Loading...
Zip Trip plans!r<r'c•s t4n.nr.rhtcnr. nl ur:sr:rquxl II.o-dOrr,w—rt3 sal anR•.,rrn"m:urr,l,noy c+.ur; aryla•s An tdu,r.;iesa-e �m��.,.,t+..:�r. rl.y.;nphr :y"Y,.r• mp4a Fx: x �r,� rly,r irryr5nra•ir V, 450 UNL_; _ . CE EX UNL� owlW, vw - .� IhCCR-OPATEU 1'8738.3188 80).594Ni1'.r 218738.318' vvvnv.rosecicyinc. coin C05TONFa RF-$PQ ^IPI.f F�,'P COE F%RC; S PCkLHC 1 l-i r..r � r. sr, •. ncc- �.ce ' 5 GNATURE. DATE. . ■ •'4: )}_ Kil i S C%W., il iE�Pf! nn„a a J V(a V tEtP M C I PP1,?AM S ik, P.., Sril :�;' t w I i ri:hCfflPM f! k':rM C<i S Y "Aw? 0 ii L Ex 7`�f !%1I=TN.�`.:�W H :cKAL •S?Y.:Kqih4T:'r.'!iC'iYm0j,Y(SCLY,P,!kA:ERCM6;'i'(LC'4Fl1T1�<<iei'XCV.i-'Cfii,'M i E.UtiLii:SWEG,1'4iXVM. tiC'17frJADE9GNI.ICCYI`y CT•I'HOWPi1'i7Uf �AI'VC4'k'iti (i1Ci��1'�1RGJii3[li:P,935P:C�l:;Ii:udN.([MIeIC[,`ISSP►Cizif ^N•M�T li�,YU[�n1t01fi:w'!Il}Ull:i�7T�J._�:CiC �7+fNXii. Z HRD AVENUE E N — - IL - iseF r,. �l } if �. 1. I r 1 5 3 • 7 -y i r + ti 1 o o n Milli $ A p s r azv CHS ZIP TRIP STORE 305 EAST 1DAHO STREET, KALISPELL. MONTANA 59901 SITE IMPROVEMENTS SITE GRADING PLAN R TD&H� Engineering Page 1 of 3 s u �nwnY 11545 W. BERNARDO COURT, SUITE 201 SANDIEGO, CA NG.CO7 ■ ENGINEERING PROJECTMANAGER@SULLAWAYEG.COM PHONE:1-858-312-5150 FAX:1-858-777-3534 PROJECT: CENEX #562087, OPTION2: SPREAD FOOTING, 305 E. IDAHO, KALISPELL, MT DATE: 08125/2023 PROJECTM 42015A ENGINEER: TH CLIENT: PERSONA SIGNS LAST REVISED: 41 ,,VlCWL F- SULLAWAY No.19763 PE 8/25/2023 5 STD OD: WALL: STONE Bi BY OTHE 13'-O"x3'-0"x3'-O" DEEP SPREAD FOOTINC WI ##4 12" O.0 EACH WA) TOP & BOTTOM MAT 12'-6° - f - 12'-0" f 1 V-4" 8'-6" O.C. k I 13'-0" 1 OPTION: SPREAD FOOTING GENERAL NOTES 1, DESIGN CODE IBC 2021 2 DESIGN LOADS: ASCE 7-16 3 WIND VELOCITY 115 MPH EXPOSURE C l CONCRETE 2500 PS MINIMUM i PIPE STEEL ASTM A53 GR. B, F,, = 35 KSI MIN 6 STEEL REINFORCEMENT IN CONCRETE ASTM A615 GR 60 7. PROVIDE MIN. 3" CLEAR COVER ON ALL STEEL EMBEDDED IN CONCRETE WHEN CAST AGAINST SOIL 8. VERTICAL SO L BEARING PER IBC CLASS 4 (2000 PSF 9 PROVIDE PROTECTION AGA NST DISSIMILAR METALS J Page 2 of 3 SULLAWAY ENGINEERING PROJECT: CENEX DATE: 8/25/2023 PROJ. NO.: 42015A ENGINEER: TH CLIENT: PERSONA SIGNS units; pounds, feet unless noted otherwise Applied Wind Loads; from ASCE 7-16 F=qZ*G*CI*AI with qZ = 0.00256KZKz,KdV (29.3.2 & 29.4) Cf= 1.407 (Fig. 29.3-1) 2 pole Cf factor= 0.97 max. height= 10.25 Kn= 1.0 (26.8.2) (=1.0 unless unusual landscape) Kz= from table 28.3-1 Exposure= c Kd= 0.85 for signs (table 26.6-1) V= 115 mph G= 0.85 (26.9) s/h= 1.000 Mop= 0.00 k-ft B/s= 1.11 Pole structure height at pressure Wind Loads component section c.g. Kz qz gz'G'C, Ar shear Moment Mw 1 1.13 0.850 24.5 29,26 27.00 790 889 2 2.38 0.850 24.5 29,26 3.13 91 217 3 2.63 0.850 24.5 29.26 2.75 80 211 4 6.50 0.850 24.5 29.26 74.63 2184 14193 sums: 107.51 3145 15.51 (Mw) k-ft arm= 4 9 two pole distribution factor `b*s (asce fig. 29.4-1 x 0.72 2279 11.24 for s/h=1, add 