition, the mail delivery site and improvements shall also be included in the preliminary and final engineering plans to be reviewed by the Public Works Department. The mail delivery site shall not impact a sidewalk or proposed boulevard area. 33. A homeowner's association (HOA) shall be formed and established to provide for the maintenance of the common areas, including, but not necessarily limited to, roads, parks and open space. Maintenance of private roads and alleys shall include both short term and long term maintenance including, but not necessarily limited to, snow plowing, landscaping, sidewalks, street repairs, overlays, and rebuilds of the street. 34. A letter from the Kalispell Fire Department approving the access, placement of the fire hydrants and fire flows within the subdivision shall be submitted prior to final plat. 35. A letter shall be obtained from the Parks and Recreation Director approving a landscape plan for the placement of trees and landscaping materials within the landscape boulevards of the streets serving the subdivision, common area, and adjoining rights -of -way. The approved landscape plan shall be implemented or a cash -in -lieu payment for installation of the street trees and groundcover be provided to the Kalispell Parks and Recreation Department. 36. A park plan shall be created and approved by the Parks and Recreation Director prior to final plat of Phase 1, and the plan shall show that the parkland dedication requirement is met for each phase. 37. A note shall be placed on the final plat indicating a waiver of the right to protest creation of a park maintenance district. This district shall only be activated in the event that the property owners' association defaults on their park and open space amenity conditions. The assessments levied within the maintenance district shall be determined by the Parks and Recreation Department with approvals by the Kalispell City Council. 38. A note shall be placed on the final plat indicating a waiver of the right to protest creation of a stormwater maintenance district. This district shall only be activated in the event that the property owner(s) default on the maintenance of the approved stormwater facilities. The assessments levied within the maintenance district shall be determined by the Public Works Department with approvals by the Kalispell City Council. 39. A minimum of two-thirds of the necessary infrastructure for the subdivision shall be completed prior to final plat submittal. 40. All utilities shall be installed underground and in locations that are approved by the Kalispell Public Works Department in accordance with the Kalispell Standards for Design and Construction. 