E2. Approve Change Order for Four Mile Drive ProjectCITY OF
KALISPELL
MEMORANDUM
To: Doug Russell — City Manager
CC: Susie Turner, PE — Public Works Director
From: Keith Haskins, PE — Deputy Director Public Works
Re: Schedule 2 — Grandview Lift Station and Four Mile Drive Force Main
Meeting Date: 6/17/2024
BACKGROUND: In June of 2023, Council awarded Schedule 2 of the Grandview Lift Station
and Four Mile Drive Force Main Project to LHC Inc. for a contract price of $1,593,220.39.
Schedule 2 is for construction of 4,312 linear feet of 10-inch force main with 1,190 installed via
horizontal directional drilling. Construction of this schedule started in April of this year and is
currently at 66% complete (based on cost of work).
Multiple sources were used to fund the project including a State Revolving Fund Loan, ARPA
Local Fiscal Recovery Funds, City Sewer Rates, and City Sewer Impact Fees
Below is a breakdown of the current contract price by schedule:
Sch 1 - Western Municipal —Bid
$ 3,874,000.00
- WM — Change Order 1
$ 67,756.10
- WM — Change Order 2
$ 4,055.58
SCH 1 TOTAL CONTRACT =
$ 3,945,811.68
Sch 2 — LHC Inc. —Bid
$ 1,593,220.39
SCH 2 TOTAL CONTRACT =
$ 1,593,220.39
Total (Sch 1 + Sch 2) = $ 5,539,032.07
Budget (Construction + Contingency) = $ 6,271,570.00
Remaining Budget = $ 732,537.93
The original contract approach for replacement of asphalt on the project was to patch back only
the utility trench line for Four Mile Drive. A plan view of a portion of the plans showing the
proposed utility patch and typical detail of the utility patch as bid are provided in Figures 1 and 2
on the following page.
Change Order 1 for Schedule 2 is recommended by staff to complete additional milling and
paving, rectify prices for valves used on the project, and to account for installation of insulation
required to protect the force main from freezing in a realignment to avoid private utilities.
201 1st Avenue E I Phone (406)758-7720
Po Box 1997 Public Works Department Fax (406)758-7831
Kalispell, MT 59903 1 1 www.kalispell.com
Doug Russell
Schedule 2 — Grandview LS and 4MD Force Main
Page 2
E KYA1 fi' I. WA AJ
t
PI f:
,....�.,.�e_ -EOP EOP---f!
$ STA, 50+25,—t'STA, 951+2%,—
2.' RT t 3.0 RT
VA. 5b+T5,
16' RT
AMC RESET
EXIST 5GN
.+wt1+Ct7 t7R
FLOWABLE FILL FOR
CROSVINO PIPC SVPN*t
Figure 1 - Plan View Showing Patch Back of Utility Trench
W-5
P '�- "+
--4L
FOUR MILE DR
......;, ...._� a ; , r.,�,;
V
Z
DUST ASPHALT
a" AS'-�ALT RE'_ACEMENT (TVPI
(1 VK1 LIFTS}
10' MAX PAY 1'
L1411 (Tw)
6" CRUSHED BASE COURSEJ,rx
04'" MINUS)
9' CRUSHED SuAt3As+
(3` MINJS)
IMPORTED TRENCH
BAr,kgLL
Figure 2 - Utility Trench Typical Section
As construction commenced and with ARPA funds available beyond the contract price, staff
decided to evaluate the cost to mill the remaining portion of the street and provide a full 2"
overlay on 4 Mile Drive from Highway 93 to Northland Drive, rather than a utility patch in the
roadway. This approach would provide a uniform surface for the street, seal off the utility
patches already in the roadway and complete work on a street currently identified by Public
Works as needing a future Mill and Overlay. Utilizing LHC's Mill and Overlay bid costs which
the City has also contracted with LHC, change order costs were negotiated. The total cost for the
additional mill and overlay is $84,660.
In addition to the mill and overlay, the change order takes into account a cost savings of $5,200
by switching from plug valves to gate valves on the force main. Additionally, in order to avoid
some private utilities, 418 feet of the force main was installed shallower than minimum depth
which required installation of insulation board. The required insulation added $23,840.78 to the
change order, bringing the total cost for Change Order No. 1 (attached) to $100,300.78.
