Loading...
2023 SIA/Stillwater Corp, KNTC Ph 4Return to: I IIIIIIII II II I III IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIII II I III IIII IIII Page: I o 9 20 Aimee Brunckhorst Fee:: Debbie Pierson, Flathead County MT by CL 8/22/2023 1!59 59 PM Kalispell City Clerk 201 1 s` Avenue East Kalispell, MT 59901 APPENDIX E SUBDIVISION IMPROVEMENT AGREEMENT THIS AGREEMENT, made and entered into this 17 day of July , 2023 , by and between the CITY COUNCIL, CITY OF KALISPELL, MONTANA, Party of the First Part and hereinafter referred to as the CITY, and Stillwater Corporation DPC (Name of Developer) a Domestic Profit Corporation (Individual, Company or Corporation) located at PO Box 7338 Kalispell MT 59904 (Street Address/P. O. Box) (City, County, State, Zip) Parry of the Second Part and hereinafter referred to as DEVELOPER. WITNESSETH: THAT WHEREAS, the Developer is the owner and developer of a new subdivision known as Kalispell North Town Center -Phase 4 (Na me of �. Subdivision) located at N 1/2 of Section 30, T. 29 N., R. 21 W., P.M., 0 (Location of Subdivision) W1 and, 0 WHEREAS, the City has conditioned it's approval of the final plat of Kalispell North Town Center - Phase 4 , upon the conditions as set forth (Name of Subdivision) in the Preliminary Plat of the Subdivision being completed and all improvements, as cited in "Exhibit A" have not been completed at this time, and the Developer wishes to bond for the completion of those improvements set forth in "Exhibit A'; and WHEREAS, the City's Subdivision Regulations require that a subdivider shall provide a financial security of 125% of the estimated total cost of construction of said improvements as evidenced by an estimate prepared by a licensed public engineer included herewith as "Exhibit B"; and WHEREAS, the estimated total cost of construction of said improvements is the sum of $713 337.54 NOW THEREFORE, in consideration of the approval of the final plat of said Subdivision by the City, the Developer hereby agrees as follows: 1. The Developer shall deposit as collateral with the City a Letter of Credit, or other acceptable collateral as determined by the City Council, in the amount of $891,671.93 . Said Letter of Credit or other collateral shall have an expiration date of at least sixty (60) days following the date set for completion of the improvements, certifying the following: a. That the creditor guarantees funds in the sum of $891,671.93 the estimated cost of completing the required improvements in Kalispell North Town Center - Phase 4 (Name of Subdivision) b. That if the Developer fails to complete the specified improvements within the required period, the creditor will pay to the City immediately, and without further action, such funds as are necessary to finance the completion of those improvements up to the limited of credit stated in the letter; 2. That said required improvements shall be fully completed by May 15 , 2024 3. That upon completion of the required improvements, the Developer shall cause to be filed with the City a statement certifying that: a. All required improvements are complete; b. That the improvements are in compliance with the minimum standards specified by the City for their construction and that the Developer warrants said improvements against any and all defects for a period of two (2) years from the date of acceptance of the completion of those improvements by the City; c. That the Developer knows of no defects in those improvements; d. That these improvements are free and clear of any encumbrances or liens; e. That a schedule of actual construction costs has been filed with the City; and, f. All applicable fees and surcharges have been paid. 4. The Developer shall cause to be filed with the City copies of final plans, profiles, grades and specifications of said improvements, with the certification of the registered professional engineer responsible for their preparation that all required improvements have been installed in conformance with said specifications. IT IS ALSO AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS, TO -WIT: That the Developer shall provide for inspection of all required improvements