10% (asce fig. 29.4-1): x 1.10 12.36 P = 1.29 kip M= 12.36 k-ft M=sgrt(MoLz+Mw2) M=sgrt(1.2MoLx+1.0Mw') = 12.36 k-ft Pole Design section; pipe M. < ¢M with M. = fyZ fY 35 ksi 0= 0.9 H M (k-ft) Z req'd. (in) Size(in) t (in) Z USE at grade 12.36 4.71 5 0.258 6.8 5 Sid. Pipe, �Mn=17.9 k- t Page 3 of 3 44 SULLAWAY ■ ENGINEERING PROJECT: CENEX DATE: 8/25/2023 PROJ. NO.: 42015A ENGINEER: TH CLIENT: PERSONA SIGNS V55 Longitude Direction applied shear at grade v= 1.966 kip applied moment at grade m= 10.663 kip-ft depth of soil above footing h,= 0.0 ft allowable soil bearing p= 2-000 ksf units, pounds, feet un ess noted otherwise unfactored load 3 145 k ffactored) unfactored load 17.06 k-ft Mu=1.1'Mw (See Page#2) Signage Weight w1 0.805 k ((107.51-27)ft^2'10psf) (Area from Autocad) Stone Base Weight w2 6.750 k ((12'-0" )-(2'-0")'(2'-3" )'0.125k/ft"3) Spread Footing Design moment m= 16.6 k-ft Footing size (ft) b= 13.00 L= 3.00 h= 3.00 S= 19.5 Footing Weight= 17.6 k See Above ,wi+w2= 7-555 k soil 000 total= 2511 Overturning; M-= 38 My>1.5M 2.274 ok soil pressure; max= 1.532 ksf ok forces on concrete pad; V- 21 k V,= 33 k (=1.6V) M= 16 k-ft Mr= 25.0 k-ft Check Slab; 40- 0.9 f,,- 60 ksi f,= 2.5 ksi 150 Ibs/ft3 Flexure As= 0,200 d- 32.0 in W.=OA,f,(d-a12)= 345 k-in = 29 k-ft M,410 ok a=AsY0.85f,b= 0.036 in Check minimum A,,,,,n=3sgrt(fjbd1f„= 12.48 200bd/fy= 16.64 or 1.333As= 0.27 in2 ACI 10.3.1 short direction y5=2/(p+1) = 0.8 with Shear; V„=ifi2sgrt(fr)bd OV,= 374.4 Top Slab Use As= 0.27 in (3= 1.5 short direction; IAs 0.21 in' Use #4@12" each direction �= 0.75 v,. V- ok Assume half of footing is in uplift weight= 9 kip arm= 0.8 ft M= 7 k-ft M,= 7.9 k-ft Flexure A,= 0-150 �Mn 0,fv(d-a12)= 259 k-in = 21.6 k-ft M,..W- ok a=A,fVO.85f,b= 0.118 in Check minimum Asnn=2sgr1(f.)bd/f, = 2.88 200bdlfy= 3.84 or 1.333A,= 0-2 in - Use AS= 0.20 in short direction ys=2/(D+1) = 0.8 with p= 1.5 short direction; yAs= 0.16 in2 Use #4@12" each direction o JUG o uoo A � O �vQ U,4m v N CO1 ma go a zi A A m Q m ~ W A , 0 a m o❑ z M PFx 1 0 D x rar a Fn r - - -- -- - - ---- Z m r CA m On f7 Wppm WT c { m X 0 Z N mm �Z W ^ (A r m o .--•� YL O L_ 3 ; rmr p Z Z Fn 0 O A u > p n T, Fq a AAA LJ� M C fD' � a o O m fNi+ I _ _ a m 00 0 z� z DOm zyZ� D ❑ ;O =< V1 NO - M aSO= r�* <Z cn N x0 rn � WZ op m 0 ry LA mZ Zp N�ra D�tnZ O N PM m m F1� Q��f LA N rR. ��t Z Z� Ax or"rn -{ r W n M M rn A a m ❑ r� r(l� 00 N DitW0 _< MID 0 A �� 0 l?Z-ia 5 Z o „ -� m � 0 ❑ rn N� v Z A 00 vv O OD 8 _4� W ", rng�o V' _ 'D _ 11 N N A?3 o w O LnuG p vv0 C N a f OEDA CA Qp 1 A m ` 0 o z o o D m �❑x � Fn N a ; Z -0 m oT - -- - -- - - - - � A O Z O� U Ll m� m A � mm I O z A 0 v - m A rn '> c a r Ju `` ('II �� _ n "y- m _ II `lIJ'ULJ I co D N .. oU I kf o v w UL r W El j Am tern m �=A-iv 00 mNmo m-0 20 �w- xo o C)A m2w FjDz O$o) �� mz z �m0 �0A'r r� m m cn v O to m 0 z o N ppUs >T� r A m mCoCO rmr�8O ZO f*t Wppmmzz+v IDz A O F, m --Ito N U)_u o v a m zM OO O