41. All areas disturbed during development shall be re -vegetated with a weed -free mix immediately after development. SECTION I Upon proper review and filing of the Final Plat of said subdivision in the office of the Flathead County Clerk and Recorder, said premises shall be a subdivision of the City of Kalispell. PASSED AND APPROVED BY THE CITY COUNCIL AND SIGNED BY THE MAYOR OF THE CITY OF KALISPELL THIS 4TH DAY OF OCTOBER, 2021. ATTEST: Ai a Brunckhorst, CMC City Clerk 011111111 Mark Johnson Mayor EXHIBITS ENGINEER'S ESTIMATE PARKLAND MEADOWS PHASE 1 j{q DesLriotion $93DSI1Y �1B)I UMt Cost Tog1 Cost 9Y3D C ftWM n Complete Completed Value OWSITE 10 MOBIL ZATION 1 LS $ 33,663.36 $ 33,663.36 0.9 90% $ 30,297.02 20 SWPPP 1 LS $ 7,645.32 S 7,645.32 1 200% $ 7,64532 30 TRACKING PAD 1 is $ 2,921.91 $ 2,821.91 1 100% $ 2,821.91 40 SILT FENCE 800 LF $ 3.14 $ 2,512.00 800 100% $ 2,512.00 50 INLET PROTECTORS 38 EA $ 68.99 $ 2,621.62 16 42% $ 1,103.84 70 DEMO EXISTING GRAVEL 6446 SF $ 0.19 S 1,224.74 6446 100% $ 1,224.74 80 DEMO EXISTING FENCE 721 LF $ 2.34 S 1,687.14 721 100% S 2,687.14 90 DEMO EXISTING IRRIGATION LINE 632 LF $ 17.87 $ 11,293.94 632 100% $ 21,293.94 100 STRIP & STOCKPILE TOPSOIL (16" DEPTH) 36667 CY $ 3.31 $ 121,367.77 36667 100% $ 121,367.77 110 SITE CUT/FILL 1 LS $ 431,667.46 $ 432,667.46 1 100% $ 431,667.46 120 PLACE PIPE SPOILS ON SITE 11524 CY $ 3.50 $ 40.334.00 11524 100% $ 40,334.00 130 REPLACE TOPSOIL - BLVD (6" DEPTH) 1533 CY $ 29.90 $ 30,506.70 2533 100% $ 30,506.70 140 REPLACE TOPSOIL -COMMERCIAL LOTS ( 6" DEPTH) 3415 CY $ 3.86 $ 13,181.90 3415 1D0% 5 23,181.90 145 REPLACE TOPSOIL- PONDS ( 6" DEPTH) 3561 CY $ 556 5 19,799.16 3561 100% 5 19.799.16 ISO HYDROSEED BLVD/PONDS 1 LS $ 37,743.77 $ (37,743.77) 1 100% S 37,743.77 160 DRILL SEED COMMERCIAL LOTS/DISTURBED PIPE CORRIDOR 1 LS $ 6,875.57 $ 6,87557 05 50% $ 3,437.79 170 8" WATER MAIN 751 LF $ 87.55 $ 65,750.05 751 100% $ 65,750.05 ISO 8' FITTINGS 5 EA $ 562.92 S 2,814.60 5 200% $ 2,814.60 190 8" GATE VALVES 9 EA $ 2,688.50 5 24,196.50 9 200% $ 24,196.SO 192 12" WATER MAIN 1080 LF $ 223.50 $ 133,380.00 1080 200% $ 133,380.00 194 12" FITTINGS 5 EA S 1,366.64 S 6,833.20 5 100% $ 6,833.20 196 12" GATE VALVES 12 EA $ 4,388.90 $ 52,666.80 12 100% $ S2,666.80 200 FIRE HYDRANT ASSEMBLY 8 EA $ 8,94653 $ 71,572.24 8 200% S 71,572.24 210 1.5- WATER SERVICE W/METER PIT 212 LF $ 157.02 $ 33,298.24 212 100% $ 33,288.24 215 2" WATER SERVICE W/METER PIT 3S4 LF $ 210.52 $ 74,524.08 354 100% $ 74,524.08 220 2" FIRE SERVICE W/CURB STOP 354 LF $ 114.26 $ 40,448.04 354 100% $ 40,448.04 230 8" SEWER MAIN 2587 LF $ 120-69 $ 191,535.03 1587 100% $ 191,535.03 240 SEWER MANHOLES W/COLLAR 9 EA $ 