by a registered professional engineer before the Developer shall be released from the Subdivision Improvement Agreement. That if the City determines that any improvements are not constructed in compliance with the specifications, it shall furnish the Developer with a list of specific deficiencies and may withhold collateral sufficient to insure such compliance. If the City determines that the Developer will not construct any or all of the improvements in accordance with the specifications, or within the required time limits, it may withdraw the collateral and employ such funds as may be necessary to construct the improvement or improvements in accordance with the specifications. The unused portions of the collateral shall be returned to the Developer or the crediting institution, as is appropriate. IN WITNESS WHEREOF, the Parties have hereunto set their hands and seals the day and year herein before written. Stillwater Corporation, DPC (Name of Sub 'vision/Develope /Firm) F by �� � 1 ame) (Title) STATE OF MONTANA COUNTY OF E f.• N l On this I�A day of � U , 20 Z—�7, before me, a Notary Public for the State of MoTutana, personally appeared \ . F �� , known to me to be the NVT of I _/� whose name is subscribed to ,t e foreg 'ng instrument and acknowledged to me that he/she e�ted the same. EREOF, I have hereunto set my hand and affixed my Notarial Seal this day and year Notary is r the Sto Printed Residing at ^ l My Commissiodi kxpires MAYOR, CITY OF KALISPELL MAYOR E TRINI �NpTAR/q� 9y y NOTARY PUBLIC for the N SEAL * State of Montana Residing at Kalispell, Montana My Commission Expires FOF Mai October 8, 2025 ATTEST: CIT CLERK SEAL =5i 1892 •r� EXHIBIT A Conditions of approval as fixed to the preliminary plat by the City Council, Kalispell, Montana. EXHIBIT B This agreement specifically includes the following improvements and their estimated construction costs. Exhibit A RESOLUTION NO.6139 A RESOLUTION CONDITIONALLY APPROVING THE PRELIMINARY PLAT OF KALISPELL NORTH TOWN CENTER PHASE 4, DESCRIBED AS LOT 1A OF THE AMENDED PLAT OF BLOCK 3 OF KALISPELL NORTH TOWN CENTER — PHASE 2 AND LOTS 8 & 9, BLOCK 1 AND LOT 1, BLOCK 2 OF KALISPELL NORTH TOWN CENTER — PHASE 2 LOCATED IN PORTIONS OF THE SOUTH HALF OF SECTION 19 AND THE NORTH HALF OF SECTION 30, SECTION 19, TOWNSHIP 29 NORTH, RANGE 21 WEST, P.M.M., FLATHEAD COUNTY, MONTANA, EXCLUDING THEREFROM THE SUBDIVISION PLAT OF KALISPELL NORTH TOWN CENTER PHASE 3, LOCATED IN THE NORTH HALF OF SECTION 30, TOWNSHIP 29 NORTH, RANGE 21 WEST, P.M.M., CITY OF KALISPELL, FLATHEAD COUNTY, MONTANA. WHEREAS, Stillwater Corporation, the owner of the certain real property described above, has petitioned for approval of the Subdivision Plat of said property; and WHEREAS, the Kalispell City Planning Board and Zoning Commission held a public hearing on June 13, 2023 on the proposal and reviewed Subdivision Report #KPP-23-05 issued by the Kalispell Planning Department; and WHEREAS, due to lack of a quorum, the Kalispell City Planning Board and Zoning Commission was not able to recommend approval of the Preliminary Plat of Kalispell North Town Center Phase 4, but expressed no concerns regarding the proposal; and WHEREAS, the city council of the City of Kalispell at its regular council meeting of July 3, 2023, reviewed the Kalispell Planning Department Report #KPP-23-05, reviewed the minutes of the Kalispell City Planning Board and Zoning Commission, and found from the Preliminary Plat, and evidence, that the subdivision is in the public interest. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF KALISPELL, MONTANA AS FOLLOWS: SECTION 1. That the Findings of Fact contained in Kalispell Planning Department Report #KPP-23-05 are hereby adopted as the Findings of Fact of the city council. SECTION 2. That the application of Stillwater Corporation for approval of the Preliminary Plat of Kalispell North Town Center Phase 4, Kalispell, Flathead County, Montana is hereby approved subject to the following conditions: The development of the site shall be in substantial compliance with the application submitted, the site plan, materials and other specifications as well as any additional conditions associated with the preliminary plat as approved by the city council. 