Loading...
Stillwater Dev/Sanitary Sewer Lift Station AgmtReturn to: Aimee Brunckhorst I IIIIIIII II II (IIIIIIII IIIIIIIIII IIIIIIIIII IIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII (III202300114 Page:1 of 3 30 Kalispell City Clerk Debbie Pierson, Flathead County MT by CL 7/27/2023 1$57 PM 201 1 s` Avenue East Kalispell, MT 59901 SANITARY SEWER LIFT STATION AGREEMENT THIS AGREEMENT, made and entered into this 13 day of June , 2023 , by and between the CITY COUNCIL, CITY OF KALISPELL, MONTANA, Party of the First Part and hereinafter referred to as the CITY, and Stillwater Bend, LLC a Limited Liability Corporation located at 341 West Second Street, Suite 1, San Bemadino, California 92401 , Party of the Second Part and hereinafter referred to as DEVELOPER. DEVELOPER intends to sell th pro eit that/'s t e sub' ct of this agreement to "4`' Stillwater Development Partners. LLC , and d 1y'�- I 1 '� � as a signatory to this agreement, agrees to be bound as set forth herein as the DEVELOPER. rp WITNESSETH: THAT WHEREAS, the Developer is the owner and developer of a new subdivision within the City of Kalispell, known as Stillwater Bend Phase 1, a 15-lot commercial subdivision located at NHN US Highway 93 North, more particularly described in Exhibit A; and WHEREAS, Section 28.8.01(C) of the City of Kalispell Subdivision Regulations states that a subdivider ? shall not be allowed to bond for public sewer infrastructure improvements necessary to serve any lot being n final platted; and 7� WHEREAS, the subdivision relies on a private lift station to provide sewer service for the subdivision; and WHEREAS current market conditions have delayed the delivery of pumps necessary for completing the construction and eventual operation of the lift station; and WHEREAS, all other required infrastructure improvements have been installed or bonded for, and all final plat requirements other than the lift station have been satisfied; and WHEREAS, the Developer wishes to apply for final plat approval in order to accomplish a sale of the entire subdivision to a third party; and WHEREAS, the City of Kalispell has determined that, due to the projected delivery date of the pumps, the status of the lift station as private, and the projected completion date of any construction requiring sewer service, that the lift station would likely be operational prior to the completion or occupancy of any building within the subdivision. NOW THEREFORE, in consideration of the approval of the final plat of said Subdivision by the City, the Developer hereby agrees as follows: 1) That documentation be provided confirming that the pumps are on order, along with the projected delivery date represented to the City. 2) That no certificates of occupancy or substantial completion for any building will be issued by the City until such time as the lift station improvements are completed, certified, and approved by the City of Kalispell Public Works Department. 3) That no water meters will be installed for any lot until such time as the lift station improvements are completed, certified, and approved by the City of Kalispell Public Works Department. 4) That impact fees will be paid at the time a building permit is issued. IN WITNESS WHEREOF, the Parties have hereunto set their hands and seals the day and year herein —J~ — - (Title) STATE OF MONTANA COUNTY OF G� On this 13 day of � v NW-- , 20 2-5, before me, a Notary Public for the State of Mon a, personally appeared NyN5.0 o 0.5 , known to me to be the of S-T hiffla _ u-L , whose name is subscribed to the foreaoinAnstrument and acknowledged to me that he/she executed the same. , I have hereunto set my hand and affixed my Notarial Seal this day and year d M pFT STEPHEN M PETRINI y4i��ptARlq�9'y NOTARY PUBLIC for the Nota b ' he S e of Montana,State of Montana * SEAL * Residing at Kalispell. Montana Printed Z`l� 1 �, r� My Commission Expires Residing at 1 9�OFM��p October S. 2025 My Commissi n Expires ;�&a I� tAL• lY I eJo1/sp/�r�� cr ~1's. by ���1��aVV� l�• 1'I�IJ Pg�C-�el�- (Name) (Title) STATE OF MONTANA COUNTY OF r— Lich On this Iyt day of 20 Z before me, a Notary Public for the State of Montana, personally appeared V, I ` 'MEtc-fit VvN-L mown to me to be the J. pele' '0-4r—_ of w , ose name is subscribed to the foregoing instrument and acknowledged to me that he/she