Loading...
E2. Fermenter and EQ Basin Bid Rejection MemoCITY OF KALISPELL MEMORANDUM To: Doug Russell, City Manager From: Susie Turner, PE, Director of Public Works Re: WWTP Equalization Basin (EQ) Expansion and Fermenter Rehabilitation Projects Meeting Date: Febuary 20, 2024 BACKGROUND: The Waste Water Treatment Plant (WWTP) Equalization Basin (EQ) Expansion and Fermenter Rehabilitation Projects generally consists of expanding the equalization basin with the construction of a circular tank, small lift station and piping, and rehabilitation of the existing fermenter. BIDDING RESULTS: Bids were opened on Febuary 8, 2024, at City Hall. Two responsive bids were received from S & L Underground, Inc. from Bonner Ferry, ID and Prospect Construction from Missoula, MT. Below is a summary of bid amounts for each bid schedule. Schedule 1 is for the Fermenter Rehabilitation and Schedule 2 is for the EQ Basin Expansion. Bid totals are listed from high to low and summarized as follows: Schedule 1 Schedule 2 Contractor Fermenter EQ Basin Rehabilitation Expansion S & L Underground, Inc. No Bid $10,978,943 Bonners Ferry, ID Prospect Construction No Bid $7,862,844 Missoula, MT Engineers Estimate $1,596,000 $3,839,000 HDR, Inc. There were no bids received for the Fermenter Rehabilitation and the contractor's cost to complete the EQ Basin Expansion exceeds the engineers cost estimate by $4,023,844. The engineer's cost estimate used recent bid costs for similar projects across the State, however there were significant cost differences between the engineer and contractor bid amounts for the piping materials, structural pilings, and tank construction. RECOMMENDATION: Considering the higher -than -expected bids, the FY 24 budgeted amount for the project, and the information received from the bidder, staff recommends investigating different engineering and bidding specifications and rebidding the projects at a later date. 201 1' Avenue E IPhone (406)758-7720 PO Box 1997 Public Works Department Fax (406)758-7831 Kalispell, MT 59903 1 www.kalispell.com FISCAL EFFECTS: None at this time. FY 24 budget and funding allocations were as follows: Fermenter — WWTP Fund • Total $2,891,961 • $1,000,000 ARPA Grant • $216,461— Line Item 922 Fermenter Reconstruction • $1,675,500 State Revolving Loan (SRF) — Line Item 922 Construct New Fermenter (rehab) EQ Basin - WWTP Fund/Impact Fee Fund • Total $2,731,453 • $216,453 Sewer System Impact Fee - Line Item 929 Construct New EQ Basin • $2,515,000 WWTP— Line Item 933 Construct New EQ Basin (State Revolving Loan (SRF)) ACTION REQUESTED: Motion to reject all bids for the WWTP Equalization Basin (EQ) Expansion and Fermenter Rehabilitation Project. ALTERNATIVES: As suggested and approved by the City Council. 2 1 P a g e