2. All applicable conditions within Ordinance 1630 (Kalispell North Town Center PUD) shall apply. The preliminary plat approval shall be valid for a period of three years from the date of approval. 4. New infrastructure required to serve the subdivision shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction. All design work shall be reviewed and approved in writing by the Kalispell Public Works Department prior to construction. This infrastructure may include but not be limited to water/sewer mains, streets, street lighting, street signage, curb, gutter, boulevard and sidewalks. The developer shall submit to the Kalispell Public Works Department for review and approval a storm water report and an engineered drainage plan that meets the requirements of the current city standards for design and construction. Prior to final plat, a certification shall be submitted to the public works department stating that the drainage plan for the subdivision has been installed as designed and approved, or a proper bond is in place for said improvements. 6. The storm water ponds shall be designed in a way that they become a visual interest to the development. Chain link fencing surrounding the retention pond as the dominant feature shall not be allowed without mitigation. The developer shall work closely with the Parks Department and Public Works to develop a design that is both visually appealing and meets the required safety guidelines. The storm water ponds will be required to be on utility lots, and access for maintenance of the ponds shall be provided in accordance with city standards. 7. The developer shall submit to the Kalispell Public Works Department prior to construction an erosion/sediment control plan for review and approval and a copy of all documents submitted to Montana Department of Environmental Quality for the General Permit for Storm Water Discharge Associated with Construction Activities. The developer shall submit water and sanitary sewer plans, applicable specifications, and design reports to the Kalispell Public Works Department and the Montana Department of Environmental Quality for concurrent review, with approval of both required prior to construction of any new mains located within Pondera Street as well as any extensions or other improvements necessary to serve Lots 8, 9, 10, and 13. Any road surfaces disturbed will require an overlay or chip seal to restore the surface to acceptable standards. 9. Any water and sewer main extensions shall be designed and constructed in accordance with the City of Kalispell's Standards for Design and Construction and in compliance with the city's facilities update and extensions of services plans. The water and sewer main extension plans shall be reviewed and approved by the Kalispell Public Works Department. Prior to final plat, a certification shall be submitted to the Public Works Department stating that the water and sewer mains have been built and tested as designed and approved, or that the improvements have been appropriately bonded for. 10. The developer shall submit the street designs for any required improvements to the Kalispell Public Works Department for review and approval prior to construction. Street designs shall meet the city standards for design and construction, including, but not limited to, sidewalks, landscape boulevard, streetlights, and curb/gutter. 11. Prior to final plat, a letter from the Kalispell Public Works Department shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell, any private infrastructure has been constructed per city standards, and a proper bond has been accepted for unfinished work. 12. All existing and proposed easements shall be indicated on the face of the final plat. Utility easements for city water and sewer shall be provided to allow for the logical extension of utilities from this subdivision to adjoining properties. A letter from the Kalispell Public Works Department shall be obtained stating that the required easements are being shown on the final plat. 13. The following statement shall appear on the final plat: "The undersigned hereby