executed the same. IIV WITNESS WHEREOF, I have hereunto set my hand and affixed my Notarial Seal this day and year first above written. Notary Public fo t e ti Printed Name Residing at �8 My Commission Exp1 es M °Fr STEPHEN M PETRINI Q�EN aOIAR144 NOTARY PUBLIC for the State of Montana " SEAL * Residing at Kalispell, Montana "� ee pfFOF My Commission Expires MDP October 8, 2025 ` `�SttIITIFFff MAYOR, CITY OF KALISPELL ATTEST: �\\ MAYOR C CLERK C).. J89 •��NiP• EXHIBIT A THAT POW nON OF THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 25. TOWNSHM KOR H, RANGE 22 WEST. PRINOPAL MERIDIAN, MONTANk FIATKEAD COUNTY, MONTANA AND Lt NG MORE PARTMUWRLY OESCMBW As FOLLOM11/5 BEGINNING AT TKE ! VMW CTWN OF THE WEST BOUNDARY OF U.S, HIGHWAY NO 93. PRWECT NO F S-302)115, AND THE NORTH SOUNDARY OF SECTION 2 $, TOWNSHIP 29 t=TM RANGE 22 WEST, THENCE ALONG SAID WEST BOIITIDARY Of SAID US M MVAY NO 93 TKE FOLLOWING THREE COURSES: SOIFrH OO'20'2r WEST 820.Q FEET. SOUTH 13.414r EAST 412 FEET AND SOUTH 0720'2r WEST 460 6 FEET TO TKE SOUTH aouhi w OF THE NORTHEAST 1/4 Of THE KORTMEAST 1/4 OF SAjD SECTION 2S, THENCE ALONG SAID SOUTH 9OUNDWRY Of SWO AMUOT PART, SOUTH 89'SB'39' WEST 33" FEET, MORE OR L ESS, TO THE CENURUME OF ME STIUWATER RT M THENCE ALOW SAID CEM6RUmE OF SAID STILL WATER WWA THE FOUOW KG THREE COURSES. KORTH OS *4rlV WEST 34.7 FEET, NORM 28.34'Ir WEST 1631 FEET, AND NORTH 60.2571' WEST 100.S FEET; TKENCf NORTH 01*W40' WEST M4 FEET. MORE OR LESS, THEM NORTH 66'OB 2r WEST 37&1 FEET, THENCE NORTH W2077• EAST 437 7 FEET TO THE NORTH BOWNDAW OF SAID AUQUOr PART, THENCE ALONG SAID NORTH BOUNDARY Of SAID ALIQUOT PART, KORTH 89-Sr14- FAST 660.0 FEET TO THE MNTOf UGrj4m-A* CONTAr►tING 19.0 ACRES OF LAND. MORE OR LESS. Return to: Aimee Brunckhorst Kalispell City Clerk 201 1" Avenue East Kalispell, MT 59901 IIIIIIII II II I III IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIII II I III IIII IIII 1 Fees: 5104 00 Debbie Pierson, Flathead County MT by CL 7/27/2023 1:57 PM APPENDIX E SUBDIVISION IMPROVEMENT AGREEMENT THIS AGREEMENT, made and entered into this 16 day of June , 2023 , by and between the CITY COUNCIL, CITY OF KALISPELL, MONTANA, Party of the First Part and hereinafter referred to as the CITY, and Stillwater Bend, LLC , (Name of Developer) a Limited Liability Company (Individual, Company or Corporation) located at Limited Liabilitv 341 W Second Street STE 1, SanBernardino, CA 92401 , ( Street Address/P. O. Box) (City, County, State, Zip) Party of the Second Part and hereinafter referred to as DEVELOPER. WITNESSETH: THAT WHEREAS, the Developer is the owner and developer of a new subdivision known as Stillwater Bend -Phase 1 (Na me of Subdivision) located at NE 1/4 of Section 25, T. 29 N.,P.M.,M. (Location of Subdivision) and, WHEREAS, the City has conditioned it's approval of the final plat of Stillwater Bend - Phase 1 , upon the conditions as set forth (Name of Subdivision) in the Preliminary Plat of the Subdivision being completed and all improvements, as cited in "Exhibit A" have not been completed at this time, and the Developer wishes to bond for the completion of those improvements set forth in "Exhibit A"; and WHEREAS, the City's Subdivision Regulations require that a subdivider shall provide a financial security of 125% of the estimated total cost of construction of said improvements as evidenced by an estimate prepared by a licensed public engineer included herewith as "Exhibit B"; and WHEREAS, the estimated total cost of construction of said improvements is the sum of S 952,776.33 NOW THEREFORE, in consideration of the approval of the final plat of said Subdivision by the City, the Developer hereby agrees as follows: The Developer shall deposit as collateral with the City a Letter of Credit, or other acceptable collateral as determined by the City Council, in the amount of $ 1,190,970.41 . Said Letter of Credit or other collateral shall have an expiration date of at least sixty (60) days following the date set for completion of the improvements, certifying the following: a. That the creditor guarantees funds in the sum of $ 1,190,970.41 the estimated cost of completing the required improvements in Stillwater Bend - Phase 1 . (Name of Subdivision) b. That if the Developer fails to complete the specified improvements within the required period, the creditor will pay