5,821.60 $ 52,394.40 9 200% $ 52,394.40 24S 4"SEWERSERVICE 103 LF $ 107.75 $ 11,098.25 103 100% $ 11,098.25 ISO 6"SEWERSERVICE 374 LF $ 117.01 $ 43,761-74 374 10(rA $ 43,762.74 255 4" IRRIGATION SLEEVES 584 LF $ 20.80 S 12,147.20 584 200% $ 12,147.20 260 12" PVC STORM DRAIN 1421 LF 5 90.80 $ 126.121.20 1389 985E $ 126,121.20 265 15" PVC STORM 500 LF 5 115.27 $ 19,480.63 169 34% 5 19,480.63 270 18" RCP PIPE 1031 LF $ 82.23 S 94,779.23 1031 1D0% $ 84,779.13 275 RIP RAP OUTFALL 2 EA $ 673.95 $ 1,347.90 2 100% 5 1,347.90 290 18" RCP STORM DRAIN - POND OUTLET PIPING 59 LF $ 149.48 $ 8,819.32 59 100% S 8,819.32 285 RIP RAP OUTFALL 2 EA 5 67395 5 1,347.90 1 50% 5 67395 290 30" CS W/APRON 15 EA $ 3,693 65 $ 51,711.10 14 93% $ 51,711 10 300 48" STORM MANHOLE W/COLLAR 19 EA $ 5,114.52 $ 76,717.80 15 79% $ 76,717 80 310 POND OUTLET SKIMMER STRUCTURES 2 EA $ 4,534.79 $ 9,069.58 2 1DO% $ 9,069.58 315 72' STORM MANHOLE W/COLLIER 1 EA $ 7,318.40 $ 7,318.40 1 100% $ 7,319.40 320 COMMON UTILITY TRENCH W/BEDDING 1805 LF $ 1452 $ 26,208.60 1805 1 $ 26,208.60 330 2" CABLE/PHONE CONDUIT W/SWEEPS & PULL ROPE 3800 LF $ 1.S1 $ 5,738.00 3800 1 $ 5,738.00 340 4" POWER CONDUIT W/SWEEPS & PULL ROPE 2900 LF $ 13.95 $ 26,505.00 1900 100% $ 26,505.00 350 JUNCTION BOX -TYPE 1 CONCRETE PULL BOX 7 EA $ 684.27 $ 4,789.89 7 100% $ 4,789.89 360 SINGLE PHASE ELECT VAULT 1 EA $ 11300.95 $ 2,300.95 1 200% $ 1,300.95 370 THREE PHASE ELECT VAULT 6 EA $ 1,985 37 $ 11,912.22 6 100% S 11,91222 380 LIGHTING TRENCH W/BEDDING 2" LF $ 23.52 $ 5,785.92 246 100% $ 5,78S 92 390 MONUMENT SIGN TRENCHING 32 LF $ 2834 $ 90688 0% 5 395 1 1/4" MONUMENT CONDUIT W/SWEEPS & PULL ROPE 197 LF $ 5.71 $ 1,124,87 D% $ - 400 11/4- UGHT CONDUIT W/SWEEPS & PULL ROPE 1598 LF $ 5.16 S 8,245.68 IS98 100% $ 8,245.68 410 FEC LIGHT BASE 8 EA 5 1,194.05 $ 9552.40 8 100% $ 9.552.40 420 CURB & GLITTER - VALLEY GUTTER 154 LF $ 27,93 $ 4,301.22 154 100% $ 4,301.22 425 STAND UP CURB 106 LF $ 31.86 $ 3,377.16 106 100% $ 3,377.16 430 CURB & GUTTER LAYDOWN 354 IF $ 27 19 $ 9,625.26 300 85% $ 8.157.00 440 CURB & GUTTER 2574 LF 5 19 84 5 51,068.16 2011 78% $ 39,898.24 450 6" CONCRETE APPROACH W/GRAVEL 2719 SF 5 9.34 $ 25,395.46 2000 74% $ 18,680.00 455 6" CONC MAILBOX TURN -OUT APRON W/GRAVEL 1633 SF $ 9.08 $ 14,827.64 1633 100% $ 14,827.64 457 8" CONCRETE MAILBOX PADS 255 SF $ 20.33 S 3,151.15 15S 100% $ 3,151.15 460 4" CONCRETE SIDEWALK W/GRAVEL 14606 SF $ 5 52 5 90,625 12 11154 76% $ 61,570.08 465 HC RAMPS W/CURB BACKING W/GRAVEL 280 SF $ 23.95 $ 3,90600 280 100% $ 3,906.00 470 HC. RAMPS W/GRAVEL 422 SF 5 1358 $ 5,717.18 421 100% S S,717.18 480 DOME TILES 10 EA $ 311.80 $ 3,118.00 30 100% $ 3,128.00 520 9'OF3'MINUS-LOCAL 44757 SF $ 1.04 $ 46,547.28 44757 100% $ 46,S47.28 530 6" OF 3/4" CRUSH -LOCAL 44757 SF $ 0.96 $ 38,491.02 44757 30D% $ 38,491.02 540 4" OF ASPHALT - LOCAL 44757 SF $ 238 $ 106,521 66 35131 78% 5 83,611.78 545 8" OF 3/4" CRUSH NEW GRAVEL ACCESS SCHOOL PROP 360 SF $ 2.85 $ 1,026.00 360 100% $ 1,026.00 550 9"OF 3"MINUS -GRAVEL TEMP CUL-DE-SAC 13523 SF $ 1.13 $ 15,280.99 13S23 200% $ 15,280.99 552 6- OF 3/4"CRUSH -GRAVEL TEMP CUL-DE-SAC 13523 SF $ 0.75 $ 20,142.25 23523 100% $ 10,142.25 554 9" OF 3" MINUS - POND ACCESS DRIVE 8061 SF $ IA7 $ 11,849.67 SD61 100% S 11,849.67 S56 6" OF 3/4" CRUSH - POND ACCESS DRIVE 8061 SF $ 047 $ 7.023.07 8061 1009E $ 7,013.07 558 MICRO POOL 2 EA 5 1,23970 $ 2,47940 0% 5 560 POND GAUGES, FORESAY BERMS & TRICKLE CHANNELS 1 is $ 8,12477 5 8,12477 0 5 50% 5 4,06239 562 9" OF 3" MINUS- LOCAL 2ND ACCESS ORIVE 8359 SF $ 1.06 $ 8,86054 0% 5 564 6" OF 3.4" CRUSH LOCAL - 2ND ACCESS DRIVE 8359 SF $ 0 86 $ 7,188.74 D% $ 566 4" OF ASPHALT LOCAL - 2ND ACCESS DRIVE 8359 SF $ 2 48 $ 20,730 32 0% S 570 STOP BARS 1 LS $ 2,133.34 $ 2,133.34 1 100% S 2,133.34 580 CROSSWALKS I LS $ 2,73506 $ 2,73S.06 1 100% $ 2,735.06 605 MONUMENT SIGN 1 LS $ 3,044.28 $ 3,044.28 1 100% $ 3,04428 610 STOP/STREET NAME SIGNS 3 EA $ 1,492.15 S 4,473AS 3 100% $ 4,473.45 620 SPEED LIMIT SIGNS 2 EA $ 1,079.90 $ 8,638.40 2 100% $ 2,15960 OFF_•SFTE 10 MOBILIZATION 1 LS $ 22,321.69 S 22,321.69 1 100% $ 22,321.69 40 SILT FENCE 1100 LF $ 3.07 5 3,377.00 100 9% $ 30700 50 INLET PROTECTORS 7 EA $ 69 D6 $ 483.42 0 0% $ 710 TRAFFIC CONTROL ( 12 DAYS) 1 LS $ 24,002.BS S 24,002.85 1 100% 5 24,002.85 712 REMOVE/SALVAGE EXISTING ROAD SIGN 5 EA $ 193.63 $ 968.15 5 100% $ 968.15 714 DEMO EXISTING LIGHT BASE/SALVAGE POLE 2 LS $ 1,640.57 IS 1,640.57 1 200% S 1,64057 718 REMOVE EXISTING CMP FES 2 EA S 137.54 S 275.08 2 200% 5 275.08 720 DEMO CURB & DRAIN CHUTE 194 LF S 9.57 5 L856.58 194 100% S 1,856.58 725 DEMO CONCRETE APPROACH 667 SF 5 1.41 $ 940.47 667 100% 5 940.47 730 SAWCUT & REMOVE ASPHALT- AIRPORT ROAD EDGE 5510 SF $ 0.66 S 3,636.60 5510 100% $ 3,636.60 735 SAWCUT& REMOVE ASPHALT - ASPHALT PATH 108 SF $ 6.00 S 648.00 208 100% $ 648.00 738 STRIP & STOCKPILE TOPSOIL (16" DEPTH) 6855 CY S 2.98 $ 20,427.90 6855 100% S 20,427.90 110 EARTHWORK 1 LS $ 48,86552 S 48,865.52 1 200% $ 48,965.52 750 PLACE PIPE SPOILS ON SITE 1577 CY $ 4.18 S 6,591.86 1577 100% S 6,591.86 T•0 REPLACE TOPSOIL ROW IS DEPTH) 2860 CY $ 6.87 5 19,648.20 2560 90% $ 17,587.20 76S HYOROSEED R O W 1 LS 5 15,228 79 $ 15,228.79 09 90% 5 13,705.91 770 8" SEWER MAIN 1660 LF S 80.94 $ 134,360.40 1660 200% $ 234,360.40 780 SEWER MANHOLES W/COLLAR 8 EA $ 6,964.32 $ 55,714.56. 