grants unto each and every person, firm or corporation, whether public or private, providing or offering to provide telephone, telegraph, electric power, gas, cable television, water or sewer service to the public, the right to the joint use of an easement for the construction, maintenance, repair, and removal of their lines and other facilities, in, over, under, and across each area designated on this plat as "Utility Easement" to have and to hold forever." Developer's Signature 14. Prior to filing the final plat, a letter from the US Postal Service shall be included stating the Service has reviewed and approved of the design and location of the mail delivery site. The mail delivery site shall be installed or bonded for prior to final plat. In addition, the mail delivery site and improvements shall also be included in the preliminary and final engineering plans to be reviewed by the Public Works Department. The mail delivery site shall not impact a sidewalk or proposed boulevard area. 15. A property owner's association shall be formed and established for the common areas prior to final plat. The association should include provisions for the maintenance of all common areas including the storm water ponds and open space areas. 16. A note shall be placed on the final plat stating that owners waive their right to protest a Special Improvement District for maintenance of common areas. A district shall only be activated in the event that the homeowner's association defaults on their common area maintenance obligations. The taxes levied within the special improvement district shall be determined by the appropriate city department with approvals by the Kalispell City Council. 17. A letter shall be obtained from the Kalispell Parks and Recreation Director approving a landscape plan for the placement of trees and landscaping materials within the landscape boulevards of the streets serving the subdivision. The approved landscape plan shall be implemented or bonded for. 18. A note shall be placed on the final plat indicating a waiver of the right to protest creation of a park maintenance district. This district shall only be activated in the event that the property owners' association defaults on their park and open space amenity conditions. The assessments levied within the maintenance district shall be determined by the Parks and Recreation Department with approvals by the Kalispell City Council. 19. A note shall be placed on the final plat indicating a waiver of the right to protest creation of a stormwater maintenance district. This district shall only be activated in the event that the property owner(s) default on the maintenance of the approved stormwater facilities. The assessments levied within the maintenance district shall be determined by the Public Works Department with approvals by the Kalispell City Council. 20. Pursuant to Sec 28.3.25 of the subdivision regulations, the final plat shall include a note stating that "The owners hereby waive the right to protest the creation of an SID for the purpose of financing improvements to area roads which specifically benefit this subdivision." 21. All utilities shall be installed underground and in locations that are approved by the Kalispell Public Works Department in accordance with the Kalispell Standards for Design and Construction. 22. All areas disturbed during development shall be re -vegetated with a weed -free mix immediately after development. 23. A letter from the Kalispell Fire Department approving the access, placement of the fire hydrants and fire flows within the subdivision shall be submitted prior to final plat. 24. The trail system shall only cross the public rights -of -way at designated locations approved by Public Works. 25. Any water rights associated with the property shall be dedicated to the City of Kalispell per Section 28.3.08 of the subdivision regulations. 