to the City immediately, and without further action, such funds as are necessary to finance the completion of those improvements up to the limited of credit stated in the letter; 2. That said required improvements shall be fully completed by March 31 , 20 24 That upon completion of the required improvements, the Developer shall cause to be filed with the City a statement certifying that: a. All required improvements are complete; b. That the improvements are in compliance with the minimum standards specified by the City for their construction and that the Developer warrants said improvements against any and all defects for a period of two (2) years from the date of acceptance of the completion of those improvements by the City; c. That the Developer knows of no defects in those improvements; d. That these improvements are free and clear of any encumbrances or liens; e. That a schedule of actual construction costs has been filed with the City; and, f. All applicable fees and surcharges have been paid. 4. The Developer shall cause to be filed with the City copies of final plans, profiles, grades and specifications of said improvements, with the certification of the registered professional engineer responsible for their preparation that all required improvements have been installed in conformance with said specifications. IT IS ALSO AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS, TO -WIT: That the Developer shall provide for inspection of all required improvements by a registered professional engineer before the Developer shall be released from the Subdivision Improvement Agreement. That if the City determines that any improvements are not constructed in compliance with the specifications, it shall furnish the Developer with a list of specific deficiencies and may withhold collateral sufficient to insure such compliance. If the City determines that the Developer will not construct any or all of the improvements in accordance with the specifications, or within the required time limits, it may withdraw the collateral and employ such funds as may be necessary to construct the improvement or improvements in accordance with the specifications. The unused portions of the collateral shall be returned to the Developer or the crediting institution, as is appropriate. IN WITNESS WHEREOF, the Parties have hereunto set their hands and seals the day and year herein before written. Stillwater Bend, LLC (Name of Subdivision/Developer/Firm) r r by ' �3 me) s Cm 6& (Title) STATE OF MONTANA COUNTY �C�' On this l day of V. ,t , 20 z—� , before me, a Notary Public for the State of Montana, ersonally appeared P f C*o LA* CoGt5501A 0 > , known to me to be the of -:ir+-i lk T;,," , �-1- �- , whose name is subscribed to t � foregoing ins meta and acknowledged to me that he/she executed the same. SS WH�RE�)F, I have hereunto set my hand and affixed my Notarial Seal this day and year State Nfttana tANk. I Vf'A./ My ComrmltsidoExpires LEY "ZS - MAYOR, CITY MKALISPELL L� MAYOR �y� �o;,,��•y% E L $Q STEPHEN M PETRINI NOTARY PUBLIC for the State of Montana Residing at Kalispell, Montane .. 'FMJN�P My Commission Expires October 8, 2025 MR./1 / 1 , i-MAPO—`� f EXHIBIT A Conditions of approval as fixed to the preliminary plat by the City Council, Kalispell, Montana. EXHIBIT B This agreement specifically includes the following improvements and their estimated construction costs. Exhibit A RESOLUTION NO.5964 A RESOLUTION CONDITIONALLY APPROVING THE PRELIMINARY PLAT OF STILLWATER BEND PHASE 1, DESCRIBED AS 25 ACRES GENERALLY LOCATED IN THE EAST HALF OF ASSESSOR TRACT 1F IN SECTION 25, TOWNSHIP 29 NORTH, RANGE 22 WEST, P.M.M., FLATHEAD COUNTY, MONTANA. WHEREAS, Spartan Holdings, LLC, the owner of the certain real property described above, has petitioned for approval of the Subdivision Plat of said property; and WHEREAS, the Kalispell City Planning Board and Zoning Commission held a public hearing on January 14, 2020 on the proposal and reviewed Subdivision Report #KPP-19-02 issued by the Kalispell Planning Department; and WHEREAS, the Kalispell City Planning Board and Zoning Commission has recommended approval of the Preliminary Plat of Stillwater Bend Phase 1 subject to certain conditions and recommendations; and WHEREAS, the city council of the City of Kalispell at its regular council meeting of February 3, 2020, reviewed the Kalispell Planning Department Report #KPP-19-02, reviewed the recommendations of the Kalispell City Planning Board and Zoning Commission, and found from the Preliminary Plat, and evidence, that the subdivision is in the public interest. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF KALISPELL, MONTANA AS FOLLOWS: SECTION 1. That the Findings of Fact contained in Kalispell Planning Department Report #KPP-19-02 are hereby adopted as the Findings of Fact of the city council. SECTION 2. That the application of Spartan Holdings, LLC, for approval of the Preliminary Plat of Stillwater Bend Phase 1, Kalispell, Flathead County, Montana is hereby approved subject to the following conditions: The Planned Unit Development for Stillwater Bend allows the following deviations from the Zoning Regulations: a) Kalispell Zoning Ordinance, Section 27.20.029(3) — Allows a reduction of the entrance corridor highway buffer from 100-feet to 50-feet. 2. The Planned Unit Development for Stillwater Bend allows the following deviations from the Kalispell Subdivision Regulations: a. Kalispell Subdivision Regulations, Section 28.3.07(B)(1) — Allows a reduction in Stillwater River setback from 200-feet to the setback line determined by the geotechnical report, provided the setback cannot be less than 100-feet. 3. A 100-foot Stillwater River setback shall be restored with native riparian habitat. A landscape plan shall be submitted by a specialist (landscape architect, engineer, hydrologist, botanist, scientist, etc.) with experience in riparian area restoration. The landscape plan shall be approved by the Parks and Recreation Director in addition to any other applicable governmental agencies prior to final plat. 4. As part of the engineering review process, the City of Kalispell shall have the option to submit the geotechnical analysis to a third party for review. 5. Architectural renderings are required to be submitted to the Kalispell Architectural Review Committee for review and approval prior to issuance of a building permit. Building design shall be provided as listed below: a. Four sided architecture is required for all structures and buildings. Large, rectangular masses should be avoided by incorporating offsets in the wall and roof. A change in the plane of the walls, changing the direction or providing some variety in the roof form gives diversity and visual interest. b. Entries should be a prominent component of the building face by providing an architectural covered or recessed entry with modified roof accent and increased usage of windows and trim. c. Franchise architecture may be subject to modification to achieve the building style objectives. d. The design of gas pump islands shall be architecturally integrated with other structures on -site using similar colors, materials and architectural detailing. e. All roof mounted equipment, i.e. HVAC, should be shielded from all views. 6. Free standing signage within the common area adjacent to the highway shall be limited to one monument sign as defined in Section 27.20.29(1)(b). The sign shall be limited to 22-feet in height and 90 square feet per face. The sign shall also function as a common monument sign for the development. 7. Lots within the development shall be limited to the sign standards applicable to the B-2 Zone, except for Lots adjacent to the common area, currently shown as Lots 1, 5, 9, 12, 14, and 15. Free standing signage on those lots shall be limited to 6-feet in height and 36 square feet per face and located to the west of the building constructed on the lots. 8. Buildings on Lots 1, 5, 9, 12, 14, and 15 shall be limited to 45-feet in height. 9. The storm water pond shall be designed in a way that it becomes a visual interest to the development. Chain link fencing surrounding the retention pond as the dominant fixture is prohibited. The developer shall work closely with the Parks Department and Public Works to come up with a design that is both visually appealing and meets the required safety guidelines. It is intended that when the project is developed the pond will act as a recreational feature and extension of the Stillwater River buffer, rather than a private maintenance utility facility. 10. An 8-foot impervious path shall be constructed within the common area connecting the unnamed north/south City street to Phase 2 to the west. 11. 