E2. Approve Change Order for Four Mile Drive ProjectCITY OF KALISPELL MEMORANDUM To: Doug Russell — City Manager CC: Susie Turner, PE — Public Works Director From: Keith Haskins, PE — Deputy Director Public Works Re: Schedule 2 — Grandview Lift Station and Four Mile Drive Force Main Meeting Date: 6/17/2024 BACKGROUND: In June of 2023, Council awarded Schedule 2 of the Grandview Lift Station and Four Mile Drive Force Main Project to LHC Inc. for a contract price of $1,593,220.39. Schedule 2 is for construction of 4,312 linear feet of 10-inch force main with 1,190 installed via horizontal directional drilling. Construction of this schedule started in April of this year and is currently at 66% complete (based on cost of work). Multiple sources were used to fund the project including a State Revolving Fund Loan, ARPA Local Fiscal Recovery Funds, City Sewer Rates, and City Sewer Impact Fees Below is a breakdown of the current contract price by schedule: Sch 1 - Western Municipal —Bid $ 3,874,000.00 - WM — Change Order 1 $ 67,756.10 - WM — Change Order 2 $ 4,055.58 SCH 1 TOTAL CONTRACT = $ 3,945,811.68 Sch 2 — LHC Inc. —Bid $ 1,593,220.39 SCH 2 TOTAL CONTRACT = $ 1,593,220.39 Total (Sch 1 + Sch 2) = $ 5,539,032.07 Budget (Construction + Contingency) = $ 6,271,570.00 Remaining Budget = $ 732,537.93 The original contract approach for replacement of asphalt on the project was to patch back only the utility trench line for Four Mile Drive. A plan view of a portion of the plans showing the proposed utility patch and typical detail of the utility patch as bid are provided in Figures 1 and 2 on the following page. Change Order 1 for Schedule 2 is recommended by staff to complete additional milling and paving, rectify prices for valves used on the project, and to account for installation of insulation required to protect the force main from freezing in a realignment to avoid private utilities. 201 1st Avenue E I Phone (406)758-7720 Po Box 1997 Public Works Department Fax (406)758-7831 Kalispell, MT 59903 1 1 www.kalispell.com Doug Russell Schedule 2 — Grandview LS and 4MD Force Main Page 2 E KYA1 fi' I. WA AJ t PI f: ,....�.,.�e_ -EOP EOP---f! $ STA, 50+25,—t'STA, 951+2%,— 2.' RT t 3.0 RT VA. 5b+T5, 16' RT AMC RESET EXIST 5GN .+wt1+Ct7 t7R FLOWABLE FILL FOR CROSVINO PIPC SVPN*t Figure 1 - Plan View Showing Patch Back of Utility Trench W-5 P '�- "+ --4L FOUR MILE DR ......;, ...._� a ; , r.,�,; V Z DUST ASPHALT a" AS'-�ALT RE'_ACEMENT (TVPI (1 VK1 LIFTS} 10' MAX PAY 1' L1411 (Tw) 6" CRUSHED BASE COURSEJ,rx 04'" MINUS) 9' CRUSHED SuAt3As+ (3` MINJS) IMPORTED TRENCH BAr,kgLL Figure 2 - Utility Trench Typical Section As construction commenced and with ARPA funds available beyond the contract price, staff decided to evaluate the cost to mill the remaining portion of the street and provide a full 2" overlay on 4 Mile Drive from Highway 93 to Northland Drive, rather than a utility patch in the roadway. This approach would provide a uniform surface for the street, seal off the utility patches already in the roadway and complete work on a street currently identified by Public Works as needing a future Mill and Overlay. Utilizing LHC's Mill and Overlay bid costs which the City has also contracted with LHC, change order costs were negotiated. The total cost for the additional mill and overlay is $84,660. In addition to the mill and overlay, the change order takes into account a cost savings of $5,200 by switching from plug valves to gate valves on the force main. Additionally, in order to avoid some private utilities, 418 feet of the force main was installed shallower than minimum depth which required installation of insulation board. The required insulation added $23,840.78 to the change order, bringing the total cost for Change Order No. 1 (attached) to $100,300.78. REQUESTED ACTION: Motion to approve Change Order I for Schedule 2 — Grandview Lift Station and Four Mile Drive Force Main Project for an increase in the contract price of $100,300.78 for a total contract price of $1,693,521.17 and no increase in contract days. FISCAL EFFECTS: Adequate funds are available in ARPA Funds, Sewer Funds, and Sewer Impact Fee Funds budgeted for the project. CHANGE ORDER NO.: 1 Owner: City of Kalispell Owner's Project No.: Engineer: Robert Peccia & Associates Engineer's Project No.: 18110 Contractor: LHC, Inc. Contractor's Project No.: Project: Grandview Lift Station and Four Mile Drive Forcemain Contract Name: Schedule 2 — Four Mile Drive Forcemain Date Issued: 6/5/2024 Effective Date of Change Order: 6/5/2024 The Contract is modified as follows upon execution of this Change Order: Description: Mill and repave 2" of asphalt the full width of the road from station 37+20 to station 61+50 (Northland Drive to Highway 93). Note that this change adds to the quantity of asphalt originally included in the contract. Substitute buried gate valves for buried plug valves as included in Work Directive Change No. 1. Installation of pipe insulation from station 56+76 to station 60+94. Attachments: Cost Estimates and Work Directive Change Pricing Change in Contract Times [State Contract Times as either a specific date or a Change in Contract Price number of days] Original Contract Price: $1,593,220.39 Original Contract Times: Substantial Completion: 120 Calendar Days Ready for final payment: 30 Calendar Days [Increase] [Decrease] from previously approved Change Orders: $N/A [Increase] [Decrease] from previously approved Change Orders: N/A Substantial Completion: N/A Ready for final payment: N/Ad Contract Price prior to this Change Order: $1,593,220.39 Contract Times prior to this Change Order: Substantial Completion: N/A Ready for final payment: N/A Increase this Change Order: $100,300.78 [Increase] [Decrease] this Change Order: Substantial Completion: N/A Ready for final payment: N/A Contract Price incorporating this Change Order: $1,696,521.17 Contract Times with all approved Change Orders: Substantial Completion: N/A Ready for final payment: N/A E1CDC° C-941, Change Order E1CDC° C-941, Change Order, Rev.1. Copyright° 2018 National Society of Professional Engineers, American Council of Engineering Companies and American Society of Civil Engineers. All rights reserved. Recommended by Engineer if required) By: Brad Koenig, PE Title: Group Manager Date: 6/5/24 Ms Title: Date: Authorized by Owner Approved by Funding Agency (if applicable) EJCDC® C-941, Change Order EJCDCII C-941, Change Order, Rev.1. Copyrightc 2018 National Society of Professional Engineers, American Council of Engineering Companies and American Society of Civil Engineers. All rights reserved. Overlay Item Description Unit Unit Price Qty Total Price mobilization LS $ 1,950.00 1 $ 1,950.00 City Haul) per 2" depth SY $ 4.00 4795 $ 19,180.00 re Pavement per 2" depth SY $ 12.00 4795 $ 57,540.00 nt EA $ 130.00 3 $ 390.00 Devices Day $ 800.00 2 $ 1,600.00 Flaggers Day $ 2000.00 2 $ 4,000.00 Subtotal $ 84,660.00 for Buried Plug Valve Item Description Unit Unit Price Qty Total Price Valve in Lieu of Buried 10" Plug Valve EA ($1,300.00) 4 ($ 5,200.00) Subtotal ($ 5,200.00) Installed Over Trenched Pipe (324 LF) Item Description Unit Unit Price Qty Total Price i LF $23.76 324 $ 7,698.24 i LF $5.75 324 $ 1,863.00 Subtotal $ 9,561.24 Installed Over Directional Drill (94 LF) Item Description Unit Unit Price Qty Total Price LF $17.83 94 $ 1,676.02 i LF $23.76 94 $ 2,233.44 i LF $5.75 94 $ 540.50 LF $63.68 94 $ 5,985.92 LF $8.91 94 $ 837.54 LF $12.97 94 $ 1,219.18 LF $19.01 94 $ 1,786.94 Subtotal 1 $ 14,279.54 Grand Total 1 $ 103,300.78