8 100% $ 55,71456 790 CONNECT TO EXISTING SEWER MANHOLE 1 LS $ 2,67625 $ 2,676.25 1 100% $ 2,676.25 795 4" SEWER SERVICE 49 LF S 217.98 $ 5,781.02 49 100% $ 5,791.02 900 6"SEWERSERVICE 213 LF $ 111.34 $ 12,582.42 213 100% $ 12,591.42 BID LIFT STATION 1 LS $ 148,553.11 $ 148553.11 1 100% $ 148,553.11 815 PUMP PACKAGE 1 LS $ 200,982.14 $ 200,982.14 1 100% $ 200,982.14 820 PREP FOR BUILDING SLAB 1 LS S 1,117.85 $ 2,117.85 1 300% S 2,117.85 825 LIFT STATION GRAVEL AREA 3164 SF $ 3.41 $ 10,789.24 3164 100% $ 10,789.24 830 ELECTRICAL LIFT STATION 1 IS $ 98,243.19 $ 98,243.19 1 200% $ 98,243.29 835 FENCE/GATE 1 LS $ 8,612.24 $ 8,612.24 1 100% $ 8,612.14 840 6" SEWER FORCE MAIN W/FIITINGS 1600 LF $ 45.16 $ 72,256.00 1600 100% $ 72.256.00 842 CONNECT TO EXISTING FORCE MAIN 1 LS S 959.77 $ 959.77 1 300% $ 959.77 848 EXTEND EXISTING 18" CMP & NEW 18- CMP W/FES 44 LF $ 194.26 $ 8,207.44 44 100% S 8,107.44 850 EXTEND EXISTING 24" CMP 23 LF $ 128.38 S 2,952.74 23 200% $ 2,952.74 852 RIP RAP OUTFALL 4 EA S 673.71 $ 2,694.84 4 100% $ 2,694.84 255 4" IRRIGATION SLEEVES 243 LF $ 2092 $ 5,083.56 243 10096 $ 5,083.56 320 COMMON UTILITY TRENCH W/BEDDING 770 LF $ 13.96 $ 10,672 20 770 100% S 10,672.20 330 2" COMMUNICATION CONDUIT W/SWEEPS & PULL ROPE 1622 LF 5 1.39 IS 2,240.68 1612 100% $ 2,240.68 966 2"CONDUIT -LIFT STATION 108 LF S 15.22 S 2,643.76 108 100% $ 1,643.76 867 3"CONDUIT -LIFT STATION 19 LF $ 29.52 $ 560.88 19 100% $ 560.88 340 4" POWER CONDUIT W/SWEEPS & PULL ROPE 806 LF $ 15.78 $ 12,718.68 806 100% $ 12,718.68 872 2" ( DOUBLE) COMMUNICATION BORE 103 LF $ 61.27 $ 6,310.81 103 10cH6 $ 6,310.81 875 4" MAIN POWER BORE 103 LF $ 54.53 $ 5,616.59 103 100% $ 5,616.59 360 SINGLE PHASE ELECT VAULT 2 EA $ 1,300.50 5 2,601.00 2 200% $ 2,601.00 370 THREE PHASE ELECT VAULT 2 EA $ 1,985.39 $ 3,970.78 2 100% $ 3,970.78 380 LIGHTING TRENCH W/BEDDING 200 LF $ 30.87 $ 2,174.00 200 100% $ 2,174.00 400 11/4- LIGHT CONDUIT W/SWEEPS & PULL ROPE 522 LF $ 9.39 S 4,901.58 522 100% $ 4,90158 935 RE -INSTALL SALVAGED LIGHT POLE 1 LS 5 1,094.02 $ 2,094.02 1 200% $ 2,094.02 430 CURB & GUTTER -LAYDOWN 112 LF $ 33.77 $ 3,782.24 112 200% $ 3,792.24 440 CURB &GUTTER 634 LF S 22.39 $ 24,195.26 634 100% $ 14,195.26 955 CONC DRAINAGE CHUTES 3 EA $ 1,842.74 $ 5,528.22 3 10096 $ 5,528.22 460 4" CONCRETE SIDEWALK W/GRAVEL 214 SF $ 6.24 $ 721.36 114 100% $ 711.36 450 6" CONCRETE APPROACH W/GRAVEL 2863 SF $ 1061 $ 30,376.43 0% 5 975 6" CONC SIDEWALK/MAINTENANCE ACCESS 5338 SF $ 8.92 $ 47,614.96 5338 100% $ 47,614.96 976 SIDEWALR/MAINTENANa ACCESS -6- OF 3/4- CR ONLY 12770 SF $ 1.43 $ 18,261.10 12770 100% S 18,262.10 978 6" CONCRETE HC RAMPS 281 SF $ 1647 $ 4,628.07 282 100% $ 4,628.07 980 DOME TILES - CAST IRON 2 EA $ 1,286.57 $ 2,573.14 2 100% $ 