5-foot sidewalks shall be constructed within the private drives accessing Lots 1-8. 12. Direct access onto Rose Crossing shall be prohibited. 13. The development of the site shall be in substantial compliance with the application submitted, the site plan, materials and other specifications as well as any additional conditions associated with the preliminary plat as approved by the city council. 14. The preliminary plat approval shall be valid for a period of three years from the date of approval. 15. The developer shall submit to the Kalispell Public Works Department for review and approval a storm water report and an engineered drainage plan that meets the requirements of the current city standards for design and construction. Prior to final plat, a certification shall be submitted to the public works department stating that the drainage plan for the subdivision has been installed as designed and approved. 16. The developer shall submit to the Kalispell Public Works Department prior to construction an erosion/sediment control plan for review and approval and a copy of all documents submitted to Montana Department of Environmental Quality for the General Permit for Storm Water Discharge Associated with Construction Activities. 17. The developer shall submit water and sanitary sewer plans, applicable specifications, and design reports to the Kalispell Public Works Department and the Montana Department of Environmental Quality for concurrent review, with approval of both required prior to construction. 18. Water mains shall not terminate in dead ends. 19. The developer shall submit the street design to the Kalispell Public Works Department for review and approval prior to construction. Street designs shall meet the city standards for design and construction. 20. Prior to final plat, a letter from the Kalispell Public Works Department shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell or a proper bond has been accepted for unfinished work. 21. The developer shall obtain an approach permit from the Montana Department of Transportation (MDT) for approaches onto U.S. 93 North. If any improvements are necessary at the intersection of the roadways, these improvements shall be completed to the satisfaction of the MDT prior to final plat and MDT shall so certify this in writing to the city. 22. Prior to final plat all mitigation required as part of the approved traffic impact study shall be completed. All improvements shall be reviewed and approved by either the Public Works Department or Montana Department of Transportation. A letter from the Kalispell Public Works Department or Montana Department of Transportation shall be submitted stating that all new infrastructure has been accepted by the City of Kalispell or State of Montana. If infrastructure work has not been accepted, a letter stating that a proper bond has been accepted for the unfinished work by the appropriate agency is required. 23. All existing and proposed easements shall be indicated on the face of the final plat. A letter from the Kalispell Public Works Department shall be obtained stating that the required easements are being shown on the final plat. 24. The following statement shall appear on the final plat: "The undersigned hereby grants unto each and every person, firm or corporation, whether public or private, providing or offering to provide telephone, telegraph, electric power, gas, cable television, water or sewer service to the public, the right to the joint use of an easement for the construction, maintenance, repair, and removal of their lines and other facilities, in, over, under, and across each area designated on this plat as "Utility Easement" to have and to hold forever." Developer's Signature 25. Prior to filing the final plat, a letter from the US Postal Service shall be included stating the Service has reviewed and approved of the design and location of the mail delivery site. The mail delivery site shall be installed or bonded for prior to final plat. In addition, the mail delivery site and improvements shall also be included in the preliminary and final engineering plans to be reviewed by the Public Works Department. The mail delivery site shall not impact a sidewalk or proposed boulevard area. 26. A property owners' association (POA) shall be formed and established for the common areas prior to final plat. The POA should include provisions for the maintenance of all common areas. 