REQUESTED ACTION: Motion to approve Change Order I for Schedule 2 — Grandview Lift
Station and Four Mile Drive Force Main Project for an increase in the contract price of
$100,300.78 for a total contract price of $1,693,521.17 and no increase in contract days.
FISCAL EFFECTS: Adequate funds are available in ARPA Funds, Sewer Funds, and Sewer
Impact Fee Funds budgeted for the project.
CHANGE ORDER NO.: 1
Owner: City of Kalispell Owner's Project No.:
Engineer: Robert Peccia & Associates Engineer's Project No.: 18110
Contractor: LHC, Inc. Contractor's Project No.:
Project: Grandview Lift Station and Four Mile Drive Forcemain
Contract Name: Schedule 2 — Four Mile Drive Forcemain
Date Issued: 6/5/2024 Effective Date of Change Order: 6/5/2024
The Contract is modified as follows upon execution of this Change Order:
Description: Mill and repave 2" of asphalt the full width of the road from station 37+20 to station 61+50
(Northland Drive to Highway 93). Note that this change adds to the quantity of asphalt originally included in
the contract. Substitute buried gate valves for buried plug valves as included in Work Directive Change No.
1. Installation of pipe insulation from station 56+76 to station 60+94.
Attachments: Cost Estimates and Work Directive Change Pricing
Change in Contract Times
[State Contract Times as either a specific date or a
Change in Contract Price number of days]
Original Contract Price:
$1,593,220.39
Original Contract Times:
Substantial Completion: 120 Calendar Days
Ready for final payment: 30 Calendar Days
[Increase] [Decrease] from previously approved Change
Orders:
$N/A
[Increase] [Decrease] from previously approved
Change Orders: N/A
Substantial Completion: N/A
Ready for final payment: N/Ad
Contract Price prior to this Change Order:
$1,593,220.39
Contract Times prior to this Change Order:
Substantial Completion: N/A
Ready for final payment: N/A
Increase this Change Order:
$100,300.78
[Increase] [Decrease] this Change Order:
Substantial Completion: N/A
Ready for final payment: N/A
Contract Price incorporating this Change Order:
$1,696,521.17
Contract Times with all approved Change Orders:
Substantial Completion: N/A
Ready for final payment: N/A
E1CDC° C-941, Change Order E1CDC° C-941, Change Order, Rev.1.
Copyright° 2018 National Society of Professional Engineers, American Council of Engineering Companies
and American Society of Civil Engineers. All rights reserved.
Recommended by Engineer if required)
By: Brad Koenig, PE
Title: Group Manager
Date: 6/5/24
Ms
Title:
Date:
Authorized by Owner
Approved by Funding Agency (if applicable)
EJCDC® C-941, Change Order EJCDCII C-941, Change Order, Rev.1.
Copyrightc 2018 National Society of Professional Engineers, American Council of Engineering Companies
and American Society of Civil Engineers. All rights reserved.
Overlay
Item Description
Unit
Unit Price
Qty
Total Price
mobilization
LS
$ 1,950.00
1
$ 1,950.00
City Haul) per 2" depth
SY
$ 4.00
4795
$ 19,180.00
re Pavement per 2" depth
SY
$ 12.00
4795
$ 57,540.00
nt
EA
$ 130.00
3
$ 390.00
Devices
Day
$ 800.00
2
$ 1,600.00
Flaggers
Day
$ 2000.00
2
$ 4,000.00
Subtotal
$ 84,660.00
for Buried Plug Valve
Item Description
Unit
Unit Price Qty
Total Price
Valve in Lieu of Buried 10" Plug Valve
EA
($1,300.00) 4
($ 5,200.00)
Subtotal
($ 5,200.00)
Installed Over Trenched Pipe (324 LF)
Item Description
Unit
Unit Price
Qty
Total Price
i
LF
$23.76
324
$ 7,698.24
i
LF
$5.75
324
$ 1,863.00
Subtotal
$ 9,561.24
Installed Over Directional Drill (94 LF)
Item Description
Unit
Unit Price
Qty
Total Price
LF
$17.83
94
$ 1,676.02
i
LF
$23.76
94
$ 2,233.44
i
LF
$5.75
94
$ 540.50
LF
$63.68
94
$ 5,985.92
LF
$8.91
94
$ 837.54
LF
$12.97
94
$ 1,219.18
LF
$19.01
94
$ 1,786.94
Subtotal
1 $ 14,279.54