2,573.24 990 15'OF 3'MINUS -COLLECTOR 7779 SF $ 2.78 $ 21,625.62 7779 200% S 22,625.62 1000 6' OF 3/4" CRUSH -COLLECTOR 7779 SF $ 1.35 $ 10,501.65 7779 100% S 20,501.65 1010 4* OF ASPHALT -COLLECTOR 7779 SF $ 347 S 26,993.13 7779 100% $ 26,993.13 1015 REPLACE EXISTING SALVAGED ROAD SIGN 5 EA $ 290.44 $ 1,452.20 5 100% $ 1,452.20 1018 "AUTHORIZED VEHICLES ONLY" SIGN 1 EA $ 1,079.80 S 2,079.80 1 100% $ 1,079.90 1020 LINE STRIPING 1 LS S 87522 $ 875.22 1 100% S 875.22 710 TRAFFIC CONTROL (9 DAYS) 1 LS $ 19,703.41 $ 19,703A1 1 100% $ 19,703.42 1040 DEMO CURB & REPLACE 20 LF $ 49 65 $ 993.00 20 100% S 993.00 1050 SAWCUT& REMOVE ASPHALT -AIRPORT RD/DRIVEWAYS 594 SF $ 3.89 $ 2,310.66 594 100% $ 2,310.66 750 PLACE PIPE SPOILS ON SITE 455 CY $ 397 $ 1,806.35 45S 100% $ L806.35 1060 CONNECT TO EXISTING 12" MAIN 1 LS $ 1,878.71 $ 1,878.71 1 100% $ 1,878.71 1065 IACK & BORE FOR 12" WATER MAIN - PH 1 70 LF $ 961.58 $ 67,310.60 70 100% S 67,310.60 192. 12' WATER MAIN 561 LF $ 91.96 $ 51,589.56 561 100% $ 51,589.56 196 12" GATE VALVES 5 EA $ 4,378.18 S 21,890.90 5 100% $ 21,890.90 194 12" RTTINGS 6 EA S 1,302.51 $ 7,815.06 6 100% $ 7,815.06 200 FIRE HYDRANT ASSEMBLY Off -Site 1 EA $ 9,660.68 S 9,660.68 1 200% $ 9,660.68 1145 GEO FABRIC 154 SF $ 0.13 $ 20.02 154 100% $ 20.02 1150 9" & 15" OF 3" MINUS -AIRPORT RD/DRIVEWAY 594 SF $ 2.33 $ L384.02 594 100% $ 1,394.02 1160 6' OF 3/4" CRUSH - AIRPORT RD/DRIVEWAY 594 SF $ 274 $ 1,62756 594 100% $ 1,62756 1170 3'&4'OF ASPHALT- AIRPORT RD/DRIVEWAY 594 SF 5 4.61 $ 2,738.34 594 100% $ 2,738.34 2275 SEEDING 1 LS S 2,363.09 $ 2,363.09 1 100% $ 2,363.09 1190 LINE STRIPING 1 LS 5 875.22 $ 87522 1 200% $ 875.22 001-1 6" ROCK, HAUL, FABRIC, EXCAV/PLACE 5W LF $ 24.50 S 22,250.00 Soo 1DD% $ 12,250.00 C01.2 TRENCH & BACKFILL/FIBER RELOCATE 400 LF $ 21.00 S 8,400.00 400 100% $ 8,400.00 CO2-1 TRENCH STABILIZATION 213 LF $ 24.50 S 5,218.50 213 100% $ 5,218.50 1190 LANDSCAPING/IRRIGATION 1 LS $ 236,13500 $ 236,135.00 0.88 98% $ 207,798.90 1200 LIFT STATION BUILDING 1 LS S 40,292.93 S 40,292.93 1 200% $ 40,292.93 TOTAL $ 6 6-140r 4,188,390 29 '2,508414 U 9a 97.3% $ 4,075,881.56 Utility Lot Landscape/irrigation 65235 SF $ 185 $ 120,684.75 0 0% $ Utility Lot MDT ROW landscape/irrigation/des 28660 SF $ 2.10 $ 60,186.00 0 0% $ - Added Lot S Hydrant ONTA A 1 EA $ 8,946.53 $ 8,946.53 1 100% $ 8,946.53 Electric Fees * 1 LS 5 375,365.00 5 375,365.00 1 100% $ 375,365.00 NW Energy Fees 1 LS $ 27,202.61 $ 27,202.61 1 100% 5 27,202.61 * North Forcemain Connection t,EE LS $ 44,875.96 $ 44,875.96 1 100% $ 44,875.96 T06�N5 4,825,651.14 94% s 4,532,271.66 ' CANTOSN Balance remaining $ 293.37949 125%Bond Amount $ 366,724.36 Q � 4ICENS ��C? SrpNP�- s13tZ4