27. A letter from the Kalispell Fire Department approving the access, placement of the fire hydrants and fire flows within the subdivision shall be submitted prior to final plat. 28. A letter shall be obtained from the Parks and Recreation Director approving a landscape plan for the placement of trees and landscaping materials within the landscape boulevards of the streets serving the subdivision, common area, and highway buffer. 29. A note shall be placed on the final plat indicating a waiver of the right to protest creation of a park maintenance district. This district shall only be activated in the event that the property owners' association defaults on their park and open space amenity conditions. The taxes levied within the maintenance district shall be determined by the Parks and Recreation Department with approvals by the Kalispell City Council. 30. A minimum of two-thirds of the necessary infrastructure for the subdivision shall be completed prior to final plat submittal. 31. All utilities shall be installed underground. 32. All areas disturbed during development shall be re -vegetated with a weed -free mix immediately after development. 33. A 310 permit shall be obtained from the Montana Department of Natural Resources and Conservation — Conservation District Bureau, for any disturbances/and or improvements adjacent the Stillwater River. 34. An approval from the Army Corps of Engineers shall be obtained for work adjacent the Stillwater River. 35. The developer shall work with Eagle Transit to establish bus stop location(s) within the development. Bus stop location(s) shall be improved in accordance with Eagle Transit's requirements, which may include a bus shelter. This condition is waived if Eagle Transit provides a letter in writing that it will not serve the development. 36. Any water rights associated with the property shall be transferred to the City of Kalispell. The water rights shall be allocated proportionally for each phase of the development prior to final plat. SECTION 3. Upon proper review and filing of the Final Plat of said subdivision in the office of the Flathead County Clerk and Recorder, said premises shall be a subdivision of the City of Kalispell. PASSED AND APPROVED BY THE CITY COUNCIL AND SIGNED BY THE MAYOR OF THE CITY OF KALISPELL THIS 3RD DAY OF FEBRUARY, 2020. ATTEST: U Al —In A -- ��6 Ai ee Brunckhorst, CMC City Clerk Mark Johns n Mayor ,owl i i 6 CP SEAL 1892 RESOLUTION NO.6115 A RESOLUTION APPROVING A TWO-YEAR EXTENSION TO THE PRELIMINARY PLAT OF STILLWATER BEND PHASE 1 SUBDIVISION. WHEREAS, the City Council of the City of Kalispell granted preliminary plat approval for Stillwater Bend Phase 1 on February 3, 2020; and WHEREAS, the developers, Spartan Holdings, LLC, have requested a two-year extension to the preliminary plat of Stillwater Bend Phase 1 due to supply chain issues and winter weather; and WHEREAS, good cause exists for the request for extension by Spartan Holdings, LLC and it is in the best interests of the city that the extension be given. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF KALISPELL, MONTANA AS FOLLOWS: SECTION 1. That the application of Spartan Holdings, LLC, for a two-year extension of the preliminary plat of Stillwater Bend Phase I Subdivision, Kalispell, Flathead County, Montana is hereby approved. PASSED AND APPROVED BY THE CITY COUNCIL AND SIGNED BY THE MAYOR OF THE CITY OF KALISPELL, THIS 3RD DAY OF JANUARY, 2023. (,-- V:-= -, - -_ _ -, Mark Johnso Mayor ATTEST: Ct' w bO/L Ai a Brunckhorst, CMC City Clerk Exhibit B - Stillwater Bend- Phase 1 Enaineers Estimate 6 12 2023 10 MOBILIZATION 1 LS $ 54,000.00 $ 54,000.00 75% $ 40,500.00 20 SWPPP 1 LS $ 6,300.00 $ 6,300.00 100% $ 6,300.00 30 WATTLES 1,400 LF $ 4.02 $ 5,628.00 60% $ 3,376.80 40 SILT FENCE 2,000 LF $ 2.88 $ 5,760.00 100% $ 5,760.00 50 TRACKING PAD 2 EA $ 2,100.00 $ 4,200.00 100% $ 4,200.00 60 INLET PROTECTORS 39 EA $ 62.00 $ 2,418.00 0% $ - 70 SURVEY STAKING 1 LS $ 32,305.63 $ 32,305.63 95% $ 30,690.35 75 ADDITIONAL SURVEY STAKING 1 LS $ 9,700.00 $ 9,700.00 100% $ 9,700.00 80 DEMO EXISTING FENCE 52 LF $ 5.30 $ 275.60 100% $ 275.60 90 REMOVE EXIST STRM PIPE/SALV ST 103 LF $ 7.18 $ 739.54 100% $ 739.54 95 CAP & ABANDON EXIST