26. Any mitigation required for this phase under the previously accepted Traffic Impact Study shall be implemented. SECTION 3. Upon proper review and filing of the Final Plat of said subdivision in the office of the Flathead County Clerk and Recorder, said premises shall be a subdivision of the City of Kalispell. PASSED AND APPROVED BY THE CITY COUNCIL AND SIGNED BY THE MAYOR OF THE CITY OF KALISPELL THIS 3RD DAY OF JULY, 2023. L� Mark Johns ATTEST: Mayor Ai ee AtCM`C& City Clerk p�Co� Q: y':"5 EXHIBIT B - ENGINEER'S ESTIMATE KALISPELL NORTH TOWN CENTER - PHASE 4 10 MOBILIZATION 1 LS $ 29,419.62 $ 29,419.62 0.5 50% $ 14,709.81 20 SURVEYSTAKING 1 LS $ 13,548.78 $ 13,548.78 0.5 50% $ 6,774.39 30 TRAFFIC CONTROL 1 LS $ 2,007.23 $ 2,007.23 0.5 50% $ 1,003.62 40 TRACKING PAD 2 EA $ 2,680.42 $ 5,360.84 1 50% $ 2,680.42 SO SILT FENCE 300 LF $ 3.06 $ 918.00 0 0% $ 60 INLET PROTECTORS 12 EA $ 61.03 $ 732.36 0 0% $ - 70 SAWCUT & REMOVE ASPHALT 2587 SF $ 3.78 $ 9,778.86 2587 100% $ 9,778.86 80 DEMO CURB & GUTTER 252 LF $ 7.84 $ 1,975.68 252 100% $ 1,975.68 90 STRIP & STOCKPILE ORGANICS 4452 CY $ 3.37 $ 15,003.24 4452 100% $ 15,003.24 100 SITE CUT/FILL 1 LS $ 63,498.69 $ 63,498.69 0.8 80% $ 50,798.95 110 REPLACE ORGANICS (6" DEPTH) 2537 CY $ 16.08 $ 40,794.96 0 0% $ - 120 CONNECT TO EXISTING 18" WATER MAIN 1 EA $ 25,886.50 $ 25,886.50 1 100% $ 25,886.50 130 CONNECT TO EXISTING 8" WATER MAIN 1 EA $ 15,082.28 $ 15,082.28 1 100% $ 15,082.28 140 8" WATER MAIN 930 LF $ 85.05 $ 79,096.50 930 100% $ 79,096.50 150 8" GATE VALVES 5 EA $ 2,434.93 $ 12,174.65 5 100% $ 12,174.65 160 8" FITTINGS 7 EA $ 649.97 $ 4,549.79 7 100% $ 4,549.79 170 LOWER WATER MAIN 1 LS $ 7,044.43 $ 7,044.43 1 100% $ 7,044.43 180 FIRE HYDRANT ASSEMBLY 3 EA $ 8,887.44 $ 26,662.32 3 100% $ 26,662.32 190 1.5" WATER SERVICE 8 EA $ 8,312.21 $ 66,497.68 8 100% $ 66,497.68 200 8" SEWER MAIN 745 LF $ 77.02 $ 57,379.90 745 100% $ 57,379.90 210 SEWER MANHOLES 6 EA $ 4,842.21 $ 29,053.26 6 100% $ 29,053.26 220 4" SEWER SERVICE 4 EA $ 3,452.58 $ 13,810.32 4 100% $ 13,810.32 230 4" SEWER SERVICE & 1.25" FM SERVICE 4 EA $ 5,971.18 $ 23,884.72 4 100% $ 23,884.72 240 CONNECT TO EXISTING XSDMH-31 1 LS $ 3,279.90 $ 3,279.90 1 100% $ 3,279.90 250 12" STORM DRAIN 737 LF $ 79.22 $ 58,385.14 720 98% $ 57,038.40 260 30" DIAMETER CATCH BASINS WINLETAPRONS 6 EA $ 3,657.06 $ 21,942.36 6 100% $ 21,942.36 270 48" DIAMETER STORM MANHOLES 4 EA $ 4,642.46 $ 18,569.84 4 100% $ 18,569.84 280 60" DIAMETER STORM MANHOLES 1 EA $ 14,956.89 $ 14,956.89 1 100% $ 14,956.89 290 4" IRRIGATION SLEEVES 279 LF $ 17.68 $ 4,932.72 0 0% $ - 300 COMMON UTILITY TRENCH W/BEDDING 1010 LF $ 13.53 $ 13,665.30 1010 100% $ 13,665.30 310 4" POWER CONDUIT W/SWEEPS & PULL ROPE 1123 LF $ 14.08 $ 15,811.84 1065 95% $ 14,995.20 320 2" COMM CONDUIT W/SWEEPS & PULL ROPE 2246 LF $ 5.26 $ 11,813.96 2135 95% $ 11,230.10 330 3 PHASE ELECT VAULT 6 EA $ 1,906.54 $ 11,439.24 6 100% $ 11,439.24 340 SINGLE PHASE ELECT VAULT 1 EA $ 1,237.98 $ 1,237.98 1 100% $ 1,237.98 350 LIGHTTRENCHING 94 LF $ 18.82 $ 1,769.08 94 100% $ 1,769.08 360 LIGHT CONDUIT W/SWEEPS & PULL ROPE 1044 LF $ 4.56 $ 4,760.64 992 9S% $ 4,523.52 370 JUNCTION BOXES 3 EA $ 701.58 $ 2,104.74 3 100% $ 2,104.74 380 FEC LIGHT BASES 5 EA $ 1,122.42 $ 5,612.10 5 100% $ 5,612.10 390 CURB & GUTTER 1710 LF $ 19.63 $ 33,567.30 0 0% $ - 400 CURB & GUTTER - LAYDOWN 136 LF $ 33.03 $ 4,492.08 0 0% $ 420 HC RAMPS W/GRAVEL 830 SF $ 15.81 $ 13,122.30 0 0% $ 430 DOME TILES 16 EA $ 388.40 $ 6,214.40 0 0% $ 440 SIDEWALK W/GRAVEL 18725 SF $ 5.45 $ 102,051.25 0 0% $ 450 9" OF 3" MINUS 24401 SF $ 1.02 $ 24,889.02 0 0% $ 460 6" OF 3/4" CRUSH 24401 SF $ 0.82 $ 20,008.82 0 0% $ 470 4" OF ASPHALT 24401 SF $ 2.45 $ 59,782.45 0 0% $ 480 9" OF 3" MINUS - PATH 18449 SF $ 1.38 $ 25,459.62 0 0% $ 490 6" OF 3/4" CRUSH - PATH 18449 SF $ 1.12 $ 20,662.88 0 0% $ 500 4" OF ASPHALT - PATH 18449 SF $ 2.77 $ 51,103.73 0 0% $ 510 STREET RESTORATION - GRAVEL & ASPHALT 2587 SF $ 7.91 $ 20,463.17 0 0% $ 515 STREET RESTORATION - CHIP SEAL 9067 SY $ 0.75 $ 6,800.25 0 0% $ 520 STRIPING 1 LS $ 9,072.66 $ 9,072.66 0 0% $ - 530 STOP SIGN W/STREET NAMES 2 EA $ 1,051.79 $ 2,103.58 0 0% $ 540 CROSSWALK SIGNAGE 1 LS $ 21,017.66 $ 21,017.66 0 0% $ 600 COMMON AREA IMPROVEMENTS 1 LS $ 150,000.00 $ 150,000.00 0 0% $ 610 LANDSCAPING/ IRRIGATION 27148 SF $ 2.00 $ 54,296.00 0 0% $ TOTAL $ 1,359,549.51 48% $ 646,211.97 Balance Remaining $ 713,337.54 125% Bond Amount $ 891,671.93 QNTANq * jpQIN LEE IONA\-� ,7Ir7�7