STORM 1 LS $ 785.00 $ 785.00 100% $ 785.00 100 DEMO EXISTING GRAVEL 192 CY $ 9.10 $ 1,747.20 100% $ 1,747.20 110 SAWCUT & REMOVE ASPHALT 5,105 SF $ 1.00 $ 5,105.00 75% $ 3,828.75 120 CLR&GRUB SLOPE TO BE REGRADED 21,500 SF $ 0.53 $ 11,395.00 100% $ 11,395.00 130 STRIP & STOCKPILE TOPSOIL 37,815 CY $ 2.51 $ 94,915.65 100% $ 94,915.65 140 SITE CUT/ FILL 1 CY $ 548,200.00 $ 548,200.00 100% $ 548,200.00 145 ADDITIONAL EARTHWORK - GRADE CHANGES 1 LS $ 70,300.00 $ 70,300.00 95% $ 66,785.00 150 REPLACE 6" OF TOPSOIL 22,810 CY $ 6.21 $ 141,650.10 100% $ 141,650.30 160 SEED DISTURBED 1 LS $ 38,500.00 $ 38,500.00 25% $ 9,625.00 170 CONN TO EXISTING 12" MAIN STUB 1 LS $ 660.00 $ 660.00 100% $ 660.00 180 CONN TO EXISTING 14" MAIN 1 LS $ 5,700.00 $ 5,700.00 100% $ 5,700.00 190 8" WATER MAIN 2,605 LF $ 65.68 $ 171,096.40 100% $ 171,096.40 200 8" FITTINGS 16 EA $ 648.00 $ 10,368.00 100% $ 10,368.00 210 8"GATE VALVES 20 EA $ 2,174.00 $ 43,480.00 100% $ 43,480.00 220 FIRE HYDRANT ASSEMBLY 9 EA $ 6,300.00 $ 56,700.00 100% $ 56,700.00 225 BOLLARDS AT FIRE HYDRANT 2 EA $ 615.00 $ 1,230.00 0% $ - 230 1" IRRIG SERV W/METER PIT 1 EA $ 2,815.00 $ 2,815.00 100% $ 2,815.00 240 1.5" WTR SERV W/METER PIT 15 EA $ 6,730.00 $ 100,950.00 100% $ 100,950.00 250 CONN TO EXIST SWR MANHOLE 1 LS $ 1,650.00 $ 1,650.00 100% $ 1,650.00 255 CONNECT TO EXIST SEWER MH - 6" FORCE MAIN 1 LS $ 1,730.00 $ 1,730.00 100% $ 1,730.00 260 4" SEWER FORCE MAIN 1,636 LF $ 46.48 $ 76,041.28 100% $ 76,041.28 265 6" SEWER FORCE MAIN 1636 LF $ 34.62 $ 56,638.32 100% $ 56,638.32 270 DIRECTIONAL DRILL 165 LF $ 62.46 $ 10,305.90 100% $ 10,305.90 275 DIRECTIONAL DRILL- 6" FORCE MAIN 165 LF $ 107.67 $ 17,765.55 100% $ 17,765.55 280 8" SEWER MAIN 1,722 LF $ 62.20 $ 107,108.40 99% $ 106,037.32 290 SEWER MANHOLES 9 EA $ 3,944.00 $ 35,496.00 100% $ 35,496.00 295 SEWER STRUCTURE ADJUSTMENTS 1 LS $ 415.00 $ 415.00 100% $ 415.00 300 4" SEWER SERVICES 15 EA $ 1,830.00 $ 27,450.00 100% $ 27,450.00 310 LIFT STATION WET WELL AND PLUMBING 1 LS $ 48,600.00 $ 48,600.00 100% $ 48,600.00 315 LIFT STATION ADJUSTMENTS 1 LS $ 11,770.00 $ 11,770.00 100% $ 11,770.00 320 PUMP PACKAGE 1 LS $ 87,850.00 $ 87,850.00 80% $ 70,280.00 325 PUMP PACKAGE ADJUSTMENTS 1 LS $ 32,485.00 $ 32,485.00 80% $ 25,988.00 330 LIFT STATION BUILDING 1 LS $ 61,525.00 $ 61,525.00 50% $ 30,762.50 340 GENERATOR 1 LS $ 64,530.00 $ 64,530.00 0% $ - 350 12" STORM DRAIN 2,497 LF $ 57.32 $ 143,128.04 99% $ 141,696.76 355 12" STORM DRAIN 286 LF $ 75.12 $ 21,484.32 100% $ 21,484.32 357 12" RCP STORM DRAIN W/ FES 80 LF $ 125.64 $ 10,051.20 100% $ 10,051.20 360 15" STORM DRAIN 813 LF $ 58.87 $ 47,861.31 100% $ 47,861.31 365 RIP RAP OUTFALLS 20 CY $ 123.01 $ 2,460.20 50% $ 1,230.10 370 CATCH BASIN W/APRON 16 EA $ 2,780.00 $ 44,480.00 100% $ 44,480.00 375 CATCH BASIN W/APRON 1 EA $ 3,185.00 $ 3,185.00 100% $ 3,185.00 380 STORM MANHOLES 16 EA $ 3,460.00 $ 55,360.00 100% $ 55,360.00 385 STORM MANHOLES 3 EA $ 4,060.00 $ 12,180.00 100% $ 12,180.00 387 STORM DRAIN STRUCTURE ADJUSTMENTS 1 LS $ 20,200.00 $ 20,200.00 100% $ 20,200.00 400 4030-8 CDS UNIT (8FT DIAMETER) 1 EA $ 51,000.00 $ 51,000.00 100% $ 51,000.00 410 CDS UNIT 1 EA $ 28,560.00 $ 28,560.00 100% $ 28,560.00 420 SKIMMER STRUCTURE 1 EA $ 4,100.00 $ 4,100.00 100% $ 4,100.00 430 GRADE SWALES 1097 $ 6.22 $ 6,823.34 100% $ 6,823.34 440 IRRIGATION SLEEVES 499 LF $ 16.21 $ 8,088.79 100% $ 8,088.79 450 COMMON UTILITY TRNCH W/BEDDING 2,863 LF $ 11.33 $ 32,437.79 100% $ 32,437.79 455 COMMON UTILITY TRENCH W/ BEDDING 1,297 LF $ 12.45 $ 16,147.65 100% $ 16,147.65 457 6" POWER CONDUIT 991 LF $ 25.42 $ 25,191.22 100% $ 25,191.22 460 4" PWR FEED W/SWEEPS&PULL ROPE 2,867 LF $ 11.20 $ 32,110.40 100% $ 32,110.40 462 4" POWER FEED CONDUIT W/SWEEPS & PULL ROPE -192 $ 9.01 $ (1,729.92) 100% $ (1,729.92) 463 3" CONDUIT W/ SWEEPS & PULL ROPE 670 LF $ 9.93 $ 6,653.10 100% $ 6,653.10 465 2" COMM CONDUIT W/SWEEPS 6,134 LF $ 5.10 $ 31,283.40 100% $ 31,283.40 467 2" COMM CONDUIT W/SWEEPS 2174 LF $ 5.01 $ 10,891.74 100% $ 10,891.74 470 LIGHT TRENCHING W/BEDDING 340 LF $ 12.94 $ 4,399.60 100% $ 4,399.60 480 LIGHT COND W/SWEEPS&PULL ROPE 1,654 LF $ 3.65 $ 6,037.10 100% $ 6,037.10 485 LIGHT CONDUIT W/SWEEPS & PULL ROPE 434 LF $ 5.91 $ 2,564.94 100% $ 2,564.94 490 LIGHT BASES 11 EA $ 1,065.00 $ 11,715.00 100% $ 11,715.00 495 JUNCTION BOXES - LIGHTING 7 EA $ 800.00 $ 5,600.00 100% $ 5,600.00 500 3 PHASE VAULTS 11 EA $ 1,700.00 $ 18,700.00 100% $ 18,700.00 505 3 PHASE VAULTS 1 EA $ 1,970.00 $ 1,970.00 100% $ 1,970.00 510 SINGLE PHASE VAULTS 2 EA $ 1,105.00 $ 2,210.00 100% $ 2,210.00 515 SINGLE PHASE VAULTS 1 EA $ 1,105.00 $ 1,105.00 100% $ 1,105.00 520 6" CONCRETE APPROACH 1,441 SF $ 7.94 $ 11,441.54 0% $ - 525 6" CONCRETE APPROACH 41 SF $ 7.93 $ 325.13 0% $ 530 6" CONCRETE MAILBOX APRON 1,441 SF $ 7.19 $ 10,360.79 0% $ - 540 8" CONCRETE MAILBOX PAD 28 SF $ 27.73 $ 776.44 0% $ - 550 MDT MOUNTABLE CURB TYPE A 131 $ 30.15 $ 3,949.65 0% $ - 560 4" MDT MEDIAN CAP 1141 $ 5.15 $ 5,876.15 0% $ - 570 MDT VERTICAL CURB 158 $ 26.14 $ 4,130.12 0% $ - 580 MDT CURB & GUTTER 130 LF $ 30.10 $ 3,913.00 0% $ 585 MDT CURB & GUTTER -59 LF $ 30.09 $ (1,775.31) 0% $ 590 CURB & GUTTER 3,825 LF $ 18.67 $ 71,412.75 85% $ 60,700.84 600 CURB & GUTTER - DRIVE OVER 365 LF $ 25.52 $ 9,314.80 0% $ - 601 CURB & GUTTER - DRIVE OVER/ LAY DN 18 LF $ 25.59 $ 460.62 0% $ - 603 VERTICAL CURB 124 LF $ 26.14 $ 3,241.36 0% $ - 605 VERTICAL CURB- LAYDOWN 24 LF $ 34.93 $ 838.32 0% $ - 607 2 FT VALLEY GUTTER 141 LF $ 28.36 $ 3,998.76 0% $ 610 lHC RAMPS W/GRAVEL 934 SF $ 9.19 $ 8,583.46 0% $ 620 HC RAMPS W/CURB BACK W/GRAVEL 352 SF $ 11.85 $ 4,171.20 0% $ 625 HC RAMPS W/CURB BACKING W/GRAVEL -21 SF $ 11.86 $ (249.06) 0% $ 630 DOME TILES 60 SF $ 30.69 $ 1,841.40 0% $ - 640 DOME TILES - CAST IRON - MDT 80 SF $ 45.77 $ 3,661.60 0% $ - 645 DOME TILES - CAST IRON - MDT 60 SF $ 45.76 $ 2,745.60 0% $ - 650 SIDEWALK W/GRAVEL 20893 SF $ 4.73 $ 98,823.89 80% $ 79,059.11 660 12" OF 3" MINUS GRAN ACCESS R 18,585 SF $ 1.12 $ 20,815.20 100% $ 20,815.20 670 3" OF 3/4" CRUSH - GRAV ACC RD 18,585 SF $ 0.36 $ 6,690.60 40% $ 2,676.24 680 GRAVEL CHECK DAM 664 SF $ 6.31 $ 4,189.84 0% $ - 690 9" OF 3" MINUS - LOCAL STREET 44,539 SF $ 0.89 $ 39,639.71 100% $ 39,639.71 700 6" OF 3/4" CRUSH- LOCAL STREET 44,539 SF $ 0.65 $ 28,950.35 100% $ 28,950.35 710 4" OF ASPHALT - LOCAL STREET 44,539 SF $ 1.94 $ 86,405.66 0% $ - 720 15" OF 3" MINUS- COLLECTOR ST 25,135 SF $ 1.41 $ 35,440.35 100% $ 35,440.35 730 6" OF 3/4" CRUSH -COLLECTORS ST 25,135 SF $ 0.66 $ 16,589.10 100% $ 16,589.10 740 4" OF ASPHALT - COLLECTORS ST 25,135 SF $ 2.00 $ 50,270.00 0% $ - 750 15" OF 3" MINUS - MDT R.O.W. 9,098 SF $ 1.37 $ 12,464.26 100% $ 12,464.26 760 6" OF 3/4" CRUSH - MDT R.O.W. 9,098 SF $ 0.68 $ 6,186.64 100% $ 6,186.64 770 4" OF ASPHALT - MDT R.O.W. 9,098 SF $ 2.07 $ 18,832.86 0% $ - 780 8" OF 3/4" CRUSH -ASPHALT PATHS 16,471 SF $ 1.21 $ 19,929.91 100% $ 19,929.91 790 3" OF ASPHALT - ASPHALT PATHS 16,471 SF $ 2.03 $ 33,436.13 0% $ - 800 PAVED DRIVE TIE-IN W/GRAVEL 226 SF j $ 9.52 $ 2,151.52 0% $ 810 BLOCK RETAINING WALL 267 LF $ 199.00 $ 53,133.00 40% $ 21,253.20 815 BLOCK RETAINING WALL 258 LF $ 151.00 $ 38,958.00 40% $ 15,583.20 820 SIGNAGE 12 EA $ 588.00 $ 7,056.00 0% $ 830 PICNIC TABLES 2 EA $ 3,874.00 $ 7,748.00 0% $ - 835 PICNIC TABLES - CONCRETE PADS 328 SF $ 9.54 $ 3,129.12 0% $ 840 BENCHES 3 EA $ 1,996.00 $ 5,988.00 0% $ 850 FENCE W/12FT & 3FT GATES 167 LF $ 37.66 $ 6,289.22 0% $ 880 24" WHITE STOP BAR 80 LF $ 6.46 $ 516.80 0% $ 890 4" SINGLE LINE STRIPE 570 LF $ 0.81 $ 461.70 0% $ 900 4" DOUBLE YELLOW C/L 1,600 LF $ 1.62 $ 2,592.00 0% $ 910 8" WHITE - CROSS WALKS 384 LF $ 3.23 $ 1,240.32 0% $ - 920 YIELD STRIPING DIAMONDS C-WALK 30 SF $ 4.85 $ 145.50 0% $ 930 GORE AREA 150 SF $ 4.85 $ 727.50 0% $ - 940 WORDS & SYMBOLS 100 SF $ 4.85 $ 485.00 0% $ 950 IRRIGATION (INCLS TEMP IRRIGA) 1 LS $ 103,800.00 $ 103,800.00 0% $ - 952 IRRIGATION 1 LS $ 129,875.00 $ 129,875.00 0% $ - 954 REMOVE/ UPSIZE 1" IRRIG SRVC TO 1.5" 1 LS $ 8,286.00 $ 8,286.00 300% $ 8,286.00 956 1.5" IRRIGATION SERVICE 1 LS $ 10,340.00 $ 10,340.00 100% $ 10,340.00 960 LANDSCAPING/TREES 1 LS $ 83,725.00 $ 83,725.00 0% $ - 965 LANDSCAPING 1 LS $ 37,110.00 $ 37,110.00 0% $ - 970 RIPARIAN WORK ALONG RIVER 1 LS $ 42,540.00 $ 42,540.00 100% $ 42,540.00 980 HWY 93 SIGNAL- DEMO / EPDXY 1 LS $ 17,250.00 $ 17,250.00 0% $ - 990 TRAFFIC CONTROL 1 LS $ 16,500.00 $ 16,500.00 80% $ 13,200.00 1000 TRAFFIC SIGNAL 1 LS $ 92,724.00 $ 92,724.00 99% $ 91,796.76 1005 SOUTH ENTRANCE MDT ELEC 1 LS $ 38,075.00 $ 38,075.00 100% $ 38,075.00 CL CL Relocation 1 LS $ 20,525.33 $ 20,525.33 100% $ 20,525.33 $ 4,093,588.621 76.7% 1 $ 3,140,812.29 Work Outstanding $ 952,776.33 SIA Bond Amount $ 1,190,970.41